WEBVTT

00:00:00.450 --> 00:00:10.074
- If we have a forum, I'd like to officially call this special session as a final quarter here on December

00:00:10.074 --> 00:00:19.331
- 15th at 4.03 p.m. Will the court please call the roll? Council Member Rosari? Hello. Daly? Just want

00:00:19.331 --> 00:00:28.497
- you to be like she has saying, John. By clarity? Here. Dean Oaksman? Here. Rallo? Good day. Roe St.

00:00:28.497 --> 00:00:30.238
- Margaret's absent.

00:00:30.786 --> 00:00:38.615
- Here. Dr. Here. And Zulik. Present. Thank you. So for the meeting today, this is a special session called

00:00:38.615 --> 00:00:46.223
- by the mayor about the Hopewell plans for Hopewell South. So we're going to start with framing remarks

00:00:46.223 --> 00:00:53.757
- from Mayor Thompson. We'll have a presentation from the consultant and planning director, Hiddle, and

00:00:53.757 --> 00:01:00.478
- then have a number of question and answer followed by Derma. So Mayor Thompson. Thank you.

00:01:00.802 --> 00:01:08.085
- President Stossford. I am really excited that we were able to pull this together. So thank you for the

00:01:08.085 --> 00:01:15.156
- special scheduling. We did invite the RDC to come as well. So just want to acknowledge that they're

00:01:15.156 --> 00:01:22.438
- present. Some of them, not all of them, because of course the RDC has been working with this property.

00:01:22.438 --> 00:01:26.398
- It's RDC owned property. And I want to just start with,

00:01:26.978 --> 00:01:34.199
- Letting you know sort of some history of Hopewell very quickly. Ali, our consultant is going to log

00:01:34.199 --> 00:01:41.564
- on and she's going to really take the bulk of the time here to present what we have. But after I sort

00:01:41.564 --> 00:01:49.001
- of tee things up, Director Hiddle is going to frame some of the planning implications here so that you

00:01:49.001 --> 00:01:53.406
- know what those are and what considerations have been given.

00:01:53.954 --> 00:02:02.768
- This is really, you know, we have submitted a PUD. What that means is that we have a really good directional

00:02:02.768 --> 00:02:10.854
- idea of where we want to go with Hopewell South. We have been through four years of master planning

00:02:10.854 --> 00:02:17.566
- as a city. We set up a task force at the beginning of the Thompson administration.

00:02:17.698 --> 00:02:25.824
- to relook at Hopewell given the change in cost in housing production and really see how we could get

00:02:25.824 --> 00:02:33.951
- Hopewell to a place where it's more attainable than what we thought it was going to be otherwise. We

00:02:33.951 --> 00:02:42.318
- have had a public session in October with sort of how we were thinking about Hopewell and where we were

00:02:42.318 --> 00:02:45.054
- going. There's room at the table.

00:02:45.538 --> 00:02:55.276
- And in addition, we have had a couple of council deliberation sessions about housing that have all impacted

00:02:55.276 --> 00:03:04.563
- this Hopewell PUD. So with that said, we have submitted the PUD. That doesn't mean that things are not

00:03:04.563 --> 00:03:08.350
- changeable. This is an opportunity today.

00:03:08.578 --> 00:03:16.167
- to ask questions, give input on blind spots that we may have, things that we haven't considered. Maybe

00:03:16.167 --> 00:03:23.682
- we totally missed the boat somewhere. That's what we want to hear from you all because we're still at

00:03:23.682 --> 00:03:31.124
- a point in the process that we can make some changes. With that said, it will seriously delay things

00:03:31.124 --> 00:03:37.534
- if we have to make such significant changes that we're going back to the drawing board

00:03:37.698 --> 00:03:46.630
- And we are really trying to mobilize Hopewell to get some housing available, even perhaps as soon as

00:03:46.630 --> 00:03:55.474
- the end of 2022. So we are, we engaged, the RDC engaged Flintlock Labs to put together this PUD. We

00:03:55.474 --> 00:04:02.814
- think that this really makes the most of the Hopewell South property. It includes,

00:04:02.946 --> 00:04:11.957
- The preservation of the old lesson center seven fourteen South Rogers while we're doing a study to see

00:04:11.957 --> 00:04:17.118
- if the police department will fit well into that facility.

00:04:17.474 --> 00:04:25.014
- And our goal really has been to seek to be an asset for attainable housing for young professionals,

00:04:25.014 --> 00:04:32.554
- first and foremost, something that's attractive to them as we are seeking to grow our wages and our

00:04:32.554 --> 00:04:40.094
- economy here in Bloomington. And that also means that it happens to be attractive to a lot of other

00:04:40.322 --> 00:04:50.135
- folks in town, people who want to be able to have an affordable place that they can walk to work, to

00:04:50.135 --> 00:04:59.948
- various other resources. And we have been hearing increasingly from seniors who want to downsize and

00:04:59.948 --> 00:05:09.470
- can't find a place that's affordable for them to purchase in the downtown setting. Again, the PUD

00:05:09.602 --> 00:05:19.725
- is in a place where we still can make some tweaks to it. I think we have really gotten to a place that

00:05:19.725 --> 00:05:28.766
- is amazing. I am thrilled with where this PUD is right now. We have gotten to a point where

00:05:28.866 --> 00:05:36.264
- A good number of these houses, and you'll see in the presentation, a good number of them are actually

00:05:36.264 --> 00:05:43.663
- affordable to the 80% and below of the area median income. And that is sort of miraculous, especially

00:05:43.663 --> 00:05:50.989
- without a bunch of government red tape that goes along with it. So they should be relatively easy to

00:05:50.989 --> 00:05:57.662
- produce. We do intend to have not only a developer workshop on how to build these, but also

00:05:57.762 --> 00:06:07.056
- some workshops for our local lenders to see what they have appetite for and how to get these loans to

00:06:07.056 --> 00:06:16.350
- be as workable as possible. So we're thrilled. I think what this does also is set a living example of

00:06:16.350 --> 00:06:20.542
- what some changes in the UDO would look like.

00:06:20.642 --> 00:06:28.854
- for Bloomington so that our community can walk through a neighborhood and see what does it look like

00:06:28.854 --> 00:06:37.147
- to have some compact lot sizes? What does it look like to have really realistic sized houses that are

00:06:37.147 --> 00:06:45.358
- not more than what somebody needs? And what that does of course is naturally keep them affordable so

00:06:45.358 --> 00:06:46.334
- that we can

00:06:46.978 --> 00:06:56.407
- offer homeownership opportunities to more and more people. So I am going to just hand it over to Director

00:06:56.407 --> 00:07:05.302
- Hiddle to talk about some of the zoning implications. Again, I think this is an incredibly exciting

00:07:05.302 --> 00:07:11.262
- point in the project and really a lot of gratitude to council both

00:07:12.226 --> 00:07:18.623
- in the past and currently and to the RDC especially who's been working really hard on getting help well

00:07:18.623 --> 00:07:24.466
- to a point where we are right now. Thank you, Mayor. I'm David Ittle, the Director of Planning

00:07:24.466 --> 00:07:30.802
- and Transportation for the City. Mr. Maybe a quick refresher on what exactly a PUD is. They don't come

00:07:30.802 --> 00:07:36.030
- down the pike very often. The last one was the Summit Planning and Development which

00:07:36.290 --> 00:07:41.815
- was approved just as I started about a year and a half ago. So, PUD, plan unit development, it's not

00:07:41.815 --> 00:07:47.286
- unique to Bloomington. Pretty much every city, every zoning district, every zoning jurisdiction has

00:07:47.286 --> 00:07:52.811
- an opportunity for a PUD. Sometimes they go by different names, but as often as not, it's just that.

00:07:52.811 --> 00:07:58.446
- And it is what you zone to, and none of the other zoning districts that exist allow for what it is you

00:07:58.446 --> 00:07:59.102
- want to do.

00:07:59.266 --> 00:08:06.247
- So we have a lot of zoning differences. We have dozens of them, R4 and MC and MNs and lots of different

00:08:06.247 --> 00:08:12.960
- combinations of letters. But none of them allow for what it is that's being proposed here, which is

00:08:12.960 --> 00:08:20.210
- a very diverse mixed set of uses, residential uses with different development standards and other different

00:08:20.210 --> 00:08:26.654
- regulations that our ordinance would ordinarily allow. So when that happens, you rezone the PUD

00:08:26.850 --> 00:08:32.851
- And you don't adhere to a given ordinance, a given set of regulations as to how you can use the property

00:08:32.851 --> 00:08:38.738
- and how you can build on it, but you write your own. And so what you write is what carries you through

00:08:38.738 --> 00:08:44.511
- the process. In this instance, as soon as I hand it off to Ali, she's going to talk about what she's

00:08:44.511 --> 00:08:48.798
- written along with the redevelopment commission, which is serving as their

00:08:48.994 --> 00:08:56.646
- petitioner here to describe development, proposed development on the property, as well as the potential

00:08:56.646 --> 00:09:04.224
- uses of the property. Hopewell, as a redevelopment site, is really the 24 acres of the former hospital

00:09:04.224 --> 00:09:11.728
- campus. It's been subject to a number of plans and studies. We are talking right now about what we're

00:09:11.728 --> 00:09:17.246
- calling Hopewell South, which is the area south of 1st Street on the Wiley

00:09:17.346 --> 00:09:42.878
- It encompasses three blocks. Could you take me to slide 32, please? Sorry to string that on you.

00:09:50.562 --> 00:09:58.081
- subject site is three blocks, one of which to eastern most of which you will call a little police station

00:09:58.081 --> 00:10:05.316
- block because it may very well be in line to become the police station. It's the brutalist structure,

00:10:05.316 --> 00:10:12.551
- architectural structure at 714 South Rogers and then west of there we have two more blocks that would

00:10:12.551 --> 00:10:19.006
- be developed residentially. Current zoning is R4 for the western two-thirds and RM for the

00:10:19.298 --> 00:10:25.782
- lot on which the police, the future potential police station stands. And then the TRL, the Transform

00:10:25.782 --> 00:10:32.652
- Redevelopment Overlay District, which was written in 2022, it was basically written for Hopewell, overlays

00:10:32.652 --> 00:10:39.458
- all of it except for the westernmost portions here. And the reasons it didn't expand to those westernmost

00:10:39.458 --> 00:10:46.006
- portions, you hear different stories from different people. One of them is potentially that there was

00:10:46.006 --> 00:10:48.446
- a desire to keep a predictable zoning

00:10:48.578 --> 00:10:55.925
- district here so that it properly and appropriately transitions to the residential neighborhood to the

00:10:55.925 --> 00:11:03.701
- south, which is in the middle of gardens. We think that what is being proposed here will do that, certainly.

00:11:03.701 --> 00:11:11.262
- So a number of plans have been put together, a number of studies in regards to Hill South over the years.

00:11:11.490 --> 00:11:18.634
- In 2018, the Urban Land Institute did one, and then in 2018, later, the comprehensive plan specifically

00:11:18.634 --> 00:11:25.778
- addressed Oakwell, but it didn't have a lot to say about it. It really said, we're calling this a focus

00:11:25.778 --> 00:11:32.853
- area, and we recommend that there be additional study done to give us a detailed idea of how this area

00:11:32.853 --> 00:11:37.662
- should develop and evolve over the years. That came together in 2021.

00:11:38.018 --> 00:11:44.419
- which is known as the Bloomington Hospital Site Redevelopment Master Plan Report. Never adopted as a

00:11:44.419 --> 00:11:50.883
- component of the comprehensive plan, but there is direct narrative link between the 2018 plan and it,

00:11:50.883 --> 00:11:57.537
- what I think makes it destructive at the very least. Just real quick, some of the themes from that plan,

00:11:57.537 --> 00:12:04.191
- which really echoed the themes that came forth from the Urban Plan Institute Plan 2018. There's a desire

00:12:04.191 --> 00:12:07.486
- for diversity of housing types, neighborhood scale,

00:12:07.586 --> 00:12:13.965
- which I think directly eschews the idea of monolithic mega projects being in this area. There's a stress

00:12:13.965 --> 00:12:20.041
- unlockability, connectivity, with an emphasis with engagement with the beeline and the public realm

00:12:20.041 --> 00:12:26.177
- generally. There's a desire to re-stitch, I think is the language used in one of the plans, which is

00:12:26.177 --> 00:12:32.374
- very appropriate, re-stitch the urban and street grid. There's a desire for aligning these abuses and

00:12:32.374 --> 00:12:34.622
- future flexibility and adaptability.

00:12:34.850 --> 00:12:43.776
- So those are sort of the themes that have been established by virtue of these studies and plans that

00:12:43.776 --> 00:12:52.702
- I think should instruct how we allow for this property to be developed going forward. I think that's

00:12:52.702 --> 00:13:00.126
- all. The line that this will travel, it's gone to the Development Review Committee.

00:13:00.322 --> 00:13:06.760
- Its next stop will be the plan commission. They think it's scheduled first with potentially two years

00:13:06.760 --> 00:13:13.513
- in front of the planning commission on January 12th. And then from there, it would go to the city council.

00:13:13.513 --> 00:13:20.140
- After that, if it's approved, the planning would take place. So the planning development ordinance would

00:13:20.140 --> 00:13:27.020
- be written and it would actually would instruct how the planning is to take place in terms of lot dimensions

00:13:27.020 --> 00:13:30.302
- and things like that. So the valley's in the house.

00:13:30.562 --> 00:13:43.174
- She has permissions. Hi guys, I'm going to steal the screen share really quickly just so I can forward

00:13:43.174 --> 00:13:53.214
- slides as we talk through. I really appreciate you guys having me in today. I'm a

00:13:53.410 --> 00:13:59.606
- I'm dual licensed, I'm an architect and a landscape architect based in Fayetteville, Arkansas. We've

00:13:59.606 --> 00:14:05.741
- been really excited to be able to work with the city on this so far and are excited to talk through

00:14:05.741 --> 00:14:11.875
- where we are and hear feedback and really hone in on exactly what we're trying to do. We're calling

00:14:11.875 --> 00:14:18.317
- this a home catalog, so housing options made easy. We are a small multidisciplinary firm, as I mentioned

00:14:18.317 --> 00:14:23.102
- here in Arkansas, and Fayetteville is a real sister city to Bloomington here.

00:14:23.330 --> 00:14:29.806
- a very similar population. We are also a major state campus. We have similar student populations, similar

00:14:29.806 --> 00:14:36.160
- student housing challenges, and we're also a karst landscape with similar topography. We really enjoyed

00:14:36.160 --> 00:14:42.270
- working through and seeing how similar a lot of the challenges with housing that we have faced are.

00:14:42.786 --> 00:14:49.024
- I'm a former planning commissioner and so get nerdy about policy after many years of having to sit through

00:14:49.024 --> 00:14:55.379
- meetings and write zoning codes. I've been really enjoying working through the PUD process as an opportunity

00:14:55.379 --> 00:15:01.442
- both to hone in on exactly what we can do for Hopewell, but also always trying to make all of this work

00:15:01.442 --> 00:15:07.797
- more expandable to the rest of the city and as an opportunity to test some theories on some of the potential

00:15:07.797 --> 00:15:12.752
- housing affordability changes that might be brought forward later into the full UDO.

00:15:12.752 --> 00:15:17.941
- this is a really easy way to test them on a smaller scale to confirm that they're working exactly the

00:15:17.941 --> 00:15:21.502
- way that we think that they will before more broadly suggesting them.

00:15:22.274 --> 00:15:28.361
- We're also working with the national nonprofit, the Incremental Development Alliance, which has trained

00:15:28.361 --> 00:15:34.272
- around 10,000 people in 33 states in the last 10 years to develop in their own neighborhoods. It's a

00:15:34.272 --> 00:15:40.183
- nonprofit that's about training locals to develop for locals, working deeply within communities, not

00:15:40.183 --> 00:15:46.212
- as an extractive developer from out of town, but as somebody small being able to build an ADU in their

00:15:46.212 --> 00:15:52.240
- own backyard, being able to take an empty lot that's near them and put something in, being able to add

00:15:52.240 --> 00:15:57.720
- what is missing to their community. And so as part of this program, we're both fully designing and entitling

00:15:57.720 --> 00:16:02.898
- all of this housing. And then we're also training locals to develop it as both a capacity building and

00:16:02.898 --> 00:16:07.422
- as a calibration to ensure that this is really aligned to what locals are wanting to see.

00:16:08.898 --> 00:16:14.903
- We're also partnered with some of our good friends who are fellow INGTIF faculty, the Cronberg Urbanist

00:16:14.903 --> 00:16:21.023
- and Architects, which are based in Atlanta, who have incredible thought leadership on housing and housing

00:16:21.023 --> 00:16:26.797
- policy and the best ways to achieve really good built outcomes. Like me, Eric, their principal is a

00:16:26.797 --> 00:16:32.917
- small developer and an architect and so really only designs things that we know will work. We feel tested

00:16:32.917 --> 00:16:38.864
- and we've signed those personal guarantees to make stuff happen. We're both really focused on building

00:16:38.864 --> 00:16:44.839
- neighborhoods, focusing on real estate development as a way to build the background for people's lives.

00:16:44.839 --> 00:16:50.583
- That we need housing and we need really vibrant places that we can live and raise families and live

00:16:50.583 --> 00:16:56.386
- good lives and that that takes working within really complicated systems that are often trying to do

00:16:56.386 --> 00:16:57.822
- multiple things at once.

00:16:58.178 --> 00:17:04.219
- That's one of the things that we really try to bring to these programs is a very systems-wide set of

00:17:04.219 --> 00:17:10.200
- experience and thinking, trying to really get to a great built outcome that is what the city really

00:17:10.200 --> 00:17:16.182
- wants to see, but working within a lot of systems and codes that conflict sometimes and really what

00:17:16.182 --> 00:17:22.402
- we're seeing nationally really limit our ability to build the thing that we all say that we want. We're

00:17:22.402 --> 00:17:28.144
- trying to build lovable, sustainable, and attainable housing at a wide variety of price points,

00:17:28.144 --> 00:17:33.696
- which also means a wide variety of sizes. We've tackled this for a number of years through the lens

00:17:33.696 --> 00:17:39.249
- of pre-approved plans programs, and we've structured this in a way that it could be rolled out into

00:17:39.249 --> 00:17:44.968
- a city-wide pre-approved program. Those may be familiar to you guys. We helped with one in South Bend,

00:17:44.968 --> 00:17:50.520
- Indiana. We've worked on the one in Kalamazoo right across the border. We're also working on one in

00:17:50.520 --> 00:17:51.742
- Fort Wayne right now.

00:17:52.418 --> 00:17:58.896
- They can be a great way to calibrate to the consistent platted lot sizes within town to build the way

00:17:58.896 --> 00:18:05.437
- a lot of our historic neighborhoods were built, which is not a custom home on every lot, but is really

00:18:05.437 --> 00:18:11.979
- consistent and repeatable house designs that are calibrated to different family sizes, different times

00:18:11.979 --> 00:18:13.630
- in life, different needs.

00:18:13.826 --> 00:18:19.102
- They become really popular nationally because they can expedite development processes. They can cut

00:18:19.102 --> 00:18:24.377
- out a lot of the cost of housing that is coming from process, but it's not really leading to better

00:18:24.377 --> 00:18:29.706
- built outcomes. They can also reduce development costs. They can create local wealth because they're

00:18:29.706 --> 00:18:35.034
- more attainable to be built by small amateurs. They also develop better built outcomes often because

00:18:35.034 --> 00:18:40.468
- the architecture is being selected at the city level as being really desirable and compatible with the

00:18:40.468 --> 00:18:43.792
- character of neighborhoods. They can have simpler zoning often

00:18:43.792 --> 00:18:49.595
- because the architecture itself is already part of the program. It also often leads to a much greater

00:18:49.595 --> 00:18:55.285
- variety of housing options. We're going to talk a lot about the importance of that as we talk about

00:18:55.285 --> 00:19:01.032
- demographics. There is often this perception that the nuclear family that we're building housing for

00:19:01.032 --> 00:19:06.721
- often we think of as being 2.5 kids and that dog. That is not a common household type anymore. That

00:19:06.721 --> 00:19:09.566
- really was what the housing market was built for.

00:19:10.274 --> 00:19:16.294
- Through the boomer generation, we saw really strong household types being the leading buyer of housing.

00:19:16.294 --> 00:19:22.256
- We saw that driving a lot of our housing policy types and the way that we financed it and the way that

00:19:22.256 --> 00:19:28.334
- we built it was a three-bedroom house with a big yard. That is no longer our market. In a lot of places,

00:19:28.334 --> 00:19:34.238
- we're still limited to that type of housing product is the only thing that our zoning type allows us.

00:19:34.338 --> 00:19:40.648
- But in a huge proportion of our communities, that nuclear families are a very small percentage of our

00:19:40.648 --> 00:19:47.205
- household types. The single most common household type here is two people living with no kids. Generally,

00:19:47.205 --> 00:19:53.639
- that's a married couple, although sometimes that's roommates. But two adults, no children is about half

00:19:53.639 --> 00:19:58.526
- of our households. Another third of our households is one person living alone.

00:19:58.690 --> 00:20:03.972
- a full three-quarters of our households are sleeping in one bed at night and don't need a three-bedroom

00:20:03.972 --> 00:20:09.153
- house. Often both people are working. They do not want to be out doing yard work in the weekends. One

00:20:09.153 --> 00:20:14.232
- of the things that we're really seeing is a big mismatch that is leading to a lot of struggles with

00:20:14.232 --> 00:20:19.412
- cost. A bigger house on a bigger yard is more expensive than a smaller house with a smaller yard. But

00:20:19.412 --> 00:20:24.491
- we also have a huge amount of our housing stock, which is three or more bedroom houses. If you want

00:20:24.491 --> 00:20:28.656
- a large house with a large yard, we've got great news. There already are a lot of

00:20:28.656 --> 00:20:34.033
- those. The thing that we're not seeing within the market, which is really high desirability and is a

00:20:34.033 --> 00:20:39.410
- really good demographic fit to a lot of household types is smaller homes on smaller lots, often in a

00:20:39.410 --> 00:20:44.841
- more creative format with more of a focus on community space, social space, and connectivity and less

00:20:44.841 --> 00:20:50.165
- of a focus on car storage. This also really helps city budgets. One of the things that we're really

00:20:50.165 --> 00:20:55.702
- struggling with across the nation is that a lot of our cities are really tapped out in terms of general

00:20:55.702 --> 00:20:57.086
- funds, being able to fund

00:20:57.250 --> 00:21:03.803
- all of the infrastructure that we layer over relatively few large homes on large lots. It's not really

00:21:03.803 --> 00:21:10.293
- possible to get enough property tax, payroll tax, all of our different taxes into the city to be able

00:21:10.293 --> 00:21:16.718
- to pay for all of this infrastructure supported by just those two homes often lived in by one or two

00:21:16.718 --> 00:21:23.335
- people. This entire little section of land, this 0.7 acres that we're seeing in this diagram might only

00:21:23.335 --> 00:21:27.216
- have three total residents. One of those houses might be one

00:21:27.216 --> 00:21:29.950
- statistically one of them is probably going to be two.

00:21:31.106 --> 00:21:36.488
- Instead, one of the things that we're trying to legalize and test here is an alternative where in a

00:21:36.488 --> 00:21:41.871
- small part of the city, right here, two city blocks, a little less, that we can get a wider variety

00:21:41.871 --> 00:21:47.630
- of housing. We can still maintain the traditional sidewalks and tree plots and what we think of as feeling

00:21:47.630 --> 00:21:53.174
- like a really traditional neighborhood, but we can get a much wider variety of housing types and price

00:21:53.174 --> 00:21:58.879
- points so that you can find the kind of house that you want at a price point you can afford in a location

00:21:58.879 --> 00:22:01.086
- that you like with a lot more neighbors.

00:22:01.474 --> 00:22:07.127
- That also really helps our city budget standpoint as we begin to have many more people paying taxes

00:22:07.127 --> 00:22:12.779
- towards the same amount of infrastructure. We're seeing cities be able to balance budgets with this

00:22:12.779 --> 00:22:18.489
- style of development and it is more affordable to the people that live there. It often builds better

00:22:18.489 --> 00:22:24.198
- community. It's much more walkable and can support much better locally owned walkable businesses. It

00:22:24.198 --> 00:22:27.646
- also houses a significantly broader contingent of residents.

00:22:27.746 --> 00:22:32.988
- And at different price points and different phases of their life. We don't need the same unit when we're

00:22:32.988 --> 00:22:37.979
- 23 that we need when we're 43 that we need when we're 73. And so part of this is about diversity of

00:22:37.979 --> 00:22:43.121
- unit type, but it's also about being able to provide options to people within a neighborhood that they

00:22:43.121 --> 00:22:43.870
- like and know.

00:22:45.506 --> 00:22:50.730
- As we look at the specific kinds of housing that we're focused on in Bloomington, we see those same

00:22:50.730 --> 00:22:56.371
- national stats really played out here that we've got about a third of households are single-family detached

00:22:56.371 --> 00:23:01.700
- homes. We have a lot of multifamily, really large multifamily projects that is something we struggled

00:23:01.700 --> 00:23:06.923
- to understand sometimes too in our community. But we have very little single-family attached and we

00:23:06.923 --> 00:23:12.252
- have very little what we would call missing middle type housing. A lot of the code changes that we're

00:23:12.252 --> 00:23:13.662
- proposing within this PUD,

00:23:13.826 --> 00:23:19.331
- are geared around legalizing a type of housing that as we dug into, kind of stress testing, okay, why

00:23:19.331 --> 00:23:24.728
- aren't we getting these kinds of projects? We found that even in some of our newer, more permissive

00:23:24.728 --> 00:23:30.125
- zoning areas, we still had some things that we needed to calibrate to be able to see these kinds of

00:23:30.125 --> 00:23:31.582
- household types legalized.

00:23:32.738 --> 00:23:38.258
- As you can see, we're down here in blocks nine and 10 in the southwest corner of the Hopewell project.

00:23:38.258 --> 00:23:44.047
- And even within these initial drawings, we can see that there's some non-typical layouts that were promoted

00:23:44.047 --> 00:23:49.406
- in the original master plan that would not be legal under the current R4 zoning. And so even within

00:23:49.406 --> 00:23:54.980
- the early master plans, I think there was an anticipation that there would be some customization within

00:23:54.980 --> 00:24:00.286
- these blocks that would require a little bit of calibration. So what we're trying to achieve here,

00:24:00.450 --> 00:24:05.954
- We'd like, as we've talked about pretty extensively, a mix of housing types with a really good mix of

00:24:05.954 --> 00:24:11.349
- price points. We'd like to get to a pre-approved home design for each one of the lots to streamline

00:24:11.349 --> 00:24:16.907
- permitting and reduce costs. We're working to be able to deliver a fully buildable set of construction

00:24:16.907 --> 00:24:22.410
- documents for each lot that our small builders and small developers can show up to the permit office,

00:24:22.410 --> 00:24:25.054
- pay their further permit, and be ready to build.

00:24:25.538 --> 00:24:30.910
- This is really about building opportunities for local builders with training and with a lot of this

00:24:30.910 --> 00:24:36.603
- pre-work. Then providing frameworks to support permanently affordable and market rate houses both blended

00:24:36.603 --> 00:24:41.975
- into the neighborhood. We'll be doing ongoing community outreach and developer trainings to support

00:24:41.975 --> 00:24:47.508
- the built outcomes being piloted and the outcomes being what we intend them to be. We're about a third

00:24:47.508 --> 00:24:53.470
- of the way through the process here towards public launch. We're working through the PUD and plotting process.

00:24:53.570 --> 00:24:59.266
- We'll be finalizing land planning, the plans catalogs, and starting to do deeper developer and lender

00:24:59.266 --> 00:25:04.961
- roundtables to confirm a lot of the early assumptions that came from interviews with locals. A little

00:25:04.961 --> 00:25:10.768
- bit deeper run-through of some of the changes here, and some examples of the kinds of places that we're

00:25:10.768 --> 00:25:16.464
- trying to get to. A lot of our historic villages have a higher density than what we allow in a lot of

00:25:16.464 --> 00:25:22.104
- our new neighborhoods, and that often requires that we do some smaller streets. Smaller streets tend

00:25:22.104 --> 00:25:22.718
- to be much

00:25:22.818 --> 00:25:27.916
- safer for pedestrian. They can be more of a shared street environment. We do still need to balance fire

00:25:27.916 --> 00:25:33.015
- code. I'll preface a smaller street need with everything that we're showing you as fully compliant with

00:25:33.015 --> 00:25:34.142
- all of our fire codes.

00:25:35.234 --> 00:25:41.615
- We're also experimenting on some non-typical frontage. We've seen quite a few situations where houses

00:25:41.615 --> 00:25:48.059
- having front doors and front porches that open out into green spaces and common spaces are really high

00:25:48.059 --> 00:25:54.502
- desirability, especially for our couple of likely young families with young kids. Having a front porch

00:25:54.502 --> 00:26:01.196
- that doesn't open out into a car space significantly improves our community engagement and our sociability

00:26:01.196 --> 00:26:05.200
- space rather than having your front door open out into traffic.

00:26:05.200 --> 00:26:09.841
- It also helps again with that budget that we've got units that have much lower infrastructure costs

00:26:09.841 --> 00:26:14.110
- for the city to maintain relative to the tax dollars that they are providing into the city.

00:26:15.426 --> 00:26:20.875
- We're also trying to reintroduce some housing types and density that we're not seeing in some places

00:26:20.875 --> 00:26:26.270
- in the city. Hopefully you're familiar with diagrams of missing middle housing. We've seen a lot of

00:26:26.270 --> 00:26:31.665
- these types of housing were very common and very popular prior to modern zoning being passed in the

00:26:31.665 --> 00:26:37.330
- 1970s. In a lot of places, a lot of these kinds of programs are really trying to reintroduce these kinds

00:26:37.330 --> 00:26:42.779
- of housing that we used as a country very successfully for a number of decades prior to zoning codes

00:26:42.779 --> 00:26:43.966
- making those illegal.

00:26:45.378 --> 00:26:51.115
- We'll give you a quick case study too of the kinds of things that we think might be attainable as changes

00:26:51.115 --> 00:26:56.527
- later on, although this is not directly proposed within our project, but just to give an example of

00:26:56.527 --> 00:27:02.102
- the kinds of studies that we've been doing about how this might impact citywide. If we look at a block

00:27:02.102 --> 00:27:05.566
- over next to Rossell Cemetery, this is between Elm and Waldron,

00:27:05.666 --> 00:27:10.680
- One of the things that Bloomington has is a really strong benefit is the large number of platted, unbuilt

00:27:10.680 --> 00:27:15.457
- alleys in the city. A lot of cities that have very deep lots, the way that you do really struggle to

00:27:15.457 --> 00:27:20.376
- get any sort of effective infill accomplished when there aren't any alleys in the back. Even when those

00:27:20.376 --> 00:27:25.390
- are unbuilt, the fact that they are platted is really useful because it means that residents could choose

00:27:25.390 --> 00:27:27.518
- to use them, could choose to build them out.

00:27:27.618 --> 00:27:33.519
- The lot depths in Bloomington are very unusual. You have very deep lots relative to most cities of your

00:27:33.519 --> 00:27:39.421
- size, which does then present this opportunity as we start to look at accessory dwelling units are very

00:27:39.421 --> 00:27:45.379
- popular nationally. One of the challenges with this accessory dwelling units is that you're then selling

00:27:45.379 --> 00:27:51.053
- packages of two houses. The overall attainability of those homes is very low. It's very hard to buy

00:27:51.053 --> 00:27:54.174
- two houses for the price of one, you're instead buying

00:27:54.274 --> 00:28:01.139
- two houses for the price of two. That really increases the price to play. It can really impact our housing

00:28:01.139 --> 00:28:07.683
- affordability only being able to have accessory dwelling units that are on those specific lots. Being

00:28:07.683 --> 00:28:14.162
- able to plat rear lots using alleys as frontages can create an opportunity for citizens to decide to

00:28:14.162 --> 00:28:18.910
- build units in the back of their lots in yard that they may not be using.

00:28:19.458 --> 00:28:25.131
- In this case, you actually can yield what most cities would say is an average lot size in the front

00:28:25.131 --> 00:28:30.861
- without losing any existing units, without losing the existing character of our historic streets, we

00:28:30.861 --> 00:28:36.534
- can get an opportunity for infill in the back. This is one of the things that we're testing through

00:28:36.534 --> 00:28:42.434
- some of the policy changes that we're showing is being able to use some alleys as frontages. As we look

00:28:42.434 --> 00:28:45.214
- at site plan and PUD, what we're proposing here,

00:28:45.346 --> 00:28:51.022
- Again, we've got three blocks, although blocks eight and nine are legally currently one block. We are

00:28:51.022 --> 00:28:56.754
- constrained with Jackson as a right-of-way in the middle of block eight and nine, has an already built

00:28:56.754 --> 00:29:02.708
- apron that needs to be aligned. You'll see that alignment is relatively fixed. Jackson does not go through

00:29:02.708 --> 00:29:08.551
- to the south, and so it does currently have a jog in it that allows a little bit more space for housing.

00:29:08.551 --> 00:29:14.227
- Wiley Street along our south edge is an existing 36-foot right-of-way. Rogers is a 41 and some change

00:29:14.227 --> 00:29:15.006
- right-of-way.

00:29:15.106 --> 00:29:21.254
- First Street is our widest right-of-way, so that one's 66 feet. Fairview is a relatively narrow 16-foot

00:29:21.254 --> 00:29:27.224
- right-of-way here. The pink hatch that you're seeing is the proposed right-of-way dedications. We're

00:29:27.224 --> 00:29:33.372
- proposing that Wiley Street and First would stay as is in terms of width, and that Fairview would widen

00:29:33.372 --> 00:29:39.284
- to a more typical right-of-way, and Jackson would widen to a little narrower than a typical street.

00:29:39.284 --> 00:29:44.190
- We're showing Rogers would dedicate up to functionally the existing building edge,

00:29:44.354 --> 00:29:50.923
- but that we are trying to preserve that building. I'll also preface that a PUD is really land use-based,

00:29:50.923 --> 00:29:57.367
- so it's functionally custom zoning for the lot. The site design is going to be coordinated, especially

00:29:57.367 --> 00:30:03.811
- on Block 8 as studies for the reuse that building are followed. We are showing those diagrammatically,

00:30:03.811 --> 00:30:08.190
- but there are some caveats on exact specifics, especially on Block 8.

00:30:08.994 --> 00:30:15.718
- One of the things that we really ran through at the beginning is what we could do under current R4 zoning

00:30:15.718 --> 00:30:22.061
- by right. Because we've got such deep lots along our Block 10 over here on the west, we end up with

00:30:22.061 --> 00:30:28.595
- relatively few blocks that are all larger than our minimum lot size. We're stuck with that minimum lot

00:30:28.595 --> 00:30:35.002
- width and the minimum lot size because we can't do anything without a rear frontage by right. We end

00:30:35.002 --> 00:30:38.110
- up with only a handful of lots over on Block 10.

00:30:38.850 --> 00:30:45.865
- On Block 9 then, with our R4 by right zoning, we end up with a little bit of a no man's land in the

00:30:45.865 --> 00:30:52.880
- back, which we were proposing to be a detention pond, but by right currently, we've got 28 lots can

00:30:52.880 --> 00:31:00.176
- be created under the existing R4 zoning. We've also provided a finished lot value. This is both taxable

00:31:00.176 --> 00:31:06.910
- to the city as an important value of the use of your land. We often describe cities like farms.

00:31:07.010 --> 00:31:12.333
- You have a limited number of fields and we have to be able to both responsibly work within them. We

00:31:12.333 --> 00:31:17.762
- have to be able to farm those in a way that we can afford to keep the farm. We also have to really be

00:31:17.762 --> 00:31:23.084
- respective of soil health. We can't be extractive on this. We want to have a long-term view as good

00:31:23.084 --> 00:31:28.566
- farmers. But we want to think about ways that we're using land in a way that both provides housing for

00:31:28.566 --> 00:31:34.155
- residents and supports an economically sustainable city. As you'd notice that finished lot value, that's

00:31:34.155 --> 00:31:36.976
- important to note from a taxation benefit as well as

00:31:36.976 --> 00:31:43.068
- value of the land itself. You see our average home price is pushed up above kind of $400,000. And so

00:31:43.068 --> 00:31:49.100
- this is in line with what we're seeing in terms of the average sale prices in Bloomington. And that

00:31:49.100 --> 00:31:55.253
- makes sense, right? We've got an overall land value and infrastructure costs that can only be divided

00:31:55.253 --> 00:32:01.285
- into so many pieces. And so those pieces are more expensive than what we'll see as we move forward.

00:32:01.285 --> 00:32:02.974
- So in our initial proposal,

00:32:03.106 --> 00:32:11.535
- We also assumed then we analyzed what happens if we take a full 60-foot right-of-way on all of our frontages,

00:32:11.535 --> 00:32:19.197
- if that extra right-of-way is taken out of farmable land, so to speak, and it's moved from an asset

00:32:19.197 --> 00:32:26.936
- into a liability for the city as land to maintain, that is infrastructure that the city maintains at

00:32:26.936 --> 00:32:32.606
- cost. We've got 84 homes. A really great impact to the city if we can get

00:32:32.834 --> 00:32:40.364
- all of these code changes passed in this version, but still about a doubling in value over what we can

00:32:40.364 --> 00:32:47.968
- do in a standard R4. But then in our final version, we've got almost 100 units. We've done some smaller

00:32:47.968 --> 00:32:51.550
- writes of way, we just picked our units back up.

00:32:51.714 --> 00:32:57.577
- We also have fronted houses into green spaces. We've got a trail frontage in an old alley that provides

00:32:57.577 --> 00:33:03.271
- us a second door frontage. Then we've got what really is functioning a green street. Pedestrian only

00:33:03.271 --> 00:33:08.908
- with community space in the middle, we've got bike storage, we've got a community pavilion. What we

00:33:08.908 --> 00:33:15.166
- might see typically in a neighborhood as a street is instead both green infrastructure space and social space.

00:33:16.610 --> 00:33:23.843
- We have picked up a few small multifamily buildings, which again, in terms of reintroducing typologies,

00:33:23.843 --> 00:33:31.006
- these are not big, you know, five-story, 200 apartments. These are relatively small buildings that are

00:33:31.106 --> 00:33:37.157
- Here in our mid-block, and then we've got another little one that is facing the police department that's

00:33:37.157 --> 00:33:43.092
- providing a little bit of screening to those parking lot lights, and then one that is helping mitigate

00:33:43.092 --> 00:33:49.143
- some large grade on the existing site. We've got four small buildings that are really still half-scaled,

00:33:49.143 --> 00:33:54.964
- and then we've got everything from really small micro units that are affordable below 50 percent AMI

00:33:54.964 --> 00:34:01.072
- for a homebuyer, which the mortgage payment on is significantly less than even a subsidized apartment is.

00:34:01.072 --> 00:34:06.207
- got some one bedroom, one level and two bedroom, one level fully accessible units. And then we've got

00:34:06.207 --> 00:34:11.744
- everything up to some of our bigger corner lots are maintained for more of a family three bedroom, relatively

00:34:11.744 --> 00:34:16.829
- nice house. So we have not very many of those, but they help hold the corners and mitigate from some

00:34:16.829 --> 00:34:22.366
- of the scale of existing neighborhoods into some of the smaller units that we keep more interior to the site.

00:34:23.938 --> 00:34:29.391
- From an accessibility standpoint, topography of the site is one of our biggest challenges here because

00:34:29.391 --> 00:34:34.738
- we need a really level site in order to be able to get parking space and kind of accessible route to

00:34:34.738 --> 00:34:40.139
- the front door and a zero step entry into a house. And so the limitation, you can see some clustering

00:34:40.139 --> 00:34:45.804
- here. We're up on a little bit of a ridge line where we've got some units that we can get fully wheelchair

00:34:45.804 --> 00:34:51.469
- accessible is shown in the blue, which is a higher standard than is required within that universal design.

00:34:51.469 --> 00:34:53.904
- So universal design is going to be zero step.

00:34:53.904 --> 00:35:00.979
- wider doorways. It is going to be adaptable to be wheelchair accessible. Full ADA is going to have full

00:35:00.979 --> 00:35:08.326
- commercial turnarounds, the full letter of the law on wheelchair accessibility built in from the beginning.

00:35:08.326 --> 00:35:15.401
- So our light blue, our full ADA units, the dark blue, our bedroom downstairs, zero step entry, a little

00:35:15.401 --> 00:35:16.830
- bit more accessible.

00:35:18.466 --> 00:35:25.109
- We've also overlaid both a pedestrian network here in the green, which again is our continuous front

00:35:25.109 --> 00:35:31.686
- door facing to the interior of our site. We've got traditional pedestrian infrastructure, sidewalks

00:35:31.686 --> 00:35:38.460
- along the streets, and then the blue is our vehicular traffic. We've got some low volume speed traffic

00:35:38.460 --> 00:35:39.710
- through our lanes.

00:35:39.842 --> 00:35:46.864
- which have parking off of them for driveways. We also then have more traditional kind of higher volume

00:35:46.864 --> 00:35:49.182
- streets surrounding these blocks.

00:35:51.170 --> 00:35:56.846
- In terms of creating lots, we currently have six lots on site. And so as we begin kind of a first phase

00:35:56.846 --> 00:36:02.359
- of one of the proposals is that we'll create four lots in the northwest corner here where we already

00:36:02.359 --> 00:36:08.199
- have infrastructure. Those can be done via lot line adjustments. Those will be built to our four standards

00:36:08.199 --> 00:36:13.820
- so that we can go ahead and get a first phase running. Lot five then will be the rest of this. Lot six

00:36:13.820 --> 00:36:15.294
- is these two large blocks.

00:36:15.458 --> 00:36:22.206
- And then we'll plot the following lot lines to create all of the smaller lots within the neighborhood.

00:36:22.206 --> 00:36:28.561
- So that will allow us to start with five initial houses while the plot process is still working.

00:36:28.561 --> 00:36:33.278
- Conceptually, the site is really roughly running kind of from the south

00:36:33.442 --> 00:36:39.048
- west to the northeast. We'll be handling water quality through green infrastructure within the neighborhood

00:36:39.048 --> 00:36:44.343
- through the hatched areas. We'll have a common storm park with the Block 10 user, which is likely the

00:36:44.343 --> 00:36:49.533
- police department, and there will likely be some underground storage underneath the surface parking

00:36:49.533 --> 00:36:54.776
- lot. That's an existing surface parking lot that is remaining more or less in the same location, but

00:36:54.776 --> 00:36:58.046
- we'll have green infrastructure and screening added around it.

00:36:59.778 --> 00:37:05.708
- Trash is remaining within Jackson Street and Fairview Street. While fire access does work through the

00:37:05.708 --> 00:37:11.755
- lanes, the fire trucks have a little smaller turning radius than the trash trucks do. We've worked with

00:37:11.755 --> 00:37:17.859
- both of those departments to ensure that trash pickup and fire access, police response, and all of those

00:37:17.859 --> 00:37:20.766
- features work fine with the proposed circulation.

00:37:22.306 --> 00:37:28.499
- For custom street sections, we're proposing that First Street would remain as is. It has currently been

00:37:28.499 --> 00:37:31.358
- improved. We are discussing an option dependent

00:37:31.458 --> 00:37:37.062
- potentially add some parking in some of those blocks on street. Generally, first street is proposed

00:37:37.062 --> 00:37:42.779
- to remain as is. Roger Street is proposed to be a slightly modified section to be able to work around

00:37:42.779 --> 00:37:48.383
- the narrow existing right-of-way and the narrow right-of-way around the existing building. We do an

00:37:48.383 --> 00:37:54.268
- eight-foot multi-use path so that we have pedestrian and bike on both sides of the street with on-street

00:37:54.268 --> 00:37:56.734
- parking both sides and typical drive lanes.

00:37:58.722 --> 00:38:05.648
- Jackson Street is proposed to have on-street parking and sidewalks and street trees. Fairview Street

00:38:05.648 --> 00:38:12.711
- is a very similar right-of-way. Those are slightly narrower than our typical at a 48-foot right-of-way

00:38:12.711 --> 00:38:19.980
- with one lane of on-street parking. Then Wiley Street is proposed to remain as is. It's a historic street

00:38:19.980 --> 00:38:22.174
- section that fits the character

00:38:22.338 --> 00:38:27.865
- and quality of the neighborhood itself. We're proposing leaving that as is. That also lets us improve

00:38:27.865 --> 00:38:33.338
- our tree preservation. There's some really nice trees at the back of the sidewalk along our southern

00:38:33.338 --> 00:38:38.919
- block. We've proposed holding houses back from those so we can maintain that tree line along Wiley and

00:38:38.919 --> 00:38:44.446
- reduce the change for residents south of Wiley of what they see as they look out their front porches.

00:38:44.546 --> 00:38:50.127
- And then our lanes really are functionally rear alleys. We've introduced a new street type so that we

00:38:50.127 --> 00:38:55.653
- can call those street frontage, but that's really intended to be a relatively typical alley section.

00:38:55.653 --> 00:39:01.233
- This is your back door, your garbage is back there, and the condensers are back there. You're pulling

00:39:01.233 --> 00:39:05.118
- into your driveway, but your front door is facing onto a green street.

00:39:06.850 --> 00:39:13.686
- The unit types and unit mixes, we can kind of run through the catalog if that's helpful later, but we're

00:39:13.686 --> 00:39:20.327
- showing some kind of examples of our smallest unit type, which is called the Aster, up to some of our

00:39:20.327 --> 00:39:27.228
- largest unit types at the corners. And there is a wide variety of kind of size and shape will feel really

00:39:27.228 --> 00:39:33.999
- familiar architectural language with these. And again, these will be provided to the builders with full

00:39:33.999 --> 00:39:34.910
- construction.

00:39:35.106 --> 00:39:40.835
- documents for these units and almost all of these units are things that we have built before and we

00:39:40.835 --> 00:39:46.736
- know work and are really marketable and desirable. So we're here for questions. I know we'll have some

00:39:46.736 --> 00:39:52.466
- and then I've also got contact information for all of us if you've got questions that come up after

00:39:52.466 --> 00:39:53.726
- today's conversation.

00:39:56.034 --> 00:40:03.611
- Great. Thank you so much for the record. That was Allison Quinlan from Flintlock Labs. So now we're

00:40:03.611 --> 00:40:11.189
- down to the council member question and answer period. Is it also permissible council president for

00:40:11.189 --> 00:40:18.766
- RDC members to ask questions? Let's start with council members. RDC has been meeting 17 minutes. So

00:40:18.766 --> 00:40:25.662
- some of the other proposals, not the one you're bringing through, but some of the A and B,

00:40:25.858 --> 00:40:32.296
- you had price points indicated, but you don't have any for that, the math for the proposed PUD. So what

00:40:32.296 --> 00:40:38.796
- are you envisioning the price points of the housing to be? Let me pull that exhibit up and we will share

00:40:38.796 --> 00:40:45.235
- that. And I apologize, we'd had an option three that we're on option five now, the option three I think

00:40:45.235 --> 00:40:49.630
- included our price points. In general too, let me fix our screen view.

00:40:57.602 --> 00:41:04.265
- We, in general, at R4, our average home price is around $400,000. With being able to make all the code

00:41:04.265 --> 00:41:10.863
- changes, but having a 60-foot right of way on all of our streets, we were about $350,000. Our current

00:41:10.863 --> 00:41:17.396
- price point here is $270,000. So we've been able to bring our overall price point down through these

00:41:17.396 --> 00:41:21.342
- code changes by about 40%. Alec, can you get the range, too?

00:41:21.794 --> 00:41:28.902
- Yes, so they range from our smallest unit, our Aster, which is our little studio, is $83,000. So that

00:41:28.902 --> 00:41:35.941
- is affordable without subsidy at market rate to 35% AMI. And then our most expensive house, so we've

00:41:35.941 --> 00:41:42.980
- got two of them on the corners, our big family houses are $650,000. So those are affordable to right

00:41:42.980 --> 00:41:46.046
- under 200% AMI. And so you'll see our Aster

00:41:46.178 --> 00:41:54.482
- we're able to stay low because we have a lot of the smaller, more affordable units and only a handful

00:41:54.482 --> 00:42:02.623
- of the more expensive units. Is that for purchase, those prices? These are purchase prices and I'll

00:42:02.623 --> 00:42:09.950
- clarify too, we're not saying this house will go for sale. This is early analysis to say,

00:42:10.082 --> 00:42:16.290
- using comps of current homes that are being sold in Bloomington and getting an average price for square

00:42:16.290 --> 00:42:22.259
- foot and then applying those to the homes of this size. This is what these would sell for at market

00:42:22.259 --> 00:42:28.766
- rates with no subsidy, you know, with none of the there will be affordability protections. We're proposing a

00:42:28.866 --> 00:42:35.843
- Forgivable down payment assistance for qualified homebuyers. There will be additional affordability

00:42:35.843 --> 00:42:43.168
- layered onto this, but this is just an early analysis of what housing currently sells for in Bloomington

00:42:43.168 --> 00:42:50.842
- in the current market. This is what these houses would sell for today. That's what the city giving developers

00:42:50.842 --> 00:42:53.982
- land or not? Well, it's not a good question.

00:42:56.418 --> 00:43:02.359
- The land is not intended to be provided for free. There's discussions about four qualified home buyers

00:43:02.359 --> 00:43:08.704
- for the affordable units. That the value of the land may end up being two buyers, the down payment assistance

00:43:08.704 --> 00:43:14.530
- that is forgivable over a number of years. But the land is not intended to be provided. Within these

00:43:14.530 --> 00:43:20.471
- numbers, this is just an, if everything was market rate with no subsidy, this is what the price points

00:43:20.471 --> 00:43:25.086
- would be naturally. Thank you. Thank you. Other questions from council members?

00:43:26.370 --> 00:43:34.369
- I see Council Member Rallo's hand up. Go ahead, please. Yes, thank you. Can you hear me? Yes. I had

00:43:34.369 --> 00:43:42.528
- also a question about home price and for your Plan A and B. Could you send us some material about the

00:43:42.528 --> 00:43:50.767
- average home price in Bloomington? Because I'm coming up with the number of around low to mid 300, and

00:43:50.767 --> 00:43:55.166
- you were mentioning something higher. But in any case,

00:43:56.130 --> 00:44:07.668
- Yeah, I was concerned about the range, but you're saying that there are only a couple of homes that

00:44:07.668 --> 00:44:20.245
- are 676,000 or whatever approximate. Could you provide a list of the number of homes that would be available

00:44:20.245 --> 00:44:26.014
- that would be say under 200,000 or say 200,000 or

00:44:26.274 --> 00:44:34.625
- close to that. In other words, I'd like the number, how many homes would we expect that would be truly

00:44:34.625 --> 00:44:43.057
- affordable? Yes. We'll send this detailed spreadsheet out, but we can give more detail about which home

00:44:43.057 --> 00:44:51.976
- plan has which number of units. One of the things that we typically do when we're doing an overall assessment

00:44:51.976 --> 00:44:56.030
- is eliminate a lot of the kinds of homes from our

00:44:56.354 --> 00:45:02.202
- comparables research that we couldn't produce now. For instance, if we've got a house that's very affordable

00:45:02.202 --> 00:45:06.334
- because it's in very bad shape, we're going to want to pull that out of this

00:45:06.626 --> 00:45:11.995
- kind of comparables group because that's not something that is really going to be used as a comparable

00:45:11.995 --> 00:45:17.468
- when we're selling it. And so we did end up with a lot of the new construction and kind of what is legal

00:45:17.468 --> 00:45:22.681
- now with seeing an overall higher comparable because our overall average is getting brought down by

00:45:22.681 --> 00:45:28.050
- people who are buying homes that are then tearing them down and they're functionally paying lot value.

00:45:28.050 --> 00:45:33.366
- But yes, I can send some more data on that. So you can send that data, you can send the whatever, the

00:45:33.366 --> 00:45:34.878
- home design, square footage,

00:45:35.618 --> 00:45:44.596
- the likely price, et cetera, and to know exactly what would be proposed here. Yes. Okay. Actually, that

00:45:44.596 --> 00:45:53.401
- was part of my planning commission lunch packet actually, so I am sending that right now via email to

00:45:53.401 --> 00:46:02.206
- everybody. You just give me a second to attach it. Then we've got that spreadsheet pulled up to share

00:46:02.370 --> 00:46:10.810
- So that you guys can see this and we can zoom in because I know that these on screen and in person these

00:46:10.810 --> 00:46:15.070
- numbers may be very small. Yeah, I didn't know that.

00:46:18.178 --> 00:46:24.448
- One of the things to discuss too, just as a caveat, when we start talking about affordability in housing,

00:46:24.448 --> 00:46:30.480
- I always want to give a couple of level setting for everybody. That everything is going to be tied to

00:46:30.480 --> 00:46:36.632
- AMI, so area median income. Area median income for a one person household is different than area median

00:46:36.632 --> 00:46:42.014
- income for a two person household. We've got a chart that is a typical census data that is

00:46:42.114 --> 00:46:49.974
- provided and available of what the area median income is for a one-person household, for a two-person,

00:46:49.974 --> 00:46:57.758
- for a three-person household. Each one of these is tied. We've got an AMI level over on the second to

00:46:57.758 --> 00:47:00.734
- last column, which is the household is

00:47:00.994 --> 00:47:08.017
- Affordable, which means that federal standards define that affordable housing is no more than 30 percent

00:47:08.017 --> 00:47:15.308
- of your total gross income going to housing. That is not just your mortgage payment, that is your utilities,

00:47:15.308 --> 00:47:22.130
- that is your home insurance, that is all of your houses related to your housing or your costs related

00:47:22.130 --> 00:47:28.819
- to your housing. We have in a really the dumb simple math version of this is our area median income

00:47:28.819 --> 00:47:29.822
- divided by 12,

00:47:29.954 --> 00:47:36.938
- And then 30% of that, we need to make sure all of these housing related costs aren't more than that

00:47:36.938 --> 00:47:44.061
- number. And so if it's affordable to 100% AMI, that means that a person making the area median income

00:47:44.061 --> 00:47:49.438
- of your town is not spending more than 30% of their gross income on housing.

00:47:49.602 --> 00:47:55.311
- In order to be affordable, that is the standard by which they're measuring it. But there is a little

00:47:55.311 --> 00:48:01.245
- bit of striation here because we've got one-bedroom units and studio units, we've got two-bedroom units,

00:48:01.245 --> 00:48:07.067
- we've got three-bedroom units. We're assuming that a two-bedroom unit is a two-person household. We're

00:48:07.067 --> 00:48:12.945
- assuming that a three-person household. We're assuming that one-bedroom and studio unit is a one-person

00:48:12.945 --> 00:48:16.958
- household. There's a little bit of variety built into the spreadsheet.

00:48:17.058 --> 00:48:25.586
- those are all tied to the current incomes of residents in the last measured year. And so we've got in

00:48:25.586 --> 00:48:34.197
- terms of units that are affordable at under 100% AMI, that is 70 of our units out of 98. So that means

00:48:34.197 --> 00:48:42.893
- 71% of units that are proposed within Hopewell South are gonna be affordable under federal definitions.

00:48:42.893 --> 00:48:45.150
- Thank you. Are there other

00:48:45.890 --> 00:48:54.028
- Thank you. What does the city envision doing with the land? I guess, is it all going to be like individual

00:48:54.028 --> 00:49:02.014
- lots sold to individuals at market rates? Is that what's envisioned? Or we don't know. We haven't gotten

00:49:02.014 --> 00:49:09.772
- there yet. Okay. I noticed, so yeah, look at the details maybe that we don't have yet. I'm looking at

00:49:09.772 --> 00:49:12.510
- the chart on the screen and it says

00:49:13.442 --> 00:49:20.396
- looks like there's a six-unit and 12-unit building, but otherwise all one-unit buildings. Looking at

00:49:20.396 --> 00:49:27.625
- some of the comparisons, for instance, using R4 zoning, it said 28 ohms, but of course, R4 zoning allows

00:49:27.625 --> 00:49:34.166
- multi-family, allows five-plexes, tri-plexes, so four-plexes, for instance, would be 112 ohms,

00:49:34.166 --> 00:49:40.638
- which would, of course, have different value, but also have different price points for units.

00:49:40.866 --> 00:49:46.999
- Can you tell me a little bit more about the range of scenarios that we're exploring, I guess, with the

00:49:46.999 --> 00:49:53.250
- existing zoning codes, including what it's zoned for right now, as well as any of the other zoning zones

00:49:53.250 --> 00:49:59.443
- that we have available to us in the recently updated UDF? Yes, and let me come back to those site plans

00:49:59.443 --> 00:50:05.635
- so that we can look at that together. So one of the things that we're finding and are finding typically

00:50:05.635 --> 00:50:07.838
- is being challenging with, you know,

00:50:08.226 --> 00:50:14.523
- Three to three and four units buildings, especially this is true. Duplexes tend to be pretty easy to

00:50:14.523 --> 00:50:21.194
- build because they can still be built under international residential code. We don't need fire sprinklers.

00:50:21.194 --> 00:50:27.677
- We can typically then park them in the back if it's a duplex. One of the challenges with a 35-foot wide

00:50:27.677 --> 00:50:32.478
- lot to be built with a fourplex is that it's not really possible to park it.

00:50:32.706 --> 00:50:38.232
- you've only got 35 feet of width in the back that you can pull into and so that's typically only like

00:50:38.232 --> 00:50:43.812
- three parking spaces and so unless we have really good on-street parking that we can count towards our

00:50:43.812 --> 00:50:49.664
- parking minimums, which is not currently something that we can do by right, we can build legally a fourplex

00:50:49.664 --> 00:50:51.614
- but we can't make it pencil because

00:50:51.746 --> 00:50:57.769
- we've got to get fire sprinklers and it's a one lot with a four plex in there, but then we also can't

00:50:57.769 --> 00:51:03.675
- get the parking to work. Duplexes then become really appealing typically. Duplexes are ADUs, but we

00:51:03.675 --> 00:51:09.757
- again get into that same affordability problem. If we've got 28 different lots that each have a duplex

00:51:09.757 --> 00:51:13.182
- on them, the only way to sell those at an affordable rate

00:51:13.282 --> 00:51:19.139
- is to be able to sell them individually, right? If we're selling two houses, two houses are more expensive

00:51:19.139 --> 00:51:24.668
- than one house, and so that's essentially what a duplex is doing. And so even if we can get a duplex

00:51:24.668 --> 00:51:30.307
- that we can park on the lot, because we probably could get three spaces to work for that duplex parked

00:51:30.307 --> 00:51:32.606
- off the rear alley, we then struggle with

00:51:32.770 --> 00:51:38.717
- We have a condo association in order to be able to sell those individually, which means we then have

00:51:38.717 --> 00:51:44.958
- 28 different condo associations that are all unrelated on the site, which becomes very complicated to do.

00:51:45.186 --> 00:51:50.968
- Practically, very few places are seeing that happen and I think that's one of the things that we often

00:51:50.968 --> 00:51:56.918
- find when we are hired in a new town is there's this desire to build a type of housing that is legalized,

00:51:56.918 --> 00:52:02.587
- but the market is not producing it. Often that means that there's an analogy that is really commonly

00:52:02.587 --> 00:52:07.134
- being used right now, which I think is great. It's not mine, but I'll borrow it.

00:52:07.234 --> 00:52:12.701
- which is that housing is like a door with a bunch of deadbolts on it. Imagine your old school apartment

00:52:12.701 --> 00:52:18.064
- door that you've got seven deadbolts on it and you've got keys, maybe you don't lock them all all the

00:52:18.064 --> 00:52:23.479
- time, but housing is like that. Zoning is one of the deadbolts and we've got to get zoning open to get

00:52:23.479 --> 00:52:28.894
- the door open. But often even once we've fixed zoning and you can build a fourplex in our four zoning,

00:52:28.894 --> 00:52:34.256
- we're still not seeing people do it. Part of the reason is building code. It's those fire sprinklers.

00:52:34.256 --> 00:52:37.200
- Part of the reason is parking, that's another deadbolt.

00:52:37.200 --> 00:52:42.445
- And then part of the reason is ownership structure and finance. So one of the other downsides of needing

00:52:42.445 --> 00:52:47.540
- to condo a building in order to sell units individually, if it's a really small building, is that you

00:52:47.540 --> 00:52:52.635
- need a condo association. Condo financing is harder than single family home financing. It's harder to

00:52:52.635 --> 00:52:53.534
- go get a loan for

00:52:53.666 --> 00:52:59.335
- You know, go get a mortgage for your condo, and you've got owner occupancy requirements and so only

00:52:59.335 --> 00:53:05.118
- a certain number of condos can get financing, you know, if they're not already sold an owner occupied

00:53:05.118 --> 00:53:08.350
- and so often then you end up with those condo buildings.

00:53:08.834 --> 00:53:14.408
- The units haven't all sold yet. The first home buyer can't get a mortgage and has to be a cash buyer

00:53:14.408 --> 00:53:20.147
- because they can't get a mortgage for it because the other units aren't currently occupied because they

00:53:20.147 --> 00:53:25.831
- haven't been purchased yet. You end up in this really complicated death spiral of housing, which a lot

00:53:25.831 --> 00:53:31.571
- of people are finding themselves in, where even when something is on paper legal, there's still a bunch

00:53:31.571 --> 00:53:37.310
- of other deadbolts that still exist. While yes, 28 homes times four would be about the number of houses

00:53:37.310 --> 00:53:38.800
- that we're proposing, it's

00:53:38.800 --> 00:53:44.538
- It's really challenging to be able to build those and then be able to execute them at an affordable

00:53:44.538 --> 00:53:50.276
- price point to a home buyer who can get a mortgage. So one of the biggest things that we're really,

00:53:50.276 --> 00:53:56.243
- one of the things that most of these PUD changes are based around, right? And one of the most important

00:53:56.243 --> 00:54:02.096
- things to kind of keep in our heads as necessary to get to attainable housing is to be able to access

00:54:02.096 --> 00:54:07.949
- federally backed, you know, subsidized mortgages that everybody uses for their big single family home

00:54:07.949 --> 00:54:08.752
- on their lot.

00:54:08.752 --> 00:54:14.845
- to be able to get to a unit on a piece of land that is owned fee simple. And so we need property corners,

00:54:14.845 --> 00:54:20.651
- we need a property description, and we need people to own the outsides of their building. And so one

00:54:20.651 --> 00:54:26.916
- of the best ways that we can do that is being able to plot very narrow, very small lots. So we've personally

00:54:26.916 --> 00:54:30.078
- built in our town on lots as small as 800 square feet.

00:54:30.178 --> 00:54:36.607
- R4 has a 4,000 square foot lot area minimum. One of the things that we're asking for is no lot area

00:54:36.607 --> 00:54:43.036
- minimum, which then allows us to do things like on our final lot plan, we've got a couple of little

00:54:43.036 --> 00:54:49.465
- Aster duplexes that each one of these Asters is a duplex, but they're each platted on their own lot

00:54:49.465 --> 00:54:56.215
- so they can each be sold fee simple, they're not a condo, they can be sold and you can use a traditional

00:54:56.215 --> 00:54:57.694
- mortgage to buy those.

00:54:57.922 --> 00:55:05.220
- Yes, it is more complicated. Absolutely. I did breeze by kind of some of the things that are allowable,

00:55:05.220 --> 00:55:12.517
- but hopefully that's helpful context to kind of understand how many different deadbolts we have to work

00:55:12.517 --> 00:55:19.674
- with and to get stuff done. Thank you. Great. Other customer questions? Just want to thank you to the

00:55:19.674 --> 00:55:24.446
- RDC members who have joined us and enjoy the rest of their meeting.

00:55:26.914 --> 00:55:34.405
- Council Member Rallo, raise your hands up from the floor. Do you have a second question? I have a second

00:55:34.405 --> 00:55:41.539
- question. Okay. Is there anybody else who needs first round question before we go to Council Member

00:55:41.539 --> 00:55:48.958
- Rallo for a second? Okay. Go ahead, Council Member Rallo. Well, I was just wondering a little bit about

00:55:48.958 --> 00:55:56.734
- background. So the way I understand it is that Flintlock is going to be recruiting and training builders and

00:55:57.474 --> 00:56:05.508
- I wonder if this has been, have you achieved that previously? Is that correct? Am I understanding that

00:56:05.508 --> 00:56:06.366
- correctly?

00:56:07.042 --> 00:56:13.194
- Yeah. That's something we're working with the Incremental Development Alliance to do, which is one of

00:56:13.194 --> 00:56:19.347
- their core mission and the thing they've been doing for the last 10 years. They've all the way served

00:56:19.347 --> 00:56:25.801
- as master developer on projects like this in places like Memphis previously, but this model of recruiting,

00:56:25.801 --> 00:56:32.013
- training, supporting local developers all the way through the process while having no actual developer

00:56:32.013 --> 00:56:35.934
- role themselves is really typical to their work. Okay. Could you

00:56:36.930 --> 00:56:43.654
- Could you include or could you tell us what the developer profit margin is in this? Is a percentage

00:56:43.654 --> 00:56:50.378
- of the list price of the home in this process? We're currently calculating and a lot of our work we

00:56:50.378 --> 00:56:57.237
- try to have be very pro forma driven because we know that there is an opportunity for a city to layer

00:56:57.237 --> 00:57:04.163
- lots of different affordability subsidies in specifically for qualified home buyers. We typically only

00:57:04.163 --> 00:57:06.046
- try to show things that are

00:57:06.210 --> 00:57:14.418
- marketable, financeable, and buildable at market rate assumptions. And so we typically are assuming

00:57:14.418 --> 00:57:16.798
- that we need a minimum of an

00:57:16.898 --> 00:57:23.289
- I'd like to really preface this, we're guaranteeing no one a return. We're guaranteeing no one any amount

00:57:23.289 --> 00:57:29.379
- of profit. Our assumptions for design is that we want to build things in that we know work at market

00:57:29.379 --> 00:57:35.770
- rate with about a 20 percent return on total purchase price because that is what a bank typically expects

00:57:35.770 --> 00:57:41.920
- to see before they'll give a construction loan. There's a lot of the details about the exact way that

00:57:41.920 --> 00:57:46.864
- the land sale is going to be financed and how is homebuyer assistance going to be

00:57:46.864 --> 00:57:53.961
- provided that will be worked out through the development process and in a separate framework. But in

00:57:53.961 --> 00:58:00.988
- our initial assumptions, we want to assume that the project works at the minimum financially viable

00:58:00.988 --> 00:58:08.085
- level, which is typically for most regional banks about a 20 percent profit margin prior to anything

00:58:08.085 --> 00:58:15.393
- going wrong, which is an important element to remember for this process. One other quick question. Have

00:58:15.393 --> 00:58:16.798
- you in any of these

00:58:17.122 --> 00:58:25.206
- past projects. We've been considering SROs, single room occupancy dwellings as a means of transitional

00:58:25.206 --> 00:58:33.211
- housing. Since we control this property, the likelihood is that it's occurring is pretty slim, but it

00:58:33.211 --> 00:58:39.646
- might be far likelier at Hopewell. Has this been considered and discussed at all?

00:58:41.762 --> 00:58:47.875
- We've specifically discussed or recommended any SROs. I'm an enormous SRO advocate. We currently have

00:58:47.875 --> 00:58:53.868
- an SRO project that we're pitching here in Fayetteville that would be our first self-developed SRO.

00:58:53.868 --> 00:58:59.861
- We tend to try to test things before we develop them ourselves as R&D to make sure they work before

00:58:59.861 --> 00:59:05.915
- we recommend other people do them. We've got a 68 unit SRO that we're currently recommending on city

00:59:05.915 --> 00:59:11.728
- land that's in our town. If that is of interest, that is certainly something that, for instance,

00:59:11.728 --> 00:59:18.979
- the Faulkner's, which is our largest set of buildings here, one or both of those could easily be swapped

00:59:18.979 --> 00:59:26.023
- out for more of an SRO format, if that is of interest. That's not been directly discussed previously,

00:59:26.023 --> 00:59:32.998
- but really small units with good public space are a great way to build in attainable housing at deep

00:59:32.998 --> 00:59:40.318
- price points that are hard to match otherwise. Excellent responses. Thank you for answering my questions.

00:59:42.306 --> 00:59:49.215
- Thank you. Are there any questions from council members? Right, I heard council members. Thanks. Thank

00:59:49.215 --> 00:59:56.124
- you so much for the presentation. One of the questions, and this may be building off of council member

00:59:56.124 --> 01:00:03.033
- Flaherty's earlier question, could you talk a little bit more about the demand signals that are market

01:00:03.033 --> 01:00:08.734
- infertility that we have about each of the types of housing? I sort of get that the,

01:00:08.930 --> 01:00:16.721
- you know, the story here is very much tied to this sort of mixed housing approach. So, like, how do

01:00:16.721 --> 01:00:24.902
- we know that this is the right mix? Like, why not more, what do you call it, the single efficiency units

01:00:24.902 --> 01:00:32.849
- or whatever we call those? Yeah, like, why not more of those? So, how do we arrive at this mix as the

01:00:32.849 --> 01:00:35.966
- right mix? Let me come back over to our

01:00:36.098 --> 01:00:44.190
- I'm gonna, I know spreadsheets are not very exciting as. I love spreadsheets, macros and stuff. I love it.

01:00:44.546 --> 01:00:51.525
- The first thing that we're often analyzing trying to get to unit mix, and the thing that a lot of developers

01:00:51.525 --> 01:00:57.928
- are going to look at first is what's our proportion of one-bedroom to two-bedroom to three-bedroom.

01:00:57.928 --> 01:01:04.523
- We have stacked our one, two, and three-bedroom proportions to match population on household size more

01:01:04.523 --> 01:01:10.990
- or less exactly for Bloomington. We're maybe a little heavy on our one-bedrooms, we're at 48 instead

01:01:10.990 --> 01:01:14.512
- of 45 percent, trying to get our affordability numbers

01:01:14.512 --> 01:01:19.655
- down a little bit and you know this is a tetris game too right there is some of this that's like okay

01:01:19.655 --> 01:01:24.698
- well we have this one lot left what will fit on that lot but we we're typically trying to match our

01:01:24.698 --> 01:01:29.791
- household types within within the community as our first stack of one you know one to three bedrooms

01:01:29.791 --> 01:01:34.833
- i'll admit to one thing that we really have discussed pretty heavily within the planning department

01:01:34.833 --> 01:01:39.926
- is that the accessibility standards within the city of bloomington are really unusual for us this is

01:01:39.926 --> 01:01:44.464
- the first community we worked in that has such a high percentage of an accessibility unit

01:01:44.464 --> 01:01:51.030
- which is it's challenging from a topographic standpoint. The reality is there's so many of those that

01:01:51.030 --> 01:01:57.725
- we can get a parking space to a front door. We are stacked with a little bit more slightly larger units

01:01:57.725 --> 01:02:04.613
- that are slightly more expensive because it's a one-story. You like us have tough soils and so foundations

01:02:04.613 --> 01:02:11.308
- are a little higher. A larger one-story unit to be accessible is slightly more expensive than a smaller

01:02:11.308 --> 01:02:14.334
- footprint, same square footage, but two-story.

01:02:14.818 --> 01:02:21.548
- So we do have a higher stack of our accessible units than we might in some other unit mixes that we

01:02:21.548 --> 01:02:22.558
- would propose.

01:02:22.658 --> 01:02:29.338
- Then we try to do an intermixed unit type, unit size within the neighborhood as well as that we don't

01:02:29.338 --> 01:02:36.477
- have one big cluster of all of our studio units are in one place. They're really evenly scattered throughout

01:02:36.477 --> 01:02:43.091
- the neighborhood is relatively important. Then from a large bedroom unit, those are really slated to

01:02:43.091 --> 01:02:49.771
- some of the financial analysis of looking at what is the thing with the fewest days on market that is

01:02:49.771 --> 01:02:51.998
- showing as really high desirable,

01:02:52.226 --> 01:02:59.408
- desirability and those are in some instances, those bigger, more expensive houses. The chinkapin is

01:02:59.408 --> 01:03:06.949
- our largest three-bedroom that I think is our most expensive house. We have three of those, that's three

01:03:06.949 --> 01:03:13.054
- of our corners on our main block nine. Then we also have the Elm is one of the other

01:03:13.538 --> 01:03:19.414
- Larger ones and so we have five of those and those have been one of our most popular three bedroom place

01:03:19.414 --> 01:03:25.011
- a very tight three bedroom that still you know kind of has all checks all the family boxes. So it's

01:03:25.011 --> 01:03:30.775
- an 1800 square foot floor plan that's been very popular in a lot of communities and so it's it's about

01:03:30.775 --> 01:03:32.062
- 520 again at you know.

01:03:32.354 --> 01:03:39.660
- average price per square foot equivalencies, and so we have slightly more of those than the slightly

01:03:39.660 --> 01:03:47.183
- nicer ones. But we've got about eight, so eight or nine percent of units are kind of those larger, more

01:03:47.183 --> 01:03:54.489
- expensive family homes, while then we've got eight are the little micro units that are affordable at

01:03:54.489 --> 01:03:55.646
- 35 percent AMI.

01:03:56.194 --> 01:04:01.566
- There is not a science to it. I don't want to lie and say, okay, well, we needed exactly 7.5

01:04:01.566 --> 01:04:07.343
- of this one. But some of this is a Tetris game, some of this is matching existing demographics, and

01:04:07.343 --> 01:04:13.178
- then some of this is analysis of what's selling quickly and what is popular. What sits on the market

01:04:13.178 --> 01:04:18.955
- for six months? What has 30 days on the market, which means somebody made an offer first day and it

01:04:18.955 --> 01:04:24.789
- closed. Awesome. Then just to follow up with in terms of mechanics and maybe this is more a question

01:04:24.789 --> 01:04:25.598
- for planning.

01:04:25.890 --> 01:04:33.012
- But in your experience doing PUDs like this, have people ever, have developers ever deviated from the

01:04:33.012 --> 01:04:40.064
- plans? I mean, as I understand it, the incentive is that you have these pre-approved plans, but that

01:04:40.064 --> 01:04:47.047
- doesn't keep a developer from buying a plot and then doing something else with it, right? Using the

01:04:47.047 --> 01:04:48.862
- normal allowed standards.

01:04:50.146 --> 01:04:56.467
- So the goals with these, you know, this is yet to be kind of fully fleshed out. So I'll describe the

01:04:56.467 --> 01:05:02.788
- goal rather than the full kind of policy. But the goal of these is that these would be sold. And one

01:05:02.788 --> 01:05:09.109
- of the conditions of sale of the land is that you are buying the land to build only the provided set

01:05:09.109 --> 01:05:10.110
- of floor plans.

01:05:10.274 --> 01:05:17.148
- And so we do have a mechanism by which the RDC could allow people to, there's a built in set of modifications

01:05:17.148 --> 01:05:21.022
- that are allowable in any of our pre-approved plans programs.

01:05:21.122 --> 01:05:26.687
- You can remove this one bathroom window if you decide that you want to. The portrayaling can be this

01:05:26.687 --> 01:05:32.416
- or it can be this. There's some amount of variety that is not impacting overall quality or neighborhood

01:05:32.416 --> 01:05:37.926
- that is within the purview of a developer. The intention though is that these are being sold with a

01:05:37.926 --> 01:05:40.350
- contractual agreement to build a house with

01:05:40.514 --> 01:05:46.401
- with the plans that you are seeing, and that there is an opportunity to swap houses. There are some

01:05:46.401 --> 01:05:52.406
- of these houses that have the same footprint, and so there's an allowable way that the RDC could okay

01:05:52.406 --> 01:05:54.878
- a developer if it's three years from now.

01:05:55.074 --> 01:06:00.633
- there's one of the unit types that has been less popular than what was expected and there's one that's

01:06:00.633 --> 01:06:06.191
- planned but they have another unit that's the same size. The RDC could choose to swap for another plan

01:06:06.191 --> 01:06:11.588
- in the catalog as the intent although the lots are very calibrated as you see to the exact width of

01:06:11.588 --> 01:06:17.092
- those houses and so there's a limited amount of switching that you could do but the intent is there's

01:06:17.092 --> 01:06:21.086
- a little flexibility but it's really driven by the RDC being able to make

01:06:21.506 --> 01:06:27.853
- call the ball, if it's three to five years from now, the market has shifted, they have something really

01:06:27.853 --> 01:06:34.017
- specific that they want to do, but they are structured where the PUD allowances are only houses that

01:06:34.017 --> 01:06:40.181
- are within this catalog or a pre-approved catalog approved by the city council, so that there's some

01:06:40.181 --> 01:06:46.467
- ability to be flexible later that they could come and ask to add another unit type to the catalog, but

01:06:46.467 --> 01:06:51.166
- that you buy the lot to build the house that we're providing you. Thank you.

01:06:51.618 --> 01:06:59.838
- Yeah. Council member Clarity, do you still have another question? Yeah. I guess one question is whether

01:06:59.838 --> 01:07:07.901
- a, so the transform overlay was mentioned by director a little earlier. We've used overlays to change

01:07:07.901 --> 01:07:16.200
- things about the base zoning district that don't quite fit the context of something unique like downtown

01:07:16.200 --> 01:07:18.334
- or in this case, you know,

01:07:18.498 --> 01:07:24.431
- a redevelopment area that has a massive parking garage outside, you know, for instance, I think parking

01:07:24.431 --> 01:07:30.306
- minimums were eliminated. I think I also heard that this section or portions of it may not fall within

01:07:30.306 --> 01:07:36.010
- the overlay district. I'm curious if the overlay district could be expanded to include this section

01:07:36.010 --> 01:07:41.772
- and if an overlay might've been a reasonable way to approach this as opposed to a PUD. I'm thinking,

01:07:41.772 --> 01:07:45.822
- I had more questions about PUDs and their administration over time and

01:07:46.018 --> 01:07:52.980
- some challenges we've experienced as a city there historically, but more specifically initially, would

01:07:52.980 --> 01:07:57.374
- an overlay be able to accomplish what's being accomplished here?

01:07:59.042 --> 01:08:06.533
- We did analyze during a PUD, it's a heavy lift. Prior to proposing the PUD, we worked through with the

01:08:06.533 --> 01:08:13.805
- city on could expanding the TRO accomplish this? The short answer was no. The frontage on lanes and

01:08:13.805 --> 01:08:21.150
- the ability to do custom street sections was one of the biggest elements of the PUD that allows this

01:08:21.150 --> 01:08:21.950
- to happen.

01:08:22.082 --> 01:08:28.647
- Minimum lot size in the TRO was still bigger than some of these that we're proposing for some of our

01:08:28.647 --> 01:08:35.277
- really deeply affordable units. It would have gotten us a lot closer, but it still wasn't all the way

01:08:35.277 --> 01:08:41.843
- there. I also tend to be a sometimes PUD suspicious person as a planning commissioner who has had to

01:08:41.843 --> 01:08:48.733
- administer really old PUDs. I don't want to say it's no administrative additional burden. This one seemed

01:08:48.733 --> 01:08:52.048
- worth proposing because of the opportunity to test

01:08:52.048 --> 01:08:57.774
- some of these really specific code changes that we think could really help with housing affordability,

01:08:57.774 --> 01:09:03.334
- attainability within the city generally, but which we would not feel comfortable proposing citywide

01:09:03.334 --> 01:09:09.227
- without more of a pilot test. This is an opportunity to test some of those elements on a small controlled

01:09:09.227 --> 01:09:14.787
- scale, which then can be assessed whether or not those are desirable for broader output. Thank you.

01:09:14.787 --> 01:09:20.958
- What a clarification. I didn't mean that overlay as it exists now. I meant the overlay as it could be amended.

01:09:21.282 --> 01:09:26.931
- So you mentioned lot size minimums that could be changed. You know, for instance, are other things that

01:09:26.931 --> 01:09:32.852
- overly district? The street, the street widths, custom street sections is a really big one because otherwise

01:09:32.852 --> 01:09:38.610
- the transportation plan would have to be amended in order to provide that. And so custom street sections,

01:09:38.610 --> 01:09:41.054
- lot frontage to allow for that green street.

01:09:41.186 --> 01:09:48.337
- and then a lot size and a lot width minimums were some of the high-level things. I don't want to say

01:09:48.337 --> 01:09:55.418
- that's a fully comprehensive list, but off the top of my head, those were some of the elements that

01:09:55.418 --> 01:10:02.570
- pushed us to a PUD rather than an overlay. Are there other questions? I have a couple more practical

01:10:02.570 --> 01:10:06.110
- questions, I guess, and some of us might be like,

01:10:06.594 --> 01:10:12.239
- Because I am the council representative on the planning commission. And so as long as it might be like,

01:10:12.239 --> 01:10:17.667
- hey, we put the planning commission, can you talk about this a little bit? But like, I'm looking at

01:10:17.667 --> 01:10:23.204
- the plan for trash collection. And like, so is, is there first an expectation that city sanitation is

01:10:23.204 --> 01:10:28.849
- going to be picking up? Yes. Okay. So with that and kind of being like, okay, so there's trash on these

01:10:28.849 --> 01:10:33.246
- very specific corners and then there's going to be one trash container per unit.

01:10:33.506 --> 01:10:40.532
- there are going to be a lot of trash containers on these corners on pickup days. And I just really anticipate

01:10:40.532 --> 01:10:46.984
- that being highly problematic in terms of just the sheer number of containers then that are on these

01:10:46.984 --> 01:10:51.838
- very limited corners. So is that something that you all have thought about?

01:10:52.610 --> 01:10:58.127
- That is something that we've we've gone all the way to laying out the size of rolling bins in plan and

01:10:58.127 --> 01:11:03.482
- we will likely be proposing some permeable pavers in some of those corners so that we've got a hard

01:11:03.482 --> 01:11:09.374
- surface that those cans are going on. That's really clear and we will likely have one or two parallel spaces.

01:11:09.570 --> 01:11:14.754
- along Fairview that will be blocked that like when you've got street cleaning and you can't park on

01:11:14.754 --> 01:11:20.145
- this side of the street for two hours this morning of the week that on trash morning that parking space

01:11:20.145 --> 01:11:25.433
- is not available and it's being used for cans. But yes, that's being fully laid out. And you know, it

01:11:25.433 --> 01:11:28.958
- is because a lot of these units can actually pull up to the street.

01:11:29.058 --> 01:11:34.502
- And we're using basically each one of the lane corners, right? So for instance, this corner of Jackson

01:11:34.502 --> 01:11:40.000
- Street, if you guys can see that little hand down here next to these parking spaces, it's actually just

01:11:40.000 --> 01:11:41.374
- these three little units.

01:11:41.602 --> 01:11:47.382
- this ADU in this house and then these two units. In some of these, it's a one-bedroom house, it doesn't

01:11:47.382 --> 01:11:52.995
- need to have the largest size can. We're guessing on using the medium-sized can for all of them, but

01:11:52.995 --> 01:11:58.664
- then we're assuming that there will also be some smaller ones that are being used. But yes, those are

01:11:58.664 --> 01:12:04.444
- being dimensionally laid out and it's being considered having a hard surface material for those to rest

01:12:04.444 --> 01:12:08.446
- on. I would appreciate seeing those details at the fine pressure model.

01:12:13.122 --> 01:12:20.751
- I think that, I guess the other thing that I wanted to know about were the parking, the perpendicular

01:12:20.751 --> 01:12:28.306
- parking spaces for Jackson and Wiley. And what are those, like are those visitor parking spaces, are

01:12:28.306 --> 01:12:36.234
- those parking spaces for those units? Like what is the vision there and why are they perpendicular spaces

01:12:36.234 --> 01:12:41.694
- as opposed to empty spaces which tends to be more unusual at this point.

01:12:42.594 --> 01:12:48.710
- Jackson Street went back and forth through each one of these iterations with the city as the preference

01:12:48.710 --> 01:12:54.591
- from police and from our side was that it's more of an alley. It doesn't go all the way through, it

01:12:54.591 --> 01:13:00.590
- is very low traffic. We really only have one street frontage because we've got the back of a building

01:13:00.590 --> 01:13:02.942
- and a parking lot along the other side.

01:13:03.202 --> 01:13:09.158
- So we started out with a very, it was an alley. We then kind of graduated up to, okay, it should actually

01:13:09.158 --> 01:13:14.890
- have sidewalks. So if we're going to do sidewalks, it should have street trees. It got itself all the

01:13:14.890 --> 01:13:16.126
- way back to a street.

01:13:16.546 --> 01:13:21.727
- challenges with this existing building and with us pushing our right of way as far to that building

01:13:21.727 --> 01:13:26.959
- as we could get it, was that the police department is frankly pretty crunched for parking. And so as

01:13:26.959 --> 01:13:32.192
- we looked through different ways that we could make up that balance to them, head-in parking in this

01:13:32.192 --> 01:13:37.373
- area, we both had really good topography to be able to achieve that. We had a really good door that

01:13:37.373 --> 01:13:42.553
- it could come into. They had a specific division that needed some extra parking that didn't need to

01:13:42.553 --> 01:13:43.486
- be within secured

01:13:43.586 --> 01:13:48.664
- secured parking and so the intention of these is that they are police, you know, specific spaces.

01:13:48.664 --> 01:13:54.001
- We can, when we load spaces onto an alley or onto a street, it's significantly more pavement efficient

01:13:54.001 --> 01:13:58.302
- because we're not making another drive aisle just to load the parking spaces onto.

01:13:58.914 --> 01:14:05.469
- We did make Jackson, part of Jackson's custom street section nature is that it can have head-in parking.

01:14:05.469 --> 01:14:11.774
- Part of the benefit of it being head-in instead of angle because Jackson is not a through street and

01:14:11.774 --> 01:14:18.079
- Wiley is relatively low traffic is that if they are head-in, then people can access and come in both

01:14:18.079 --> 01:14:24.634
- coming and going back up to first instead of pushing more traffic onto Wiley. Some of that is just being

01:14:24.634 --> 01:14:27.006
- reflective of it's a very low traffic

01:14:27.170 --> 01:14:33.245
- street, we are not expecting, um, back in to be problematic whatsoever. And in a lot of ways, we actually

01:14:33.245 --> 01:14:39.263
- want the extra traffic calming of the little bit of extra friction, but we'd like those to be accessible

01:14:39.263 --> 01:14:45.167
- from both directions to really push as much police traffic up, much less residential, much wider right

01:14:45.167 --> 01:14:51.013
- of way, larger setbacks, um, versus pushing any additional traffic down onto Wiley. Okay. And then to

01:14:51.013 --> 01:14:56.286
- follow up on that, I feel like that whole explanation was finished on the back of, of this,

01:14:56.834 --> 01:15:03.203
- current building on South Rockers becoming a police station, which he also said, you know, that that

01:15:03.203 --> 01:15:09.634
- was still in process of being studied. That is also something that would need to come through council

01:15:09.634 --> 01:15:16.129
- as a bond and a completely separate thing. So how much of this whole concept is kind of hinging around

01:15:16.129 --> 01:15:22.498
- this assumption that that is going to end up being a future police headquarters? So we have built in

01:15:22.498 --> 01:15:24.894
- in the PUD quite a bit of flexibility

01:15:24.994 --> 01:15:30.537
- for the recognition that everything that's being shown on Block 8, which is this police block, is very

01:15:30.537 --> 01:15:36.133
- conceptual. Everything that's being shown on Block 9 and 10, the housing, is not very conceptual. Those

01:15:36.133 --> 01:15:41.730
- are fully designed houses and I can tell you where their parking space and their trash goes. Everything

01:15:41.730 --> 01:15:47.542
- that is on Block 8 here, their design consultants came on weeks ago. They are still in very early analysis.

01:15:47.542 --> 01:15:50.878
- We have built-in flexibility that everything on this block is

01:15:50.978 --> 01:15:57.302
- conceptual and will be adjusted. There are some things that when we show them in the PUD, the number

01:15:57.302 --> 01:16:03.939
- of accesses onto streets and roughly where those go are less flexible and would require more modification

01:16:03.939 --> 01:16:07.070
- if those came back and changed. Things like that.

01:16:07.202 --> 01:16:12.791
- are somewhat set. We wanted to show some of the head-end parking on Jackson because we wrote Jackson

01:16:12.791 --> 01:16:18.381
- that head-end parking was allowed, and so we wanted to show that that was possible. The east side of

01:16:18.381 --> 01:16:23.970
- the center line of the street, we want to recognize might be slightly different as long as it's like

01:16:23.970 --> 01:16:29.670
- the transportation plan within the standard street sections, that there's a little bit of variety that

01:16:29.670 --> 01:16:30.334
- is allowed.

01:16:30.530 --> 01:16:38.143
- But if the building was removed and this block was entirely redeveloped, it would more or less default

01:16:38.143 --> 01:16:45.609
- back to the existing TRO overlay standards because the PUD only modifies the underlying standards in

01:16:45.609 --> 01:16:53.000
- the specific ways that are listed and we've only listed a handful of modifications to code. The PUD

01:16:53.000 --> 01:17:00.318
- for that block is relatively light. In terms of changes that you all would see from normal zoning,

01:17:00.450 --> 01:17:09.618
- if for some reason the building came down and had a totally different user. Thank you. Other council

01:17:09.618 --> 01:17:19.240
- member questions? All right. Oh, yeah, this was clarity. Thank you. Thank you for the explanation earlier

01:17:19.240 --> 01:17:29.406
- about some of the challenges with missing middle housing types from a financing and administrative perspective.

01:17:30.082 --> 01:17:37.006
- What I'm hearing from you is that basically, despite zoning allowing duplexes, triplexes, fourplexes,

01:17:37.006 --> 01:17:43.929
- they're too difficult to build. So what we really need is smaller single-family homes on smaller lots

01:17:43.929 --> 01:17:51.328
- in order to have market rate affordability for homeownership. Is that right? For homeownership specifically,

01:17:51.328 --> 01:17:58.387
- that has been the single thing that we have been able to find that is fitting through the most of these

01:17:58.387 --> 01:17:59.134
- deadbolts.

01:17:59.266 --> 01:18:05.819
- And townhouses can count, you know, attached single family houses can still work for that, but really

01:18:05.819 --> 01:18:06.718
- small format.

01:18:06.818 --> 01:18:12.943
- Homes on their own lots has been the only thing that we are finding that works for homeownership

01:18:12.943 --> 01:18:19.700
- specifically. If we were only trying to gear this towards affordability and we were really gearing towards

01:18:19.700 --> 01:18:26.078
- a larger percentage of rentals, we might see more multifamily in what we would propose, but with the

01:18:26.078 --> 01:18:32.456
- really explicit goal here of promoting homeownership, small homes on small lots or where it's at. No

01:18:32.456 --> 01:18:35.550
- zoning district at the City of New England's UDO

01:18:35.906 --> 01:18:42.688
- makes it legal to build that type of market rate affordability, is that right? None that we were able

01:18:42.688 --> 01:18:49.404
- to find had both a lot width minimum and a lot size minimum and setbacks that worked for what we are

01:18:49.404 --> 01:18:56.253
- currently showing you. Okay, that's disappointing. We should perhaps propose a lot of change that. Why

01:18:56.253 --> 01:19:03.035
- not develop a new zoning district though or change an existing one? If this is like a good idea, it's

01:19:03.035 --> 01:19:04.830
- been proven out elsewhere.

01:19:05.762 --> 01:19:11.009
- I'm struggling with the TUV aspect of it, I'm sure you can tell, because we've had a lot of

01:19:11.009 --> 01:19:16.882
- mixed experiences, they become stale over time, difficult to administer, costly, et cetera, et cetera.

01:19:16.882 --> 01:19:22.756
- And in some instances, like within the parking, for instance, actually don't meet our standards, which

01:19:22.756 --> 01:19:28.687
- is a concern. So I guess, yeah, why not make a zoning district that allows this, even if it's only here

01:19:28.687 --> 01:19:34.846
- to start, and then allow that zoning district to apply in a targeted way elsewhere over time, for instance,

01:19:35.202 --> 01:19:41.244
- Corner lots in gridded neighborhoods where lots of it is easy places where we improve the alley to allow

01:19:41.244 --> 01:19:47.344
- that type of subdivision you were demonstrating on the lot between third and fourth Street, for instance,

01:19:47.344 --> 01:19:53.502
- and nonprofit bill. So, yeah, tell me tell me what you do not. Custom Street sections is the short answer.

01:19:53.602 --> 01:19:59.216
- I do think that new zoning districts and that exactly the mechanism that you are describing is something

01:19:59.216 --> 01:20:04.776
- we've used a number of times where we test a new zoning district just on one lot or we've even had some

01:20:04.776 --> 01:20:10.443
- communities where we pass a new district, but it's functionally opt-in. People can come and ask to rezone

01:20:10.443 --> 01:20:15.789
- to it, but it's not put on the map anywhere, although it's adopted first, which is a great way once

01:20:15.789 --> 01:20:18.302
- some of these other things are worked through.

01:20:18.434 --> 01:20:24.962
- The custom street sections is the reason that the PUD really took the lead on the approach that we could

01:20:24.962 --> 01:20:31.179
- use because I do think that a modification to the transportation plan to allow for some more narrow

01:20:31.179 --> 01:20:37.396
- street sections long-term is a really great recommendation and that's a pretty big lift in terms of

01:20:37.396 --> 01:20:43.737
- administrative process before anything can happen. The PUD allows us to get rolling and to see how it

01:20:43.737 --> 01:20:48.400
- works while some of these other processes that are much longer process can

01:20:48.400 --> 01:20:55.685
- take place. Well, I think it's a small follow up. That's OK. Which is, let's assume the world in the

01:20:55.685 --> 01:21:03.042
- next five years where we do some of these things, maybe develop or amend existing zoning districts to

01:21:03.042 --> 01:21:09.894
- have the lot dimensional requirements that would fit with this as a zoning district and update

01:21:09.894 --> 01:21:14.366
- the transportation plan, the comprehensive plan to allow more

01:21:14.626 --> 01:21:21.073
- I don't know what it is exactly. I have to learn more about it. Flexibility of respect to non-car streets

01:21:21.073 --> 01:21:27.338
- as frontage, for instance. Would the idea be to like, I'm wondering about like this, as it's like over

01:21:27.338 --> 01:21:33.724
- time, decades in the future, right? It'd be really nice if when we do sweep anxiety changes 10, 20 years

01:21:33.724 --> 01:21:40.414
- from now, that this is part of it and we don't leave this behind as a P and D. That was a great idea in 2025.

01:21:40.706 --> 01:21:46.876
- But come 20, 40, we're much more enlightened on something else. And this is left behind, you know, like

01:21:46.876 --> 01:21:52.867
- so many PDs have been in that, that our recent UDO re-mapping process that went a really long way to

01:21:52.867 --> 01:21:58.325
- overcome this patchwork we had on over blue maintaining over 87 PDs or whatever it was. So.

01:21:58.325 --> 01:22:04.317
- Thought on that, the ability to adapt this, um, in the future, I guess, to, to do the normal process

01:22:04.317 --> 01:22:06.334
- instead of its own special thing.

01:22:08.354 --> 01:22:14.859
- think that the more that that can be done, the more positive impact you're going to see about housing

01:22:14.859 --> 01:22:21.301
- everywhere. I think modifying your existing zoning districts that are already on the map is going to

01:22:21.301 --> 01:22:27.743
- be the most impactful way to do that. I know that there's political challenge and that's not as easy

01:22:27.743 --> 01:22:34.184
- as just saying it. I can fully appreciate that too. Maybe a good question for David too. I can fully

01:22:34.184 --> 01:22:37.118
- hear you on the challenges of PUDs over time.

01:22:37.730 --> 01:22:43.366
- I absolutely agree. I'm also not sure whether this could be designed to sunset that the intention is

01:22:43.366 --> 01:22:48.946
- to build exactly what you're seeing. And a lot of the PUD is written around that, right? That there

01:22:48.946 --> 01:22:54.527
- aren't intended to be really significant architectural standards for the existing buildings because

01:22:54.527 --> 01:23:00.386
- we're showing you what every single building looks like and it can't be modified. But then modifications

01:23:00.386 --> 01:23:06.134
- to buildings default back to the prevailing architectural standards at the time. And so we've intended

01:23:06.134 --> 01:23:07.696
- it to be able to be default

01:23:07.696 --> 01:23:14.951
- back to zoning, but I'm not sure if you could build in a sunset to a PUD that allows it to be built

01:23:14.951 --> 01:23:22.568
- and then it automatically sunsets unless extended. I can add a little bit to that. The UDO stopped short

01:23:22.568 --> 01:23:30.113
- of forcing PUDs to be absorbed into an existing zone district, but it does strongly encourage that they

01:23:30.113 --> 01:23:34.974
- be absorbed into an existing zone district. I would certainly hope

01:23:35.074 --> 01:23:42.964
- that in 5, 10 years time we do have the district that accommodates the things that are being shown here.

01:23:42.964 --> 01:23:50.629
- And so when that happens, as I think over the past several years, we've taken down dozens of pea weed

01:23:50.629 --> 01:23:58.144
- and assigned them standard conventional bone districts. Close to 100? Close to 100. I would imagine

01:23:58.144 --> 01:24:01.150
- that's exactly what would be done here.

01:24:02.946 --> 01:24:10.078
- Thank you. Any other last questions from council members? Okay, that was technically the last thing

01:24:10.078 --> 01:24:17.210
- on our agenda. Mayor Thompson, is there any other types of information or general feedback that you

01:24:17.210 --> 01:24:24.343
- appreciate right now as part of this session or Allie or Director Kiddle? I think it's just, I want

01:24:24.343 --> 01:24:31.760
- to express that this meeting is an effort to keep you all in the loop before it's a thumbs up or thumbs

01:24:31.760 --> 01:24:32.830
- down decision.

01:24:33.122 --> 01:24:41.795
- And so this is a good time to provide feedback and concerns while we're still working with the PUD.

01:24:41.795 --> 01:24:50.468
- And my hope is that this is an active conversation and it's not a, you know, we don't hear anything

01:24:50.468 --> 01:24:59.142
- and then we get to council meeting and there's a whole bunch of changes asked for, or we just don't

01:24:59.142 --> 01:25:01.310
- like the PUD in the end.

01:25:01.602 --> 01:25:08.541
- This is an effort at co-creating and keeping you plugged in throughout the process. So that sounds to

01:25:08.541 --> 01:25:15.684
- me like maybe feedback from council members would be appreciated if anybody has a comment perhaps around

01:25:15.684 --> 01:25:22.487
- what they've heard or any specific concerns that they would like to see addressed before it goes to

01:25:22.487 --> 01:25:29.426
- council in a more official way. Council member, I'll see if that's what happened. Well, I just wonder

01:25:29.426 --> 01:25:30.174
- if I like,

01:25:30.786 --> 01:25:39.229
- the plan in general. I like the PUD in general. And I do note that if council member Rosenbarger's resolution

01:25:39.229 --> 01:25:47.135
- last spring is on board, then a lot of these missing middle things would have been allowed to be built

01:25:47.135 --> 01:25:54.888
- sooner throughout the community. So I did want to point that out. But in general, the sticking point

01:25:54.888 --> 01:26:00.414
- for triplexes and fourplexes seems to be the financing. And I wonder if

01:26:00.866 --> 01:26:09.794
- there have been any conversations with CDFI, Renly Bloomington, or any other funders to make financing

01:26:09.794 --> 01:26:18.549
- more available for those kind of types? We have had, I don't know if you're asking me, but I'll tell

01:26:18.549 --> 01:26:27.217
- you what I know, we have had conversations with lenders, CDFI, et cetera. It's just right now, it's

01:26:27.217 --> 01:26:30.078
- hard to get done unless you have

01:26:30.530 --> 01:26:38.863
- a good model for doing it. And the reason that we are getting some flexes built elsewhere is because

01:26:38.863 --> 01:26:47.362
- they're all rentals and then they're rentals primarily for students. We're still not housing our young

01:26:47.362 --> 01:26:55.695
- professions. We're not. And once they're big enough that they need a sprinkler system, it's not just

01:26:55.695 --> 01:26:57.758
- that a mortgage would be

01:26:58.178 --> 01:27:05.960
- more affordable, the rent also goes up. The developer has more money in that unit. And so if we can

01:27:05.960 --> 01:27:14.442
- look at developing things that fit the code that don't require that, that's where we get some affordability.

01:27:14.442 --> 01:27:22.302
- Yeah, I want to reinforce that. It's not a small change for cost. So International Residential Code,

01:27:22.302 --> 01:27:25.726
- the IRC, is one or two units or townhouses.

01:27:26.082 --> 01:27:31.186
- Anything under the international residential code can be built by a residential contractor. We don't

01:27:31.186 --> 01:27:36.291
- need fire sprinklers. You don't have weird fire separations where you've got, you know, fire cocking

01:27:36.291 --> 01:27:41.395
- or lightweight chipcrete that's on top of a floor plate, which is a really it's a custom detail that

01:27:41.395 --> 01:27:45.438
- like commercial contractors can do what we're finding. And we've done a number.

01:27:45.634 --> 01:27:51.092
- of just volunteer basis, state level code changes, both the incremental development alliance and our

01:27:51.092 --> 01:27:56.550
- office. We just introduced a bill in Oklahoma to move more units under the international residential

01:27:56.550 --> 01:28:02.063
- code. We successfully, one of our alumni and faculty got one passed in Tennessee. We've passed one in

01:28:02.063 --> 01:28:06.494
- North Carolina. We've passed one in New Hampshire that's existing buildings only.

01:28:06.658 --> 01:28:11.668
- they don't have a lot of new construction, so that was effective. Dallas is recently, because in Texas,

01:28:11.668 --> 01:28:16.534
- states have their own power to pass their own building code, so Dallas has now legalized up to eight

01:28:16.534 --> 01:28:18.846
- units under the International Residential Code.

01:28:18.946 --> 01:28:25.170
- But the thing that we are finding, having done the state code change in Tennessee was in 2019, I think.

01:28:25.170 --> 01:28:31.334
- And so since then, Cronberg is one of our partners on this project and a good friend has built several

01:28:31.334 --> 01:28:37.498
- multiplexes under IRC and under IBC. So the International Building Code, three units or more, it's the

01:28:37.498 --> 01:28:40.670
- same code we used to do like airports and factories.

01:28:41.250 --> 01:28:46.666
- They've built them both in Chattanooga and then with the same builder, same floor plans, just the different

01:28:46.666 --> 01:28:51.731
- codes, and then cross pricing of the two of them to be able to field test what kind of a cost change

01:28:51.731 --> 01:28:56.745
- that makes. The same building built under IBC is approximately 40% more expensive, which means your

01:28:56.745 --> 01:28:57.598
- rent needs to be

01:28:57.730 --> 01:29:03.723
- 40% or more more expensive. So it's not just the financing. There is a huge threshold by which we have

01:29:03.723 --> 01:29:09.542
- very few communities in America that we've ever worked that you can build one fourplex and make any

01:29:09.542 --> 01:29:15.360
- money. It doesn't pencil. You can't make it work. And so a lot of that is building code driven. And

01:29:15.360 --> 01:29:21.470
- so we are working on that at the state level. And we've had some conversations about a potential Indiana

01:29:21.470 --> 01:29:27.696
- bill. Because there are so many communities in Indiana, they're struggling with exactly the same question.

01:29:27.696 --> 01:29:34.506
- is a delinearal state, which means communities cannot pass their own building code that conflicts with

01:29:34.506 --> 01:29:41.250
- the state fire code. So it would need to be done at the state level. But three and fourplex buildings

01:29:41.250 --> 01:29:47.995
- nowhere in America for building code reasons really make any sense. You can get a traditional 30-year

01:29:47.995 --> 01:29:54.871
- residential mortgage, an FHA loan, a secondary market mortgage for up to 40 residential units on a lot.

01:29:54.871 --> 01:29:57.648
- So you can get a mortgage for a fourplex.

01:29:57.648 --> 01:30:02.794
- You don't have any comps for fourplexes, even if it would work, which means we can't get an appraisal

01:30:02.794 --> 01:30:07.991
- that works yet. And if we have to build it under IBC, no one can build it and make any money. And even

01:30:07.991 --> 01:30:13.087
- if a foundation came in and did it, which is what's happening in Chattanooga, the rents in them have

01:30:13.087 --> 01:30:17.022
- to be so high to cover the construction costs that they don't make sense yet.

01:30:17.122 --> 01:30:23.789
- That is something that zoning is fixed, but we still got a bunch of other dead bolts that we've got

01:30:23.789 --> 01:30:30.656
- to work through. There are ways that some of those corner three-bedroom houses could be converted into

01:30:30.656 --> 01:30:37.523
- a four-plex later if building code changes were made, but it doesn't make any sense for us to show and

01:30:37.523 --> 01:30:44.190
- legalize building something that then is not going to be able to be financeable and nobody is going

01:30:44.190 --> 01:30:46.590
- to be able to make work. Thank you.

01:30:46.818 --> 01:30:53.428
- Other comments from council members? Thank you. I'll share some thoughts with you, Bec. I'm very excited

01:30:53.428 --> 01:30:59.974
- about the value of the lands that may be possible to use as downhandle systems. I think that's a really

01:30:59.974 --> 01:31:06.647
- cool aspect of the project in addition to the smaller streets. And I'm really interested in the developer

01:31:06.647 --> 01:31:13.445
- and lender workshops. And if it would be possible to attend, I would love to just to be able to communicate

01:31:13.445 --> 01:31:15.774
- that with the rest of the community.

01:31:16.066 --> 01:31:25.665
- Is there anything else that I wanted to say? Thank you for this. Any other passing member points of

01:31:25.665 --> 01:31:35.935
- feedback or comments? Just a question for us too. The presentation is very helpful, by way of information,

01:31:35.935 --> 01:31:43.806
- but I think it puts in the fine commission packet is probably much more detailed.

01:31:45.026 --> 01:31:51.151
- A lot of it was duplicative. Well, this is just a presentation. I mean, there's no, like, it's code,

01:31:51.151 --> 01:31:57.336
- essentially, right? I mean, it's like a substitute for code, like an actual VEV of what all the exact

01:31:57.336 --> 01:32:00.126
- standards are. Like, that's not what you get.

01:32:00.386 --> 01:32:06.543
- Honestly, I mean, what we got was kind of like a preview for our session as opposed to an accidental

01:32:06.543 --> 01:32:12.761
- petition. No, we have not gotten the petition yet at all. I'm not sure if the petition is going to be

01:32:12.761 --> 01:32:19.041
- a little bit more detailed. There is a little bit more detail about the unit types of those plans, but

01:32:19.041 --> 01:32:25.137
- I think not as much detail. OK, thinking of the mayor's request for feedback, it's definitely happy

01:32:25.137 --> 01:32:30.014
- to try to do that. It is also a little hard until you actually see the proposed

01:32:30.274 --> 01:32:39.195
- zoning district standards or PUD district standards to fully comprehend it slash give detailed feedback.

01:32:39.195 --> 01:32:47.775
- My only feedback I guess is that I appreciate this session. It might have been nice a little earlier

01:32:47.775 --> 01:32:57.036
- to talk about whether or not we wanted to go PUD versus zoning district approach. I expressed some hesitancy

01:32:57.036 --> 01:33:00.094
- about using a PUD as a tool for our

01:33:00.450 --> 01:33:07.066
- our best thinking on affordability. If this is really what we think is that it's gonna move the needle,

01:33:07.066 --> 01:33:13.491
- like we should be talking about it in the context of our zoning code and what needs to change in our

01:33:13.491 --> 01:33:20.297
- zoning code. So not that's precluded necessarily by this, but it does add layers that might be unnecessary

01:33:20.297 --> 01:33:27.358
- in my view and are like kind of suboptimal. So that's my general concern, but I need to sort of find a review.

01:33:29.602 --> 01:33:37.660
- Thank you. Other council member comments about it. I guess my primary comment also revolved around that

01:33:37.660 --> 01:33:45.796
- idea is that it really need to be a community and the primary reason that seems to be the street escapes

01:33:45.796 --> 01:33:54.009
- and that seems to open up kind of a bigger concern for me about exactly how inflexible the transportation

01:33:54.009 --> 01:33:56.798
- plan might be in terms of trying to

01:33:58.594 --> 01:34:06.035
- trying to make our goals kind of work together in line in ways that there may be less aligned right

01:34:06.035 --> 01:34:13.922
- now. I'm also generally skeptical, I guess, and I mean, to get a PV right now, you have to have a minimum

01:34:13.922 --> 01:34:21.437
- acreage. And that is probably at least partly why that last quorum of the proposed police station is

01:34:21.437 --> 01:34:27.166
- in there. And I guess I just have in general a lot more questions about that

01:34:27.362 --> 01:34:34.906
- building and that whole project, which was, you know, originally kind of spent the demo and a replacement

01:34:34.906 --> 01:34:42.664
- entirely. So, I have more questions about that kind of place, but I don't think it's necessarily appropriate

01:34:42.664 --> 01:34:50.066
- here, but I also wonder whether DOD is really the right tool for this job, but maybe it's the only tool

01:34:50.066 --> 01:34:51.774
- for this job, but yeah.

01:34:53.922 --> 01:34:59.998
- I think that is an accurate assessment of, we did go back and forth a number of times

01:35:00.322 --> 01:35:06.140
- Pretty in-depth with RBC and with planning to assess that we did all get to the point we thought was

01:35:06.140 --> 01:35:11.901
- that this was the best tool to get it accomplished. That doesn't mean it was a perfect tool, but it

01:35:11.901 --> 01:35:17.661
- was the tool that we could use to get to a lot of these things relatively quickly without coming to

01:35:17.661 --> 01:35:23.595
- you guys with a really comprehensive and intense zoning set of revisions that was going to feel pretty

01:35:23.595 --> 01:35:24.286
- aggressive.

01:35:29.090 --> 01:35:36.950
- There are no other last comments. Anybody? Thank you to the mayor for calling us in. Yeah. And thank

01:35:36.950 --> 01:35:44.733
- you to Allison, and there's a lot of people. There are fewer people in our now than there were when

01:35:44.733 --> 01:35:52.827
- we started, but there is interest from us. So thank you everybody for coming. Thank you, Allie. Thanks,

01:35:52.827 --> 01:35:58.430
- guys. I appreciate it. Thank you. Thank you. With that, I will adjourn.