- I'll go ahead and call the order the border zoning appeals meeting for the state Thursday November 19th

00:00:08.674 --> 00:00:16.860
- two thousand twenty six. And if I could please have a roll call. Burrell here. Fernandez here could

00:00:16.860 --> 00:00:25.045
- sinko here. Throck Morton here. Smith. And then what we'll do is we'll just watch out for him if he

00:00:25.045 --> 00:00:27.582
- joins just let us know please.

00:00:28.322 --> 00:00:39.071
- We did have minutes I believe attached here. Let me just double check We have the October 22nd 2026

00:00:39.071 --> 00:00:50.035
- minutes to have a motion to approve a motion to approve the October 22nd 22nd minutes second Call the

00:00:50.035 --> 00:00:57.022
- roll Burrell. Yes Fernandez. Yes Cosinco. Yes, Throckmorton. Yes

00:00:57.602 --> 00:01:05.195
- The minutes are put into the record. Before we get to resolutions and communications, I just wanted

00:01:05.195 --> 00:01:13.243
- to make a brief point for the minutes concerning board membership. We have two members whose term expires

00:01:13.243 --> 00:01:20.836
- at the end of the year, which should be just over a month and a half away. And those are Flavia and

00:01:20.836 --> 00:01:26.910
- John. And their terms are both set to expire on the 31st of December this year.

00:01:27.394 --> 00:01:36.497
- So we just want to make this a point of the record so that we can have both of those both of those appointee

00:01:36.497 --> 00:01:44.849
- or pointers aware of it so that we can make sure that we have a full board on January. Okay. And at

00:01:44.849 --> 00:01:53.368
- the moment, Flavia is our vice president. So it would be nice to know what we're going to do on that,

00:01:53.368 --> 00:01:55.038
- on that standpoint.

00:01:55.906 --> 00:02:04.496
- All right, so that's in the record. Let's go ahead and look at what we're gonna do today. We do have

00:02:04.496 --> 00:02:13.681
- one expedited petition. We don't have any that are continued. The expedited agenda item is ZR-2026-10-0044.

00:02:13.681 --> 00:02:22.186
- And then we do have two regular petitions, ZR-2026-10-0045 and ZR-2026-10-0046. And what we will do

00:02:22.186 --> 00:02:25.758
- here, do we have any other communications

00:02:26.306 --> 00:02:34.856
- No, nothing from staff anything from the board before we get going. Okay, very good. Well with that

00:02:34.856 --> 00:02:43.406
- then let's That we've got that Let's go to the expedited agenda items ZR 20 26 10 00 44 11 40 South

00:02:43.406 --> 00:02:46.142
- Morton Street for a variance of

00:02:47.778 --> 00:02:54.901
- Yes, thank you. So this is a request at 1140 South Morton Street from the New Hope for family shelters.

00:02:54.901 --> 00:03:02.023
- They're here tonight to request a variance from setback standards for accessory structures in a planned

00:03:02.023 --> 00:03:08.872
- unit development. So this property was developed in 2019. It's at the northwest corner of Patterson

00:03:08.872 --> 00:03:09.694
- and Morton.

00:03:09.762 --> 00:03:16.327
- It was developed for a variety of uses to provide housing and service needs for families that are in

00:03:16.327 --> 00:03:22.892
- need. They constructed two buildings that are on the site. The property, as I mentioned, sits at the

00:03:22.892 --> 00:03:29.521
- corner. There is also a section of right of way and street that extends from Madison on the northwest

00:03:29.521 --> 00:03:36.086
- corner of the site. So as you can see in this exhibit, the property has a very unique shape, as well

00:03:36.086 --> 00:03:38.686
- as has street frontages on three sides.

00:03:38.850 --> 00:03:45.696
- which creates some challenges with the use on the site. The PUD, the Thompson PUD was silent on accessory

00:03:45.696 --> 00:03:52.218
- structures, so that defaults to the Unified Development Ordinance requirements, which have a 35-foot

00:03:52.218 --> 00:03:59.257
- setback requirement for accessory structures from the front. So the petitioner has constructed two accessory

00:03:59.257 --> 00:04:05.780
- structures. There is a shed on the north side of the property and a gazebo kind of on the south side

00:04:05.780 --> 00:04:06.878
- of the property.

00:04:07.042 --> 00:04:13.634
- Both of those do require a variance to be located on a site with the right of way. There is also a utility

00:04:13.634 --> 00:04:20.350
- easement that runs through the site that also creates a challenge that you can see that moves east and west.

00:04:20.642 --> 00:04:26.584
- So due to the peculiarities of the site regarding the shape as well as the street frontage, there are

00:04:26.584 --> 00:04:32.526
- challenges to constructing the accessory structures on the site without the granting of the variance.

00:04:32.526 --> 00:04:38.584
- So the petitioner is requesting a variance from those setbacks to allow for those two structures, which

00:04:38.584 --> 00:04:40.798
- you can see here again on this slide.

00:04:40.898 --> 00:04:47.347
- So staff has evaluated this for the criteria that are stated in the staff report. As I mentioned, we

00:04:47.347 --> 00:04:54.306
- did find the peculiarities that I've mentioned in regards to the lot configuration as well as road frontage.

00:04:54.306 --> 00:05:00.691
- And we are recommending that the board adopt this petition with the one condition that is listed in

00:05:00.691 --> 00:05:07.140
- staff's report. And I'm happy to answer any questions once the petitioner has had a chance to speak.

00:05:07.140 --> 00:05:09.694
- Thank you, Eric. I have the petitioner.

00:05:09.826 --> 00:05:17.200
- Do you affirm that the testimony you're about to give us the truth the whole truth and nothing but the

00:05:17.200 --> 00:05:24.360
- truth Okay, so you have 20 minutes total You don't have to use it all now if after we discuss it We

00:05:24.360 --> 00:05:31.662
- can come back and give you the remainder of your time before we have any type of motion, right? Thank

00:05:31.662 --> 00:05:38.750
- you Thank you all. Thank you for serving on this committee. Thanks to the staff for making time to

00:05:38.850 --> 00:05:43.783
- address our variance request. Like I said, my name is Chase Tekington. I've been on staff here at New

00:05:43.783 --> 00:05:48.813
- Hope for the last seven years, long enough to remember when the property we're talking about was a bare

00:05:48.813 --> 00:05:53.795
- hill, used as overflow parking there on the corner on the B line. So today I just want to briefly show

00:05:53.795 --> 00:05:58.631
- you how we've improved it, how granting this variance will relieve our practical needs, and I think

00:05:58.631 --> 00:06:03.854
- actually serve to elevate the use of the lot. Three years ago, like I said, we constructed those buildings.

00:06:03.854 --> 00:06:08.062
- I'm going to run through some of these slides quickly because Eric has done a good job

00:06:08.226 --> 00:06:13.936
- with this exposition about the history of the lot, but I do want to say that New Hope's programming

00:06:13.936 --> 00:06:19.761
- there addresses the needs of families who are experiencing homelessness or at risk of homelessness in

00:06:19.761 --> 00:06:25.471
- two ways. We have an emergency overnight shelter for families with kids, and we meet those needs by

00:06:25.471 --> 00:06:31.296
- serving the needs of hundreds of families who call us who might become homeless very soon and prevent

00:06:31.296 --> 00:06:33.694
- their homelessness. The emergency shelter

00:06:33.826 --> 00:06:39.431
- provides overnight shelter for all children who experience homelessness in our community. We don't let

00:06:39.431 --> 00:06:45.199
- any kids sleep outside. We always address that. And parents and families move quickly through the shelter

00:06:45.199 --> 00:06:50.804
- into a lease in their name. That's success for us. Statewide, 32% of people leave a shelter to a place

00:06:50.804 --> 00:06:56.083
- to live, which is like 32% of people leaving a soup kitchen with soup, which is a bad statistic.

00:06:56.083 --> 00:07:00.382
- In New Hope, that number is 86% of households move into a lease in their name.

00:07:00.610 --> 00:07:06.082
- So we're really proud of that and the work that we're able to do leveraging these facilities. That's

00:07:06.082 --> 00:07:11.500
- not possible without the Early Learning Center. Most of the families we serve are young themselves.

00:07:11.500 --> 00:07:17.189
- Their kids are birth to five, which means child care is very difficult to access, which affects people's

00:07:17.189 --> 00:07:18.110
- ability to work.

00:07:18.242 --> 00:07:24.558
- and attain and retain housing. So we put those two programs together to make sure that kids are always

00:07:24.558 --> 00:07:30.691
- in shelter, that families are always together, they move out into stable housing, and that they can

00:07:30.691 --> 00:07:37.007
- stay in stable housing because they have the childcare that they need to stay employed. So that's what

00:07:37.007 --> 00:07:43.140
- we're doing with the property and with these facilities. When we grew into these buildings, we also

00:07:43.140 --> 00:07:47.678
- grew our programming in some big ways. So we moved some of our storage of

00:07:47.778 --> 00:07:54.949
- things like a lawnmower and a handful of other items out into that storage shed. We also expanded a

00:07:54.949 --> 00:08:02.264
- lot of programming, like offering a summer camp and family-focused programming that we store a lot of

00:08:02.264 --> 00:08:09.865
- items for in the shed that's out there. Like we mentioned, the many regulatory overlays on the triangular

00:08:09.865 --> 00:08:16.606
- portion of the property make it so there's no other way to get shade onto the property there.

00:08:16.770 --> 00:08:24.388
- precludes a lot of uses. So the gazebo is a way to offer programming there, to offer shade, to house

00:08:24.388 --> 00:08:32.007
- lots of different things that we're doing with families, like having our preschoolers come up to our

00:08:32.007 --> 00:08:39.550
- garden, like hosting events for families who are staying in the shelter, like summer activities and

00:08:39.650 --> 00:08:45.961
- fun volunteer events where people get to come and just have an enjoyable time even though they're still

00:08:45.961 --> 00:08:52.089
- in the context of shelter. So those two buildings underpin a lot of important programming that we're

00:08:52.089 --> 00:08:58.582
- doing and there is not another way to, as you see with the colored map that we'll show at the end, there's

00:08:58.582 --> 00:09:04.710
- another place to put a shed because we've already used the space pretty economically for parking, to

00:09:04.710 --> 00:09:08.958
- accommodate the right of way like we were saying because the property

00:09:09.602 --> 00:09:16.880
- Astonishingly has three fronts and we have a lot of drainage basins and things that we did to make sure

00:09:16.880 --> 00:09:23.948
- that we were addressing all the engineering needs because it's quite a steep grade there. I did want

00:09:23.948 --> 00:09:30.946
- to point out the, forgive me. Finally just with the last few points I want to make are that the UDO

00:09:30.946 --> 00:09:38.224
- provides a three-part test to approve a variance so we just want to address those in that format. First

00:09:38.224 --> 00:09:39.134
- it says that

00:09:39.330 --> 00:09:46.330
- a variance should not interrupt the public health and safety or the morals of the community. I think

00:09:46.330 --> 00:09:53.607
- that the shed and the gazebo pretty unambiguously do not violate that first part of the test. The second

00:09:53.607 --> 00:10:00.884
- part of the test asks if the variance affects the adjacent properties in a substantially adverse manner.

00:10:00.884 --> 00:10:02.270
- No, as evidenced by

00:10:02.370 --> 00:10:07.780
- the letters of support that we've gotten from our neighborhood association and other neighbors. We have

00:10:07.780 --> 00:10:13.034
- strong community support for these structures in particular and for our presence and our programming

00:10:13.034 --> 00:10:18.444
- on that corner generally. Moreover, as we've already mentioned, the placement of the gazebo in the shed

00:10:18.444 --> 00:10:23.699
- don't have a negative effect on people around us, substantial or even ethereal. And instead, I think

00:10:23.699 --> 00:10:28.953
- they make our property more beautiful, more organized, and actually stand to improve the use and the

00:10:28.953 --> 00:10:32.126
- value of the land in our neighbors' properties there. Third,

00:10:32.514 --> 00:10:38.872
- Yes, the strict application of the step-back measurements impose practical difficulties, like we've

00:10:38.872 --> 00:10:45.294
- already mentioned. We can't get shade on the property another way. The setbacks and utility overlays

00:10:45.294 --> 00:10:51.653
- make it difficult to store equipment, items like gasoline that can't be stored indoors at any other

00:10:51.653 --> 00:10:58.138
- place on the property, and that it's related to the particular layout of the land. It's not as if the

00:10:58.138 --> 00:11:02.462
- land is a perfect square and it would work in any other normal lot.

00:11:02.562 --> 00:11:09.083
- spot so in conclusion the variance we're requesting is Supported as part of the general welfare of the

00:11:09.083 --> 00:11:15.415
- community does no harm to anyone around us relieves our practical difficulties that are peculiar to

00:11:15.415 --> 00:11:21.936
- the property and I thank you guys for your attention and your consideration of this request Thank you.

00:11:21.936 --> 00:11:28.394
- How much time does he have left? About 13 minutes 13. Okay. Thank you Thank you. We'll go back to the

00:11:28.394 --> 00:11:32.446
- board you hear any questions of the petitioner or for the staff

00:11:35.970 --> 00:11:43.960
- What about John? No, I'm good. I only have one question. You threw up that diagram, Eric, that showed

00:11:43.960 --> 00:11:51.949
- temporary structure. It was the line drawing. It said temporary structures. And I was just curious as

00:11:51.949 --> 00:12:00.095
- to aren't they really permanent structures? You're not going to take them down every winter or anything

00:12:00.095 --> 00:12:01.662
- like that, are you?

00:12:02.082 --> 00:12:08.468
- That's correct. They do not have foundations. They're on runners. So I think that in a technical sense,

00:12:08.468 --> 00:12:14.732
- they are permanent structures. And then in a much realer sense, we could move them. That doesn't make

00:12:14.732 --> 00:12:20.996
- any difference. I was just curious about why it was labeled that way, Eric. It was on one of the just

00:12:20.996 --> 00:12:27.689
- plain black and white, the one that pointed them out with the big arrows. It just said temporary structures.

00:12:27.689 --> 00:12:31.742
- Both of those maps were made by one of our. Temporary structures.

00:12:31.938 --> 00:12:37.831
- Yeah, those were made by our dedicated volunteer, Kathy Weller. She's a retired landscape architect.

00:12:37.831 --> 00:12:43.783
- And she did not label those with the UDO's meaning of temporary structure in mind. We're calling them

00:12:43.783 --> 00:12:50.084
- accessory buildings, right? Yeah, we classify them as permanent structures. There's no separate allowances,

00:12:50.084 --> 00:12:56.211
- temporary structures, other than with a temporary use, which this is not. So we treat them as permanent.

00:12:56.211 --> 00:13:00.062
- And so that's why they have to meet the setback requirements. OK.

00:13:00.962 --> 00:13:06.467
- Then the only other thing was, while we as a board really enjoy hearing about what the organizations

00:13:06.467 --> 00:13:12.080
- do, we try to focus in on the things that you're talking about towards the end, which is why these are

00:13:12.080 --> 00:13:17.749
- placed where they are and the need for that. And I just want to make sure that I completely understand.

00:13:17.749 --> 00:13:23.362
- I don't think there's any issue with the city. But for the clarity of those who actually look at these

00:13:23.362 --> 00:13:29.630
- meetings, the two positions you have, the gazebo and the storage shed, what we're hearing is that there's no other

00:13:30.082 --> 00:13:37.027
- realistic option for those to be placed anywhere else in the building. And if you put that overhead

00:13:37.027 --> 00:13:44.041
- back up, for example, you don't want to stick that shed back behind the family building, say, in the

00:13:44.041 --> 00:13:51.403
- north-west corner, because it wouldn't be accessible easily to do things with it. Correct. And the gazebo

00:13:51.403 --> 00:13:58.487
- is pretty much out on the street, so it is fairly close. Yes. But you're saying that there's no other

00:13:58.487 --> 00:13:59.390
- place that's

00:13:59.682 --> 00:14:06.397
- on the current property that would allow for that type of structure to be placed where it would be done

00:14:06.397 --> 00:14:12.983
- so with enough safe space around it and things like that for those people to use it. Is that correct?

00:14:12.983 --> 00:14:19.440
- That's correct. Okay. All right. Thank you. Um, if we have no other, if we have no other questions,

00:14:19.440 --> 00:14:26.026
- it'll go back to, um, the public for comment. Is anyone here wishing to comment on this petition? And

00:14:26.026 --> 00:14:28.286
- if not in chambers, anyone online?

00:14:29.538 --> 00:14:37.062
- There's anybody online, please use to raise hand function and we could recognize you for comment time

00:14:37.062 --> 00:14:44.586
- I'm not seeing anybody online and seeing none. Does the petitioner have anything that they would like

00:14:44.586 --> 00:14:51.963
- to say in the with their final 13 minutes I Yield. Okay with that it goes back to the board seeking

00:14:51.963 --> 00:14:53.438
- a motion, please. I

00:15:00.258 --> 00:15:10.291
- Make a motion to approve ZR twenty twenty six dash ten dash zero zero four four with the following condition

00:15:10.291 --> 00:15:19.588
- the variant the variance approves only the existing locations of the gazebo and shed as shown in the

00:15:19.588 --> 00:15:28.885
- petitioner site plan Second we have a second further discussion Seeing none I call the question bro.

00:15:28.885 --> 00:15:30.174
- Yes Fernandez

00:15:31.170 --> 00:15:38.667
- Yes, because thank you. Yes. Throck Morton. Yes. Motion passes. Thank you for your time. We'll move

00:15:38.667 --> 00:15:46.388
- on to the non expedited agenda items. We'll go to the petitions up is the are 2026 10 double 045. It's

00:15:46.388 --> 00:15:54.110
- requested to 846 East 3rd Street for a variance from building design standards, et cetera. We're going

00:15:54.110 --> 00:15:56.734
- to go to the staff report, please.

00:16:00.290 --> 00:16:11.120
- Certainly, my name is Gabriel Holbrough. I'm the zoning planner, here to present the staff report. And

00:16:11.120 --> 00:16:22.160
- here we go. Is it following along? There we go. So this is a request for a variance from building design

00:16:22.160 --> 00:16:30.046
- standards to allow reuse of an existing building for a retail sales medium

00:16:30.210 --> 00:16:37.101
- use in the mixed use corridor or MC zoning district. As you'll see, this is about building design standards,

00:16:37.101 --> 00:16:43.485
- it really comes down to one window that is existing that they wanna take out. And then as you'll see

00:16:43.485 --> 00:16:49.997
- later when we get to the proposed findings, the difference of opinion between the petitioner and staff

00:16:49.997 --> 00:16:56.887
- really boils down to one issue, that is whether there are peculiarities of the property that cause practical

00:16:56.887 --> 00:16:58.910
- difficulty. So we'll get there.

00:16:59.298 --> 00:17:07.070
- I'm just giving you a heads up, we're really talking about one window and one criterion. So this is

00:17:07.070 --> 00:17:14.919
- at the College Mall, this is highlighted, the College Mall properties. Third Street is roughly along

00:17:14.919 --> 00:17:22.924
- the top of this image, north of the College Mall. College Mall Road is to the left along the west side

00:17:22.924 --> 00:17:27.742
- of the College Mall property and then it reaches over the old

00:17:28.066 --> 00:17:35.891
- Macy's building all the way to Clariz Boulevard there on the right side of the screen on the east. But

00:17:35.891 --> 00:17:43.639
- we're zooming in to this part here. That's the building we're talking about. It's a separate building

00:17:43.639 --> 00:17:51.236
- from the rest of the mall that's right next to it on the west side of the main mall building. We'll

00:17:51.236 --> 00:17:55.262
- zoom in a little bit here. That's College Mall Road.

00:17:55.650 --> 00:18:02.303
- on the left side of the image right at the intersection with Second Street and one of the entrances

00:18:02.303 --> 00:18:09.488
- to the mall, and we're talking about this building right here. It was most recently a Red Robin restaurant.

00:18:09.488 --> 00:18:16.674
- This is an image from Google Street View showing the south facade. And if we compare that to their proposed

00:18:16.674 --> 00:18:23.460
- south facade, actually we're sort of looking at the corner, but on the right side of the image is the

00:18:23.460 --> 00:18:24.990
- proposed south facade,

00:18:25.666 --> 00:18:32.748
- where those black and white horizontal stripes are in the middle, they're proposing to remove the window,

00:18:32.748 --> 00:18:39.497
- but the details are in the staff report, but this facade actually still is compliant with our design

00:18:39.497 --> 00:18:46.178
- standards. Just barely, but it is. So that's fine. Turning to the west facade is what existing. You

00:18:46.178 --> 00:18:53.127
- can see sort of three window areas, one around the building entrance on the right, and then two others.

00:18:53.127 --> 00:18:55.198
- And then this is the proposed,

00:18:55.522 --> 00:19:03.581
- And again, in an essential area, they're planning on removing a window. Now, because of how the design

00:19:03.581 --> 00:19:11.562
- standards fit in with these existing and proposed facades, the windows are actually relevant for this

00:19:11.562 --> 00:19:19.934
- facade. So removing a window brings them further out of compliance that can only be allowed by a variance.

00:19:22.818 --> 00:19:29.663
- So to the variance criteria, this is just a summary. The full proposed findings are in the packet, but

00:19:29.663 --> 00:19:36.575
- the summary is that it will not be injurious to the public health and welfare of the community. It will

00:19:36.575 --> 00:19:43.353
- degrade the pedestrian experience, but these facades are far from public streets and in a parking lot

00:19:43.353 --> 00:19:50.398
- context, so any harm to the welfare of the community is expected to be minimal. For the second criterion,

00:19:51.426 --> 00:19:58.716
- No substantial adverse effects on adjacent properties. For one thing, the facades are relatively far

00:19:58.716 --> 00:20:06.007
- from adjacent properties. So to the third criteria, and I would ask the petitioners to correct me if

00:20:06.007 --> 00:20:13.586
- I'm wrong, but my understanding is this is the only point that staff is understanding things differently

00:20:13.586 --> 00:20:18.494
- than what they're proposing. So in summary for the third criterion,

00:20:18.690 --> 00:20:24.888
- The strict application that you do, it will result in practical difficulties. But those are difficulties

00:20:24.888 --> 00:20:31.204
- specifically for the desired operations of this proposed store. The difficulties are not caused by aspects

00:20:31.204 --> 00:20:37.521
- of the property or of the existing building. The difficulties are instead due to the nature of the desired

00:20:37.521 --> 00:20:43.660
- operations model of the store. And the difficulties would not apply to other allowed and feasible uses,

00:20:43.660 --> 00:20:45.726
- such as the previous restaurant or

00:20:46.018 --> 00:20:53.550
- a hypothetical different cosmetics retail that had different operations. So staff's recommended finding

00:20:53.550 --> 00:21:01.011
- is there are no peculiarities of the property which result in practical difficulties in the use of the

00:21:01.011 --> 00:21:08.543
- property in general. So with that, the Planning and Transportation Department recommends that the Board

00:21:08.543 --> 00:21:15.134
- of Zoning Appeals adopt the proposed findings and deny the variance. Thank you. Thank you.

00:21:17.314 --> 00:21:23.290
- Who do we have here from the petitioner who would like to speak to us? There are three. There are three

00:21:23.290 --> 00:21:29.151
- people who are associated with the petition. I'm not sure who would like to speak first. Are they all

00:21:29.151 --> 00:21:35.070
- online? Yes, all of them are online. Yes, I don't know. We do not have anyone in the room. Well, let's

00:21:35.070 --> 00:21:41.161
- to make things a little easier for us because they're unable to attend in chambers. Let's pick one person

00:21:41.161 --> 00:21:45.758
- that will hear from initially. When that person is done, the others then we can

00:21:46.274 --> 00:21:53.911
- add them in as needed. But if they could actually have one person as a spokesperson because they are

00:21:53.911 --> 00:22:01.699
- online, it makes it very difficult to have multiple people in this conversation since we don't control

00:22:01.699 --> 00:22:09.335
- the Zoom. So who might that be from the petitioner? Hello, sir. My name is Luke Chow. I'm the senior

00:22:09.335 --> 00:22:15.838
- store design manager for Sephora USA. The truth and nothing but the truth? I do, sir.

00:22:16.002 --> 00:22:22.539
- Okay, so Luke, what'll happen here is, to make things easier, is we'll have you speak for the petitioner

00:22:22.539 --> 00:22:28.951
- at this moment. However, we'll be happy to square anyone else in later. You have a total of 20 minutes

00:22:28.951 --> 00:22:35.363
- total to speak to this petition. Whatever time you don't use here initially, after the board has asked

00:22:35.363 --> 00:22:41.651
- questions, you will have the remainder of that time in order to make any further statements that you

00:22:41.651 --> 00:22:42.398
- would like.

00:22:43.330 --> 00:22:49.086
- and then it'll come back to the board for a motion. Does that make sense, Luke? I understand, sir. Okay,

00:22:49.086 --> 00:22:54.623
- very good. So when you get to the point when you feel that you have nothing more to add and you want

00:22:54.623 --> 00:23:00.105
- to add others, let me know and we'll swear them in and we'll continue, okay? Go ahead and start the

00:23:00.105 --> 00:23:05.751
- timer now. Please, we'd love to hear from you. Yeah, hi. I do want to thank Gabriel, first of all, for

00:23:05.751 --> 00:23:09.150
- helping us through this process. He's been extremely helpful.

00:23:09.250 --> 00:23:19.237
- The thing I would like to note, and I guess the differences that we are talking about is the third criteria.

00:23:19.237 --> 00:23:29.042
- Unfortunately for us, based upon the model of business that we use, we need more wall space than typically

00:23:29.042 --> 00:23:36.830
- is necessary for a typical retailer. What ends up happening is that many brands have

00:23:37.154 --> 00:23:47.113
- negotiations with our company and they are required to be on the wall or on the floor, depending on

00:23:47.113 --> 00:23:57.272
- who they are. But because of that, we have a specific amount of wall space needed. In a store in this

00:23:57.272 --> 00:24:04.542
- shape, typically we are limited because not only that, we have services.

00:24:04.674 --> 00:24:12.107
- that are wall-based as well as our cash wrap and where our point of sale ends up being. And so with

00:24:12.107 --> 00:24:19.838
- a store that is kind of square, which if you took a look at the planning on this store is a little more

00:24:19.838 --> 00:24:27.494
- square-like. Unfortunately, what ends up happening is with a storefront, you have less wall space than

00:24:27.494 --> 00:24:34.110
- a typical store that we usually go into, which is kind of a narrow storefront, but deep.

00:24:34.594 --> 00:24:43.070
- building which will usually allow us more wall space without interfering with like a storefront where

00:24:43.070 --> 00:24:51.712
- there's glazing and visibility into the store. We are asking to remove this window specifically because

00:24:51.712 --> 00:24:58.526
- there are certain adjacencies to the worlds that we are operating in that require

00:24:59.362 --> 00:25:07.577
- wall space specifically in that area. Our original plan was to remove two of the windows on that side

00:25:07.577 --> 00:25:15.631
- because we really needed them, but we made adjustments based upon how we can go. But at this point,

00:25:15.631 --> 00:25:23.766
- we are really limited in how we can operate because if we have to remove this window, we'll probably

00:25:23.766 --> 00:25:27.390
- have to put our cash wraps onto these custom

00:25:28.130 --> 00:25:35.994
- units that we put into the sales floor. And that's not a great experience for our customer, as well

00:25:35.994 --> 00:25:44.172
- as becoming kind of an LP issue. And we've experienced some, I won't say violent crime issues, but when

00:25:44.172 --> 00:25:52.115
- you have the cash register on the sales floor, it becomes an issue. So that's our concern with this.

00:25:52.115 --> 00:25:54.238
- Other than that, we really

00:25:54.594 --> 00:26:04.801
- do feel strongly that this is a less impactful situation if we can just close this one window. We have

00:26:04.801 --> 00:26:14.909
- already agreed to leave the other glazing to remaining so that we can have visibility into the stores

00:26:14.909 --> 00:26:23.134
- and we will work in any way possible to adjust our store as needed to be as little

00:26:23.234 --> 00:26:33.172
- as little impactful when it comes to the visibility of the storefront to our neighbors. Is there anyone

00:26:33.172 --> 00:26:43.015
- else with you, Luke, on your team that would like to speak at this point? I do not believe so. I think

00:26:43.015 --> 00:26:51.806
- I'm speaking for the design point of view as well as any questions that the board may have.

00:26:52.130 --> 00:26:59.112
- team members are here specifically to support me if there's an architectural or structural need. OK,

00:26:59.112 --> 00:27:06.093
- very good. So we'll withhold the rest of your time, which is about how much time they have left? 16.

00:27:06.093 --> 00:27:13.282
- So you roughly have 15, 16 minutes left. So you can use that later on if you choose. But at the moment,

00:27:13.282 --> 00:27:20.264
- we'll stop there then, Luke, if that's the end of your initial comments. Is it? It is. OK, with that

00:27:20.264 --> 00:27:21.854
- then, we can go to the

00:27:22.018 --> 00:27:34.117
- Board to see if they have any questions of the petitioner or of the staff Please petitioner so as I

00:27:34.117 --> 00:27:46.216
- understand the necessity to remove the window is an operational issue for the type of business that

00:27:46.216 --> 00:27:50.814
- will occupy this location correct and

00:27:52.162 --> 00:28:10.835
- It is. What is going to take place there? Is it shelving? It is a displace. In that space, it is merchandise

00:28:10.835 --> 00:28:22.142
- being displayed on the wall and sold. Okay. All right. Thank you.

00:28:26.018 --> 00:28:34.234
- Actually, I'm going to open this up first to the staff because they may be able to resolve this. If

00:28:34.234 --> 00:28:42.614
- you go by a place like CVS on Kirkwood, they have the windows there, but they're not looking into the

00:28:42.614 --> 00:28:51.570
- building. They have some kind of like a display there, like a permanent artwork or something that represents

00:28:51.570 --> 00:28:52.638
- their store.

00:28:53.410 --> 00:29:01.229
- Did you guys discuss having the same thing done where they left the structural windows intact and then

00:29:01.229 --> 00:29:08.897
- cover the windows from the inside in a similar manner? Did you have that discussion so that down the

00:29:08.897 --> 00:29:16.944
- road, say Sephora leaves, that building then could have the interior removed and it's back in compliance?

00:29:16.944 --> 00:29:22.334
- Again, this is Gabriel Holbrook, zoning planner. Staff discussion with

00:29:22.594 --> 00:29:32.731
- the petitioner and the petitioner's group. I believe we discussed the idea of keeping glazing glass,

00:29:32.731 --> 00:29:42.869
- but maybe other things would be behind it. There are some challenges with that, that the windows, in

00:29:42.869 --> 00:29:49.694
- order for them to be considered windows for the purposes of facade,

00:29:50.018 --> 00:29:57.945
- Design standards, there has to be actual usable space behind it where a person could be or there could

00:29:57.945 --> 00:30:05.640
- be things happening. In the case you brought up of CVS on Kirkwood, I'm actually not familiar. I've

00:30:05.640 --> 00:30:13.182
- walked by the building, but I can't picture in my head what it looks like or how it was approved.

00:30:13.410 --> 00:30:21.317
- I apologize that I can't make that comparison point here, but generally speaking, there has to be something

00:30:21.317 --> 00:30:29.004
- behind those windows. And they are actually doing something that's a little similar to that on the south

00:30:29.004 --> 00:30:36.618
- facade, which is the one that is compliant. Their initial plan took out the central window that they're

00:30:36.618 --> 00:30:43.134
- taking on and also a window on the right. But then they modified their plan to have that

00:30:43.394 --> 00:30:51.722
- I believe it already currently is sort of, it comes out almost like a bay window. And then I think there's

00:30:51.722 --> 00:30:59.505
- gonna, I have to look at the plans, but my recollection is that there's some usable space there and

00:30:59.505 --> 00:31:07.443
- then there's actually a wall behind it where they're gonna have merchandise on that wall. So they did

00:31:07.443 --> 00:31:11.646
- take an approach kind of like that on the south wall.

00:31:12.418 --> 00:31:19.362
- Well, the reason I'm bringing up is they're seeking a variance. To me, it's a lot easier to have a compromise

00:31:19.362 --> 00:31:25.737
- in the variance by keeping the building intact, structurally intact, so that we know that in a place

00:31:25.737 --> 00:31:32.176
- like a mall that there's turnover in businesses. So my concern is we give them a variance. They cover

00:31:32.176 --> 00:31:38.551
- up or take out those windows. It becomes a wall. Then the next people to come in, they would have to

00:31:38.551 --> 00:31:40.382
- then turn around and rebuild

00:31:40.546 --> 00:31:47.265
- the windows into it, correct, in order to come into compliance? Yes. So I'm just looking ahead at what's

00:31:47.265 --> 00:31:53.792
- a way to compromise so that it would still need a variance for us to go, okay, this isn't really what

00:31:53.792 --> 00:32:00.319
- classifies as a usable window, but what it does is it prevents unnecessary construction cost in terms

00:32:00.319 --> 00:32:05.822
- of ripping out a window, putting it up a wall, et cetera, and instead you cover it up

00:32:06.082 --> 00:32:11.824
- I'm just I'm just asking like what kind of options were discussed in order to try to make it

00:32:11.824 --> 00:32:18.060
- Both economically feasible to do it as well as maintaining that building in compliance down the road

00:32:18.060 --> 00:32:24.482
- should it no longer become a Sephora and something else So I think you understand why I'm asking. Yeah,

00:32:24.482 --> 00:32:30.718
- certainly and and your your General ideas is spot-on. It's and we tried to you know approach I think

00:32:30.978 --> 00:32:38.272
- My understanding was the Sephora team was also approaching it, trying to figure out what's the ways

00:32:38.272 --> 00:32:45.712
- to come closest to compliance. I'd let the petitioner speak directly to this, but my understanding is

00:32:45.712 --> 00:32:53.079
- this proposal is as close as they think they can get to compliance. Another just a minor point which

00:32:53.079 --> 00:33:00.446
- doesn't change your overall point. If this variance were approved, then any future tenant would also

00:33:00.802 --> 00:33:07.251
- enjoy the variance as well. So if the variance is approved, there's no future scenario where someone

00:33:07.251 --> 00:33:14.148
- has to put back a window. Or similarly, the Red Robin facades, the West facade, wasn't completely compliant

00:33:14.148 --> 00:33:20.724
- anyway now. And if support wanted to move in and keep all the windows, that's fine. They can continue.

00:33:20.724 --> 00:33:27.238
- The issue is just bringing them further out of compliance. We can't attach anything on it, though, to

00:33:27.238 --> 00:33:30.558
- say that the building has to return if it's vacated

00:33:30.658 --> 00:33:37.922
- by this particular petitioner. My understanding is that would be a condition that you could make. We

00:33:37.922 --> 00:33:45.258
- would have concerns about the enforcement about that. It would be a little bit challenging. Yeah. No,

00:33:45.258 --> 00:33:52.523
- I understand that. It would be on the next person. But they're moving into a building. They're going

00:33:52.523 --> 00:33:56.766
- to make a change from Red Robin. So the construction's on.

00:33:56.898 --> 00:34:04.355
- the current tenant. I was just asking on a couple of different scenarios to see what would make the

00:34:04.355 --> 00:34:12.483
- most sense. I would like to see a comparison between the south side and the west side. I know you explained,

00:34:12.483 --> 00:34:16.286
- I know it's been explained, but I want, yes. Sure.

00:34:40.994 --> 00:34:49.035
- Let's see, would it be more helpful to look at the existing or the proposed? Okay, well, let's start

00:34:49.035 --> 00:34:57.155
- with existing. So this is the south facade. Well, actually, if it's okay, I'm just gonna hop back and

00:34:57.155 --> 00:35:05.116
- forth a little bit. This is the south facade existing slash previous. I mean, the Red Robin signage

00:35:05.116 --> 00:35:08.062
- might be down already, but... And...

00:35:10.082 --> 00:35:16.796
- This is the west facade. So other than being mirror image of each other, very similar. We have sort

00:35:16.796 --> 00:35:23.576
- of three, I don't wanna use the word facade module because that's actually something specific in the

00:35:23.576 --> 00:35:30.290
- code and we're actually counting it as two facade modules, but we have sort of three sections here.

00:35:30.290 --> 00:35:37.205
- We've got the tower on the right where the entrance is. You got the middle one that has a sort of gray

00:35:37.205 --> 00:35:38.078
- stone color.

00:35:38.178 --> 00:35:45.286
- and then you got the red one farther to the left. And then if we hop back to the south facade,

00:35:45.286 --> 00:35:52.993
- similar idea, we got the entrance on the left there, we got the central one, and then we got a red one

00:35:52.993 --> 00:36:00.550
- over on the right. Of course, Sephora plans on not having to be red, but for this image, it's red on

00:36:00.550 --> 00:36:06.686
- the right. So the, what the difference really comes, so the facade standards are,

00:36:06.882 --> 00:36:15.452
- you have to have three elements. They can be canopy, windows, change in building height, and recesses

00:36:15.452 --> 00:36:24.275
- or projections. So the part of the building is farther forward, part of the building is recessed farther

00:36:24.275 --> 00:36:32.677
- back. And the crucial difference here is that on this facade, the sort of bump out of the window on

00:36:32.677 --> 00:36:35.870
- the right means that it is different,

00:36:36.706 --> 00:36:44.559
- It's projecting farther out. So we have the tower on the left projecting out, the middle part recessing

00:36:44.559 --> 00:36:52.185
- in, and the part on the right projecting out. So we've got projections. And then, of course, we have

00:36:52.185 --> 00:36:59.811
- building height change, and we have canopies. And so we don't need the windows because that would be

00:36:59.811 --> 00:37:06.078
- a fourth item. It's great that the windows are there. And then on the west facade,

00:37:06.434 --> 00:37:13.694
- Again, we have change in building height, we've got canopies, and between the tower, or sorry, the entrance

00:37:13.694 --> 00:37:20.416
- area, calling it tower, it's not really tower, the entrance area on the right, and the other parts,

00:37:20.416 --> 00:37:27.273
- the entrance area is farther forward, it's projecting forward, and the others are recessed, so that's

00:37:27.273 --> 00:37:33.726
- good, but then it's, the remaining part is longer than 40 feet, and there is a little bit of a,

00:37:33.858 --> 00:37:40.113
- recess projection between the middle one and the one on the left, but it's, I believe, half a foot,

00:37:40.113 --> 00:37:46.369
- so it's not enough to count. So it really all comes down to the difference, for the compliance, the

00:37:46.369 --> 00:37:52.749
- difference between the west facade and the south facade, is that the south facade has that projection

00:37:52.749 --> 00:37:59.192
- on the outer part of it, the one on the right, and the west facade doesn't have that projection on the

00:37:59.192 --> 00:38:00.318
- part to the left.

00:38:02.178 --> 00:38:09.992
- The one thing that's confusing to me, though, is this facade, the west facade, is the one that faces

00:38:09.992 --> 00:38:17.960
- the most people. And the south facade actually faces a blank wall on that walkway. So it would be very

00:38:17.960 --> 00:38:25.929
- easy for me to say, you can have a variance on that south wall. Just fill that one in because it's not

00:38:25.929 --> 00:38:31.422
- really degrading the pedestrian experience as much as you would think.

00:38:32.322 --> 00:38:39.096
- Why not that? Can it not be flipped due to the way the store's laid out? Or did you guys discuss that

00:38:39.096 --> 00:38:45.871
- as well? Because this is the one that's most publicly facing, the west side. And this is the one that

00:38:45.871 --> 00:38:52.711
- they're looking for the variance on, in addition to the other side. So the other side gets blocked in,

00:38:52.711 --> 00:38:59.685
- right? It gets removed. The window gets removed on the south side, correct? Correct, correct. That makes

00:38:59.685 --> 00:39:02.142
- a lot of sense. That's a no-brainer.

00:39:02.818 --> 00:39:09.352
- this one's the one that everyone sees. That's why it's a little more difficult. That's why I ask about

00:39:09.352 --> 00:39:16.012
- keeping, as you call it, the glazing, keeping it, even if we found a different way to allow that product

00:39:16.012 --> 00:39:22.356
- to be displayed on the inside, even though that also is against code. Yeah, so I mean, I think that

00:39:22.356 --> 00:39:28.953
- would be a good question for the petitioner. Yes, and I want the petitioner to address it, but I wanted

00:39:28.953 --> 00:39:31.934
- to know where the city was on this, where the,

00:39:33.314 --> 00:39:39.025
- You know, what's, he needs to know, Luke, if you haven't discussed it, he needs to know what's allowed

00:39:39.025 --> 00:39:44.570
- and what's not allowed. And the code doesn't really allow for us to do that, to maybe put up a wall

00:39:44.570 --> 00:39:50.282
- right there against the windows and put some kind of faux advertising, whatever nature scene, whatever

00:39:50.282 --> 00:39:55.827
- you want, and then have the interior have a wall. If you didn't discuss that, that's why I'm asking

00:39:55.827 --> 00:40:01.150
- you first, and then if Luke wants to. We only discussed it as far as to say that that wouldn't,

00:40:01.346 --> 00:40:08.393
- that would still not be compliant with the facade standards. With the facade, even if the, because it's

00:40:08.393 --> 00:40:15.169
- not a useful window. Right. Right, however, it goes to the idea that it still has the impression of

00:40:15.169 --> 00:40:22.013
- a useful window. Yeah, certainly, I think you could make an analysis that it's better than no window

00:40:22.013 --> 00:40:29.060
- at all, right? Right, and down the road, if there's a changeover, it's also easier if that person wants

00:40:29.060 --> 00:40:30.686
- to turn it back into a,

00:40:30.914 --> 00:40:37.163
- a usable window, they take the wall down as opposed to a full construction deal where they have to rip

00:40:37.163 --> 00:40:43.231
- out the windows or put new windows in. I'm just asking what the options are and what makes the most

00:40:43.231 --> 00:40:49.662
- sense economically, as well as what we're trying to maintain, which is a certain visual approach we want.

00:40:52.258 --> 00:40:57.596
- I think that's an option for the board to condition a variance on something like that. Unfortunately,

00:40:57.596 --> 00:41:02.829
- it's not an option for staff to approve. No, I'm not asking that. I'm just asking where that stands

00:41:02.829 --> 00:41:08.271
- so that when I go to Luke here and say, I mean, is that something that they consider? Is that something

00:41:08.271 --> 00:41:13.923
- they can do? Then at least we know, is that even feasible for them? So, but I just thank you for clarifying

00:41:13.923 --> 00:41:19.156
- what it was, Gabriel. So let's go to Luke. Luke, do you understand what we're talking about here on

00:41:19.156 --> 00:41:21.406
- the West? I do. Yeah, as Gabriel had said,

00:41:21.666 --> 00:41:28.749
- You know, we did not go far in the discussion because, you know, one of the things we did propose that

00:41:28.749 --> 00:41:35.901
- on on the glazing originally, but Gabriel did note that that wasn't going to help us in our compliance.

00:41:35.901 --> 00:41:42.846
- So we never looked at it in the sense of a compromise for the variance to make it easier. So, so, so

00:41:42.978 --> 00:41:50.277
- We did consider it. It's one of those things that, yes, I think we can do that as an option.

00:41:50.277 --> 00:41:58.126
- I think for us, and our opinion from a design point of view is that if we covered the windows with,

00:41:58.126 --> 00:42:06.210
- say, a vinyl graphic, we would want to make it serviceable. If we want to make it serviceable, it will

00:42:06.210 --> 00:42:12.254
- be first surface. That means that we probably put a graphic over the windows

00:42:12.354 --> 00:42:20.826
- on the exterior rather than interior, because we would probably, to make it work, we would have to build

00:42:20.826 --> 00:42:29.055
- a wall behind that glazing. And then it would be unserviceable if, say, we put a graphic in there and

00:42:29.055 --> 00:42:37.204
- it started to peel or bubble or do something like that. So we would probably first surface apply the

00:42:37.204 --> 00:42:42.206
- graphic. I think one of the things that we considered when we

00:42:42.786 --> 00:42:51.302
- put our design into this variance was also to, we considered if we take out the windows and just made

00:42:51.302 --> 00:42:59.818
- it a continuous wall, I think it would also look more, a little less, we were concerned that it would

00:42:59.818 --> 00:43:09.086
- look a little slap dashed into our design or something. So while we're as understandable that you guys want to

00:43:09.410 --> 00:43:17.859
- preserve this building as much as possible for the next vendor to use when it comes up. We're just concerned

00:43:17.859 --> 00:43:25.688
- that with our design, it would be a little more integrated with it so that it would be a better look

00:43:25.688 --> 00:43:33.672
- while we are in the store, in that location, if you understand what I mean. That makes sense. That was

00:43:33.672 --> 00:43:37.470
- just a question that I had. Just exploring. Yes.

00:43:38.466 --> 00:43:48.532
- Just the board knows mr. Fernandez stuff has his hand raised, okay Go ahead John Yeah, I guess I I'm

00:43:48.532 --> 00:43:58.499
- not suggesting that we do this if we haven't already observed it, but I guess my I wanted to make a

00:43:58.499 --> 00:44:03.582
- comment about the orientation of this building and

00:44:04.834 --> 00:44:12.813
- I think Joe you made the comment that most people experience the building from the West side. I would

00:44:12.813 --> 00:44:20.791
- say that's true when they're in their cars. There's an entrance to the mall on the you know just past

00:44:20.791 --> 00:44:28.770
- the the South side of this building most of the people coming into that red Robin building are coming

00:44:28.770 --> 00:44:30.334
- from the North lot.

00:44:30.722 --> 00:44:37.721
- Most of the pedestrian activity is on the south side of the building where, you know, the main entrance

00:44:37.721 --> 00:44:44.450
- to the mall is, yes, that. So, I mean, it's... So I'm just having to... I'm just trying to... No, I

00:44:44.450 --> 00:44:51.314
- understand what you're saying, John, and I agree, because that is a main entrance. I was just talking

00:44:51.314 --> 00:44:58.514
- about how that window overlooks... And my question is that with the proposed... Do you have the renderings

00:44:58.514 --> 00:45:00.062
- of the proposed store?

00:45:02.402 --> 00:45:09.597
- We do. Gabriel, do you need me to share? Yeah, let me see if I can pull them up. OK. Because I guess

00:45:09.597 --> 00:45:16.863
- my question is, is that big, is that mature tree going to still be there? That tree's not going to be

00:45:16.863 --> 00:45:23.987
- there. I have to... Were you looking at the west side or the south side? The one right there on the

00:45:23.987 --> 00:45:30.398
- right. The west side. It's the one right there on the right. That tree's going to remain.

00:45:31.618 --> 00:45:39.153
- That's my understanding. Yes, there would remain that's what's Well, their plans don't we're talking

00:45:39.153 --> 00:45:46.911
- we're talking about One window that is partially obscured by a growing tree On the side of the building

00:45:46.911 --> 00:45:54.670
- that really doesn't have the majority of the pedestrian traffic That's what we're talking about, right?

00:45:54.670 --> 00:46:00.414
- So I just you know, I want to start by saying Thank you to Luke and his team

00:46:00.802 --> 00:46:09.185
- For their willingness to make an investment like this in Bloomington. I mean some context matters.

00:46:09.185 --> 00:46:17.906
- I mean, this is the only mall in Bloomington and There's a lot vacancies in that mall so I'm glad that

00:46:17.906 --> 00:46:27.390
- your company's interested in making this kind of investment and I'll save my comments and motions for later and

00:46:30.146 --> 00:46:36.984
- Yeah, and so following on to watch John saying the reason I brought up that issue about the window the

00:46:36.984 --> 00:46:43.822
- glazing was because we're being recommended by the the staff to deny this petition Correct So I'm just

00:46:43.822 --> 00:46:50.659
- trying to establish that there aren't maybe some other avenues for us to go down before we get to that

00:46:50.659 --> 00:46:57.630
- point Because we'll have to come up with alternative findings so John what John says is true in terms of

00:46:59.266 --> 00:47:05.337
- There's a there's an awful lot of wall space on a mall anyway So and this is a newer portion of it and

00:47:05.337 --> 00:47:11.349
- it's for the most part in compliance. So it's it's a little easier to find To it's a little easier in

00:47:11.349 --> 00:47:17.302
- my opinion to grant a variance But now when we go down that road, the question is why have we looked

00:47:17.302 --> 00:47:23.609
- at other options? That was one of the reasons I discussed that but giving that there are really no options

00:47:23.609 --> 00:47:28.030
- that make a lot of sense to go through such as maintaining the glazing and

00:47:28.130 --> 00:47:36.180
- It doesn't really seem to be necessary. So if that's the case, then we could certainly grant the variance,

00:47:36.180 --> 00:47:44.080
- I think, easily. But then the question becomes, we just need to have good findings for that. Sure. Well,

00:47:44.080 --> 00:47:51.754
- I have another way of looking at this. So we're removing a window, and we have to have four elements,

00:47:51.754 --> 00:47:57.246
- you said, on that facade. Three. Three elements. So what are we missing?

00:47:58.018 --> 00:48:09.962
- They have change in building hiding canopy. So the other two possible ones are windows and recess or

00:48:09.962 --> 00:48:21.787
- projection Okay, so if they bumped out the the third The red part on that facade if that got bumped

00:48:21.787 --> 00:48:27.582
- out a little bit To the front would that do? Yes

00:48:28.354 --> 00:48:37.826
- then they could remove the window and bump that wall out a little. Right. Because then it would be analogous

00:48:37.826 --> 00:48:46.603
- to the south side. Yes. And as long as they kept the awning over the bump that window. Yes. And kept

00:48:46.603 --> 00:48:55.293
- the awning. So my question for the petitioner is, does that sound like an idea you would entertain?

00:48:55.293 --> 00:48:56.510
- That is that.

00:48:56.898 --> 00:49:10.380
- may run into other issues like setback, foundation. It may be prohibitively expensive for us to change

00:49:10.380 --> 00:49:23.469
- the envelope of the building, as well as that is actually something that I think the landlord would

00:49:23.469 --> 00:49:25.694
- probably have to

00:49:25.826 --> 00:49:35.782
- take into consideration and get, for us, it's a large change. It's not something that I think can necessarily

00:49:35.782 --> 00:49:45.647
- be, I can say yes to, especially since based upon leasing and all the negotiations that go through something

00:49:45.647 --> 00:49:55.422
- like this, I'm not certain I could say yes to something like that. But hold that image right there, though.

00:49:55.778 --> 00:50:03.990
- I mean, let's go again to what John said. I mean, we have a semi-mature tree right there that's essentially

00:50:03.990 --> 00:50:11.670
- covering up that window anyway. So losing that window, again, from that side, from the pedestrian or

00:50:11.670 --> 00:50:19.198
- from those that are driving by, from their experience, it's going to be negligible, in my opinion.

00:50:22.786 --> 00:50:29.305
- What's the difference between the west side window and the other window? Are you talking about the one

00:50:29.305 --> 00:50:35.825
- that they want to remove or are you talking about the ones next to it that has a punch out? What's the

00:50:35.825 --> 00:50:42.281
- difference with the west side window and the other one that is approved? Yeah, the difference between

00:50:42.281 --> 00:50:48.674
- the west facade and the south facade really comes down to the opposite side from the entrance. So on

00:50:48.674 --> 00:50:51.902
- the south, that's the right, has a projection out.

00:50:52.418 --> 00:51:00.704
- Correct. Okay, so I'm looking at a picture of it dead on, and the red part projecting looks exactly

00:51:00.704 --> 00:51:08.990
- the same on both. Yeah, so if you look at the, sorry, Eric. So is it only the front, is it only the

00:51:08.990 --> 00:51:17.276
- red robin front section? On the image here on the screen, you see up at the top gourmet burgers and

00:51:17.276 --> 00:51:21.502
- brews, which you'll no longer be there as Sephora.

00:51:21.666 --> 00:51:31.783
- just to stay zoomed in. And then we have the awning. And then you can see sort of silver, there's like

00:51:31.783 --> 00:51:41.802
- a silver grid, right? And on the far left of that, there's a face that's actually right angles to the

00:51:41.802 --> 00:51:51.134
- other one. So that's the projection. So the sort of grid you can see with the windows in it is

00:51:51.682 --> 00:52:00.498
- poking out. Whereas on the west facade, the window is just a window. That's really the... When you boil

00:52:00.498 --> 00:52:08.975
- it down, that's the difference. Does that make sense what you're saying? Because the one in the red

00:52:08.975 --> 00:52:16.859
- brick projects out. It's got sides on it. This is projecting. Yeah, and the other one's not.

00:52:16.859 --> 00:52:21.182
- That's the only... I'm talking about the red side.

00:52:22.178 --> 00:52:36.076
- This one here, that one's flat. And then on the other side, it's projected out. I just had a view where

00:52:36.076 --> 00:52:44.094
- it showed that the red was exactly projecting out the same.

00:52:48.322 --> 00:53:00.194
- When I look at the west side, and I see their proposed drawing, the symmetry of what they are doing

00:53:00.194 --> 00:53:11.710
- makes sense. Otherwise, it just won't make sense. Can you put their proposed drawing up, please?

00:53:17.826 --> 00:53:25.417
- do you want to clarify that for them? Yeah, I think the difference was I wasn't talking about the windows

00:53:25.417 --> 00:53:32.579
- on the red building. I was talking about the distance coming out from the wall. The projection. The

00:53:32.579 --> 00:53:40.385
- projection. Got it. Yeah, so that is the same on the two sides, right? Correct. OK. So there's no difference

00:53:40.385 --> 00:53:46.974
- in that. The only difference between the two sides is that the red has a window coming out.

00:53:48.738 --> 00:53:54.908
- Yes, yes. So how does that affect the window on the other side? Because then it meets the the one of

00:53:54.908 --> 00:54:01.078
- the design standards of having recesses and projections in this case. It's a projection on the south

00:54:01.078 --> 00:54:07.187
- side Yeah, so there's no projection that is happening other than the tower element at the southeast

00:54:07.187 --> 00:54:13.784
- corner at the southwest corner So on the south side, you've got two areas of projections that are happening

00:54:13.784 --> 00:54:17.694
- You've got the tower and then the east side of the building and

00:54:17.954 --> 00:54:25.658
- On the west side, there's only the tower element projection at the southwest corner, and then the rest

00:54:25.658 --> 00:54:33.212
- of the building faces flush. So the windows are meeting the requirement for the other third element.

00:54:33.212 --> 00:54:40.990
- They're coming closer in terms of the 50% glass. So the lack of the projection along the west side only

00:54:40.990 --> 00:54:47.198
- gives it two elements, the awning, the windows, and the change in building height,

00:54:47.362 --> 00:54:56.376
- Windows aren't meeting it they're close and this variance or this request would be bringing it further

00:54:56.376 --> 00:55:05.128
- Okay Okay, I'll save my comments John do you have anything further before we move on to the public?

00:55:05.128 --> 00:55:13.967
- No, I don't Flavia Okay, not right now let's do the public and so we'll have a couple of comments it

00:55:13.967 --> 00:55:17.118
- sounds like from the board before I

00:55:17.250 --> 00:55:24.679
- We go to a motion. So let's go ahead and go to the public Is there anyone in the public here to address

00:55:24.679 --> 00:55:32.179
- this particular petition if they would like to do so, please come to the podium and sign in Or if you're

00:55:32.179 --> 00:55:39.679
- online, please raise your hand so you can be recognized No one in chambers I'm not seeing anybody online

00:55:39.679 --> 00:55:41.822
- with the raised hand. Okay, I

00:55:42.210 --> 00:55:49.905
- With that, it goes back to the petitioner. So Luke, do you have anything for you to use the remainder

00:55:49.905 --> 00:55:56.997
- of your time, the 16 minutes, for any further presentation on your part? No, I yield my time.

00:55:56.997 --> 00:56:04.616
- In that case, it's back to the board. We'll either take a motion or further questions at this point.

00:56:04.616 --> 00:56:11.934
- Leslie, I think you said you might have a. Oh, go ahead, John. No, I was going to make a motion.

00:56:12.898 --> 00:56:24.746
- Yes, please do. Okay, let me see if I can do this. I just dropped some proposed wording for revised

00:56:24.746 --> 00:56:36.593
- frightening for criteria three. And so I would move that we adopt the staff findings for ZR 2026 10

00:56:36.593 --> 00:56:41.214
- 0 5 for criteria one and two and adopt

00:56:41.666 --> 00:56:48.684
- I propose a new findings for criteria three. I'll read those and then the motion would be to approve

00:56:48.684 --> 00:56:56.258
- the variance. My proposed findings read strict application of the terms of the unified development ordinance

00:56:56.258 --> 00:57:03.276
- will result in practical difficulties in the use of the property. Those difficulties are peculiar to

00:57:03.276 --> 00:57:10.364
- this property and the variance will relieve them. The property is peculiar because the building is an

00:57:10.364 --> 00:57:11.198
- outbuilding

00:57:11.586 --> 00:57:19.889
- of the college mall, the only closed shopping mall in Bloomington, Indiana. It sits within a wall property

00:57:19.889 --> 00:57:27.727
- of 62 acres. That stereo facade standards in the UDO section 20, 04, 70, D2D are meant to support an

00:57:27.727 --> 00:57:35.720
- active pedestrian experience with transparent glass and broken up building walls. The subject property

00:57:35.720 --> 00:57:39.678
- is far from College Mall Road and is surrounded by

00:57:39.970 --> 00:57:46.857
- mall parking and drive aisles. The department makes the same point in the proposed finding for criteria

00:57:46.857 --> 00:57:53.479
- one. The facades are far from the public street and in a parking lot context. The south side of the

00:57:53.479 --> 00:58:00.366
- building is where most pedestrians entering the mall will experience the building, and the south facade

00:58:00.366 --> 00:58:07.120
- fully complies with the standards. The variance is needed only for a small portion of the west facade

00:58:07.120 --> 00:58:09.438
- module, which faces a parking lot.

00:58:09.762 --> 00:58:16.239
- and not a public street. These particular conditions come from the property's location, layout, and

00:58:16.239 --> 00:58:22.975
- mall setting. They do not come from a petitioner's operations. Any retail user that needs interior wall

00:58:22.975 --> 00:58:29.581
- space on that side of the building would face the same conflict between street-oriented standards and

00:58:29.581 --> 00:58:36.382
- the building's actual setting. Strict application would require additional glazing and full high facade.

00:58:36.930 --> 00:58:43.821
- projections on the secondary parking lot facing wall of an existing building, which was already, luckily,

00:58:43.821 --> 00:58:50.647
- not conforming. That would impose real costs and design limits on reusing this building while delivering

00:58:50.647 --> 00:58:57.148
- none of the public benefit the standard is meant to achieve, granting the variance to release these

00:58:57.148 --> 00:59:03.454
- practical difficulties that allows productive reuse of an existing building at the college mall.

00:59:04.066 --> 00:59:12.864
- building south facade and its interest module still meet the purpose of the facade standards and public

00:59:12.864 --> 00:59:21.663
- interest and the public's interest as standard of tax is not compromised. So that's my proposed amended

00:59:21.663 --> 00:59:30.545
- finding and I would again propose that we make a motion that we approve the variance and adopt the staff

00:59:30.545 --> 00:59:34.014
- recommendations for criteria one and two

00:59:34.210 --> 00:59:42.100
- replace it with this new proposed criteria three Now here's the trick John. So on a second, I want you

00:59:42.100 --> 00:59:49.838
- to repeat exactly everything you said I'm just kidding. So we do have a motion in front of the board

00:59:49.838 --> 00:59:57.575
- I Do have a motion in front of the board. Do I have a second second? Okay with that I will before we

00:59:57.575 --> 01:00:01.022
- have further discussion. Is there any issues

01:00:01.890 --> 01:00:09.918
- from staff that we need to address in the alternative findings? Or was it sufficient? Just real quick,

01:00:09.918 --> 01:00:17.868
- Mr. Fernandez, I did just send you a chat. I don't see those findings in our chat. If you could email

01:00:17.868 --> 01:00:25.662
- those to me, that would be very helpful. So we can get them in the record when we sign off tonight?

01:00:25.662 --> 01:00:31.742
- Yes, I will do that right now, Eric. Other than that, though, legal or staff?

01:00:32.002 --> 01:00:41.182
- I can yes, please just if Would recommend a condition like like you just saw with the The new hope for

01:00:41.182 --> 01:00:50.094
- families variance something like this variance approves only the proposed building facades as shown

01:00:50.094 --> 01:00:59.274
- in the petitioners submitted plans just to clarify the scope of the John if you were Yes, okay, I will

01:00:59.274 --> 01:01:00.254
- amend your

01:01:03.106 --> 01:01:10.722
- With with the following words the variance approves only the proposed building building facades as shown

01:01:10.722 --> 01:01:18.483
- in the petition submitted plans that we've viewed today And in the record reflects that John John accepted

01:01:18.483 --> 01:01:25.882
- that amendment So we have a first and a second with the amendment any further discussion before votes

01:01:25.882 --> 01:01:32.990
- taken Okay. So again a vote of yes is to approve this variance That's been applied for by Sephora

01:01:33.282 --> 01:01:44.739
- Anything further? I call the question. And just for the record, Ms. Borrell, you were the second, correct?

01:01:44.739 --> 01:01:55.233
- Yes, I was. Thank you. And the amender. She was the second and the amender. And the amender, yes.

01:01:55.233 --> 01:02:02.942
- And Eric, when you're ready. Oh, yeah, thank you. Sorry, I missed that.

01:02:03.586 --> 01:02:12.730
- Yes. Fernandez. Yes. Cosinco. Yes. Throckmorton. Yes. The motion passes. 4-0. They left this, so I had

01:02:12.730 --> 01:02:21.875
- to use it. Sorry. Sorry, Eric. Thanks again. Thanks again, Luke. All right. Thank you. And Luke, thank

01:02:21.875 --> 01:02:30.842
- you for your patience on that, and good luck. Thank you very much, sir. You bet. It's public service

01:02:30.842 --> 01:02:33.150
- at work. Thanks, Gabriel.

01:02:34.722 --> 01:02:42.329
- Thank you, Gaber. All right, we're gonna move on to ZR 2026-10046, request at 2379 South Walnut Street

01:02:42.329 --> 01:02:49.936
- for variances for maximum parking, vehicle parking allowance as standards and for landscape bump outs,

01:02:49.936 --> 01:02:57.617
- islands, and escape standards for the use of vehicular repair major within a mixed corridor. Can I have

01:02:57.617 --> 01:02:59.390
- a staff report, please?

01:03:27.394 --> 01:03:34.817
- Can't hear you. Good evening. I'm Joe Patterson zoning a long-range planner. Are you here? No, we're

01:03:34.817 --> 01:03:42.167
- not hearing you Sorry Good evening. I am Joe Patterson zoning and long-range planner And tonight we

01:03:42.167 --> 01:03:49.738
- are looking at two variances for 2379 South Walnut Street one is for maximum vehicle parking allowance

01:03:49.738 --> 01:03:55.838
- and the other is for land variance from landscape bumpouts islands and in caps and

01:03:58.690 --> 01:04:06.448
- This location was previously a soil furniture warehouse. To the west, you have JC Bank, to the north

01:04:06.448 --> 01:04:14.205
- church, to the northwest TNT pet food supply. Southwest is Dairy Queen. And all those properties are

01:04:14.205 --> 01:04:22.270
- zoned mixed use corridor. To the east and to the south, you have Timber Ridge Town Homes, which is zoned

01:04:22.270 --> 01:04:24.190
- multifamily residential.

01:04:30.626 --> 01:04:38.946
- Currently, there is a, as I discussed, the stall furniture warehouse building. There is a gravel parking

01:04:38.946 --> 01:04:47.583
- lot on the east side of that, as well as existing vegetation along the east and south sides of the property.

01:04:47.583 --> 01:04:55.587
- Calibre Collision is proposing to renovate the facility, as well as construct two parking areas, one

01:04:55.587 --> 01:04:57.726
- in yellow and one in blue.

01:04:58.530 --> 01:05:07.172
- The detention pond is also proposed in the southeast corner, as well as additional screening vegetation

01:05:07.172 --> 01:05:15.481
- shown in green. The two parking areas will consist of 42 total spaces. There's a north parking area

01:05:15.481 --> 01:05:23.873
- in yellow and the blue parking area. For each of these, the blue parking area will also be fenced to

01:05:23.873 --> 01:05:26.366
- provide additional screening.

01:05:26.978 --> 01:05:36.058
- that will primarily be used for employees, as well as staging for vehicles receiving service. There

01:05:36.058 --> 01:05:44.684
- is one interior planting island in that north parking lot, consisting of about 350 square feet

01:05:44.684 --> 01:05:53.855
- of landscaping. Now the petitioner is proposing to have 20 service bays on site, as well as just shy

01:05:53.855 --> 01:05:56.670
- of 1,500 square feet of office

01:05:57.218 --> 01:06:05.865
- sales space and so that would normally equate to 24 parking spaces allowed by the UDO. Now the petitioner

01:06:05.865 --> 01:06:14.022
- based off of their day-to-day operations the number of employees required for those 20 service bays

01:06:14.022 --> 01:06:22.750
- and how they process the vehicles in and out of for their repairs does show that they would need a minimum

01:06:22.750 --> 01:06:26.910
- of 42 spaces which is what they are requesting and

01:06:35.778 --> 01:06:46.973
- Sorry, going back to the blue parking area, the east parking area. One major point of contention here

01:06:46.973 --> 01:06:58.278
- is that the drive aisle is 60 feet wide. The UDO requires a minimum drive access aisle of 20 feet. And

01:06:58.278 --> 01:07:02.558
- so having that large of a parking area

01:07:03.234 --> 01:07:11.977
- unnecessarily raise the amount of required landscaping. Now, with this proposed layout and the number

01:07:11.977 --> 01:07:20.549
- of required parking spaces, we do find a practical difficulty in maintaining the number of required

01:07:20.549 --> 01:07:29.464
- spaces for their day-to-day operations. By moving into our findings for each of the two variances, that

01:07:29.464 --> 01:07:33.150
- the approval would not be injurious to the

01:07:33.634 --> 01:07:40.930
- health safety morals, general welfare. For the maximum parking number, based off of their day-to-day

01:07:40.930 --> 01:07:48.226
- operations, we do not find any injury there. For the parking and landscaping and bump-outs variants,

01:07:48.226 --> 01:07:55.667
- the minor changes that could be incorporated to reduce the amount of parking area, as we outlined with

01:07:55.667 --> 01:08:01.374
- the conditions attached at the very end, we feel if those conditions were met,

01:08:02.466 --> 01:08:08.837
- then that would reduce the amount of required landscaping and would not be injurious at that point.

01:08:08.837 --> 01:08:15.655
- For criteria two, the use and value adjacent to the areas would not be affected in a substantially adverse

01:08:15.655 --> 01:08:22.281
- manner. Again, for the max parking number, we find that with the conversion of the parking lot, as well

01:08:22.281 --> 01:08:28.844
- as the installation of fencing and additional screening and buffering of vegetation, that the adjacent

01:08:28.844 --> 01:08:31.902
- properties would not be affected substantially.

01:08:33.090 --> 01:08:41.709
- for the parking landscaping and bump-outs variants. Again, since the solid wood panel fencing and planned

01:08:41.709 --> 01:08:50.246
- vegetation would screen and provide that buffer from the adjacent residential areas, and with decreasing

01:08:50.246 --> 01:08:58.539
- the amount of pavement within the parking areas and lowering that overall threshold for the landscape

01:08:58.539 --> 01:09:02.686
- requirement, again, we find that the peculiarities

01:09:03.074 --> 01:09:11.544
- of maintaining those 42 spaces while reducing the overall pavement would then meet the peculiar conditions.

01:09:11.544 --> 01:09:19.544
- For criteria three, that the application would result in practical difficulties and that the variance

01:09:19.544 --> 01:09:27.387
- would relieve those. Again, for the maximum parking number, we find that the granting would relieve

01:09:27.387 --> 01:09:32.798
- the practical difficulties based off of their day-to-day operations.

01:09:34.722 --> 01:09:43.537
- And for the parking and landscaping, again, the majority of this comes down to that 60-foot drive access

01:09:43.537 --> 01:09:51.932
- aisle as well as the slightly lengthened parking spaces that they are proposing. So that does place

01:09:51.932 --> 01:10:00.999
- a unnecessary and self-imposed requirement for the additional landscaping. And by lowering those thresholds

01:10:00.999 --> 01:10:02.174
- or installing

01:10:02.530 --> 01:10:13.168
- additional landscaping within those drive access aisles that could increase the amount or lower the

01:10:13.168 --> 01:10:23.912
- threshold to meeting the required amount of landscaping. By meeting the conditions that we attach to

01:10:23.912 --> 01:10:31.678
- this, we feel that the peculiarities would then be satisfied. Therefore,

01:10:32.002 --> 01:10:40.063
- It is our recommendation that the board adopt the proposed findings and approve both of the variances

01:10:40.063 --> 01:10:48.044
- with the following conditions. That the approval allows a maximum of 42 parking spaces. The interior

01:10:48.044 --> 01:10:56.342
- drive aisle on the East parking area shall be reduced to a maximum of 20 feet wide. Parking spaces shall

01:10:56.342 --> 01:10:59.582
- be reduced to a maximum of 16 feet long.

01:11:00.546 --> 01:11:05.949
- A staff level minor site plan site development permit reviews and approvals are required prior

01:11:05.949 --> 01:11:11.750
- to establishing and commencing business operations on site. The proposed solid panel wood fencing and

01:11:11.750 --> 01:11:17.836
- additional vegetation is to be installed to meet screening concerns and verified to meet UDO requirements.

01:11:17.836 --> 01:11:23.807
- Large canopy trees are to be installed along the entire eastern edge of the parking lot. And all parking

01:11:23.807 --> 01:11:29.438
- spaces provided above the maximum are to be constructed with primary will pavers or other approved

01:11:30.178 --> 01:11:36.240
- previous services. Thank you. We have a petitioner here that would like to speak to this petition. Is

01:11:36.240 --> 01:11:42.302
- it one person or three? If all three of you want to speak, we can just swear you all in right now and

01:11:42.302 --> 01:11:48.542
- be done with it. Go ahead and come on forward and we'll just do all of you. All right, what's your first

01:11:48.542 --> 01:11:54.544
- and last name, please? Anthony Willis. Anthony, do you affirm the testimony you're about to give us,

01:11:54.544 --> 01:11:59.774
- the whole truth and nothing but the truth? I do. Thank you. Who's next? Aaron Bertrand.

01:11:59.938 --> 01:12:05.215
- Aaron, do you also affirm that the testimony you're about to give is the whole truth and nothing but

01:12:05.215 --> 01:12:10.439
- the truth? I do. Thank you. And? Brett Flory. Brett? Yeah. Do you affirm the testimony you're about

01:12:10.439 --> 01:12:16.029
- to give is the whole truth and nothing but the truth? I do. Speaking to the mic when you say that, please,

01:12:16.029 --> 01:12:21.410
- for the record. I do. Thank you. All right. So you guys have heard the drill. You've gone through two.

01:12:21.410 --> 01:12:26.739
- So you get a total of 20 minutes. Use what you want now, addressing the concerns of the petition. And

01:12:26.739 --> 01:12:28.254
- then whatever you don't use,

01:12:28.770 --> 01:12:35.147
- Held and then after we've had some discussion then you have the remainder of that time to address as

01:12:35.147 --> 01:12:41.588
- you wish Using that time anything you've heard before any action is taken by the board. Okay, so with

01:12:41.588 --> 01:12:48.028
- that we'll go ahead and start you off and Please give us your presentation My name is Anthony Willis.

01:12:48.028 --> 01:12:50.238
- I'm an engineer with Bynum finance

01:12:50.370 --> 01:12:59.727
- and I'm here with the petitioner tonight. So Caliber Collision is an auto-body repair service shop.

01:12:59.727 --> 01:13:10.206
- Their main services they offer are minor auto-body repair, some painting, and some other automated repair uses.

01:13:10.946 --> 01:13:19.004
- So with this site, this is a limited compliance project, and as the staff mentioned, it's the old stall

01:13:19.004 --> 01:13:27.216
- furniture place. With our improvements, we're proposing improving the existing gravel pavement to asphalt

01:13:27.216 --> 01:13:35.119
- pavement, landscaping improvements, fencing in the eastern parking area that will be for the vehicles

01:13:35.119 --> 01:13:36.126
- that will be

01:13:36.258 --> 01:13:44.342
- under maintenance, employee parking, as well as some customer parking on the north side of the building.

01:13:44.342 --> 01:13:52.349
- We'll have some perimeter landscaping along the eastern portion of the parking lot with some additional

01:13:52.349 --> 01:14:00.126
- landscaping on the eastern property line. We'll also be constructing one water quality and detention

01:14:00.126 --> 01:14:05.438
- facility to treat any runoff from the parking areas in the building.

01:14:06.338 --> 01:14:16.107
- So with the two variances on the petition tonight, we would like to revise two of the conditions. We

01:14:16.107 --> 01:14:26.263
- would like to remove the condition number two. So the UDO requires a minimum drive-out width of 20 feet.

01:14:26.263 --> 01:14:35.838
- However, it's silent on a maximum width. And since this is an automotive repair, auto body repair,

01:14:36.514 --> 01:14:43.638
- There will be times where there are larger vehicles that will need maintenance or there will be,

01:14:43.638 --> 01:14:50.982
- you know, the necessity for a tow truck to enter the site and drop off a vehicle. With that 20 feet

01:14:50.982 --> 01:14:58.399
- drive aisle width and parking on both sides of that drive aisle, it's going to be very difficult for

01:14:58.399 --> 01:15:04.862
- the tow trucks in these larger vehicles to maneuver the parking area safely and without

01:15:05.026 --> 01:15:12.035
- damaging, you know, the potential of damaging other vehicles that are parked there that have had previous

01:15:12.035 --> 01:15:18.647
- work done on them. And since this is a limited compliance project, we're not expanding the existing

01:15:18.647 --> 01:15:25.524
- limits of the gravel paved area and we're not really changing the shape of it. We feel that just paving

01:15:25.524 --> 01:15:30.814
- these areas and improving it and creating the new drive aisle and parking areas

01:15:31.522 --> 01:15:42.836
- That's kind of follows the nature of the limited compliance projects. And then so condition number six,

01:15:42.836 --> 01:15:54.476
- we would like to revise that to say that the additional parking spaces over the allowed maximum is allowed

01:15:54.476 --> 01:15:59.806
- to be asphalt pavement and not permeable pavers.

01:16:00.066 --> 01:16:07.971
- With this being a limited compliance project, the goal of the UDO is to kind of reuse and revitalize

01:16:07.971 --> 01:16:16.190
- existing vacant properties in the town with minimizing improvements that are necessary to bring the site

01:16:16.674 --> 01:16:23.657
- into compliance with certain aspects of the UDO. We feel that the pavers create an additional long-term

01:16:23.657 --> 01:16:30.572
- maintenance difficulty, as well as adding some construction difficulties and construction costs to the

01:16:30.572 --> 01:16:37.622
- project. Since we're not really expanding the limits of the existing gravel area, and like I said, we're

01:16:37.622 --> 01:16:39.838
- matching the shape, we feel that

01:16:40.930 --> 01:16:49.321
- That entire area being paved with asphalt paving is consistent with a limited compliance project. With

01:16:49.321 --> 01:16:57.794
- the landscaping variance, you know, reducing the interior landscaping requirements for the parking lot,

01:16:57.794 --> 01:17:06.104
- that's really to, you know, reach that total that's necessary for this business operation. I think it

01:17:06.104 --> 01:17:10.014
- was mentioned that there was 20 bays within the

01:17:10.978 --> 01:17:18.555
- within the building, and they'll have about 20 employees on site. So all those employees and vehicles

01:17:18.555 --> 01:17:26.429
- that are being dropped off to be worked on will all be parked in that eastern parking area, and we really

01:17:26.429 --> 01:17:34.378
- need to maximize that parking to get to the 42 that's necessary for the operations. We propose significant

01:17:34.378 --> 01:17:40.766
- landscaping permits along that eastern portion of that paved area, which will provide

01:17:41.538 --> 01:17:49.727
- some, you know, shade and relief for mitigating heat from the parking lot. So we are still taking several

01:17:49.727 --> 01:17:57.530
- steps to kind of mitigate the increase in the asphalt or the replacement with the asphalt paving. So

01:17:57.530 --> 01:18:05.641
- we feel this won't really have an impact on the adjacent properties. It won't be interest to the public.

01:18:05.641 --> 01:18:11.358
- We're still, you know, taking steps to kind of upgrade the site and bring

01:18:11.874 --> 01:18:18.923
- a lot of it into compliance. And I think that's all I had tonight. If you have any questions for me,

01:18:18.923 --> 01:18:25.971
- I'm more than happy to answer. Sure. Does anyone else like to speak at this point, or do you want to

01:18:25.971 --> 01:18:33.159
- hold your time? OK, please. So I'm Brett Flory. I'm the architect. And I do most of Caliber's work all

01:18:33.159 --> 01:18:40.766
- over the country for the last 14 years. But I just wanted to add one thing. So this building was a furniture

01:18:40.766 --> 01:18:41.534
- warehouse.

01:18:41.890 --> 01:18:48.726
- And the parking lot actually slopes towards the south. And that overhead door on the south end of the

01:18:48.726 --> 01:18:55.630
- building is actually a dock high. It's a dock, basically. 48 inches above grade. And so we have a ramp

01:18:55.630 --> 01:19:02.399
- on there. You can kind of see it on the site plan. And the ramp is 48 feet long. We typically try to

01:19:02.399 --> 01:19:09.102
- just do one inch per foot. We could probably reduce it a little bit. But they actually pull records

01:19:09.102 --> 01:19:10.174
- in the building

01:19:11.298 --> 01:19:17.307
- And that's why we kind of create a loop through the entire building. And on that end of the building,

01:19:17.307 --> 01:19:23.198
- we have a 48 foot concrete ramp. So if we did try to, I mean, we couldn't reduce the drive-all very

01:19:23.198 --> 01:19:29.207
- much more than it is right now. Just if you're driving a wrecker through the building and then you're

01:19:29.207 --> 01:19:35.452
- coming down a 48 foot ramp and trying to make the turn and get out of there. So that's one of the reasons

01:19:35.452 --> 01:19:39.870
- this drive-all's so wide. That's the main reason this drive-all's so wide.

01:19:40.386 --> 01:19:48.228
- Now we do have 20 foot deep parking spaces. We could probably make those 18 foot deep and that would

01:19:48.228 --> 01:19:56.302
- save four foot overall in asphalt all the way across the back of the parking lot. That would help some,

01:19:56.302 --> 01:20:04.222
- but they really need that wide drive, that driveway back there to get access, full access back there.

01:20:04.222 --> 01:20:08.958
- Plus the fire truck is coming around there and I don't know,

01:20:09.410 --> 01:20:15.468
- Doesn't have great fire department access, but they did approve it. We sent it to them. They're okay

01:20:15.468 --> 01:20:21.766
- with it But I'm happy to answer any questions that you have you know, this is an outdoor vehicle storage

01:20:21.766 --> 01:20:27.884
- area and that's secured Public never goes back. They're just caliber employees. They move cars around

01:20:27.884 --> 01:20:34.003
- some armor wrecked some armor repaired They're just waiting for the customers and they will have some

01:20:34.003 --> 01:20:36.222
- employees parking back there, too so

01:20:39.266 --> 01:20:46.526
- It's, um, actually they typically have more parking spaces in this, but they're willing to, um, go with

01:20:46.526 --> 01:20:53.926
- a reduced number, total number of parking spaces to try to be here. And they want to be at this location.

01:20:53.926 --> 01:21:01.395
- Okay. Do you wish? Okay. How much time do they have left? Uh, 11, little over 11 minutes. Okay. So there's

01:21:01.395 --> 01:21:08.446
- 11 minutes remaining that you can use. Uh, after we've had further discussion. Thank you. Thank you.

01:21:09.762 --> 01:21:17.584
- So with that we're back to the board for any questions so the petitioner for the staff. Do you have

01:21:17.584 --> 01:21:25.641
- anything. So how would this this is for the petitioner. How would condition to read the interior drive

01:21:25.641 --> 01:21:33.776
- aisle on the East parking area shall be reduced to the maximum of. Yes. So we would like to remove that

01:21:33.776 --> 01:21:38.782
- condition remove it all together. Yes. So he mentioned that the

01:21:39.010 --> 01:21:47.829
- Parking spaces could be eight Did he say 18 feet long? Yes, so the minimum parking space length that

01:21:47.829 --> 01:21:56.560
- the city requires is 18 feet or 16 feet so we can produce it So the reason we have it set up is the

01:21:56.560 --> 01:22:05.378
- 20 by 60 by 20 that matches the limits of that existing gravel area But you want to remove condition

01:22:05.378 --> 01:22:08.958
- to all together Correct. Yeah, so we had

01:22:09.058 --> 01:22:18.862
- Remove condition to all together for that additional maneuver ability for the the tow trucks, the wreckers

01:22:18.862 --> 01:22:28.116
- and a 20 foot drive aisle. It's it would be too difficult to really maneuver a truck of that size in

01:22:28.116 --> 01:22:37.278
- that area without, you know, really risking damage to parked vehicles. What's the standard with for

01:22:41.314 --> 01:22:51.392
- What's the standard with if it's not 20? I'm sorry. What's the standard with that if it's not 20, what's

01:22:51.392 --> 01:23:01.374
- the with you would ask for? The drive aisle? We would ask for 60. Is it current 60? What is the current

01:23:01.374 --> 01:23:03.102
- with the existing

01:23:03.490 --> 01:23:08.541
- Well, what they're what they're showing is 60 feet. So we don't have, you know, a turning exhibit or

01:23:08.541 --> 01:23:13.641
- anything that's showing that, you know, as the petitioner said, they're just simply paving all of the

01:23:13.641 --> 01:23:18.742
- gravel that is there now. And so that is just wound up to an aisle that is 60 feet wide. So it wasn't

01:23:18.742 --> 01:23:23.743
- necessary, hasn't been demonstrated that there's a turning exhibit that this is the minimum that is

01:23:23.743 --> 01:23:28.793
- necessary for a tow truck to get in here and use this. You know, we don't have any information other

01:23:28.793 --> 01:23:32.894
- than their statement of they're just paving exactly everything that is there now.

01:23:33.538 --> 01:23:39.742
- Okay. As we mentioned, you know, the UD only requires a 20 foot drive while, um, for two way traffic.

01:23:39.742 --> 01:23:45.946
- Yeah. But that, that would be for regular cars, not, um, uh, semi or a big truck. Sure. So, you know,

01:23:45.946 --> 01:23:52.212
- I mean, a semi is not getting back here. Um, you know, they, they just can't even get in here and turn

01:23:52.212 --> 01:23:58.477
- around. Um, you know, if a record truck is getting in here, I mean, again, you know, show us a turning

01:23:58.477 --> 01:24:01.822
- exhibit and we're happy to, um, you know, review that.

01:24:02.018 --> 01:24:11.110
- Do you have a turning exhibit? We do not know. John, do you have any questions? Yeah, I'm sorry. Mr.

01:24:11.110 --> 01:24:20.292
- Fernandez said he had to step away for another business engagement. Any other questions yet before we

01:24:20.292 --> 01:24:30.014
- go to the public? So I did have one question, which was I completely understand what you're asking about on

01:24:30.466 --> 01:24:39.069
- But item six, I'm trying to understand. You're asking us to provide a variance where we're taking the

01:24:39.069 --> 01:24:47.925
- parking lot, the current gravel coverage that is permeable and turning it completely into an impermeable

01:24:47.925 --> 01:24:56.443
- surface without any mitigation on your part. Is that what you're asking? Yeah. So what we've done to

01:24:56.443 --> 01:24:58.046
- kind of, you know,

01:24:59.202 --> 01:25:06.774
- mitigate, you know, the I guess the increase from gravel, which is permeable to the asphalt paving is

01:25:06.774 --> 01:25:14.273
- we've incorporated a water quality and detention for this site. I don't believe there was previously

01:25:14.273 --> 01:25:21.771
- a adequate retention or water quality or detention facility on the site. So we're adding a new water

01:25:21.771 --> 01:25:27.710
- quality detention pond, which will treat the stormwater runoff and will kind of

01:25:29.282 --> 01:25:36.878
- mitigate any adverse impacts from the transition from gravel to pavement. Did you do a cost analysis

01:25:36.878 --> 01:25:44.925
- between what it would cost to do the full paving as opposed to doing partial paving with permeable pavers?

01:25:44.925 --> 01:25:52.521
- I have not, no. We are allowed as a board to consider some of the economic impact. Why would you not

01:25:52.521 --> 01:25:58.462
- do that? It's just something we haven't done. We haven't been asked to do yet.

01:25:58.754 --> 01:26:06.129
- The reason I say that is because you were saying that it would be cost prohibitive. How did you arrive

01:26:06.129 --> 01:26:13.575
- at a statement like that if you haven't done a cost analysis? In our experience, previous projects that

01:26:13.575 --> 01:26:20.734
- we specced and have priced out or completed estimates on, the pavers are more expensive than simply

01:26:20.734 --> 01:26:22.238
- paving with asphalt.

01:26:22.946 --> 01:26:31.728
- The pavers themselves as opposed to the asphalt itself or for the full cost? For the full cost of the

01:26:31.728 --> 01:26:40.769
- materials and the construction. So you have those numbers? I don't have a number off the top of my head.

01:26:40.769 --> 01:26:49.895
- That's just from our experience that any time we've prepared estimates for other developers, contractors,

01:26:49.895 --> 01:26:52.478
- the pavers are more expensive

01:26:52.578 --> 01:26:58.902
- And then the asphalt paving, you know, speaking of a relative area, I just, I don't know those numbers

01:26:58.902 --> 01:27:05.227
- off the top of my head because they're constantly changing. All right. But there were a certain number

01:27:05.227 --> 01:27:11.490
- of items that the city set exceptions and number six was one of them. And you've asked for two things

01:27:11.490 --> 01:27:17.753
- to be considered. And I think that's pretty important. And it seems to me that if it's that important

01:27:17.753 --> 01:27:19.902
- to you to ask for it and ask us to

01:27:20.066 --> 01:27:26.486
- to vary that, because that's a pretty serious variance, that you would have done due diligence on that,

01:27:26.486 --> 01:27:32.658
- and you haven't. You should bring us those numbers so that we can understand whether this is really

01:27:32.658 --> 01:27:38.646
- a particular hardship for you. So that's difficult for us as a board to just give you that. Now,

01:27:38.646 --> 01:27:44.880
- number two, though, addressing that, I can understand that, because the while of the aisle width, it

01:27:44.880 --> 01:27:47.102
- does seem inherently to make sense.

01:27:47.682 --> 01:27:53.730
- But I understand I think really what the city's saying is if it was a narrower aisle, then it wouldn't

01:27:53.730 --> 01:27:59.719
- cover the entire gravel. So that would also mitigate part of what we would lose in terms of permeable

01:27:59.719 --> 01:28:05.708
- surface area. That's a fair statement, isn't it, Eric, for me to say? Yeah, so what we were obviously

01:28:05.708 --> 01:28:11.697
- looking for in terms of reducing the aisle width was just reducing the amount of the variance that is

01:28:11.697 --> 01:28:14.750
- being requested here. You know, the presence of the

01:28:14.946 --> 01:28:21.601
- wider dry valve just exasperates the variance request, making it narrower reduces that variance request

01:28:21.601 --> 01:28:28.128
- into a little bit more. That was my understanding. But at the same time, though, I do understand. And

01:28:28.128 --> 01:28:34.527
- first of all, let's be clear about what this site is. It's off the road. It's behind the bank. It's

01:28:34.527 --> 01:28:41.950
- going to have a fence. We've had this discussion before on other automobile. We just had one a few months ago about

01:28:42.658 --> 01:28:48.557
- moving that automobile dealership. So we understand that. And we've gone through those things as far

01:28:48.557 --> 01:28:54.456
- as islands and coverage for landscaping, et cetera. But I would just say that looking at this before

01:28:54.456 --> 01:29:00.355
- we go to the public is that number two, that makes a lot of sense. I don't really have so much of an

01:29:00.355 --> 01:29:06.195
- issue. But if I'm going to do that, there's no way I'm going to agree to number six, because that's

01:29:06.195 --> 01:29:12.094
- just way too much of a request, especially without any findings on your side to present to us. Yeah.

01:29:12.418 --> 01:29:21.053
- For us, condition two is really the crucial one for the business operations. That's the crucial change

01:29:21.053 --> 01:29:29.436
- in conditions. Since John has left us, I can almost hear what John would say, which is there has to

01:29:29.436 --> 01:29:36.478
- be some compromise and understanding about what's needed for a business like yours.

01:29:36.802 --> 01:29:42.710
- Business like this and that does make a lot of sense, especially given where it's locked into the land

01:29:42.710 --> 01:29:48.446
- there And there will be landscaping etc. So that all makes sense to us but there are certain things

01:29:48.446 --> 01:29:54.354
- that we do need to mitigate and one of those is is what's gonna happen with water and That is a pretty

01:29:54.354 --> 01:30:00.262
- serious issue Okay, so I just wanted you to understand kind of where my questions are right now. Yeah,

01:30:00.262 --> 01:30:06.686
- I understand All right. Now with that do we have any other questions on the board? No, not at this moment, okay

01:30:06.818 --> 01:30:12.975
- We can go to the public then for comment. Is there anyone in chambers who would like to speak to this?

01:30:12.975 --> 01:30:19.252
- And if no one in chambers, is there anyone online if you make yourself known by raising, using the raise

01:30:19.252 --> 01:30:25.290
- hand function? Yeah, there's nobody online. Okay. So then that means it goes back to the petitioner.

01:30:25.290 --> 01:30:31.387
- Any of you may speak using the remainder of your time to anything that's come up to this point before

01:30:31.387 --> 01:30:34.974
- the board takes action. So the time is yours at this point.

01:30:39.714 --> 01:30:47.665
- I just wanted to add one thing. It sounds like the concern is how much the pervious surface we're adding,

01:30:47.665 --> 01:30:55.617
- because it is a gravel lot right now. Caliber does have shops where they do their outdoor vehicle storage

01:30:55.617 --> 01:31:03.493
- on gravel lots. But most cities want paved surfaces in the outdoor vehicle storage area. I assume that's

01:31:03.493 --> 01:31:08.894
- the way it is here. I'm not sure. Yeah. OK. We have done pavers before.

01:31:09.730 --> 01:31:19.422
- and we've done pervious asphalt, it costs more. It's like probably 40 to 50% more than just average

01:31:19.422 --> 01:31:29.502
- asphalt. And they don't, it serves a purpose, I guess, because there's less pervious surface. But there

01:31:29.502 --> 01:31:39.582
- is a, the whole backside of this property is all grass. It's all native vegetation back there. So it's,

01:31:40.514 --> 01:31:48.221
- Understand the desire, you know to have the pavers there because we're exceeding the parking requirement

01:31:48.221 --> 01:31:55.561
- But I mean one thing that might I don't know well, I guess y'all wouldn't allow that I was thinking

01:31:55.561 --> 01:32:03.048
- maybe we could just do gravel in the parking areas You know for the spaces that we would have to have

01:32:03.048 --> 01:32:06.718
- pavers But how many pavers do we have to like 20?

01:32:09.218 --> 01:32:17.138
- 18 parking spaces, we'd have to have pavers. I mean, normally, if we were going to have to do pavers,

01:32:17.138 --> 01:32:24.902
- we'd put them on the customer side so you'd be able to see them. It would actually look better. But

01:32:24.902 --> 01:32:32.744
- putting them behind the fences, it serves the purpose of having less impervious, but no one sees it.

01:32:32.744 --> 01:32:38.878
- But anyway, it would be helpful maybe if we just had to do the ones out on the

01:32:39.170 --> 01:32:49.846
- customer side. If that's something y'all would consider, but just want to throw that out there. Thanks.

01:32:49.846 --> 01:33:00.420
- How much time do they have left? Nine minutes, 45 seconds left. Yeah, I just want to kind of piggyback

01:33:00.420 --> 01:33:08.222
- on that a little bit. So the previous area kind of what we've done is like,

01:33:09.378 --> 01:33:17.299
- With the landscaping improvements along the east side and the water quality detention and, you know,

01:33:17.299 --> 01:33:25.376
- this large area east of the parking area where all the runoff will be directed, that is the mitigation

01:33:25.376 --> 01:33:33.925
- efforts for the change in the gravel to the pavement. But we understand your concerns. And like I previously

01:33:33.925 --> 01:33:38.238
- said, you know, that number two items are crucial one.

01:33:38.690 --> 01:33:45.603
- We would prefer, you know, the condition number six, um, be revised that it's just asphalt paving just

01:33:45.603 --> 01:33:52.314
- because of those, those long-term maintenance items, um, the cost and the construction difficulties

01:33:52.314 --> 01:33:59.226
- associated with pavers. Um, but yeah, so, um, just want to thank you again for, you know, hearing this

01:33:59.226 --> 01:34:06.206
- petition, um, and being here tonight. Anything further from the petitioner? Okay. With that we're back.

01:34:06.530 --> 01:34:11.794
- board. I mean, let me just jump on that since you're addressing my concern, which is looking at the

01:34:11.794 --> 01:34:17.268
- property. Um, there's grass. Uh, yeah, there is grass. There's a small piece of grass to the south side

01:34:17.268 --> 01:34:22.585
- and it runs into a parking lot, which means that any water that runs off that asphalt is going to go

01:34:22.585 --> 01:34:28.007
- into that parking lot. It's going to continue to go on. Uh, that's, that's a problem for me. The other

01:34:28.007 --> 01:34:31.902
- one is if it does go east, it goes right towards the housing development.

01:34:32.834 --> 01:34:38.375
- So it goes into their backyard, and there's a walking path there, et cetera. This is my concern. And

01:34:38.375 --> 01:34:44.354
- I understand it's not ideal in terms of not being able to use the less expensive asphalt. But unfortunately,

01:34:44.354 --> 01:34:50.169
- when you come in situations like this, when you're asking for a variance, you're asking for us to balance

01:34:50.169 --> 01:34:55.765
- what is the company's responsibility to the overall good of that area. And the overall good is to see

01:34:55.765 --> 01:35:01.854
- to it that we can mitigate these issues that we have with water runoff. And so yeah, that's a difficult thing.

01:35:01.986 --> 01:35:07.670
- And we understand that it costs money. That's why I was asking about, did you do a true cost analysis

01:35:07.670 --> 01:35:13.522
- of that so that we would have a better understanding of what you're asking us to give up for that money?

01:35:13.522 --> 01:35:19.541
- Because this is not really a great place to put a whole lot more asphalt, as you can see from the overhead.

01:35:19.541 --> 01:35:25.336
- The building next to you is the bank, and it's all asphalt. To the south, the Dairy Queen, all asphalt.

01:35:25.336 --> 01:35:27.454
- And to the east of that, all asphalt.

01:35:27.714 --> 01:35:33.823
- And that's more asphalt. The water's gotten nowhere to go. And so unfortunately with this request, this

01:35:33.823 --> 01:35:39.873
- is the one place where we can mitigate it. Those will all be handled in future when new uses are asked

01:35:39.873 --> 01:35:45.864
- for for those properties. They will all have the same requirements. So that's part of what the UDO is

01:35:45.864 --> 01:35:51.679
- about. So I did want to let you understand why we were at. I'm particularly asking for that issue.

01:35:51.679 --> 01:35:55.614
- All right. Anything else from the board? I have a question for the

01:35:56.386 --> 01:36:04.909
- for staff so. Just to clarify what one of the petitioners talk about the paper the papers being on the.

01:36:04.909 --> 01:36:13.104
- Instead of being in the back being on. On the client tell side. Is are you opposed to that is there

01:36:13.104 --> 01:36:21.380
- any issues with that. So so we don't you know we did not in our condition of approval state where on

01:36:21.380 --> 01:36:25.150
- the site where the papers we just simply said

01:36:25.282 --> 01:36:31.883
- The parking spaces that are over that maximum number have to be in papers, whether they put those all

01:36:31.883 --> 01:36:38.678
- on the customer side or they put some in the front and some of the back, that's up to them. Like I said,

01:36:38.678 --> 01:36:45.149
- this was just a recommended condition of approval. The board can certainly adjust that if they want

01:36:45.149 --> 01:36:51.621
- to require only for the eight spaces that are along the front or something in between there. So how

01:36:51.621 --> 01:36:53.886
- many spaces total would be papers?

01:36:56.098 --> 01:37:04.579
- So they are currently 18 over. So 18 spaces would be pavers. Correct. And how many spaces are on a customer

01:37:04.579 --> 01:37:12.432
- side? On that north side, including the two ADA spaces, there are nine. Nine. So they could do half

01:37:12.432 --> 01:37:20.912
- of the pavers there and then on the other side. OK. But this is in front of the board, too, for discussion.

01:37:20.912 --> 01:37:25.310
- I mean, I'm just throwing that out as that concerns me.

01:37:26.114 --> 01:37:32.770
- This doesn't mean I can't be swayed, but I'm saying that sticks out as, I think, a little too much.

01:37:32.770 --> 01:37:39.825
- But you have a little bit more experience with building than I do. Well, when I look at this, I'm looking

01:37:39.825 --> 01:37:46.746
- at the type of business. So I understand why they are asking asphalt, because it's a continuous surface

01:37:46.746 --> 01:37:52.670
- that they're going to be bringing cars in and out. And when you have favors in the back,

01:37:53.570 --> 01:38:02.378
- One paver pops up, and then you're bringing cars back, and it's not their car, it's somebody else's

01:38:02.378 --> 01:38:11.187
- car, which, viability as well. So I understand why they are saying that. My other question is about

01:38:11.187 --> 01:38:19.995
- the water mitigation. If the runoff water mitigation that is in place is sufficient to take care of

01:38:19.995 --> 01:38:22.814
- the water of this large asphalt

01:38:23.010 --> 01:38:31.813
- surface that they're proposing. So, yeah, that evaluation will be done by Seablomington Utilities. They're

01:38:31.813 --> 01:38:40.370
- currently going through that process. I know that they do have some comments back to Binomfano for some

01:38:40.370 --> 01:38:48.350
- updates that are required, and that would be reviewed during the minor site plan review process.

01:38:50.242 --> 01:38:57.232
- We could put a condition in there that CBU has to approve the water mitigation to fit this this size

01:38:57.232 --> 01:39:04.569
- of paved area. That'll be required regardless. You don't have to put a condition on that. I'm just trying

01:39:04.569 --> 01:39:11.490
- to figure out what do we do here because okay, we approve the paved area, but then we end up with a

01:39:11.490 --> 01:39:16.542
- problem down the road with CBU and that's what I'm trying to figure out.

01:39:17.250 --> 01:39:23.664
- Yeah, certainly it's hard to predict how CBU will review that or incorporate the pavers in their review,

01:39:23.664 --> 01:39:29.406
- whether they look at it as permeable or not. That's a separate thing. We can't speak to that.

01:39:29.538 --> 01:39:35.185
- You know, we're just simply approaching it from a typical perspective and the udio does have language

01:39:35.185 --> 01:39:40.887
- in situations where the director or you know at a staff level Adjustments to parking maximum are done.

01:39:40.887 --> 01:39:46.423
- It says that all of those spaces over the maximum has to be permeable So we've we've taken the same

01:39:46.423 --> 01:39:52.014
- approach in some other situations of you know recommending that all parking spaces over that maximum

01:39:52.014 --> 01:39:52.734
- be of pavers

01:39:52.834 --> 01:39:58.406
- So again, you know, we're just that is a suggested condition of approval. The board can incorporate

01:39:58.406 --> 01:40:03.811
- it. They can modify it. They can strike it What was the overdue in 18 or 20? What was it 18? So,

01:40:03.811 --> 01:40:09.551
- you know, the thing is probably that that's a good point and it goes to what the petitioner said which

01:40:09.551 --> 01:40:15.179
- is to use the public parking area That's nine. That's half. Well half is a lot better than zero Yeah

01:40:15.179 --> 01:40:20.807
- in my opinion and it also makes sense because it doesn't have the truck traveling my concern too was

01:40:20.807 --> 01:40:22.590
- wanted to have that 60 feet and

01:40:23.106 --> 01:40:28.748
- when why not 40 and you mitigate because then you don't have to be as, you don't have to cover the entire

01:40:28.748 --> 01:40:34.283
- surface. So right now it's a matter of we have this gravel and it covers this area and if we just paved

01:40:34.283 --> 01:40:39.712
- this area then that leaves us a 60 foot wide drive line, which again they don't have a turning, would

01:40:39.712 --> 01:40:45.141
- you call it a turning? Yeah, turning exhibit. Yeah, so there's no turning exhibit. So we don't really

01:40:45.141 --> 01:40:50.942
- know what they need even though it's been stated they need 60. But we don't have a document that shows that.

01:40:51.074 --> 01:40:57.193
- Regardless, that's why I'm trying to figure out what's the way to get around I completely for Having

01:40:57.193 --> 01:41:03.373
- some kind of water control. That's a great idea But whatever we can do to to do our best to see to it

01:41:03.373 --> 01:41:09.614
- that is it's not going to just flow out into these other two properties It was my concern and at least

01:41:09.614 --> 01:41:15.733
- we could do is say that we require the nine public spaces to be permeable to use the pavers Which is

01:41:15.733 --> 01:41:19.550
- goes along with your question. I mean that could be made up of

01:41:21.090 --> 01:41:28.361
- Because then after that's done, if the CBU comes in and says, well, this water handling that they want

01:41:28.361 --> 01:41:35.633
- isn't going to meet it, then they're still going to have to figure out a way to mitigate that, whether

01:41:35.633 --> 01:41:42.622
- it's narrowing up the entire width of that paved area or turning some of those spaces into pavers.

01:41:55.010 --> 01:42:02.113
- I mean, again, those are two documents we were looking to use. I mean, knowing that this is what standard

01:42:02.113 --> 01:42:08.881
- helps a lot. Yeah, please. Yeah. So we do turning radius templates all the time. So that's something

01:42:08.881 --> 01:42:15.850
- we could turn in with our SOP plan for the minor SOP plan or whatever we got to do. We can include that

01:42:15.850 --> 01:42:22.552
- with that. It's not a problem. And then I would just add, yeah. He's going to talk to you about the

01:42:22.552 --> 01:42:24.830
- drainage a little bit. Yep. Yeah.

01:42:24.930 --> 01:42:31.980
- water quality detention facility will be reviewed and approved by cbu. They will be reviewing that for

01:42:31.980 --> 01:42:38.826
- compliance to cat. They have you know for limited compliance have seen you typically treats that is

01:42:38.826 --> 01:42:45.739
- whatever the disturbed areas you have to capture that provide as much water quality as possible. And

01:42:45.739 --> 01:42:47.998
- that's what we're doing with our

01:42:48.162 --> 01:42:54.905
- Now, this may not be the final design as we're going through the CBU review process, but whatever we

01:42:54.905 --> 01:43:01.782
- do propose will be reviewed and approved by CBU. Additionally, I do not believe the ADA parking in the

01:43:01.782 --> 01:43:08.725
- public area can be pavers. That typically has to be a hard, smooth surface. So I don't think, you know,

01:43:08.725 --> 01:43:15.735
- it would be a good idea to have pavers for that ADA area. So that would leave seven spaces in the public

01:43:15.735 --> 01:43:16.670
- parking area.

01:43:22.530 --> 01:43:32.029
- the employees be parking? In the eastern Finstan parking area. Okay. Where would the employees be parking?

01:43:32.029 --> 01:43:40.994
- So would it, could we have an employee, the employee parking be pavers? Yeah, so really just the ADA

01:43:40.994 --> 01:43:50.227
- is what cannot be pavers. Yeah, I understand, because then it's uneven. They're getting out of the car.

01:43:50.227 --> 01:43:52.446
- They might fall, break a

01:43:53.154 --> 01:44:01.461
- Yes, I understand. And to that point, if you fill in the remainder of those 11 spaces on the eastern

01:44:01.461 --> 01:44:09.768
- side, starting from the north going south on the east side, that's well away from the slope that has

01:44:09.768 --> 01:44:18.239
- to be used to turn into. Just as another note, so there would be no reason, even if there were no cars

01:44:18.239 --> 01:44:19.966
- parked further south

01:44:20.258 --> 01:44:27.265
- Along the east side and he wanted to make a wider turn that heavy vehicle which would be a tow truck

01:44:27.265 --> 01:44:34.272
- would not be going across pavers Do you see that on the overhead? So that does make a lot of sense I

01:44:34.272 --> 01:44:41.764
- mean I think that for me that makes a lot of senses to just ask for that Because it does look very feasible

01:44:41.764 --> 01:44:48.771
- here. I mean, that's a hundred. That's a hundred feet wide And that's sixty that's a sixty foot turn

01:44:48.771 --> 01:44:49.950
- that seems to be

01:44:50.626 --> 01:44:59.595
- ample in it I Don't see why tow truck cannot get in there to that to that slope easily on asphalt So

01:44:59.595 --> 01:45:09.097
- that that's my only only comment I could eat you know if I were to make the motion that might be something

01:45:09.097 --> 01:45:13.182
- that I would add Is there any other questions

01:45:22.082 --> 01:45:29.263
- Before we before we go forward then I mean For me, I'm not making a motion here. But for me, I would

01:45:29.263 --> 01:45:36.373
- I think that all of the conditions Should remain intact except for two I don't really have an issue

01:45:36.373 --> 01:45:43.483
- with with dropping two doesn't do you guys have an issue with dropping number two so long as we get

01:45:43.483 --> 01:45:48.318
- the permeable which is it will be permeable pavers and item six and

01:45:54.018 --> 01:46:03.334
- What kind of findings do I need to have for number two to be dropped? Any? No, because of how the criteria

01:46:03.334 --> 01:46:12.127
- were found, it would just be that staff recommended that with the conditions, then the peculiarities

01:46:12.127 --> 01:46:21.094
- would be met. Okay. But I think the petitioner had said, you know, it has a minimum of 20, but there's

01:46:21.094 --> 01:46:23.358
- no maximum listed, right?

01:46:23.682 --> 01:46:31.813
- I was in the same line is the parking spaces shall be reduced to 16 feet long. So it's not just the

01:46:31.813 --> 01:46:40.187
- drive. So it's not going to be 100 feet wide. Yeah. Well, no, I'm saying it's not just the drive. It's

01:46:40.187 --> 01:46:48.724
- the parking space length. Okay. That makes sense. Any, any other comments? Uh, we had no public comment,

01:46:48.724 --> 01:46:51.326
- right? So we can make a motion.

01:46:51.778 --> 01:47:11.177
- You want me to make the motion? Sure, that'd be great if you would. Make the motion for ZR 2026-10-0046.

01:47:11.177 --> 01:47:20.414
- The motion is that we adopt the proposed findings

01:47:21.186 --> 01:47:28.852
- from the city of Bloomington and approve the variance of maximum parking allowance standards and the

01:47:28.852 --> 01:47:36.593
- variance from landscapes, bump outs and islands and then cap standards with the following conditions.

01:47:36.593 --> 01:47:44.259
- Number one, exclude number three, number two, three, four, five and six. Do I have a second? Second.

01:47:44.259 --> 01:47:51.166
- Motion for the board, any further discussion? Seeing none, can I call the question please?

01:47:51.746 --> 01:48:00.397
- Voted a vote of yeses to approve the petition with that minor adjustment, please bro. Yes Cosinka.

01:48:00.397 --> 01:48:09.136
- Yes Yes, the petition passes Thank you. Now, let's see. Do we have any further business in front of

01:48:09.136 --> 01:48:12.894
- this board? Seeing none we stand adjourned