WEBVTT

00:00:00.578 --> 00:00:07.564
- Good evening folks Adam Wason public works director for the city of Bloomington. It is 5 29 p.m. On

00:00:07.564 --> 00:00:14.899
- September 8th 2026. We're here in council chambers at 401 North Morton Street Bloomington, Indiana Looks

00:00:14.899 --> 00:00:21.955
- like the captions are working The zoom link is up and running. There are currently no members of the

00:00:21.955 --> 00:00:29.150
- public on the zoom link but there is a meeting ID and a passcode on the agenda for today's meeting and

00:00:29.250 --> 00:00:35.715
- And if there are members of the public that show up, they can use the raise hand function or the chat

00:00:35.715 --> 00:00:42.434
- function to offer public comment on any of the items, any of the items on the agenda or for the petitions

00:00:42.434 --> 00:00:48.899
- and remonstrances for items not on the agenda. Otherwise, we've got 5 30 p.m. So I'll turn it over to

00:00:48.899 --> 00:00:52.702
- Elizabeth Crone, president of the Board of Public Works and

00:00:52.898 --> 00:00:59.852
- Just a note for tonight's meeting. We did not have an opportunity for a work session with the holiday

00:00:59.852 --> 00:01:06.806
- yesterday. So It may be a little longer than normal, but I'll turn it over to Elizabeth and thank you

00:01:06.806 --> 00:01:13.623
- so much I call to order tonight's meeting of the Board of Public Works on Tuesday, September 8 2026

00:01:13.623 --> 00:01:17.918
- first we have opening of bids and bids to open for deicing and

00:01:24.994 --> 00:01:34.173
- Stevens Public Works Street Division and we sent out bids in August and we've received no bids back

00:01:34.173 --> 00:01:43.351
- So we did hear response from Cargill Compass Materials and Morton salt So we will go back with plan

00:01:43.351 --> 00:01:47.390
- B. You'll be hearing more from us Not ideal

00:01:47.810 --> 00:01:55.691
- There's been some issues with salt shortages throughout the Midwest. So And that is dealing with some

00:01:55.691 --> 00:02:03.726
- of the similar Situation that we are with trying to get bitters for the statewide GPA as well Good news

00:02:03.726 --> 00:02:11.607
- is right now our barns are full and we'll keep working on other avenues to hopefully Get something in

00:02:11.607 --> 00:02:15.934
- place before the winter season. So, thank you All right

00:02:16.162 --> 00:02:23.494
- Next up is messages from board members. There are any messages from the board tonight All right, next

00:02:23.494 --> 00:02:30.970
- is title six abatements and we have a request for a continuous abatement at 2225 South High Street Good

00:02:30.970 --> 00:02:38.231
- evening, I'm Sean Hampton neighborhood compliance officer with housing and neighborhood development.

00:02:38.231 --> 00:02:43.838
- I Am seeking continuous abatement for excessive growth at the property of two

00:02:44.290 --> 00:02:52.255
- 2225 South High Street This was previously abated in June and July by the former compliance officer

00:02:52.255 --> 00:03:00.538
- and I wrote my first citation on the 19th of August and was instructed to send it straight to abatement

00:03:00.538 --> 00:03:08.582
- due to the history in circumstances of the property All right, thank you questions from the board So

00:03:08.582 --> 00:03:14.078
- I am familiar with this property and recognized it from the previous

00:03:14.178 --> 00:03:22.254
- violations With the Abatements that happened over the course of the other summer months was that Part

00:03:22.254 --> 00:03:30.647
- of the continuous abatement that had been approved before and now we're entering into a new season August

00:03:30.647 --> 00:03:33.022
- 1st was the reset date, okay?

00:03:38.914 --> 00:03:44.229
- Summary says that contact with mr. Adam indicated there would not be a possibility of compliance Can

00:03:44.229 --> 00:03:49.597
- you just tell us about what contact you have had with him and his response, please? I have personally

00:03:49.597 --> 00:03:55.017
- had no contact with the property owner It was the former neighborhood compliance officer for that area

00:03:55.017 --> 00:04:00.385
- that had the contact with him and he stated the property owner stated to that compliance officer that

00:04:00.385 --> 00:04:04.542
- he would not be mowing or taking care of the property due to health issues and

00:04:07.490 --> 00:04:17.270
- Similar response we've gotten in years past. Other questions from the board. All right. Is there public

00:04:17.270 --> 00:04:26.767
- comment on this item. If you are in council chambers please approach approach the podium. If you are

00:04:26.767 --> 00:04:33.726
- on zoom you can no one on zoom. All right. Seeing none is there a motion.

00:04:34.306 --> 00:04:42.376
- Move that we approve continuous abatement at 2225 South High Street Second with a motion in a second.

00:04:42.376 --> 00:04:49.813
- I will call the roll Roach Cox Decker and I Caron I motion passes Thank you Next is petitions

00:04:49.813 --> 00:04:57.884
- and remonstrances if there's any member of the public who has a comment on something not on tonight's

00:04:57.884 --> 00:05:03.422
- agenda Please approach the podium Adam. I assume still no one on zoom

00:05:06.146 --> 00:05:19.975
- None, we will move to new business. First is minutes from July 28th 2026 I Will call the roll Roach

00:05:19.975 --> 00:05:34.910
- Cox Decker Caron I motion passes Next we have minutes from August 11th 2026 any questions from the board. I

00:05:38.754 --> 00:05:53.759
- I will call the roll Roche Cox Decker and I Korone I motion passes Next is resolution 2026 dash zero

00:05:53.759 --> 00:06:06.238
- three eight mobile vendor uno moss taco truck Susan coach from ESD we have this new

00:06:09.986 --> 00:06:20.432
- License that is being renewed. It's not new for when a must taco truck. Any questions. You said this

00:06:20.432 --> 00:06:31.189
- is a renewal. Yeah they've been around a few years. OK. Thank you. Questions from the board. Any public

00:06:31.189 --> 00:06:35.326
- comment. Seeing none is there a motion.

00:06:36.610 --> 00:06:44.720
- Move that we approve resolution 2026 dash zero three eight mobile vendor, you know moss talk a truck

00:06:44.720 --> 00:06:52.990
- I will call the roll Roach. Hi Cox Decker. I Korone. I motion passes Next is resolution 2026 dash zero

00:06:52.990 --> 00:06:57.406
- three nine art on a traffic box by Bloomington zine. I

00:07:05.570 --> 00:07:15.089
- Christina Elam with ESD just request permission to read to paint a traffic box in downtown Bloomington

00:07:15.089 --> 00:07:24.885
- is at the corner of Roger Street and third caddy corner from secretly group They will be painting between

00:07:24.885 --> 00:07:32.094
- September 14th and October 4th And the design is attached Thank you questions

00:07:32.962 --> 00:07:43.518
- I'm still not able to get in. I don't know if it's. I was not able to. Let's see if James. Yeah I got

00:07:43.518 --> 00:07:53.349
- to that point but then I tried to open like the JPEG. I tried to open a couple of those files.

00:07:53.349 --> 00:08:01.214
- Oh there we go. OK. I'll just peek. Very good. Thanks. Any other questions.

00:08:02.466 --> 00:08:12.185
- Is there a motion? I move that we approve resolution 20 26-0 3 9 art on a traffic box by Bloomington

00:08:12.185 --> 00:08:21.807
- zine Second I will call the roll Roach. Hi Cox Decker. I her own I motion passes Next is resolution

00:08:21.807 --> 00:08:28.062
- 20 26-0 4 0 art in the right-of-way Lotus Fest art installations

00:08:32.290 --> 00:08:42.094
- So Lotus actually filled out two applications for two separate installations during their festival the

00:08:42.094 --> 00:08:51.992
- festival will be October 2nd through the 4th the I'm sorry, which one did you what number was this one?

00:08:51.992 --> 00:08:58.750
- Okay, so can I just do all of them together great so the first one was

00:08:59.202 --> 00:09:05.708
- Lanterns that will be installed out some of them will be installed in trees and some of them will be

00:09:05.708 --> 00:09:08.542
- installed freestanding and mounted in place

00:09:08.866 --> 00:09:15.592
- They have been approved by the urban forestry department for the ones that will be hanging trees the

00:09:15.592 --> 00:09:22.784
- materials of these Lanterns are paper. So these are more of like crafts that will be hung and then there'll

00:09:22.784 --> 00:09:29.576
- be LED lights Within the metals to light them up. So that's the first installation and the second one

00:09:29.576 --> 00:09:31.774
- is a chalk installation of their

00:09:31.970 --> 00:09:39.673
- Logo of the lotus flower and it'll be used as more so wayfinding and that will be on the streets and

00:09:39.673 --> 00:09:47.528
- designated areas throughout the festival Thank you questions from the board I just asked if I can peek

00:09:47.528 --> 00:09:55.764
- at the documents if you're able to get in. Yeah, I have not She's loading that I'll ask a couple questions.

00:09:55.764 --> 00:09:59.806
- So this is it for a limited period of time, right to

00:10:00.002 --> 00:10:09.251
- Three days. Is that right? Yes, is that longer than the defined? Temporary art so now we have some provisions

00:10:09.251 --> 00:10:17.744
- in the code or The BPW resolution about temporary art. Is that right? Yeah, so temporary art is less

00:10:17.744 --> 00:10:26.656
- than seven days within the code So yeah, so this is this is temporary and this is a private installation.

00:10:26.656 --> 00:10:28.254
- This is not a city

00:10:28.674 --> 00:10:51.317
- Partnership like the previous one that we saw correct. Okay We're trying to find the images The chocolate

00:10:51.317 --> 00:10:58.366
- and the And the lantern image is

00:11:00.418 --> 00:11:12.871
- This one dancing lotus. It's like it's it's installed on top of some type of like illumination power.

00:11:12.871 --> 00:11:25.324
- The low power emitting LEDs. You said something about paper lanterns. Yeah. Yes. I don't know if this

00:11:25.324 --> 00:11:28.254
- is the same thing then.

00:11:31.266 --> 00:11:39.366
- Look familiar. Yes. So yes, that's it. Okay. All right. Any other questions from the board. All right.

00:11:39.366 --> 00:11:47.466
- Is there a motion. I move that we approve resolution twenty twenty six dash zero four zero art and the

00:11:47.466 --> 00:11:55.487
- right of way. Lotus Fest art installations. Second. Thank you Christina. I will call the roll. Roach.

00:11:55.487 --> 00:11:59.262
- Hi. Cox Decker. Aye. Caron. Aye. Motion passes.

00:12:01.506 --> 00:12:07.965
- Next is resolution 2026 dash zero for one declaration of fleet surplus September 2026 Adam waste on

00:12:07.965 --> 00:12:14.423
- behalf of Cory Snyder and Keith sharp down at fleet maintenance. So this is just our ongoing effort

00:12:14.423 --> 00:12:20.882
- to get surplus property declared so that we can use our gov deals online auction site to dispose of

00:12:20.882 --> 00:12:27.340
- unneeded surplus vehicles to get them off the insurance rolls and save us money. So happy to answer

00:12:27.340 --> 00:12:29.278
- any questions here but pretty

00:12:29.442 --> 00:12:47.129
- Typical standard process we're going through. Thank you questions on this item Still no one on zoom

00:12:47.129 --> 00:12:57.918
- Okay, thank you is there a motion I Will call the roll Roach

00:12:58.114 --> 00:13:06.799
- Cox Decker, I Korone I motion passes Now as a contract with Cassidy electric for installation of a fast

00:13:06.799 --> 00:13:15.735
- charger in the trades district garage Just goodman parking garage manager Cassidy electric will be working

00:13:15.735 --> 00:13:22.750
- along with Duke energy to install a dual fast charger in the trades district garage

00:13:23.074 --> 00:13:30.860
- We didn't have enough ampage in that garage. So we had to get Duke involved. And so they're going to

00:13:30.860 --> 00:13:38.878
- be bringing in a line from the transformer outside into a meter to the to the dual charger. This amount

00:13:38.878 --> 00:13:46.664
- for everything is thirty eight thousand seven hundred twenty five dollars. Thank you. Questions from

00:13:46.664 --> 00:13:52.446
- the board. So this charger is it. Are we contracting with a third party to

00:13:52.642 --> 00:13:59.896
- Own it or is it a city-owned charger? It's city-owned. Okay, and then we use a we do contract for up

00:13:59.896 --> 00:14:07.366
- With ev connect as far as for public use and billing and things like that But this is one that the city

00:14:07.366 --> 00:14:14.549
- purchased itself the charger just out of curiosity. What's the Typical return on that investment we

00:14:14.549 --> 00:14:20.510
- ever anticipated this is as much for city vehicles as So we've got a pretty decent

00:14:20.770 --> 00:14:27.551
- fleet of electric vehicles for city usage So it'll be available to the public, but it's also primarily

00:14:27.551 --> 00:14:34.332
- gonna be During the day and such for city vehicles. Great. Thank you And so for the public Someone who

00:14:34.332 --> 00:14:40.982
- is using the trades district garage as a regular parking Location for them whether they're there for

00:14:40.982 --> 00:14:47.960
- a short period of time or there for workday or something like that They can use the charger while they're

00:14:47.960 --> 00:14:50.462
- in the garage. Yeah And you said that

00:14:50.946 --> 00:14:59.103
- Sum of thirty eight thousand seven twenty five is all in so that's Cassidy Duke Yeah, it says my excavator

00:14:59.103 --> 00:15:06.878
- will have to remove that's all included in there. Okay. Thank you Is there any public comment on this

00:15:06.878 --> 00:15:14.654
- item if you are on zoom feel free to use the raise hand function or chat Seeing none is there emotion

00:15:15.426 --> 00:15:23.092
- Move that we approve the contract with Cassidy Electric for installation of a fast charger in the trades

00:15:23.092 --> 00:15:29.955
- district garage Second I will call the roll broach. Hi Cox Decker. I Korone. I motion passes.

00:15:29.955 --> 00:15:37.475
- Thank you. Thank you Next is payroll in the amount of eight hundred eight thousand seven hundred forty

00:15:37.475 --> 00:15:40.030
- nine dollars and sixteen cents and

00:15:41.154 --> 00:15:49.269
- Move that we approve payroll in the amount of eight hundred and eight thousand seven hundred forty nine

00:15:49.269 --> 00:15:57.384
- dollars and sixteen cents second. I Will call the roll Roche I Cox Decker and I her own I motion passes

00:15:57.384 --> 00:16:05.342
- Next is the contract with milestone contractors LLC for the Liberty Drive paving project Dana Street,

00:16:05.342 --> 00:16:09.790
- sorry Dana Stevens with Public Works Street Division and

00:16:10.082 --> 00:16:17.321
- This is to order a contractor agreement with milestone contractors for Liberty Drive. It's doing Liberty

00:16:17.321 --> 00:16:24.353
- Drive from West 3rd Street to the end of city maintenance. It will be milling fixing about eight nine

00:16:24.353 --> 00:16:31.799
- soft spots in the road will be resurfacing and then pavement markings reinstalled. They will the contractor

00:16:31.799 --> 00:16:38.693
- will also be working with in dot because of the traffic signal. The loops are on our side so I work

00:16:38.693 --> 00:16:39.934
- with them not to.

00:16:40.418 --> 00:16:47.990
- with their loops. So this is to a word of contract to milestone as they were the only better for one

00:16:47.990 --> 00:16:55.711
- hundred eighty six thousand five hundred fifty dollars. They are going to do this at night and we will

00:16:55.711 --> 00:17:03.582
- notify all businesses within that area to let them know ahead of time that this is going to be happening

00:17:03.582 --> 00:17:08.830
- and then we'll give them a date as soon as we have that confirmation.

00:17:11.330 --> 00:17:22.265
- Thank you questions from the board Did this come in and about the cost that the city was planning since

00:17:22.265 --> 00:17:33.621
- there was just one We were actually actually in Dan Bittner Street Department we were actually anticipating

00:17:33.621 --> 00:17:35.934
- maybe a little higher

00:17:36.258 --> 00:17:45.910
- And fortunately enough, we just had the one the one bit and I think it was very very competitive. So

00:17:45.910 --> 00:17:55.753
- I'm looking at the map of the portion on Liberty in city Boundaries, is there any talk with the county

00:17:55.753 --> 00:18:05.310
- about continuing on in their portion of it? Not not on this project on we have with a Kennedy Drive

00:18:05.730 --> 00:18:12.836
- We've reached out or the counties reached out to us were where we're We're paving something that that

00:18:12.836 --> 00:18:15.902
- that puts up to theirs, but not on that. No

00:18:17.026 --> 00:18:22.587
- And I believe the section that the county maintains between where ours leaves off on the northern boundary

00:18:22.587 --> 00:18:28.148
- to where we pick up on the southern boundary is pavement within the last five to six seven years probably.

00:18:28.148 --> 00:18:33.604
- So I don't know that theirs is ready for a fresh coat at this time. They did theirs between the sections

00:18:33.604 --> 00:18:38.801
- that we've gotten done. So it's one of those anomalies where we've got the northern section towards

00:18:38.801 --> 00:18:44.414
- Third Street and the southern section towards Second Street and the county's got the section in the middle.

00:18:44.738 --> 00:18:53.450
- And so but yeah, I don't believe there's a schedule ready for a new fresh code payment yet. That's helpful.

00:18:53.450 --> 00:19:01.598
- Thank you Any other questions any public comment on this item All right, is there a motion I move we

00:19:01.598 --> 00:19:09.988
- approve the contract with milestone contractors LLC for Liberty Drive paving project Second I will call

00:19:09.988 --> 00:19:11.198
- the roll Roach

00:19:11.490 --> 00:19:22.244
- Cox Decker, I Korone I motion passes. Thank you Next is a right-of-way closure and noise permit request

00:19:22.244 --> 00:19:31.550
- for city of Bloomington utilities for Monroe Street and 17th Street Zach bill engineering

00:19:32.226 --> 00:19:38.723
- Bloomington utilities is requesting approval of a temporary right-of-way closure South of the intersection

00:19:38.723 --> 00:19:44.916
- of North Monroe Street in West 17th Street to accommodate utility work The request includes temporary

00:19:44.916 --> 00:19:51.230
- closures of the travel lane and sidewalk as necessary to safely complete the work Closures are proposed

00:19:51.230 --> 00:19:57.423
- from September 10th through September 11th pedestrian vehicle vehicular traffic will be maintained in

00:19:57.423 --> 00:20:00.702
- accordance with the approved maintenance traffic plan

00:20:00.930 --> 00:20:10.315
- Side book closure will be on the east side of the sidewalk along North Monroe Street with a detour to

00:20:10.315 --> 00:20:19.885
- the west side of North Monroe Street and the traveling closure will occupy the northbound lane of North

00:20:19.885 --> 00:20:29.086
- Monroe Street and This work will occur at night Thank you questions from the board The work's gonna

00:20:29.086 --> 00:20:30.558
- happen at night

00:20:31.106 --> 00:20:40.486
- Multi-day closure. All right from what I understand is James on the Okay from what I understand it should

00:20:40.486 --> 00:20:49.246
- wrap up in the morning, okay So that's why it would say the 10th through the 11th. Oh, here we go.

00:20:49.246 --> 00:20:58.094
- Here we go. I got the time on there 1800 to 600 so except at the top event date so Set six at night

00:20:58.094 --> 00:21:00.926
- six in the morning. Okay, right

00:21:01.090 --> 00:21:14.608
- I would assume this will have In our coordination meeting last week between Street Engineering and CBU

00:21:14.608 --> 00:21:27.863
- it was discussed and they recognize the impacts that they can't have on the school We will make sure

00:21:27.863 --> 00:21:30.750
- to let them know yeah

00:21:35.458 --> 00:21:44.916
- Any public comment on this item? All right, is there a motion I Move that we approve the right-of-way

00:21:44.916 --> 00:21:54.374
- closure and noise permit requests for city of Bloomington utilities for Monroe Street and 17th second

00:21:54.374 --> 00:22:00.958
- I will call the roll Roach. I Cox Decker. I Korone. I motion passes. I

00:22:02.882 --> 00:22:09.321
- Next is a right-of-way closure request for City of Bloomington utilities for North Lincoln Street Zach

00:22:09.321 --> 00:22:15.948
- Bell engineering City of Bloomington utilities is requesting approval of a temporary right-of-way closure

00:22:15.948 --> 00:22:22.200
- at 1101 North Lincoln Street to accommodate utility work the request includes temporary closures of

00:22:22.200 --> 00:22:28.514
- the road a bike lane and an alley as necessary to safely complete the work the closures are proposed

00:22:28.514 --> 00:22:31.390
- from September 9th through September 16th and

00:22:31.650 --> 00:22:37.266
- Pedestrian vehicular traffic will be maintained shifted or rerouted in accordance with the approved

00:22:37.266 --> 00:22:42.938
- maintenance of traffic plan The bike lane closure will take place adjacent to one one zero one North

00:22:42.938 --> 00:22:48.947
- Lincoln The detour route will be East 15th Street North Grant Street in East 16th Street the alley closure

00:22:48.947 --> 00:22:52.766
- will occupy the East West alley between East 15th and East 16th and

00:22:54.018 --> 00:23:04.072
- The street closure will take place adjacent to 1 1 0 1 North Lincoln with local access to be maintained.

00:23:04.072 --> 00:23:14.031
- The detour route will be East 15th Street North Grant Street and East 16th Street. Thank you. Questions

00:23:14.031 --> 00:23:20.542
- from the board. Any public comment on this item. Is there a motion.

00:23:21.154 --> 00:23:28.278
- I move that we approve the right-of-way closure request for City of Bloomington utilities for North

00:23:28.278 --> 00:23:35.403
- Lincoln Street Second, I will call the roll Roach. I Cox Decker. I Korone. I motion passes Before a

00:23:35.403 --> 00:23:42.670
- member president for the next item I checked the Tri-North calendar. There was a home volleyball game

00:23:42.670 --> 00:23:45.662
- that starts at 6 o'clock that night. So I

00:23:45.762 --> 00:23:54.049
- It's a closure of the northbound lane it should be Yeah, it should be handleable. But yeah, we will

00:23:54.049 --> 00:24:02.419
- give the principal make sure somebody reaches out to the principal to inform them All right right of

00:24:02.419 --> 00:24:11.038
- way closure request for city of Bloomington utilities for South College Mall Road Zach Bell engineering

00:24:11.426 --> 00:24:17.099
- City of Bloomington utilities is requesting approval of a temporary right away closure at 720 South

00:24:17.099 --> 00:24:22.828
- College Mall Road To accommodate utility work the request includes temporary closures of a crosswalk

00:24:22.828 --> 00:24:28.670
- and a travel lane as necessary to safely complete the work Closures are proposed to start on September

00:24:28.670 --> 00:24:34.513
- 17th and are expected to reopen in one day Pedestrian and vehicular traffic will be maintained shifted

00:24:34.513 --> 00:24:38.654
- or rerouted in accordance with the approved maintenance of traffic plans

00:24:39.554 --> 00:24:48.069
- Crosswalk closure will be on the west side of the sidewalk along South South College Mall Road with

00:24:48.069 --> 00:24:56.840
- a detour to the east side of South College Mall Road Traveling closure will occupy the southbound lane

00:24:56.840 --> 00:25:06.718
- of South College Mall Road Thank you questions from the board I Notice that there we have two right-of-way requests

00:25:06.978 --> 00:25:15.199
- Or closure requests on College Mall Road. These are on different dates, I believe Number 18 which we

00:25:15.199 --> 00:25:23.583
- will get to is College Mall Road and Buick Cadillac Drive. I know they're not identical locations, but

00:25:23.583 --> 00:25:30.014
- just making sure that the Dates are coordinated That's the CGR Oh got it, okay

00:25:30.210 --> 00:25:38.666
- Utility so item 18 is CGR for College Mall Road and Buick Cadillac for a bus stop. Those are told that

00:25:38.666 --> 00:25:47.205
- in separate Yeah, they're separate, but they won't have sorry Kyle's popping up here, too Yes, so these

00:25:47.205 --> 00:25:54.430
- will not Great. Thank you. Just confirming for the record. Absolutely. Appreciate it. I

00:25:56.514 --> 00:26:03.170
- Seeing no other questions or comment. I will call the ask for a motion. I Move that we approve

00:26:03.170 --> 00:26:10.316
- the right-of-way closure request for City of Bloomington utilities for South College Mall Road Second

00:26:10.316 --> 00:26:17.392
- I will call the roll Roach. Hi Cox Decker. I grown. I motion passes Next is the right-of-way closure

00:26:17.392 --> 00:26:24.958
- and noise permit request for City of Bloomington utilities for South Smith Road Zach Bell engineering again

00:26:25.730 --> 00:26:31.732
- City of Bloomington utilities is requesting approval of a temporary right of way closure at 1320 South

00:26:31.732 --> 00:26:37.676
- Smith Road to accommodate utility work. The request includes temporary closure of South Smith Road as

00:26:37.676 --> 00:26:43.562
- necessary to safely complete the work. The closure is proposed from September 24th through September

00:26:43.562 --> 00:26:49.855
- 25th during overnight hours. Vehicular traffic will be rerouted in accordance with the approved maintenance

00:26:49.855 --> 00:26:50.846
- of traffic plan.

00:26:51.490 --> 00:27:01.653
- The street closure will take place adjacent to 1320 South Smith Road with local access to be maintained.

00:27:01.653 --> 00:27:11.525
- The detour route will be South Sarah Road and East Moore's Pike. Thank you. Questions from the board.

00:27:11.525 --> 00:27:18.494
- Is there any public comment on this item. All right. Is there a motion.

00:27:18.914 --> 00:27:26.977
- I move that we approve the right-of-way closure and noise permit request for city of Bloomington utilities

00:27:26.977 --> 00:27:34.587
- for South Smith Road Second I will call the roll Roach. I Cox Decker. I Korone. I motion passes Next

00:27:34.587 --> 00:27:43.102
- is the right-of-way closure request for city of Bloomington utilities for Pete Ellis Zach Bell engineering again

00:27:43.618 --> 00:27:49.148
- City of Bloomington utilities is requesting approval of a temporary right away closure on PL's drive

00:27:49.148 --> 00:27:54.787
- to accommodate utility work. The request includes temporary closures of a travel lane and the sidewalk

00:27:54.787 --> 00:28:00.754
- as necessary to safely complete the work. The closures are proposed from September 21st through to September

00:28:00.754 --> 00:28:06.229
- 23rd. The travel lane will close during the day and will reopen nightly with the sidewalk remaining

00:28:06.229 --> 00:28:08.638
- closed through the duration of the project.

00:28:09.026 --> 00:28:16.521
- Pedestrian and vehicular traffic will be maintained in accordance with the approved maintenance of traffic

00:28:16.521 --> 00:28:23.667
- plan Sidewalk closure will be on the west side of the sidewalk along Pete Ellis Drive with the detour

00:28:23.667 --> 00:28:31.022
- to the east side of Pete Ellis Drive The traveling closure will occupy the southbound lane of Pete Ellis

00:28:31.022 --> 00:28:36.766
- Drive Thank you questions from the board Is there any public comment on this item

00:28:40.354 --> 00:28:48.642
- Seeing none. Is there a motion? I move that we approve the right-of-way closure request for city of

00:28:48.642 --> 00:28:57.262
- Bloomington utilities for Pete Ellis Second I will call the roll Roach. I cox Decker. I Korone I motion

00:28:57.262 --> 00:29:05.634
- passes Next is a right-of-way closure request from Duke Energy for extension of permit at 6th Street

00:29:05.634 --> 00:29:08.286
- and Grant Zack bill engineering

00:29:08.482 --> 00:29:14.605
- Duke is requesting approval of temporary right equate closures on East 6th Street and North Grant Street

00:29:14.605 --> 00:29:20.728
- to accommodate Boring work that was not completed in a previous permit Which is now expired the proposed

00:29:20.728 --> 00:29:26.734
- work includes temporary closure of travel lanes and sidewalks as necessary to safely complete the work

00:29:26.734 --> 00:29:32.624
- closures are proposed to They've already begun but the closures are proposed to last until September

00:29:32.624 --> 00:29:37.406
- 30th during normal construction hours We have received a detailed schedule noting

00:29:37.538 --> 00:29:47.076
- Timing and location of the closures along with assurance that adjacent properties will be notified of

00:29:47.076 --> 00:29:56.988
- the closures And Liz is Liz on I believe Liz from Duke is available for any questions Thank you questions

00:29:56.988 --> 00:30:06.526
- from the board Correct, yeah, so a big update to the staff report we have received Enough material to

00:30:07.458 --> 00:30:14.244
- Recommend approval and you said that this work is it's it's something that just recently expired They

00:30:14.244 --> 00:30:21.031
- had a permit for the area. Yes, it expired on the 14th And we've worked with Duke to get them back on

00:30:21.031 --> 00:30:27.817
- track and working and it looks like we're there as long as they receive approval This was the project

00:30:27.817 --> 00:30:29.214
- that we talked about

00:30:29.410 --> 00:30:36.701
- pretty extensively about earlier this summer with the lines that we're going towards the university

00:30:36.701 --> 00:30:44.064
- so that occurs there subcontractors some underground boring there by the library principle spoon and

00:30:44.064 --> 00:30:51.501
- others. So I think this is just the extension to continue the work and get it finished up. Thank you.

00:30:51.501 --> 00:30:56.094
- Any public comment on this item. All right. Is there a motion.

00:30:56.610 --> 00:31:04.584
- We approve the right-of-way closure request from Duke Energy for extension of permit at 6th Street and

00:31:04.584 --> 00:31:12.481
- grant Second I will call the roll Roche. I Cox Decker. I Caron I motion passes Next is a right-of-way

00:31:12.481 --> 00:31:20.533
- closure request for a high decor Wheat Lake at Broadview neighborhood Pardon me exacting a glass water.

00:31:20.533 --> 00:31:26.494
- I just want to make sure it's the last one. I'm almost done Thank you though

00:31:26.882 --> 00:31:33.480
- Took a sip before I came in. I knew it was gonna be long So Zach Bell engineering Hidecker Wheat Lake

00:31:33.480 --> 00:31:40.207
- is requesting approval of a temporary right-of-way closure within and around the Broadview neighborhood

00:31:40.207 --> 00:31:47.192
- to accommodate gas line modernization The request includes temporary closures of travel lanes and sidewalks

00:31:47.192 --> 00:31:54.113
- as necessary to safely complete the work The closures are proposed from September 9th 2026 through January

00:31:54.113 --> 00:31:56.830
- 8th 2027 during normal construction hours

00:31:56.962 --> 00:32:03.088
- Pedestrian and vehicular traffic will be maintained shifted or rerouted in accordance with the approved

00:32:03.088 --> 00:32:09.273
- maintenance of traffic plan Sidewalk closures will be limited to areas within the scope of their project

00:32:09.273 --> 00:32:15.164
- that do have sidewalks some parts of the neighborhood do some parts don't So that's how we're going

00:32:15.164 --> 00:32:21.054
- to handle that Traveling closures will only occupy one lane at a time starting at South bent Avenue

00:32:21.054 --> 00:32:26.238
- installing mains first then laterals and We'll have compliant temporary traffic control

00:32:29.314 --> 00:32:42.863
- I'm just curious about the petitioners as a subcontractor for Centerpoint. So it's okay. Yeah And Because

00:32:42.863 --> 00:32:55.518
- this neighborhood has intermittent sidewalks I know the there's the line that basically the access

00:32:55.714 --> 00:33:03.808
- Sidewalk will it will provide the most feasible and compliant sidewalk detour or closure. So in most

00:33:03.808 --> 00:33:12.063
- cases we would be looking at Something that would detour Like a pedestrian, right? So in a place where

00:33:12.063 --> 00:33:20.638
- there isn't an adjacent sidewalk to send them to will have to create there They have to create a diversion

00:33:21.346 --> 00:33:28.921
- So that would be a Pro Act compliant route around the work. So you could either send them into the street

00:33:28.921 --> 00:33:36.211
- protected or as long as it's level and the Whatever you use to create the pathway is compliant That's

00:33:36.211 --> 00:33:43.714
- fine. And that's kind of what I'll recommend for them in some cases, you know if there's only Two people

00:33:43.714 --> 00:33:50.718
- that may ever use the sidewalk and it would be too dangerous to create a diversion. We might just

00:33:50.978 --> 00:34:04.789
- You to close it, but I don't think that's what we would need. I think we could just do a diversion Okay

00:34:04.789 --> 00:34:18.334
- And most of these probably wouldn't be over 24 hours anyway in this case All right, is there a motion

00:34:18.722 --> 00:34:26.841
- I move that we approve the right-of-way closure request for Heidecker wheat leg at Broadview neighborhood

00:34:26.841 --> 00:34:34.041
- Second I will call the roll Roach. I Cox Decker. I grown I motion passes Thank you, Zach Next

00:34:34.041 --> 00:34:41.930
- is a right-of-way closure request for Crider and Crider on the South Walnut Street I just want to give

00:34:41.930 --> 00:34:48.670
- a kudos to Zach for potentially breaking the record for most items on a singular agenda

00:34:49.346 --> 00:34:57.254
- We don't deserve him Kyle ball engineering. So this request is from Crider and Crider for temporary

00:34:57.254 --> 00:35:05.557
- closure of the westernmost southbound lane and the western sidewalk adjacent to 2130 South Walnut Street

00:35:05.557 --> 00:35:13.544
- So this is basically to me across the street from Bloomington High School South's soccer field there

00:35:13.544 --> 00:35:18.526
- in between North and South Street They were requesting this to

00:35:18.722 --> 00:35:27.091
- some public improvements of sidewalk curb storm sewer system And add some new commercial drive entrances

00:35:27.091 --> 00:35:35.300
- as part of that project there These closures are proposed to take place September 14th through October

00:35:35.300 --> 00:35:43.270
- 22nd or October 12th of this year Happy to take any questions if there are Thank you questions from

00:35:43.270 --> 00:35:45.502
- the board Is this under use

00:35:46.434 --> 00:35:55.760
- So this is gonna be a new car lot just an extension of the community group there And You gave us a range

00:35:55.760 --> 00:36:04.819
- of about a month But the actual closure will just be one week within that month and I assume one week

00:36:04.819 --> 00:36:13.790
- continuously That's my understanding. Okay This is also obviously such a traveled area I will assume

00:36:14.338 --> 00:36:23.139
- Coordination with MCCSE and the businesses along that route are aware as well. Yes, absolutely. Thank

00:36:23.139 --> 00:36:31.940
- you All right, any public comment on this item All right seeing none is there a motion I move that we

00:36:31.940 --> 00:36:40.655
- approve the right-of-way closure request for Crider and Crider on South Walnut Street Second, I will

00:36:40.655 --> 00:36:43.934
- call the roll Rote. I cox Decker. I I

00:36:44.066 --> 00:36:53.038
- I motion passes Next is a right-of-way closure request for CGR at College Mall Road and Buick Cadillac

00:36:53.038 --> 00:37:01.138
- Drive Kyle ball engineering again. So this request Is going to be from CGR services. So this

00:37:01.138 --> 00:37:10.197
- is a right-of-way closure request adjacent to the 700 South College Mall Road property, excuse me where

00:37:10.197 --> 00:37:11.678
- they're going to

00:37:11.906 --> 00:37:21.105
- Demolish and rebuild the existing bus stop there on the east side of the street So this is for two days,

00:37:21.105 --> 00:37:30.041
- I believe September 10th and 11th of this year with weather dates planned for September 14th and 15th

00:37:30.041 --> 00:37:39.678
- of this year if needed Thank you questions from the board All right, is there any public comment on this item

00:37:43.394 --> 00:37:51.137
- Seeing none is there a motion? I move that we approve the right-of-way closure request for CGR at College

00:37:51.137 --> 00:37:58.515
- Mall Road and Buick Cadillac Drive Second I will call the roll Roach. I Cox Decker. I Caron I motion

00:37:58.515 --> 00:38:06.258
- passes And the final item on a lengthy new business agenda is the right-of-way closure request for buying

00:38:06.258 --> 00:38:11.006
- them fan Yo on Pete Ellis Drive Kyle ball engineering once again

00:38:11.106 --> 00:38:18.481
- So Bynum Vanyo is requesting Lane bike lane and some sidewalk closure on Pete Ellis Drive We talked

00:38:18.481 --> 00:38:25.857
- a bit about this last session with some clarifications. So this is part of a private development of

00:38:25.857 --> 00:38:33.380
- the former Pizza Hut location there off Pete Ellis and this is going to be a tie-in that was required

00:38:33.380 --> 00:38:39.870
- by CBU that will be performed by a private subcontractor for the project not by CBU and

00:38:40.642 --> 00:38:48.226
- which would run this new train system essentially from that Pizza Hut, former Pizza Hut location over

00:38:48.226 --> 00:38:55.809
- into East Third Street. So all the improvements were deemed appropriate and necessary by CBU upon the

00:38:55.809 --> 00:39:03.244
- review of the project proposal. They are requesting the third and fourth week of October to be this

00:39:03.244 --> 00:39:09.118
- two-week time span. There might be some shift there, a few days here or there.

00:39:09.282 --> 00:39:15.657
- But that gives us plenty of time to make sure that they're notifying all the adjacent properties I know

00:39:15.657 --> 00:39:22.277
- there's lots of there's housing density in that area that would be affected by this So a three-day sidewalk

00:39:22.277 --> 00:39:28.529
- closure and then a two-week lane closure where we'll actually be shifting traffic and utilizing those

00:39:28.529 --> 00:39:35.211
- Bike lanes that are on the east and west side of the street there to merge that traffic and shift everything

00:39:35.211 --> 00:39:38.398
- over To allow for this work to take place Thank you

00:39:40.610 --> 00:39:58.566
- So two lanes will be maintained it will just be shifting and bikes and vehicles will travel in the same

00:39:58.566 --> 00:40:07.198
- Any public comment on this item Is there a motion

00:40:07.714 --> 00:40:16.022
- We approve the right-of-way closure request for Bynum Fanyo on Pete Ellis Drive Second I will call the

00:40:16.022 --> 00:40:24.169
- roll Roach. I Cox Decker. I Korone I motion passes Next on the agenda is staff reports Nothing major

00:40:24.169 --> 00:40:32.477
- tonight just wanted to say it seemed like we had a good successful 4th Street Arts Festival Cassie was

00:40:32.477 --> 00:40:34.494
- working with Brendan and

00:40:34.978 --> 00:40:41.961
- Juliet and the team to make sure everything went smoothly for the weekend. Didn't hear any reports of

00:40:41.961 --> 00:40:48.807
- anything major. Had a couple fixes with some of the traffic barricades, just making sure we had ADA

00:40:48.807 --> 00:40:56.064
- accessibility for folks that might use mobility devices, but otherwise no issues there. And still working

00:40:56.064 --> 00:41:00.446
- on some major construction projects, so South Walnut Street and

00:41:00.546 --> 00:41:06.935
- Third Street from Walnut to Indiana final phases of that project wrapping up with the striping today

00:41:06.935 --> 00:41:13.261
- tomorrow possibly into Friday. And so those will wrap up the Convention Center Third Street project

00:41:13.261 --> 00:41:19.840
- has a little bit of a delay so that may have a staff level extension waiting for some final information

00:41:19.840 --> 00:41:26.166
- on that one but working closely with what all to coordinate all of that. And yeah continuing with a

00:41:26.166 --> 00:41:28.190
- busy busy summer. So thank you.

00:41:31.554 --> 00:41:40.667
- Next is the approval of claims. Are there questions from the board on claims tonight. Any public comment

00:41:40.667 --> 00:41:49.780
- on claims. Seeing none is there a motion. I move that we approve the claims in the amount of two million

00:41:49.780 --> 00:41:58.459
- eight hundred eighty eight thousand one hundred seventy one dollars and ninety one cents. So I will

00:41:58.459 --> 00:41:59.934
- call roll Roach.

00:42:00.162 --> 00:42:08.446
- Cox Decker. I Perrone. I motion passes and with no other items on the agenda. I will call for adjournment