00:00:00.034 --> 00:00:19.742
-  Folks it's 530 p.m. Here on Tuesday, August 26 This is the regularly scheduled meeting of the board of public works We are here at City Hall at 401 North Morton Street We have a quorum of the board president and we have board member James Roach online on zoom and

00:00:19.842 --> 00:00:48.574
-  And there is a Zoom link on the agenda with a meeting ID and a passcode for anybody that needed to attend via Zoom. Does it look like we have any public on Zoom right now? No. Okay. As of right now, no public has joined via Zoom. James, can we? We good? Thumbs up, James. Oh. That would be why.

00:00:50.466 --> 00:01:17.022
-  All right James how's that a little better. All right. Okay. So yeah there's a zoom link on the agenda with meeting ID and passcode. If someone from the public does join via zoom they can use the chat or raise hand function to offer public comment on the various items on the agenda tonight. And otherwise we have a lengthy consent agenda and a pretty lengthy new business. So I'll turn it over to board president Kyla Cox Decker.

00:01:20.418 --> 00:01:44.990
-  meeting of the Board of Public Works this Tuesday August 26th of 2025. First up on our agenda we have messages from board members. Do we have any messages from the board this evening. Seeing none. Next we have title for me. Thank you James. Next we have title six abatements 1912 South Roger Street.

00:01:51.714 --> 00:02:15.358
-  Mike Arnold from hand. This is a property that has excessive growth We cited them on July 2nd, July 17th July 25th and July 30th and have had no response and The property has not been mowed. So we're asking permission to make the property on a continuous basis Thank you questions from the board on this item I

00:02:19.618 --> 00:02:48.670
-  And any public comments on this item? Seeing none, is there a motion? I move that we approve the abatement at 1912 South Roger Street. Second. All right, we have a motion and a second. I will call the roll. Caron. I Roach. I Cox Deckard. I motion passes. Thank you. Thanks.

00:02:49.218 --> 00:03:15.422
-  Next we have title six abatements at 2225 South High Street Rebecca Davis from Housing and Neighborhood Development neighborhood compliance officer. I'm requesting a continuous abatement at 220 2225 South High Street for overgrowth I issued tickets on

00:03:15.810 --> 00:03:45.150
-  July 19th July 28th and the 1st of August. I have spoken with the homeowner. He was there when I delivered the last ticket. He said you know to go ahead with the abatement. He mentioned he might come to this meeting but I'm not sure that he is present. Thank you. Questions from the board.

00:03:46.146 --> 00:04:15.518
-  If I may real quick. We're present. This is the property at the northeast corner of high and the Winslow roundabout. So this has come to us many times over the past several years. There's just been no willingness by the homeowner to take any responsibility for this. Can I ask as part of this abatement can they do anything other than mo can they take care of the downed tree limbs and things like that. I know that's part of an issue that's kind of ongoing with the neighbors as well.

00:04:16.130 --> 00:04:42.366
-  I think that that might be tricky because I don't see I'm I feel like the like piles of rubbish is a different citation. OK. What I think may happen from what I could tell what may happen is they're going to have to mow around a lot of them. So you may have tall grass like growing up through the branches and such. So I just trying to work with the landscape company to see what they can do. OK. Yeah I will communicate about that.

00:04:46.658 --> 00:05:13.054
-  Any questions from the board Any public comments on this item And just confirming the property owner is not connected on zoom All right Do we have a motion on this item

00:05:13.250 --> 00:05:30.302
-  I move that we approve the abatement at twenty two twenty five South High Street. Second. All right. We have a motion and a second. I will call the roll. Crone I Roach I Cox Deckard I motion passes.

00:05:31.746 --> 00:05:56.318
-  Now on our agenda, we have petitions and remonstrances. This is an opportunity for anyone from the public to make a public comment about items not on the agenda this evening. If we have anyone who has joined us on Zoom, you can use the raised hand function or the chat function to let us know you'd like to make a public comment. If you are here in person and would like to make a comment about something not on our agenda, you may approach the microphone.

00:06:03.042 --> 00:06:29.982
-  None Next. Yep. Sorry. Yeah before we move on a question for Adam about the abatements Work session. We heard a third abatement. Oh, yeah Yeah, so that property was put mode today and in compliance so that came off the agenda Great. Thank you Thanks

00:06:32.034 --> 00:06:57.790
-  Next up we have the consent agenda and I'm going to try to get through this without making any mistakes. Let's see how we do on the consent agenda this evening. We have the minutes for May 20th of twenty twenty five the minutes for June 3rd twenty twenty five resolution twenty twenty five dash zero sixty four IU homecoming parade resolution twenty twenty five dash zero sixty five trades district block party.

00:06:58.114 --> 00:07:16.062
-  Resolution twenty twenty five dash zero sixty three in a mass taco truck resolution twenty twenty five dash zero sixty seven weaver smoke eaters barbecue LLC. We have outdoor lighting service agreements with Duke Energy for West Second Street between South Adams Street and South Rogers Street.

00:07:16.162 --> 00:07:46.128
-  Outdoor lighting service agreement with Duke Energy for West 4th Street between South Elm Street and South College Avenue. Outdoor lighting service agreement with Duke Energy for West 7th Street between North Ritter Street and North Rogers Street. Outdoor lighting service agreement with Duke Energy for West 8th Street between North Spring Street and North Waldron Street. Outdoor lighting service agreement with Duke Energy for West 10th Street between North Adams Street and West Cottage Grove. Outdoor lighting service agreement with Duke Energy for West Kirkwood

00:07:46.128 --> 00:08:13.662
-  Avenue between North Adams Street and North Rogers Street addendum to to contract with Caramita for soil investigation at the beeline change order number one to contract with ENB paving for North Walnut Street resurfacing contract with Hollars Welding to repair the guardrail at Winslow and Henderson contract with precision concrete concrete for trip hazard elimination project. Ironic that I tripped over that.

00:08:14.050 --> 00:08:41.694
-  A contract with Cargill Inc for deicing salt change order number two to contract with milestone contractors LP for paving Kinser Pike project and payroll. Do we have any items that need to be removed from the consent agenda this evening? Do we have any public comments on any of the items within the consent agenda? None on zoom.

00:08:42.818 --> 00:09:03.710
-  Seeing none. Is there a motion on the consent agenda. I move that we approve the consent agenda for tonight's meeting of August 26 2025. Second. All right. We have a motion and a second. I will call the roll. Caron I Roach I Cox Deckard I motion passes.

00:09:04.386 --> 00:09:32.414
-  And next we have new business first center new business is change order number one to contract with Crider and Crider for Hopewell West South Jackson Street and South Rogers Street contract. Hello. Zack Rogers with engineering. This project was awarded to Crider and Crider on July 1st 2025 due to soil testing requirements on Hopewell West site. This change order includes necessary items for stockpile soils for testing purposes in accordance with the soil management plan.

00:09:33.250 --> 00:09:58.238
-  This change order would add stockpile material which would include stripping topsoil transporting and stockpiling all excavated soils and designated locations added silt fence and seed mix. And this would also add 14 calendar days to the contract time. This change orders for one hundred fifty three thousand four hundred forty four dollars and seventy cents and that would revise contract amount would be

00:09:58.370 --> 00:10:24.318
-  One million eight hundred forty thousand seven hundred sixty three dollars and fifty five cents happy to answer any questions Thank you any questions from the board on this item Any public comments on this item None on zoom seeing none is there emotion I

00:10:24.802 --> 00:10:54.718
-  I move that we approve change order number one to the contract with the Crider and Crider for Hopewell West South Jackson Street and South Roger Street contract. Second. All right. We have a motion and a second. I will call the roll. Caron I Roach I Cox Deckard I motion passes. Next we have right of way closure request at West Second Street from South Morton Street to South Jackson Street for city of Bloomington utilities.

00:10:56.770 --> 00:11:25.694
-  Kyle ball engineering so City of Bloomington utilities is requesting road closures along with a short-term closure of the beeline trail with a detour on West 2nd Street as part of the West 2nd Street modernization project For utility relocations and upgrades. So this traffic control would be in place through the different phases between September 21st and October 17th of 2025

00:11:25.826 --> 00:11:55.742
-  So just to run through each phase really quickly. So this is phase three, because the previous two phases were completed, I believe, a month or so ago. So phase three would be the starting point for this, starting on the 21st of September. So this location is West Second Street and South Morden Street. So that will include the Beeline Trail crossing. And as James from CBU alluded to yesterday, this will be detoured via the sidewalks on that east side of the street there.

00:11:56.290 --> 00:12:26.046
-  north to south. So that'll be in place overnight to the 22nd of September. Then they move into phase four, starting September 22nd, of course, through October 8th, with the location there being west second between South Rogers and South Morton. That'll be in place, yes, until October 8th. Phase five would be the eighth through the ninth. So second Rogers intersection there.

00:12:26.146 --> 00:12:54.558
-  And then phase six would occur on the ninth if not before then they were really quick with those first two phases So we're hoping with a little little luck. We could make sure that happens again, but no guarantees so planning for the ninth to start that last phase Happy to take any questions if there are any James might be on the line, but I know he had to drop off some kiddos as well Thank you

00:12:54.754 --> 00:13:22.622
-  Questions from the board on this item under phase six. There's no end date, but I assume since in your intro paragraph It says October 17th that phase six would last from the 9th to the 17th. Yes, that's correct Sorry about that. Okay, no problem at all. And then the two overnight phases phase three and phase five What are the approximate times? I believe that was 8 p.m. To 6 a.m. I remember correctly And for

00:13:23.106 --> 00:13:50.206
-  Phase four that I am estimating will be very similar to a closure we had in one of the recent phases That's I think it was that same block had been closed on the on Second Street and I'm just curious if well, maybe it was the block to the west I'm looking at the

00:13:50.722 --> 00:14:20.670
-  map just thinking about When when it was closed before it was primarily Kroger and Wendy's affected So just checking that any of the locations affected by that closure because that's a it's a longer Regular daytime northern side, right? I will yeah, I'll ensure that those coordinations are happening. Okay. Yeah, just making sure that for any whether it's you know residential or

00:14:20.770 --> 00:14:49.726
-  business affected that they are clear on what their access points will be and any changes to that process. Absolutely. Any other questions from the board. Any public comments on this item. None on zoom.

00:14:52.066 --> 00:15:21.118
-  None is there a motion on this item I move that we approve the right-of-way closure request at West 2nd Street from South Morton Street to South Jackson Street for City of Bloomington utilities Second all right, we have a motion in a second. I will call the roll Caron. I roach I Cox Deckard I motion passes Next we have right-of-way closure for bone-dry roofing at 524 North College Avenue

00:15:22.434 --> 00:15:48.798
-  Hello Zach Bell engineering phone dry roofing is requesting a two week closure of the easternmost lane of North College Avenue at 524 North College Avenue. This request is to accommodate an aerial lift for metal facial repair overhead protection and the associated traffic control will be in place beginning September 1st and lasting until September 14th.

00:15:50.050 --> 00:16:15.262
-  Bone Dry has submitted MOTs and has communicated with the adjacent buildings about the scope. Thank you. Any questions from the board on this item. I don't have a question unless there's any follow up from what we were discussing yesterday during the work session about the timing of this and number four and then

00:16:15.746 --> 00:16:44.478
-  the convention center but if that's all coordinated well then I've got no questions. Any public comments on this item. None on zoom. All right. Seeing none is there a motion. I move that we approve the right of way closure for bone dry roofing at 524 North College Avenue. Second.

00:16:45.122 --> 00:17:13.182
-  All right. I will call the roll Crohn. I roach I Cox Deckard I motion passes Next we have right-of-way closure for CFC properties at 205 North College Avenue Thank You Zach Bell from engineering CFC's properties is requesting a two-week lane closure of the westernmost lane of North College Avenue for masonry work at 205 North College Avenue

00:17:13.506 --> 00:17:41.310
-  This request is to accommodate a crane for masonry work overhead protection and the associated traffic control will be in place from October 6 to October 20. Shane from CFC has supplied MOTs and they're also coordinating with adjacent buildings. And this is the one that is closer in proximity to the current closure for the convention center.

00:17:44.514 --> 00:18:12.062
-  Any questions from the board on this item. Any public comments on this item. Is there a motion. I move that we approve the right of way closure for CFC properties at 205 North College Avenue.

00:18:12.802 --> 00:18:40.894
-  All right. I will call the roll Karon. I roach I Cox Deckard. I motion passes Next we have a service agreement with action target for Bloomington Police Department range Hello, I'm Myrick Williams with the Bloomington Police Department this is a request for a service agreement with action target at our range on the south side of town at the training complex and

00:18:41.154 --> 00:19:08.638
-  This is a one time visit by action target technicians to come in and do maintenance training for our firearms instructor staff and conduct some minor repairs as well at this time. It is a one time service agreement. It will be a one day event for fourteen hundred dollars. Thank you. Questions from the board. Any public comments. None on zoom.

00:19:09.602 --> 00:19:37.502
-  Seeing none. Is there a motion? I move that we approve the service agreement with action target for Bloomington Police Department range Second all right. I will call the roll Caron. I roach I Cox Deckard I motion passes Next we have a prove environmental deed restriction at West Fountain Drive and 8th Street Good evening, Chris Wheeler with city legal

00:19:37.698 --> 00:20:03.710
-  This is an environmental restrictive covenant and it's for CBU utilities department. We are asking for two things from the board this evening first to have the board approve the environmental restrictive covenant to be placed on this parcel this remnant parcel and we would also ask for approval from the board to proceed with plans to install the bio retention facility on this remnant parcel.

00:20:04.162 --> 00:20:29.726
-  Will say this though you might see me coming back shortly to ask the board to transfer the property to CBU so that the utilities Department can take their actions to the utility service board as opposed to coming up here We love coming and visiting but you guys might rather do other things. So What we talked about yesterday in the work session is that we did an environmental study before

00:20:29.858 --> 00:20:56.958
-  We are required to do an environmental study on this property before putting in the by our retention pond that environmental study has been completed and One of the things that IDEM required was for us to place this environmental restrictive covenant on the property It restricts use of the property It prevents us from putting things like a kindergarten on this remnant property. It's too small for that, but we can't do it We can't do daycares. We can't do residential property

00:20:57.314 --> 00:21:23.518
-  It also requires us to provide notice to anybody that we might sell the property to. So if we do do if we do create a transfer from one department to the other we might have to put that notice in the transfer that explains that there is this restrictive covenant on the property. And when we do transfers we are required to let item know that the transfer has occurred. Those are the highlights of the covenant. I'm happy to talk about more if you have questions.

00:21:23.746 --> 00:21:48.062
-  And anything else you might want to discuss regarding the environmental study itself. We do have the director for utilities Catherine Zager here tonight to try and answer those questions with you. So happy to take questions. Thank you. Questions from the board. I have a question. If you could just briefly describe what the environmental issues are on the property would be appreciated.

00:22:11.042 --> 00:22:38.462
-  I just want to make sure I have my documents. All right. So one of the elevated levels was okay. Catherine Zager utilities director. One of the raised levels was lead and arsenic arsenic.

00:22:38.690 --> 00:23:05.438
-  Bloomington has a history of having elevated soil arsenic, but that was again detected here. And then additionally, there were some readings in the PFAS category. So those were the contaminants that were found and we have a soil management plan that we intend to fully implement as part of this project. Thank you.

00:23:08.546 --> 00:23:37.406
-  We just have a process question. The way this is written is to approve the deed restriction. Do we need any additional language that we're approving the installation of a bio retention pond or that's included in. We're just asking for the authority or approval to move forward with our intentions to install that bio retention. So we'll have to come back with contracting and things like that. But we would like the authority to move forward with that. I didn't present any kind of a resolution or anything.

00:23:38.946 --> 00:24:06.430
-  I don't know. I don't know that we've ever. So we've got other rain gardens. I don't know if we've had the board approve those as installations into the right away or not. But we can look into that in the future if we need to. I don't know that they need to. You need to take any action on that tonight. OK. It's not our property. So we wanted to make sure someone was telling us telling us that it's OK to put things on your property. That's all. Yeah. That makes sense. I think it.

00:24:06.690 --> 00:24:35.678
-  It seems like if we review the item as it's written on the agenda and approve that knowing that we're looking ahead to likely doing some sort of transfer I think maybe I don't know how long that process will take to draft the documentation but that will probably take care of any of those questions. Perfect. Without creating any confusion or issues then. Thank you.

00:24:39.522 --> 00:25:08.350
-  Other questions from the board. All right. Any public comments on this item. Seeing none. Is there a motion. I move that we approve the environmental deed restriction at West Fountain Drive and 8th Street. Second. All right. I will call the roll. Caron I roach.

00:25:09.314 --> 00:25:36.126
-  I Cox Deckard I motion passes. Thank you. Thanks Next we have addendum number one to contract with infrastructure management services for asset management data collection So this is an addendum to our original contract for our field data collection sidewalk surface tester So we under the original contract

00:25:36.514 --> 00:26:05.758
-  The amount of mileage was lower than expected after they did their roadway inventory. So this is to expand an additional 73 miles and it will be a change in the amount of twenty three thousand four hundred and seventy five dollars. And that would take that not to exceed amount to two hundred and fifty thousand eight hundred ninety one dollars. Question your approval. Thank you. Questions on this item.

00:26:10.946 --> 00:26:37.950
-  Any public comments on this item. None seeing none. Is there a motion. I move that we approve addendum number one to the contract with infrastructure management services for asset management data collection. Second. All right. I will call the roll. Crone I Roach I Cox Deckard I motion passes.

00:26:38.850 --> 00:27:06.750
-  Next we have professional service agreement with studio access for providing conceptual design. Yeah, so this is a professional services agreement with studio access to assist the public works department in a conceptual design package for a public works operations center that we hope to one day be able to build for all of our public works divisions to be more

00:27:06.914 --> 00:27:35.646
-  co-located and centrally located. So this will be in agreement with Studio Access for that conceptual design. I want to be clear, this is not fully architectural, full architectural drawings. This is conceptual design, so helping us with site design, some of the civil engineering, but it will not be fully architect drawings or anything like that. One of the other parts that they'll help us assist with

00:27:35.842 --> 00:27:56.766
-  ever changing dynamic of municipal finances to be looking at the different bonding strategies and partnership options and how you build these. So this is to kind of kick this off and we ask for your approval of the professional services agreement and the amount not to exceed fifty five thousand dollars. Thank you. Questions from the board on this item.

00:28:05.282 --> 00:28:35.134
-  Thanks for the added clarification about the architecture. Because I thought, well, this is a pretty low price for a full set of plants. But it makes sense in that context that it's more of a pre-planning strategy document. They do offer architectural services. It's not to say that we wouldn't choose them into the future. But at this point in time, this is more of the conceptual design and definitely not a fully architect. I don't know how to make that a verb. It will not include full architectural drawings.

00:28:35.298 --> 00:29:04.254
-  That sounds good. Any public comments on this item. None on zoom. All right. Seeing none. Is there a motion. I move that we approve the professional service agreement with studio access for providing conceptual design. Second. All right. I will call the roll. Caron. I roach. I Cox Deckard. I motion passes.

00:29:06.082 --> 00:29:32.766
-  We have staff reports and other business First up we have the update on the citywide fiber project Hey everybody Kyle ball engineering once again So we have in the staff report list of locations where repairs from the citywide fiber project are currently underway our intention is to bring these every two weeks for these two week permitted intervals and

00:29:32.930 --> 00:30:02.174
-  Short-term closures to get these repairs made the focus here is the core holes that are going to be in the asphalt of these various locations So we have a few that have been completed So this is the starting from a couple weeks ago and then the current that was just issued yesterday So we're looking forward to getting much many more of these repairs completed in the next several weeks they Have case on the contract and they're working very quickly

00:30:02.306 --> 00:30:31.070
-  Try to remediate as much as possible to get everything back in order Thank you When you mentioned short closures, are we talking like an hour or an eight hour day? Usually a day or less if it's extending into that next day. So sometimes they have to excavate something They should be plating that overnight, you know things like that, but there's gonna be no open excavations or anything like that If anyone sees anything like that, please let me know

00:30:32.290 --> 00:30:57.502
-  Thanks. Thanks. All right. Then we have the Duke Energy proposed amendment update. Yes. So Adam Mason public works director. This is just a kind of cover our bases with the board and for the state board of accounts. We turn to a lot of outdoor lighting service agreements with Duke Energy and we

00:30:58.338 --> 00:31:25.758
-  Often as part of our contracts with contractors and others we have certain Language in addendums that we require those contractors to adhere to So with Duke Energy in particular and their regulation through the Indiana utility regulatory Commission they are they state that they Cannot enter into these types of addendums and so

00:31:25.922 --> 00:31:37.502
-  Basically with some email documentation that's included in the packet the legal department notified Duke that in order to proceed with future outdoors lighting service agreements.

00:31:37.986 --> 00:32:07.952
-  for installations within the public right of way, the following conditions apply. We will continue to send the agreements through to the board without the addendum. However, a copy of Duke's original email noting compliance with e-verified non-conclusion and non-discrimination. And then that original email will be kept on file with each agreement in case we're audited by the State Board of Accounts and would have that documentation and backup readily available. So just kind of making sure we're covering all of

00:32:07.952 --> 00:32:26.750
-  We talked a little bit about this yesterday and it's not an unusual circumstance for two large and any municipality and another large entity to have some adjustments for different reasons different regulations things like that.

00:32:26.850 --> 00:32:54.782
-  I think you know what I was hearing yesterday was that the city is maybe not particularly clear on what it is within the iurc Regulations that allows for Duke to say that they're either exempt or compliant whichever position they're taking Hi, sorry Audrey Brittingham city attorney, that's correct. That's a statement or the implication in their email

00:32:54.946 --> 00:33:24.702
-  I intend to ask that person if they want to connect me with their legal team because I Consulted with other attorneys in the department and we don't know of an exception including Chris Wheeler The utilities attorney and he is also unaware of an exception that exists And so I'm gonna see if I can get them to send me something And I also intend to attend their forum coming up their public forum and see if there are other public entities that I've had similar

00:33:24.834 --> 00:33:51.166
-  Issues and how they've addressed theirs as well. Yeah that I think that would be great because presumably With given the footprint that Duke has there are many municipalities that have very similar agreements and requirements that they would be navigating in the same way and It seems like it should be, you know fairly clear on the Duke side exactly what it is that they're You know putting forward

00:33:51.266 --> 00:34:18.750
-  on that. So I think that would be ideal to have for our own documentation. And then, you know, perhaps when we have a regular conversation with the State Board of Accounts, it would be interesting to hear their perspective on that for the purposes of just making sure going forward we have exactly what they're looking for. And that they are clear that Duke is

00:34:18.946 --> 00:34:45.918
-  complying with that when we're entering into those agreements All right, thank you Any other staff reports another business did you ask me to mention something yesterday I was just curious about and maybe maybe Kyle knows the Roger Street The impending closure on Roger Street for that section like near Switchyard Park Do we have any dates on that yet?

00:34:49.058 --> 00:35:18.238
-  I know the signs up and it's warning everyone that the closure is eminent and you can see the staging happening. And so I was just curious if for the public and for me, if I can be honest, I believe that closure was intended to happen much earlier in the summer. I'm not sure why it got pushed to where it is currently. I had forgotten about it until parks reached out and asked about access to switch yard. So they have the temporary traffic control plan in hand now.

00:35:18.402 --> 00:35:24.862
-  for the entire staff. There's still going to be accessibility to everything throughout that corridor.

00:35:26.882 --> 00:35:56.190
-  To be yeah to be determined as to exactly when they're gonna do that And I can't remember what the length of time was gonna be on the original work But I'm I am glad to hear you say that you believed it was gonna happen earlier because I also had a conversation with some people along that corridor and I I thought it would happen before this point when I saw those signs I thought oh, we're just now we're heading into that closure. So yes, I will say that

00:35:56.834 --> 00:36:23.134
-  There have been, when I did look up the permits to refresh myself, there was a mention of 120 days, but there's lots of auxiliary work that's gonna go into that. I don't think that that closure is going to be in place for nearly that duration. But there's gonna be some sidewalk closures along the former Catalan, now NOFO, NORDISC site. So it'll be outside of that particular area.

00:36:23.266 --> 00:36:49.790
-  Yeah and if I remember right there was still going to be local access correct for those organizations and presumably switch your parks got an arrangement so that people can get in and out of those spaces even during the closure. Yes. Well we'll wait and see. I'll send Adam a picture when it's closed. Can't wait. Thank you.

00:36:54.530 --> 00:37:24.126
-  All right. Next up is approval of claims. Any questions from the board on the claims. Any public comments on claims. Not on zoom. All right. Seeing none is there a motion. I move that we approve claims tonight in the amount of one million two hundred eighty six thousand three hundred eighty three dollars and seventy eight cents. Second.

00:37:24.866 --> 00:37:37.246
-  All right. I will call the roll. Caron. I Roach. I Cox Deckard. I motion passes. And seeing as there's nothing else on our agenda I will call for adjournment.