- Evening public works director for the city of Bloomington. It is Tuesday March 10th 2026 and we are

00:00:07.264 --> 00:00:14.366
- in the Bloomington City Hall council chambers for one North Morton Street. We also have a live zoom

00:00:14.366 --> 00:00:19.550
- link with a meeting ID and passcode on the agenda for tonight's meeting.

00:00:20.226 --> 00:00:26.213
- And if you are on zoom and need to offer any comment or answer any questions We'll use the raise hand

00:00:26.213 --> 00:00:32.200
- function or for your agenda item. We'll just unmute you and Otherwise, i'll turn it over to elizabeth

00:00:32.200 --> 00:00:38.187
- corrone president of the board of public works Thank you adam. I will call to order tonight's meeting

00:00:38.187 --> 00:00:44.350
- of march 10th 2026 First we have messages from the board members. Are there any messages from the board?

00:00:45.794 --> 00:00:54.304
- None we will move to petitions and remonstrances. This is the time for anyone who has questions about

00:00:54.304 --> 00:01:02.980
- items that are not on the agenda There's no one in council chambers other than staff if there's anybody

00:01:02.980 --> 00:01:11.406
- on zoom with a question about something not on the agenda Please use the chat function or raise your

00:01:11.406 --> 00:01:14.910
- hand Okay And we will move to the consent

00:01:15.298 --> 00:01:26.291
- Agenda tonight's consent agenda includes minutes from December 16 2025 minutes from December 29 2025

00:01:26.291 --> 00:01:37.392
- resolution 2026-012 ITS surplus to binary heart resolution 2026-013 pushcart license for big dog cart

00:01:37.392 --> 00:01:39.678
- LLC change orders to

00:01:39.842 --> 00:01:47.882
- 48 and 49 for the Hopewell East construction contract with milestone contractors LLC public improvement

00:01:47.882 --> 00:01:55.768
- bond acceptance for Renwick phase 3 Addendum to the service agreement with Ivy Tech for a CDL program

00:01:55.768 --> 00:02:03.653
- and payroll There are any items that need to be removed from the consent agenda tonight Any questions

00:02:03.653 --> 00:02:09.374
- from the board on the consent agenda Public comment on the consent agenda

00:02:10.690 --> 00:02:20.379
- None on zoom. All right seeing none. Is there a motion? I move we approve the consent agenda for March

00:02:20.379 --> 00:02:30.067
- 10th 2026 second With a motion in a second, I will call the roll Cox Deckard. I Roach I Caron I motion

00:02:30.067 --> 00:02:34.206
- passes Next we will move on to new business

00:02:34.722 --> 00:02:41.831
- The first item is Amendment 3 to the on call service agreement with R.E.A. for engineering services.

00:02:41.831 --> 00:02:49.010
- Good evening Neil Copper with the engineering department. This is an existing contract with R.E.A. It

00:02:49.010 --> 00:02:53.022
- provides as needed assistance with engineering services.

00:02:53.090 --> 00:02:59.930
- This amendment increases the total contract amount to allow continued use, supporting various projects,

00:02:59.930 --> 00:03:06.638
- particularly working on design for resurfacing contracts, supporting the public works department. The

00:03:06.638 --> 00:03:13.544
- amendment increases the total amount by $100,000 for a new total not to exceed of $404,143 and 60 cents.

00:03:13.544 --> 00:03:20.121
- Staff has reviewed and supports this amendment and I'd be happy to answer any questions. Thank you.

00:03:20.121 --> 00:03:22.686
- Questions from the board on this item.

00:03:25.058 --> 00:03:33.154
- Public comment on this item. None on zoom. All right. Seeing none is there a motion. I move that we

00:03:33.154 --> 00:03:41.493
- approve the amendment three to on call service agreement with R.E.A. for engineering services. Second.

00:03:41.493 --> 00:03:47.646
- I will call the roll. Cox Deckard aye. Roach aye. Caron aye. Motion passes.

00:03:50.018 --> 00:03:56.975
- Next item is the LPA consulting agreement with our EA for engineering services for downtown curb ramps

00:03:56.975 --> 00:04:03.729
- phase five Neil copper again. This is a new contract for a project that is expected to include curb

00:04:03.729 --> 00:04:07.038
- ramps and crosswalk improvements along both east

00:04:07.362 --> 00:04:14.523
- both East 3rd Street and Atwater Avenue adjacent to IU campus. The project is programmed in the Metropolitan

00:04:14.523 --> 00:04:21.159
- Planning Organization for federal funding support for both design and construction. REA was selected

00:04:21.159 --> 00:04:27.926
- to perform the design services for the project based on their response to a request for proposals. The

00:04:27.926 --> 00:04:31.934
- contract is set at a total not to exceed amount of $271,490.

00:04:32.034 --> 00:04:41.569
- Construction is anticipated to occur in 2029 staff has reviewed and supports this contract and I would

00:04:41.569 --> 00:04:51.290
- be happy to answer any questions Thank you questions from the board I Just Want to confirm that at water

00:04:51.290 --> 00:04:58.974
- and east third between Indiana and High Street That's generally the area. Correct?

00:05:01.794 --> 00:05:13.206
- Public comment on this item. Okay. Is there a motion. I move that we approve the LPA consulting agreement

00:05:13.206 --> 00:05:24.296
- with R.E.A. for engineering services for downtown curb ramps phase five. Second. I will call the roll.

00:05:24.296 --> 00:05:31.294
- Cox Deckard aye. Roach aye. Caron aye. Motion passes. Thank you.

00:05:32.322 --> 00:05:39.612
- Thank you. Next item is the right of way closure request for Centerpoint Energy. Good evening. Kyle

00:05:39.612 --> 00:05:47.340
- ball from engineering. So Miller pipeline on behalf of Centerpoint Energy is requesting sidewalk closures

00:05:47.340 --> 00:05:54.995
- lane closures and alley closures associated with utility work along West Second Street from South Walker

00:05:54.995 --> 00:05:57.182
- Street to South Maple Street.

00:05:57.826 --> 00:06:05.130
- This work is required to relocate utilities in advance of the Second Street modernization project. These

00:06:05.130 --> 00:06:12.225
- closures are requested to occur in the timeframe between March 16th and May 31st of this year. I have

00:06:12.225 --> 00:06:19.320
- an on-site meeting planned with Miller Pipeline to go over expectations, how to execute the closures,

00:06:19.320 --> 00:06:24.606
- ensuring that they're not closing any paired sidewalks, anything like that.

00:06:24.706 --> 00:06:32.571
- And we'll continue to work with them to work with Bloomington Transit and MCC SC To make sure that those

00:06:32.571 --> 00:06:40.136
- closures aren't prohibitive to them to them rather and happy to take any questions I think yesterday

00:06:40.136 --> 00:06:47.926
- in the work session. We had just talked a little bit about that cooperation with MCC SC and Bloomington

00:06:47.926 --> 00:06:53.918
- Transit and given that the project is getting ready to start I mean fairly soon

00:06:54.018 --> 00:07:00.937
- Have you received information that they have coordinated that or is someone here on their behalf to

00:07:00.937 --> 00:07:08.340
- I believe we have Robin Cooper from Miller on the call Those coordinations I planned on having our meeting

00:07:08.340 --> 00:07:15.398
- this week Shouldn't shouldn't be closing off any access or anything just a slight delay with the lane

00:07:15.398 --> 00:07:16.574
- closure. Okay, I

00:07:22.114 --> 00:07:32.015
- Also as we discussed yesterday the lane closure will happen in phases correct as it goes through the

00:07:32.015 --> 00:07:41.916
- project. Okay. Questions from the public on this item. I'm sorry public comment on this item none on

00:07:41.916 --> 00:07:48.190
- zoom. All right. Seeing none I will call actually their motion.

00:07:48.290 --> 00:07:55.797
- I move that we approve the right-of-way closure requests for Centerpoint energy second Now I will call

00:07:55.797 --> 00:08:03.159
- the roll and I promise I will get the hang of this at some point soon Cox-Duckard. I Roach I Caron I

00:08:03.159 --> 00:08:10.302
- motion passes Next is the right-of-way closure request for FA Wilhelm at the Poplar's development

00:08:11.170 --> 00:08:19.441
- Kyle ball engineering once again FA Willam is requesting sidewalk closure on North Grant Street as part

00:08:19.441 --> 00:08:27.633
- of the Beverly project located at 400 East 7th Street This request is for facade work as well as final

00:08:27.633 --> 00:08:35.586
- landscaping work This requested closure would take place March 18th through April 10th of this year

00:08:35.586 --> 00:08:39.006
- Thank you questions from the board We just

00:08:39.170 --> 00:08:45.488
- talked during the work session about the fact that this is likely the last item that we are going to

00:08:45.488 --> 00:08:51.870
- receive as far as closures right of way closures. That was the last indication that we had from them.

00:08:51.870 --> 00:08:58.251
- And I will say I think we spelled out kind of the plan for execution here is to finalize this western

00:08:58.251 --> 00:09:04.694
- side and then the project completion would move from this sidewalk to the southern sidewalk on seventh

00:09:04.694 --> 00:09:07.134
- and then the western sidewalk on done.

00:09:09.378 --> 00:09:17.481
- I just want to clarify it's not there won't be more permanent applications But they have right away

00:09:17.481 --> 00:09:25.583
- permanent applications that are currently valid Correct. Yeah, they're the end of use I believe was

00:09:25.583 --> 00:09:34.334
- end of July if I'm not mistaken for this other phases All right other questions Public comment on this item

00:09:38.626 --> 00:09:44.285
- Could you please state your name for the record? Hi, I'm Greg Alexander I think we got to look at the

00:09:44.285 --> 00:09:49.945
- history of this because they're using the MOT that was used last June for a pair of sidewalk closures

00:09:49.945 --> 00:09:55.493
- on done and on grant and the logic behind that MOT was that there is no way to put a walk around on

00:09:55.493 --> 00:10:01.041
- done and done is a higher priority street because of the bus traffic there, but that's Those things

00:10:01.041 --> 00:10:06.700
- aren't true about grant. We just decided to screw over grant too because we screwed over done Another

00:10:06.700 --> 00:10:08.254
- consideration was that last

00:10:08.450 --> 00:10:13.206
- June's proposal was affecting the summer, which was people like me and my kids walking in the street

00:10:13.206 --> 00:10:18.056
- rather than undergraduates walking in the street. But this is happening in the middle of the semester,

00:10:18.056 --> 00:10:22.812
- a very busy travel time, very busy visit time, family weekends. I'm telling you, every single time I

00:10:22.812 --> 00:10:27.568
- was there and the Grant Street sidewalk was closed, which I go through there almost every day, I saw

00:10:27.568 --> 00:10:32.512
- pedestrians in the street. It is a very well-used, there are going to be groups of drunk undergraduates,

00:10:32.512 --> 00:10:35.902
- there are going to be groups of parents walking in the street on Grant.

00:10:36.002 --> 00:10:41.800
- if you approve this closure. That's antithetical to our stated goals and the law in this instance. You're

00:10:41.800 --> 00:10:47.216
- not allowed to close a sidewalk unless they have a walk-around that fully reproduces the desirable

00:10:47.216 --> 00:10:52.905
- characteristics of the original path. The 7th Street sidewalk has been closed for much more than a year

00:10:52.905 --> 00:10:58.430
- now. That's insane to close a sidewalk. That's our priority, transportation infrastructure, and it's

00:10:58.430 --> 00:11:03.900
- just closed for more than a year as if it doesn't matter. So this is already a stressed environment

00:11:03.900 --> 00:11:04.830
- for pedestrians.

00:11:05.570 --> 00:11:10.502
- So this isn't summer, and this is a screw pedestrians detour, and I'm trying not to use bad words, but

00:11:10.502 --> 00:11:15.483
- we have to be clear, it's very hard to do these things. Somebody's gonna have to give, the contractor's

00:11:15.483 --> 00:11:20.367
- gonna have to give, the cars are gonna have to give, somebody's gonna have to give. Well, it's always

00:11:20.367 --> 00:11:25.348
- easiest to pick the lowest priority person and make them give, so screw pedestrians. But you don't have

00:11:25.348 --> 00:11:30.136
- the legal authority to screw pedestrians. Pedestrians are in law enshrined as the highest priority.

00:11:30.136 --> 00:11:34.590
- And another piece of history you just need to be aware of is that the seven line was closed.

00:11:35.234 --> 00:11:40.603
- That was a poor decision. There was a mistake by the part of this board. But because it was closed for,

00:11:40.603 --> 00:11:46.076
- what, about eight months, you guys extended it for another two months. Once you establish this precedent,

00:11:46.076 --> 00:11:51.393
- last summer you closed grant. You shouldn't have, but you did. Because you established this precedent,

00:11:51.393 --> 00:11:56.659
- it goes on and on. And so they say, well, it's not a big deal because it's a short closure. But short

00:11:56.659 --> 00:12:01.925
- closures become long closures. Bad closures become repeated closures. Thank you. Thank you. Any other

00:12:01.925 --> 00:12:03.422
- public comment on this item?

00:12:07.650 --> 00:12:15.679
- None on Zoom. All right. Is there a motion. I move we approve the right of way closure request for F.A.

00:12:15.679 --> 00:12:23.476
- Wilhelm at Poplar's development. Second with a motion and a second I will call the roll. Cox Deckard

00:12:23.476 --> 00:12:26.718
- aye. Roach aye. Caron aye. Motion passes.

00:12:36.802 --> 00:12:43.229
- Next item is the right of way closure request from high Decker Wheat Lake Company for Fritz Terrace

00:12:43.229 --> 00:12:50.235
- gas line modernization Hello Zach Bell engineering High Decker Wheat Lake Company is requesting an extension

00:12:50.235 --> 00:12:56.790
- of an approved right away permit from 14 days to eight months the closures for this work will consist

00:12:56.790 --> 00:13:03.217
- of single-lane closures with the southwest portion within the southwest portion of Fritz Terrace as

00:13:03.217 --> 00:13:06.238
- part of the gas main modernization project and

00:13:06.818 --> 00:13:13.692
- This request is to accommodate fifteen thousand thirty five linear feet of boring. The traffic control

00:13:13.692 --> 00:13:20.432
- would be in place from March 9th through October 8th 2026. Hi Decker Wheat Lake Company has supplied

00:13:20.432 --> 00:13:27.106
- maintenance of traffic plans for all work and they have placed door hangers in advance of all work.

00:13:27.106 --> 00:13:34.046
- Bloomington High School North has also been notified. Thank you. Questions from the board on this item.

00:13:37.314 --> 00:13:43.936
- Yesterday in the work session we had asked if MCC SC had been notified because it indicates Bloomington

00:13:43.936 --> 00:13:50.304
- High School North but there are probably some other impacts for the other schools. Were you able to

00:13:50.304 --> 00:13:56.799
- confirm that or is there someone on the line that can confirm that. I don't believe that anybody's on

00:13:56.799 --> 00:14:03.230
- the line. If further communication with the school corporation is required I can get that from them.

00:14:03.746 --> 00:14:11.404
- My standpoint was the main priority was just Bloomington North is right there. Most of this will be

00:14:11.404 --> 00:14:19.138
- well all of this will be within Fritz Terrace. So only the local and the non arterial roads in here.

00:14:19.138 --> 00:14:27.102
- So I actually don't really see any other effects directly affecting the schools aside from Bloomington.

00:14:27.906 --> 00:14:35.068
- Yeah there'll be bus traffic or the other schools so it will be good just to make sure that transportation

00:14:35.068 --> 00:14:41.829
- MCCSE transportation knows in case they need to you know adjust their timing or communicate that and

00:14:41.829 --> 00:14:48.523
- that's something I can ask I can make that happen and just to reassure you this is one crew will be

00:14:48.523 --> 00:14:53.342
- out here and it will only be single lane closure so very minimal handle

00:14:54.658 --> 00:15:02.388
- We shouldn't see a traffic jam in front stairs, but if we do At least MCC SC will know right? Yeah Could

00:15:02.388 --> 00:15:09.896
- you also repeat what we talked about at the work session? Which is the permit extension from 14 days?

00:15:09.896 --> 00:15:17.258
- Sounds like a long time. So they they had submitted their Application and wanted to get started. So

00:15:17.258 --> 00:15:21.086
- within my jurisdiction or within my abilities I can

00:15:21.218 --> 00:15:30.129
- approved for up to 14 days on this street. So I went ahead and did that expecting that it would be passed.

00:15:30.129 --> 00:15:39.041
- Thank you. Public comment on this item. None on zoom. All right. Is there a motion. I move that we approve

00:15:39.041 --> 00:15:48.702
- the right of way closure request from Heidecker Wheat Lake Company for Fritz Harris gas line modernization. Second.

00:15:49.442 --> 00:15:56.371
- I will call the roll Cox Decker. I roach. I Caron. I motion passes Next is the right-of-way closure

00:15:56.371 --> 00:16:03.855
- request for Duke Energy Zach Bell again Duke Energy is requesting three weeks of lane and sidewalk closures

00:16:03.855 --> 00:16:11.131
- on South Sarah Road This request is to accommodate boring of underground utilities Traffic control would

00:16:11.131 --> 00:16:15.774
- be in place for three weeks with the dates dependent upon approval

00:16:16.162 --> 00:16:28.022
- Duke has supplied maintenance of traffic plans for all work. They have also notified MCC and will modify

00:16:28.022 --> 00:16:34.686
- their work schedule accordingly. Questions from the board.

00:16:36.034 --> 00:16:43.395
- I think one thing we discussed yesterday was just the very nearby impacts of the school there with Jackson

00:16:43.395 --> 00:16:50.413
- Creek and the fact that the crew was planning on adjusting their work times based on the traffic flow

00:16:50.413 --> 00:16:57.568
- for the school. Yes and times they've been directed to start. I think it was eight thirty and then wrap

00:16:57.568 --> 00:17:03.966
- up for pick up at two forty five I believe. So they have to be out of the road at that time.

00:17:04.098 --> 00:17:13.282
- I think pick up is 3 15 there or somewhere around there but then they can they may come back but they

00:17:13.282 --> 00:17:22.286
- have to be out of the road during those time frames for pick up and drop off. And the sidewalk will

00:17:22.286 --> 00:17:30.750
- reopen each and those will also reopen when they're in outside of the modified work schedule.

00:17:34.242 --> 00:17:42.824
- Any other questions from the board. All right. Public comment on this item. None on Zoom. All right.

00:17:42.824 --> 00:17:51.320
- Is there a motion to move that we approve the right of way closure request for Duke Energy. Second.

00:17:51.320 --> 00:17:59.902
- I will call the roll. Cox Deckard I Roach I Caron I motion passes. Next we move on to staff reports.

00:18:01.634 --> 00:18:09.332
- Kyle's gonna start with one on this right-of-way request for Myron age them and then I'll follow up

00:18:09.332 --> 00:18:17.183
- Yeah, kind of all from engineering again So yesterday afternoon we had a request from Myron age M who

00:18:17.183 --> 00:18:25.651
- is responsible for the Arlington multifamily project Right there on Arlington just adjacent to the roundabout

00:18:25.651 --> 00:18:27.806
- there 17th in Arlington and

00:18:27.906 --> 00:18:36.201
- So they were doing some field work and realized that they did not have the adequate spacing from the

00:18:36.201 --> 00:18:44.577
- infrastructure, the traffic circle infrastructure to facilitate a lane closure in this area. So their

00:18:44.577 --> 00:18:53.036
- proposal was to have a closure during the spring break period. So starting March 14th this weekend and

00:18:53.036 --> 00:18:55.582
- then concluding by March 22nd.

00:18:55.746 --> 00:19:03.527
- So in talks with Mr. Wason, the director of engineering and our traffic engineer, we felt like this

00:19:03.527 --> 00:19:11.386
- was a decent plan and would help minimize impacts. If they push this down the road, no pun intended,

00:19:11.386 --> 00:19:19.167
- they would impact a larger volume of traffic as they push these dates out. I have been working with

00:19:19.167 --> 00:19:22.046
- them as well as Bloomington Transit.

00:19:22.210 --> 00:19:28.624
- Bloomington transits concern was access to tell you ride to the apartment complex back there We haven't

00:19:28.624 --> 00:19:34.853
- had any indication that that was going to be limited in any capacity Local access will be maintained

00:19:34.853 --> 00:19:41.205
- for those few private businesses on the west side of the street As well as the homes that are a little

00:19:41.205 --> 00:19:47.619
- just north of the project there Can can you just clarify I was gonna make sure I'm understanding that's

00:19:47.619 --> 00:19:51.134
- correct. So we're talking about like distance northbound

00:19:51.650 --> 00:19:58.881
- Arlington and not enough distance to Scoop cars over is that what we're talking about? So there's a

00:19:58.881 --> 00:20:06.402
- taper minimum distance as we required according to the Indiana MUT CD That distance is 60 feet. There's

00:20:06.402 --> 00:20:13.706
- roughly 30 feet from the location of the manhole that they're going to be accessing So they're gonna

00:20:13.706 --> 00:20:18.334
- be digging a trench there trench boxes that whole deal and it's

00:20:18.562 --> 00:20:25.477
- too close of a proximity to, basically in that traffic circle, there's those pedestrian islands with

00:20:25.477 --> 00:20:32.393
- the triangles. So that would be the limiting factor to create that distance that they would need for

00:20:32.393 --> 00:20:39.102
- that. So you're telling me that scoot over is not a technical term? I use that term a lot, James,

00:20:39.102 --> 00:20:46.018
- but I'm, yeah, scoot over is a term that everyone understands but does not show up in the MUTCD. The

00:20:46.018 --> 00:20:48.414
- big issue here is they do need to,

00:20:49.922 --> 00:20:56.459
- The trench box is ensuring is the real big issue here that's changed the elevations of the sewer lateral

00:20:56.459 --> 00:21:02.686
- have caused some of this and so While we did not while we were always hopeful that we wouldn't need

00:21:02.686 --> 00:21:09.285
- a full closure of Arlington for this When we reviewed all the factors this morning There's just no option

00:21:09.285 --> 00:21:15.511
- to try to fit all of this in and so really trying to push them next week We may do did they respond

00:21:15.511 --> 00:21:17.566
- about night work at all? Not yet

00:21:17.730 --> 00:21:22.818
- We did ask him if it was possible for them to continue later into the evening and such and so we may

00:21:22.818 --> 00:21:27.856
- do an Administrative level noise permit depending on if they're able to do a couple of extra nights

00:21:27.856 --> 00:21:33.247
- of night work to try to really limit it to that spring break period But we're talking about a full closure

00:21:33.247 --> 00:21:38.436
- and not just a northbound lane closure, right? It's a full closure And had this we would have normally

00:21:38.436 --> 00:21:42.718
- wanted this to come through as a normal regular agenda item given the timing and and

00:21:43.426 --> 00:21:48.909
- Knowing spring break is next week. We wanted to go go go to try to avoid any impacts of a full closure

00:21:48.909 --> 00:21:54.445
- after spring break The residences and businesses that are directly impacted been specifically notified.

00:21:54.445 --> 00:21:59.768
- I'll be sure that they are That's what we're working on right now. They're getting signed should be

00:21:59.768 --> 00:22:05.090
- out today Awesome sign boards out everything in advance. Thank you. Yeah, and just for framing here

00:22:05.090 --> 00:22:10.680
- I think the original request from this project was closure for the entire summer Last summer that didn't

00:22:10.680 --> 00:22:12.862
- end up happening for a number of factors

00:22:12.994 --> 00:22:18.986
- So we reduced that to the lane closure and we were happy with that plan until we realized the link which

00:22:18.986 --> 00:22:24.807
- we didn't have quite enough room so They've been great working with us on this Flagging it as soon as

00:22:24.807 --> 00:22:30.857
- they realized it and you know providing all the materials and doing the lake work that we would typically

00:22:30.857 --> 00:22:36.792
- ask Perfect. Thank you Kyle. We'll keep you up to speed if anything changes on that just via email I've

00:22:36.792 --> 00:22:40.958
- got a couple items for the board just to go over, you know, I do want to

00:22:41.218 --> 00:22:47.503
- Just offer some comment about when these when a sidewalk closure comes to the board We have exhausted

00:22:47.503 --> 00:22:53.973
- options for walk-arounds and such, you know, mr. Alexander's passionate about keeping all the pedestrian

00:22:53.973 --> 00:23:00.320
- right away is open at all times I understand that the issue here, you know, there are sidewalk detours

00:23:00.320 --> 00:23:06.789
- and if we ever have a closure We're gonna have a detour in place for a sidewalk. So while it's not ideal

00:23:06.789 --> 00:23:08.638
- Trying we would the idea that

00:23:09.922 --> 00:23:15.290
- Putting in full walk arounds or reducing traffic lanes in this area is going to create more of an issue

00:23:15.290 --> 00:23:20.916
- than it is to try to detour those pedestrians for a short amount of time we get that, you know, he disagrees

00:23:20.916 --> 00:23:26.078
- with us on that but Kyle and the team and engineering are always trying to find the best solutions.

00:23:26.178 --> 00:23:31.609
- I can tell you we were not thrilled about the seven line issue and it being extended. We had lots of

00:23:31.609 --> 00:23:37.094
- conversations. There are other requests from Wilhelm that are not coming to the board because we have

00:23:37.094 --> 00:23:39.998
- told them no you've asked for too much at this point.

00:23:40.098 --> 00:23:45.483
- There may be a request still come through for Sunday work if that does come through to the board It's

00:23:45.483 --> 00:23:50.761
- not going to be supported by staff. So we are trying to keep their project within limited, you know

00:23:50.761 --> 00:23:56.199
- within The scope of what we can control there. So just some points there on that one I did want to let

00:23:56.199 --> 00:24:01.636
- you know the public and the board knows some additional work that's going to go on during spring break

00:24:01.636 --> 00:24:06.915
- next week That's going to have a road closure undone we found out we found from a got word from our

00:24:06.915 --> 00:24:08.446
- contractor that is doing the

00:24:08.578 --> 00:24:15.926
- Bollard installation project in a few locations around Kirkwood that they are able they were able to

00:24:15.926 --> 00:24:23.857
- get the materials in for the Dunn Street Installation and we thought let's go go go and so they're committed

00:24:23.857 --> 00:24:31.569
- to being there Monday The closure may bleed into the following Monday after spring break, but much better

00:24:31.569 --> 00:24:34.334
- than you know a couple three weeks so

00:24:34.498 --> 00:24:39.585
- We're gonna be working with Cassie and everybody to get word out about that closure for Dunn. Good thing

00:24:39.585 --> 00:24:44.430
- is everything's open down there, so traffic will still be able to circulate east and west when they

00:24:44.430 --> 00:24:49.517
- do get to Kirkwood and Dunn. These ballers are going in between basically Kilroy's on Kirkwood and Jimmy

00:24:49.517 --> 00:24:51.358
- John's for points of reference there.

00:24:51.650 --> 00:24:59.629
- Otherwise, it's weather season in Indiana. So possible severe weather this evening with thunderstorms

00:24:59.629 --> 00:25:07.685
- and then next Tuesday, they're talking like we could get some snow again. So Yeah, we're we're dealing

00:25:07.685 --> 00:25:15.820
- with all the weather in Indiana Yeah, so Any questions from board happy to answer those? Thank you Next

00:25:15.820 --> 00:25:21.374
- we go to approval of claims questions from the board on claims tonight

00:25:24.642 --> 00:25:31.804
- All right. Public comment on claims none on zoom. All right. Is there a motion. I move that we approve

00:25:31.804 --> 00:25:39.105
- the claims in the amount of two million four hundred eighty one thousand five hundred ninety two dollars

00:25:39.105 --> 00:25:46.267
- and fifty cents. Second. I will call the roll. Cox Decker. I Roach I Caron. I motion passes and seeing

00:25:46.267 --> 00:25:51.134
- that there is nothing else on the agenda I will call for adjournment.