Good evening folks Adam Wason public works director for the city of Bloomington. It is 5 29 p.m. On September 8th 2026. We're here in council chambers at 401 North Morton Street Bloomington, Indiana Looks like the captions are working The zoom link is up and running. There are currently no members of the public on the zoom link but there is a meeting ID and a passcode on the agenda for today's meeting and And if there are members of the public that show up, they can use the raise hand function or the chat function to offer public comment on any of the items, any of the items on the agenda or for the petitions and remonstrances for items not on the agenda. Otherwise, we've got 5 30 p.m. So I'll turn it over to Elizabeth Crone, president of the Board of Public Works and Just a note for tonight's meeting. We did not have an opportunity for a work session with the holiday yesterday. So It may be a little longer than normal, but I'll turn it over to Elizabeth and thank you so much I call to order tonight's meeting of the Board of Public Works on Tuesday, September 8 2026 first we have opening of bids and bids to open for deicing and Stevens Public Works Street Division and we sent out bids in August and we've received no bids back So we did hear response from Cargill Compass Materials and Morton salt So we will go back with plan B. You'll be hearing more from us Not ideal There's been some issues with salt shortages throughout the Midwest. So And that is dealing with some of the similar Situation that we are with trying to get bitters for the statewide GPA as well Good news is right now our barns are full and we'll keep working on other avenues to hopefully Get something in place before the winter season. So, thank you All right Next up is messages from board members. There are any messages from the board tonight All right, next is title six abatements and we have a request for a continuous abatement at 2225 South High Street Good evening, I'm Sean Hampton neighborhood compliance officer with housing and neighborhood development. I Am seeking continuous abatement for excessive growth at the property of two 2225 South High Street This was previously abated in June and July by the former compliance officer and I wrote my first citation on the 19th of August and was instructed to send it straight to abatement due to the history in circumstances of the property All right, thank you questions from the board So I am familiar with this property and recognized it from the previous violations With the Abatements that happened over the course of the other summer months was that Part of the continuous abatement that had been approved before and now we're entering into a new season August 1st was the reset date, okay? Summary says that contact with mr. Adam indicated there would not be a possibility of compliance Can you just tell us about what contact you have had with him and his response, please? I have personally had no contact with the property owner It was the former neighborhood compliance officer for that area that had the contact with him and he stated the property owner stated to that compliance officer that he would not be mowing or taking care of the property due to health issues and Similar response we've gotten in years past. Other questions from the board. All right. Is there public comment on this item. If you are in council chambers please approach approach the podium. If you are on zoom you can no one on zoom. All right. Seeing none is there a motion. Move that we approve continuous abatement at 2225 South High Street Second with a motion in a second. I will call the roll Roach Cox Decker and I Caron I motion passes Thank you Next is petitions and remonstrances if there's any member of the public who has a comment on something not on tonight's agenda Please approach the podium Adam. I assume still no one on zoom None, we will move to new business. First is minutes from July 28th 2026 I Will call the roll Roach Cox Decker Caron I motion passes Next we have minutes from August 11th 2026 any questions from the board. I I will call the roll Roche Cox Decker and I Korone I motion passes Next is resolution 2026 dash zero three eight mobile vendor uno moss taco truck Susan coach from ESD we have this new License that is being renewed. It's not new for when a must taco truck. Any questions. You said this is a renewal. Yeah they've been around a few years. OK. Thank you. Questions from the board. Any public comment. Seeing none is there a motion. Move that we approve resolution 2026 dash zero three eight mobile vendor, you know moss talk a truck I will call the roll Roach. Hi Cox Decker. I Korone. I motion passes Next is resolution 2026 dash zero three nine art on a traffic box by Bloomington zine. I Christina Elam with ESD just request permission to read to paint a traffic box in downtown Bloomington is at the corner of Roger Street and third caddy corner from secretly group They will be painting between September 14th and October 4th And the design is attached Thank you questions I'm still not able to get in. I don't know if it's. I was not able to. Let's see if James. Yeah I got to that point but then I tried to open like the JPEG. I tried to open a couple of those files. Oh there we go. OK. I'll just peek. Very good. Thanks. Any other questions. Is there a motion? I move that we approve resolution 20 26-0 3 9 art on a traffic box by Bloomington zine Second I will call the roll Roach. Hi Cox Decker. I her own I motion passes Next is resolution 20 26-0 4 0 art in the right-of-way Lotus Fest art installations So Lotus actually filled out two applications for two separate installations during their festival the festival will be October 2nd through the 4th the I'm sorry, which one did you what number was this one? Okay, so can I just do all of them together great so the first one was Lanterns that will be installed out some of them will be installed in trees and some of them will be installed freestanding and mounted in place They have been approved by the urban forestry department for the ones that will be hanging trees the materials of these Lanterns are paper. So these are more of like crafts that will be hung and then there'll be LED lights Within the metals to light them up. So that's the first installation and the second one is a chalk installation of their Logo of the lotus flower and it'll be used as more so wayfinding and that will be on the streets and designated areas throughout the festival Thank you questions from the board I just asked if I can peek at the documents if you're able to get in. Yeah, I have not She's loading that I'll ask a couple questions. So this is it for a limited period of time, right to Three days. Is that right? Yes, is that longer than the defined? Temporary art so now we have some provisions in the code or The BPW resolution about temporary art. Is that right? Yeah, so temporary art is less than seven days within the code So yeah, so this is this is temporary and this is a private installation. This is not a city Partnership like the previous one that we saw correct. Okay We're trying to find the images The chocolate and the And the lantern image is This one dancing lotus. It's like it's it's installed on top of some type of like illumination power. The low power emitting LEDs. You said something about paper lanterns. Yeah. Yes. I don't know if this is the same thing then. Look familiar. Yes. So yes, that's it. Okay. All right. Any other questions from the board. All right. Is there a motion. I move that we approve resolution twenty twenty six dash zero four zero art and the right of way. Lotus Fest art installations. Second. Thank you Christina. I will call the roll. Roach. Hi. Cox Decker. Aye. Caron. Aye. Motion passes. Next is resolution 2026 dash zero for one declaration of fleet surplus September 2026 Adam waste on behalf of Cory Snyder and Keith sharp down at fleet maintenance. So this is just our ongoing effort to get surplus property declared so that we can use our gov deals online auction site to dispose of unneeded surplus vehicles to get them off the insurance rolls and save us money. So happy to answer any questions here but pretty Typical standard process we're going through. Thank you questions on this item Still no one on zoom Okay, thank you is there a motion I Will call the roll Roach Cox Decker, I Korone I motion passes Now as a contract with Cassidy electric for installation of a fast charger in the trades district garage Just goodman parking garage manager Cassidy electric will be working along with Duke energy to install a dual fast charger in the trades district garage We didn't have enough ampage in that garage. So we had to get Duke involved. And so they're going to be bringing in a line from the transformer outside into a meter to the to the dual charger. This amount for everything is thirty eight thousand seven hundred twenty five dollars. Thank you. Questions from the board. So this charger is it. Are we contracting with a third party to Own it or is it a city-owned charger? It's city-owned. Okay, and then we use a we do contract for up With ev connect as far as for public use and billing and things like that But this is one that the city purchased itself the charger just out of curiosity. What's the Typical return on that investment we ever anticipated this is as much for city vehicles as So we've got a pretty decent fleet of electric vehicles for city usage So it'll be available to the public, but it's also primarily gonna be During the day and such for city vehicles. Great. Thank you And so for the public Someone who is using the trades district garage as a regular parking Location for them whether they're there for a short period of time or there for workday or something like that They can use the charger while they're in the garage. Yeah And you said that Sum of thirty eight thousand seven twenty five is all in so that's Cassidy Duke Yeah, it says my excavator will have to remove that's all included in there. Okay. Thank you Is there any public comment on this item if you are on zoom feel free to use the raise hand function or chat Seeing none is there emotion Move that we approve the contract with Cassidy Electric for installation of a fast charger in the trades district garage Second I will call the roll broach. Hi Cox Decker. I Korone. I motion passes. Thank you. Thank you Next is payroll in the amount of eight hundred eight thousand seven hundred forty nine dollars and sixteen cents and Move that we approve payroll in the amount of eight hundred and eight thousand seven hundred forty nine dollars and sixteen cents second. I Will call the roll Roche I Cox Decker and I her own I motion passes Next is the contract with milestone contractors LLC for the Liberty Drive paving project Dana Street, sorry Dana Stevens with Public Works Street Division and This is to order a contractor agreement with milestone contractors for Liberty Drive. It's doing Liberty Drive from West 3rd Street to the end of city maintenance. It will be milling fixing about eight nine soft spots in the road will be resurfacing and then pavement markings reinstalled. They will the contractor will also be working with in dot because of the traffic signal. The loops are on our side so I work with them not to. with their loops. So this is to a word of contract to milestone as they were the only better for one hundred eighty six thousand five hundred fifty dollars. They are going to do this at night and we will notify all businesses within that area to let them know ahead of time that this is going to be happening and then we'll give them a date as soon as we have that confirmation. Thank you questions from the board Did this come in and about the cost that the city was planning since there was just one We were actually actually in Dan Bittner Street Department we were actually anticipating maybe a little higher And fortunately enough, we just had the one the one bit and I think it was very very competitive. So I'm looking at the map of the portion on Liberty in city Boundaries, is there any talk with the county about continuing on in their portion of it? Not not on this project on we have with a Kennedy Drive We've reached out or the counties reached out to us were where we're We're paving something that that that puts up to theirs, but not on that. No And I believe the section that the county maintains between where ours leaves off on the northern boundary to where we pick up on the southern boundary is pavement within the last five to six seven years probably. So I don't know that theirs is ready for a fresh coat at this time. They did theirs between the sections that we've gotten done. So it's one of those anomalies where we've got the northern section towards Third Street and the southern section towards Second Street and the county's got the section in the middle. And so but yeah, I don't believe there's a schedule ready for a new fresh code payment yet. That's helpful. Thank you Any other questions any public comment on this item All right, is there a motion I move we approve the contract with milestone contractors LLC for Liberty Drive paving project Second I will call the roll Roach Cox Decker, I Korone I motion passes. Thank you Next is a right-of-way closure and noise permit request for city of Bloomington utilities for Monroe Street and 17th Street Zach bill engineering Bloomington utilities is requesting approval of a temporary right-of-way closure South of the intersection of North Monroe Street in West 17th Street to accommodate utility work The request includes temporary closures of the travel lane and sidewalk as necessary to safely complete the work Closures are proposed from September 10th through September 11th pedestrian vehicle vehicular traffic will be maintained in accordance with the approved maintenance traffic plan Side book closure will be on the east side of the sidewalk along North Monroe Street with a detour to the west side of North Monroe Street and the traveling closure will occupy the northbound lane of North Monroe Street and This work will occur at night Thank you questions from the board The work's gonna happen at night Multi-day closure. All right from what I understand is James on the Okay from what I understand it should wrap up in the morning, okay So that's why it would say the 10th through the 11th. Oh, here we go. Here we go. I got the time on there 1800 to 600 so except at the top event date so Set six at night six in the morning. Okay, right I would assume this will have In our coordination meeting last week between Street Engineering and CBU it was discussed and they recognize the impacts that they can't have on the school We will make sure to let them know yeah Any public comment on this item? All right, is there a motion I Move that we approve the right-of-way closure and noise permit requests for city of Bloomington utilities for Monroe Street and 17th second I will call the roll Roach. I Cox Decker. I Korone. I motion passes. I Next is a right-of-way closure request for City of Bloomington utilities for North Lincoln Street Zach Bell engineering City of Bloomington utilities is requesting approval of a temporary right-of-way closure at 1101 North Lincoln Street to accommodate utility work the request includes temporary closures of the road a bike lane and an alley as necessary to safely complete the work the closures are proposed from September 9th through September 16th and Pedestrian vehicular traffic will be maintained shifted or rerouted in accordance with the approved maintenance of traffic plan The bike lane closure will take place adjacent to one one zero one North Lincoln The detour route will be East 15th Street North Grant Street in East 16th Street the alley closure will occupy the East West alley between East 15th and East 16th and The street closure will take place adjacent to 1 1 0 1 North Lincoln with local access to be maintained. The detour route will be East 15th Street North Grant Street and East 16th Street. Thank you. Questions from the board. Any public comment on this item. Is there a motion. I move that we approve the right-of-way closure request for City of Bloomington utilities for North Lincoln Street Second, I will call the roll Roach. I Cox Decker. I Korone. I motion passes Before a member president for the next item I checked the Tri-North calendar. There was a home volleyball game that starts at 6 o'clock that night. So I It's a closure of the northbound lane it should be Yeah, it should be handleable. But yeah, we will give the principal make sure somebody reaches out to the principal to inform them All right right of way closure request for city of Bloomington utilities for South College Mall Road Zach Bell engineering City of Bloomington utilities is requesting approval of a temporary right away closure at 720 South College Mall Road To accommodate utility work the request includes temporary closures of a crosswalk and a travel lane as necessary to safely complete the work Closures are proposed to start on September 17th and are expected to reopen in one day Pedestrian and vehicular traffic will be maintained shifted or rerouted in accordance with the approved maintenance of traffic plans Crosswalk closure will be on the west side of the sidewalk along South South College Mall Road with a detour to the east side of South College Mall Road Traveling closure will occupy the southbound lane of South College Mall Road Thank you questions from the board I Notice that there we have two right-of-way requests Or closure requests on College Mall Road. These are on different dates, I believe Number 18 which we will get to is College Mall Road and Buick Cadillac Drive. I know they're not identical locations, but just making sure that the Dates are coordinated That's the CGR Oh got it, okay Utility so item 18 is CGR for College Mall Road and Buick Cadillac for a bus stop. Those are told that in separate Yeah, they're separate, but they won't have sorry Kyle's popping up here, too Yes, so these will not Great. Thank you. Just confirming for the record. Absolutely. Appreciate it. I Seeing no other questions or comment. I will call the ask for a motion. I Move that we approve the right-of-way closure request for City of Bloomington utilities for South College Mall Road Second I will call the roll Roach. Hi Cox Decker. I grown. I motion passes Next is the right-of-way closure and noise permit request for City of Bloomington utilities for South Smith Road Zach Bell engineering again City of Bloomington utilities is requesting approval of a temporary right of way closure at 1320 South Smith Road to accommodate utility work. The request includes temporary closure of South Smith Road as necessary to safely complete the work. The closure is proposed from September 24th through September 25th during overnight hours. Vehicular traffic will be rerouted in accordance with the approved maintenance of traffic plan. The street closure will take place adjacent to 1320 South Smith Road with local access to be maintained. The detour route will be South Sarah Road and East Moore's Pike. Thank you. Questions from the board. Is there any public comment on this item. All right. Is there a motion. I move that we approve the right-of-way closure and noise permit request for city of Bloomington utilities for South Smith Road Second I will call the roll Roach. I Cox Decker. I Korone. I motion passes Next is the right-of-way closure request for city of Bloomington utilities for Pete Ellis Zach Bell engineering again City of Bloomington utilities is requesting approval of a temporary right away closure on PL's drive to accommodate utility work. The request includes temporary closures of a travel lane and the sidewalk as necessary to safely complete the work. The closures are proposed from September 21st through to September 23rd. The travel lane will close during the day and will reopen nightly with the sidewalk remaining closed through the duration of the project. Pedestrian and vehicular traffic will be maintained in accordance with the approved maintenance of traffic plan Sidewalk closure will be on the west side of the sidewalk along Pete Ellis Drive with the detour to the east side of Pete Ellis Drive The traveling closure will occupy the southbound lane of Pete Ellis Drive Thank you questions from the board Is there any public comment on this item Seeing none. Is there a motion? I move that we approve the right-of-way closure request for city of Bloomington utilities for Pete Ellis Second I will call the roll Roach. I cox Decker. I Korone I motion passes Next is a right-of-way closure request from Duke Energy for extension of permit at 6th Street and Grant Zack bill engineering Duke is requesting approval of temporary right equate closures on East 6th Street and North Grant Street to accommodate Boring work that was not completed in a previous permit Which is now expired the proposed work includes temporary closure of travel lanes and sidewalks as necessary to safely complete the work closures are proposed to They've already begun but the closures are proposed to last until September 30th during normal construction hours We have received a detailed schedule noting Timing and location of the closures along with assurance that adjacent properties will be notified of the closures And Liz is Liz on I believe Liz from Duke is available for any questions Thank you questions from the board Correct, yeah, so a big update to the staff report we have received Enough material to Recommend approval and you said that this work is it's it's something that just recently expired They had a permit for the area. Yes, it expired on the 14th And we've worked with Duke to get them back on track and working and it looks like we're there as long as they receive approval This was the project that we talked about pretty extensively about earlier this summer with the lines that we're going towards the university so that occurs there subcontractors some underground boring there by the library principle spoon and others. So I think this is just the extension to continue the work and get it finished up. Thank you. Any public comment on this item. All right. Is there a motion. We approve the right-of-way closure request from Duke Energy for extension of permit at 6th Street and grant Second I will call the roll Roche. I Cox Decker. I Caron I motion passes Next is a right-of-way closure request for a high decor Wheat Lake at Broadview neighborhood Pardon me exacting a glass water. I just want to make sure it's the last one. I'm almost done Thank you though Took a sip before I came in. I knew it was gonna be long So Zach Bell engineering Hidecker Wheat Lake is requesting approval of a temporary right-of-way closure within and around the Broadview neighborhood to accommodate gas line modernization The request includes temporary closures of travel lanes and sidewalks as necessary to safely complete the work The closures are proposed from September 9th 2026 through January 8th 2027 during normal construction hours Pedestrian and vehicular traffic will be maintained shifted or rerouted in accordance with the approved maintenance of traffic plan Sidewalk closures will be limited to areas within the scope of their project that do have sidewalks some parts of the neighborhood do some parts don't So that's how we're going to handle that Traveling closures will only occupy one lane at a time starting at South bent Avenue installing mains first then laterals and We'll have compliant temporary traffic control I'm just curious about the petitioners as a subcontractor for Centerpoint. So it's okay. Yeah And Because this neighborhood has intermittent sidewalks I know the there's the line that basically the access Sidewalk will it will provide the most feasible and compliant sidewalk detour or closure. So in most cases we would be looking at Something that would detour Like a pedestrian, right? So in a place where there isn't an adjacent sidewalk to send them to will have to create there They have to create a diversion So that would be a Pro Act compliant route around the work. So you could either send them into the street protected or as long as it's level and the Whatever you use to create the pathway is compliant That's fine. And that's kind of what I'll recommend for them in some cases, you know if there's only Two people that may ever use the sidewalk and it would be too dangerous to create a diversion. We might just You to close it, but I don't think that's what we would need. I think we could just do a diversion Okay And most of these probably wouldn't be over 24 hours anyway in this case All right, is there a motion I move that we approve the right-of-way closure request for Heidecker wheat leg at Broadview neighborhood Second I will call the roll Roach. I Cox Decker. I grown I motion passes Thank you, Zach Next is a right-of-way closure request for Crider and Crider on the South Walnut Street I just want to give a kudos to Zach for potentially breaking the record for most items on a singular agenda We don't deserve him Kyle ball engineering. So this request is from Crider and Crider for temporary closure of the westernmost southbound lane and the western sidewalk adjacent to 2130 South Walnut Street So this is basically to me across the street from Bloomington High School South's soccer field there in between North and South Street They were requesting this to some public improvements of sidewalk curb storm sewer system And add some new commercial drive entrances as part of that project there These closures are proposed to take place September 14th through October 22nd or October 12th of this year Happy to take any questions if there are Thank you questions from the board Is this under use So this is gonna be a new car lot just an extension of the community group there And You gave us a range of about a month But the actual closure will just be one week within that month and I assume one week continuously That's my understanding. Okay This is also obviously such a traveled area I will assume Coordination with MCCSE and the businesses along that route are aware as well. Yes, absolutely. Thank you All right, any public comment on this item All right seeing none is there a motion I move that we approve the right-of-way closure request for Crider and Crider on South Walnut Street Second, I will call the roll Rote. I cox Decker. I I I motion passes Next is a right-of-way closure request for CGR at College Mall Road and Buick Cadillac Drive Kyle ball engineering again. So this request Is going to be from CGR services. So this is a right-of-way closure request adjacent to the 700 South College Mall Road property, excuse me where they're going to Demolish and rebuild the existing bus stop there on the east side of the street So this is for two days, I believe September 10th and 11th of this year with weather dates planned for September 14th and 15th of this year if needed Thank you questions from the board All right, is there any public comment on this item Seeing none is there a motion? I move that we approve the right-of-way closure request for CGR at College Mall Road and Buick Cadillac Drive Second I will call the roll Roach. I Cox Decker. I Caron I motion passes And the final item on a lengthy new business agenda is the right-of-way closure request for buying them fan Yo on Pete Ellis Drive Kyle ball engineering once again So Bynum Vanyo is requesting Lane bike lane and some sidewalk closure on Pete Ellis Drive We talked a bit about this last session with some clarifications. So this is part of a private development of the former Pizza Hut location there off Pete Ellis and this is going to be a tie-in that was required by CBU that will be performed by a private subcontractor for the project not by CBU and which would run this new train system essentially from that Pizza Hut, former Pizza Hut location over into East Third Street. So all the improvements were deemed appropriate and necessary by CBU upon the review of the project proposal. They are requesting the third and fourth week of October to be this two-week time span. There might be some shift there, a few days here or there. But that gives us plenty of time to make sure that they're notifying all the adjacent properties I know there's lots of there's housing density in that area that would be affected by this So a three-day sidewalk closure and then a two-week lane closure where we'll actually be shifting traffic and utilizing those Bike lanes that are on the east and west side of the street there to merge that traffic and shift everything over To allow for this work to take place Thank you So two lanes will be maintained it will just be shifting and bikes and vehicles will travel in the same Any public comment on this item Is there a motion We approve the right-of-way closure request for Bynum Fanyo on Pete Ellis Drive Second I will call the roll Roach. I Cox Decker. I Korone I motion passes Next on the agenda is staff reports Nothing major tonight just wanted to say it seemed like we had a good successful 4th Street Arts Festival Cassie was working with Brendan and Juliet and the team to make sure everything went smoothly for the weekend. Didn't hear any reports of anything major. Had a couple fixes with some of the traffic barricades, just making sure we had ADA accessibility for folks that might use mobility devices, but otherwise no issues there. And still working on some major construction projects, so South Walnut Street and Third Street from Walnut to Indiana final phases of that project wrapping up with the striping today tomorrow possibly into Friday. And so those will wrap up the Convention Center Third Street project has a little bit of a delay so that may have a staff level extension waiting for some final information on that one but working closely with what all to coordinate all of that. And yeah continuing with a busy busy summer. So thank you. Next is the approval of claims. Are there questions from the board on claims tonight. Any public comment on claims. Seeing none is there a motion. I move that we approve the claims in the amount of two million eight hundred eighty eight thousand one hundred seventy one dollars and ninety one cents. So I will call roll Roach. Cox Decker. I Perrone. I motion passes and with no other items on the agenda. I will call for adjournment