WEBVTT

00:00:00.706 --> 00:00:10.453
- All right, here we are at a pedestrian safety committee meeting, 2026 for 2027 funding, Thursday, November

00:00:10.453 --> 00:00:20.200
- 19th. Let's do a little roll call of everyone in the room and then online. Kate Rosenbergers, city council

00:00:20.200 --> 00:00:29.310
- district two. Jacob Rossman, attorney for the city council. Sydney Zulek, Bloomington city council.

00:00:32.706 --> 00:00:40.113
- Sophia McDowell, Clerk's Office. David Brantes, Alternative Transportation and Planning. Ryan Roebling,

00:00:40.113 --> 00:00:47.307
- Planning Services Manager for Planning and Transportation. Neil Copper, Senior Project Engineer with

00:00:47.307 --> 00:00:50.654
- the Engineering Department. Thank you. Online.

00:01:04.290 --> 00:01:27.416
- Thank you. Andy. Great. That's us with our quorum doing fine. Okay, so we went packetless this year,

00:01:27.416 --> 00:01:30.622
- saving paper.

00:01:30.818 --> 00:01:38.942
- So I'm just going to roll through our agenda that's the same as every year, so no surprises. We did

00:01:38.942 --> 00:01:47.066
- introductions. We're going to do disclosures of any conflicts of interest. Just mentioned that 2027

00:01:47.066 --> 00:01:54.540
- funding is $500,000 from the ATF. Staff presentation, a little update on 2026 projects, and

00:01:54.540 --> 00:01:58.846
- then recommendations for 2027. That's pretty casual.

00:01:59.010 --> 00:02:07.111
- a slideshow and just questions as anyone thinks about them. Time for public comment and then if we're

00:02:07.111 --> 00:02:15.211
- ready to make recommendations for council, we'll do that. And if not, we will schedule a new meeting.

00:02:15.211 --> 00:02:23.470
- Any other matters that people want to talk about and then we will adjourn. So, sound good? Yes. Silence

00:02:23.470 --> 00:02:25.694
- is a yes. Great. Okay. Yes.

00:02:25.986 --> 00:02:34.018
- We'll start with disclosures of any conflicts of interest. Does anyone have anything to say? Okay, that

00:02:34.018 --> 00:02:42.437
- sounds good. So number two, this year is the same as last year, $500,000 from the alternative transportation

00:02:42.437 --> 00:02:50.932
- fund that we appropriate. So getting that out there. And number three, we'll start on the staff presentation.

00:02:50.932 --> 00:02:53.790
- So David, feel free to take it away.

00:02:57.506 --> 00:03:27.038
- my screen here so we can all look at these pictures. Okay, so

00:03:27.202 --> 00:03:35.678
- I have two things to talk about. One is essentially the same as the 2026 mid-year report that Safe Streets

00:03:35.678 --> 00:03:43.758
- program manager Hank Duncan sent along a couple of weeks ago. And that will give an update as to what

00:03:43.758 --> 00:03:51.837
- was approved last time and what projects we've been working on with engineering. And then I will give

00:03:51.837 --> 00:03:55.006
- our recommendation for the 2027 funding

00:03:55.330 --> 00:04:04.463
- Again, these are both the same amount of money. They're both $500,000. So as you can see, the lion's

00:04:04.463 --> 00:04:13.596
- share of 2026 money was spent on pedestrian safety upgrades on the Safe Streets Priority Network. So

00:04:13.596 --> 00:04:23.362
- that would be Patterson, Grimton, Rogers. And then North Jefferson sidewalk had previously been prioritized

00:04:23.362 --> 00:04:24.990
- by this committee

00:04:25.090 --> 00:04:34.640
- for some design and then partial construction. And last year, with this remaining $58,000, that project

00:04:34.640 --> 00:04:43.822
- is finished out. And then there was a change order for the Union Street sidewalk. And the remaining

00:04:43.822 --> 00:04:53.004
- not shown here, I think it's about $35,500, that is going to be put towards a larger design project

00:04:53.004 --> 00:04:54.014
- of the fee

00:04:54.370 --> 00:05:02.781
- lane and law lane intersection. And that is a paving project coming up in 2028. So a small part of a

00:05:02.781 --> 00:05:11.774
- much larger project there. So these were also in that mid-year report, just a couple of pictures, Jefferson

00:05:11.774 --> 00:05:18.686
- sidewalk. And then you'll see the truck aprons over there on Rogers and Patterson.

00:05:24.642 --> 00:05:33.027
- Is a truck apron just mountable for a big truck, but a place that discourages other people from driving?

00:05:33.027 --> 00:05:41.173
- Yes. So there's, Neil, you can jump in if I get the terms wrong. But there's a control vehicle, which

00:05:41.173 --> 00:05:49.558
- is like a regular passenger car. And that turn radius is tightened down by the truck apron. So it gives,

00:05:49.558 --> 00:05:54.270
- well, it encourages you to drive more slowly, and then you

00:05:54.946 --> 00:06:04.140
- your vehicle would pass through the crosswalk at a more direct and better angle to the pedestrians walking

00:06:04.140 --> 00:06:12.732
- through, so that A column in your car might otherwise block, especially if you're going at a higher

00:06:12.732 --> 00:06:21.324
- speed. And then there's the design vehicle. Neil, is that right? You're doing great. OK. Which is a

00:06:21.324 --> 00:06:23.902
- vehicle that would, you know,

00:06:24.034 --> 00:06:30.927
- Maybe it's a bus or a truck that needs to go through once or twice a day. And they can slow down and

00:06:30.927 --> 00:06:37.957
- roll over that curb if needed. But because they're going to be mounting something in the roadway, they

00:06:37.957 --> 00:06:44.987
- are going to slow down and not want to tip over or anything. So I believe it is drivable. But that red

00:06:44.987 --> 00:06:51.198
- asphalt is that pop of color is getting you to look. And then it does change the radius of

00:06:51.198 --> 00:06:53.246
- what is comfortable to drive.

00:06:53.634 --> 00:07:04.152
- as well. On seventh and college, there is kind of the bike lane and lane kind of goes out kind of into

00:07:04.152 --> 00:07:14.670
- the turn when you're turning. Is that for a similar reason? I've always wondered about that. So you're

00:07:14.670 --> 00:07:20.286
- talking about the? The corner. So when you're driving,

00:07:20.898 --> 00:07:28.543
- West on 7th, and you're turning left onto College, the bike lane kind of comes out into the turn. And

00:07:28.543 --> 00:07:36.338
- I may or may not know, because I may or may not have hit that curb before, but I'm never going to admit

00:07:36.338 --> 00:07:43.908
- that. So I was just wondering if that might have been why, because of the angle. I'm saying nodding.

00:07:43.908 --> 00:07:50.654
- I believe this is a similar concept to the, this is related to the bike lane, right? Yes.

00:07:51.074 --> 00:07:57.051
- That is both protecting the bike lane, but then acting similar to like a hardened center line, which

00:07:57.051 --> 00:08:03.324
- juts out in front of a crosswalk. Because when you're taking a left turn, that's a, that's a wider angle.

00:08:03.324 --> 00:08:09.538
- Like, um, then a right turn is more likely to be like a 90 degree, which is, you have to take it slower.

00:08:09.538 --> 00:08:15.752
- It's very tight. You might have to swing out a little bit to make that. Um, but with left turns, there's

00:08:15.752 --> 00:08:20.190
- a tendency to go at a higher speed just because you have the room. Gotcha.

00:08:20.482 --> 00:08:29.586
- So a hardened center line or one of those cast-in-place concrete pieces out there is making sure that

00:08:29.586 --> 00:08:38.779
- you're going maybe it's 10 more feet and then taking a similarly angled turn as you would going right.

00:08:38.779 --> 00:08:48.062
- OK, thank you. I'm not saying I fit that curve, just to be clear. I'm seeing where that's the wild one.

00:08:54.114 --> 00:09:06.023
- This is more on Grimes, a pedestrian refuge island and race crosswalk. And more refuge island and a

00:09:06.023 --> 00:09:18.408
- curb extension, both on Rogers. And this is a curb extension on Rogers on the left and the race asphalt

00:09:18.408 --> 00:09:22.814
- crosswalk on Union near 10th Street.

00:09:25.762 --> 00:09:38.066
- So this year's pretty simple. We don't have any expected change orders or specified projects to pick

00:09:38.066 --> 00:09:50.491
- up on from previous years. So we're keeping it pretty general. Essentially, the safe streets priority

00:09:50.491 --> 00:09:55.486
- network identifies areas where there are

00:09:56.898 --> 00:10:05.952
- vehicle-only high-injury crashes there. There's vulnerable road user crashes. And as well as in our

00:10:05.952 --> 00:10:15.459
- transportation plan or in our Safe Streets for All safety action plan, we took into account demographics

00:10:15.459 --> 00:10:24.694
- of who lives in the area and public input. So this is the framework that we're kind of always working

00:10:24.694 --> 00:10:26.686
- from and prioritizing

00:10:26.978 --> 00:10:35.995
- the most dangerous intersections and corridors that we can make improvements on first. And then eventually

00:10:35.995 --> 00:10:44.675
- the scores will tick down and we'll have new highest priorities. And the idea is that this is the best

00:10:44.675 --> 00:10:53.439
- way to get to Vision Zero and we have an adopted Vision Zero goal by the year 2039. So this is the most

00:10:53.439 --> 00:10:56.894
- effective way we figure to achieve that.

00:10:58.626 --> 00:11:07.006
- So this money is oriented towards pedestrian safety. So a couple of examples that you've seen is those

00:11:07.006 --> 00:11:15.712
- sidewalk, well, sidewalk construction has historically been included, such as Jefferson Street, crosswalks

00:11:15.712 --> 00:11:24.010
- and intersection improvements. So some of those intersection improvements would be those truck aprons

00:11:24.010 --> 00:11:27.102
- or improved curb ramps maybe making a

00:11:27.394 --> 00:11:37.742
- sort of sweeping curb, more of like a directional curb ramp with some protection in the middle. It could

00:11:37.742 --> 00:11:47.992
- be a refuge island. It could be removing a right turn lane near an intersection to shorten the crossing

00:11:47.992 --> 00:11:56.862
- distance. These are effectively where pedestrians are having most conflicts with drivers.

00:11:57.442 --> 00:12:06.615
- So we find that that's going to have the greatest impact and we will be choosing these projects based

00:12:06.615 --> 00:12:15.249
- on their feasibility. So working with the engineering department to see what can we spend money

00:12:15.249 --> 00:12:24.333
- on effectively and all being on the priority network and also what can we do efficiently and we have

00:12:24.333 --> 00:12:25.502
- to work with

00:12:25.634 --> 00:12:34.391
- public works to incorporate some of these changes into regularly scheduled paving projects. And I do

00:12:34.391 --> 00:12:43.408
- want to couch all of these as options. We're not necessarily committing to a specific project with this

00:12:43.408 --> 00:12:52.079
- recommendation, but we're allowing for some flexibility to, if something that's highest on the list

00:12:52.079 --> 00:12:53.726
- does not work out,

00:12:53.858 --> 00:13:02.512
- Or it may be infeasible for one reason or another. When paving gets delayed, we can scoot on to the

00:13:02.512 --> 00:13:11.338
- next thing on that list. So two corridors I want to highlight is ones that we're already studying. So

00:13:11.338 --> 00:13:20.338
- we're in the midst of these studies being reviewed by various commissions. And we have some preliminary

00:13:20.338 --> 00:13:21.982
- designs for these.

00:13:23.074 --> 00:13:33.358
- There may be parts of these designs at intersections where we can do little bits and pieces and incrementally

00:13:33.358 --> 00:13:43.362
- work our way to that full design once it's approved. So we've identified some ideas that we can implement.

00:13:43.362 --> 00:13:51.870
- Obviously $500,000 is not enough to revamp an entire corridor here. But as it is feasible,

00:13:52.098 --> 00:14:01.346
- we can start to use these studies and implement them quickly with this. So Rogers, oops, sorry. Rogers

00:14:01.346 --> 00:14:10.413
- Madison Kinzer is full of high priority intersections and highest priority intersections. We do have

00:14:10.413 --> 00:14:19.392
- a grant application in for a sidewalk app on Kinzer. I believe it's on the west side. So we haven't

00:14:19.392 --> 00:14:21.726
- heard back from that yet.

00:14:21.954 --> 00:14:31.754
- yet know whether that will be covered by other funds. Potentially, we could use this pedestrian safety

00:14:31.754 --> 00:14:41.745
- committee money there, or if that's taken care of, we could give it to something else. So there's taking

00:14:41.745 --> 00:14:50.974
- a number of different avenues to try to get the safety concerns solved and give pedestrians more

00:14:51.106 --> 00:15:01.275
- connectivity and options here. Yeah, for sure. Third and Rogers is just like left out of that a little

00:15:01.275 --> 00:15:11.345
- bit. It was like second to country club and fourth to 17th. Is it part of the fourth to 17th? I mean,

00:15:11.345 --> 00:15:19.934
- would it? Because I think it is in it. Yeah, that is a very high priority intersection

00:15:20.034 --> 00:15:27.359
- I think that's just an error I was trying to label. Since Rogers changes its priority level part way

00:15:27.359 --> 00:15:34.611
- through, I don't remember where exactly it changes. But Third and Rogers is, I believe it's on that

00:15:34.611 --> 00:15:41.936
- list. I may be thinking College and Rogers. Third and Rogers is, I actually just had a resident talk

00:15:41.936 --> 00:15:49.406
- to me about it. So it was on my radar that people mostly go west on Third and then turn left or right.

00:15:49.538 --> 00:15:56.445
- they don't go into the neighborhood. And so it's like a little trickier to cross because most of the

00:15:56.445 --> 00:16:03.353
- traffic is going this way. So I just wondered if it is on one of the highest priority intersections.

00:16:03.353 --> 00:16:10.260
- It is highest priority. And I believe that's being that intersection from, well, Thurden Rogers over

00:16:10.260 --> 00:16:17.235
- to Thurden College was included in that recent bond. Is that right? Yeah, we're starting up design on

00:16:17.235 --> 00:16:18.398
- a project there.

00:16:20.002 --> 00:16:29.621
- So it is on the list. I should have had it here, but probably not something that we'll need money for,

00:16:29.621 --> 00:16:39.333
- I don't imagine, because we have that bond already. Great. So here's just an example of an intersection

00:16:39.333 --> 00:16:46.430
- we've already had looked at under the Rodgers Madison Kinzer quarter study.

00:16:47.362 --> 00:16:55.279
- What's the cross street? Oh, that's six. I'm sorry. Six goes east and west there. And that's one that

00:16:55.279 --> 00:17:03.506
- historically we've gotten a lot of feedback about. Right. We have a hard time crossing there. Yes. That's

00:17:03.506 --> 00:17:11.423
- just the intersection as it is now? Yes, as it is now. And then College and Walnut Corridor obviously

00:17:11.423 --> 00:17:15.614
- has lots of intersections that could see improvement.

00:17:15.874 --> 00:17:23.811
- It's a little bit more difficult with this amount of money. But I didn't want to rule anything out yet

00:17:23.811 --> 00:17:31.672
- without talking to engineering about all of their various projects that are going on here. And if you

00:17:31.672 --> 00:17:39.455
- have more questions, Neil and Ryan are both familiar with what projects are going on here. I believe

00:17:39.455 --> 00:17:44.926
- there's more going on the northern portion of both college and Walnut.

00:17:45.538 --> 00:17:56.298
- We have addressed a lot of the minor changes that could happen before needing to fully change the cross

00:17:56.298 --> 00:18:06.852
- section or the curb to curb configuration. And then next is repaving opportunities. Fee lane is a big

00:18:06.852 --> 00:18:12.542
- one. That is scheduled actually to be repaved in 2028.

00:18:14.498 --> 00:18:24.529
- but this would be the year to encumber funds for construction. As I mentioned before, in 2026, there

00:18:24.529 --> 00:18:34.858
- were some design funds sent towards Fee Lane. There is an existing project going on with trying to make

00:18:34.858 --> 00:18:44.094
- improvements on that corridor, I believe from 10th to 17th. So that is coming down the line,

00:18:44.226 --> 00:18:52.817
- it would be an effective use of these funds as well. Okay, good to do, any questions? With the fee line,

00:18:52.817 --> 00:19:01.000
- fee and law repaving, so we're going to work on that design with IU, is that right? Or is it all up

00:19:01.000 --> 00:19:09.182
- to us? We are coordinating with IU, yeah, the ownership in that area is very murky, so we're trying

00:19:14.178 --> 00:19:22.372
- The bridge on Eagleson is being replaced right now, which has led to like a temporary traffic signal

00:19:22.372 --> 00:19:29.999
- at P and Long that you'll see. But I think that's, that may be what you're thinking of. Okay,

00:19:29.999 --> 00:19:38.193
- thank you. What happened to, I thought we were putting in some kind of crosswalk by Briscoe from the

00:19:38.193 --> 00:19:43.710
- bus stop across, from the east. Is Briscoe the northern mayor of P?

00:19:44.290 --> 00:19:51.758
- So that is tentatively included in this as a potential piece of this larger project. OK. Because I think

00:19:51.758 --> 00:19:59.156
- students are just shooting across the street, you know, and it's wild right there. OK. OK, great. Andy,

00:19:59.156 --> 00:20:06.553
- do you have any questions? Well, you'll just shout them if you do have them, I think. Yeah, I have just

00:20:06.553 --> 00:20:13.310
- a couple general questions. First of all, just generally speaking, this is a little tentative.

00:20:13.474 --> 00:20:19.946
- Is it, would it be possible to use any of these funds to go towards public transit, at least to maybe

00:20:19.946 --> 00:20:26.481
- help in the event that they needed funding to be sort of, to continue to provide service for the year,

00:20:26.481 --> 00:20:32.889
- just to get through a period, a rough period or whatever? You know, alternative transportation would

00:20:32.889 --> 00:20:39.234
- seem to be anything other than single occupancy vehicles, so it seems like transit fits this, and I

00:20:39.234 --> 00:20:43.358
- don't know, it's not really directly related maybe to the safety

00:20:44.002 --> 00:20:50.472
- component as much, but that's one question. And then second of all, which I don't expect an immediate

00:20:50.472 --> 00:20:56.942
- answer, but that's just something I was thinking about. Then the other thing, though, is all the data

00:20:56.942 --> 00:21:03.920
- I'd like to ask staff, to be on the record, is asking for all the data that's being used, all the information

00:21:03.920 --> 00:21:10.327
- and data and resources that are being used to determine, to ascertain the dangerous intersections of

00:21:10.327 --> 00:21:13.118
- what the criteria are and what data led to.

00:21:13.250 --> 00:21:21.180
- I know there's a lot of publics that are really interested in this information, to be able to see it.

00:21:21.180 --> 00:21:28.954
- See how maybe they live nearby, these intersections, and they want to see that data. So I'd like to

00:21:28.954 --> 00:21:37.273
- make a formal request that everything that's being used by staff makes these recommendations and decisions

00:21:37.273 --> 00:21:38.750
- to be made public.

00:21:41.922 --> 00:21:52.288
- Could staff answer the question about the data? Yeah, to my knowledge, it is publicly available in the

00:21:52.288 --> 00:22:03.358
- Safe Streets for All safety action plan. And I went through some of the criteria, but. Yeah, well. Everything

00:22:03.358 --> 00:22:10.302
- that's being used to make the determination all the data related to.

00:22:10.498 --> 00:22:18.008
- any traffic data or accident data or anything? Yeah, all data used for the safety action plan was included

00:22:18.008 --> 00:22:25.238
- and then there's also the crash dashboard for ongoing data, crash data. So, and you're sure that's all

00:22:25.238 --> 00:22:32.327
- updated? Because I've had a lot of members of the public say that there are big gaps and it's really

00:22:32.327 --> 00:22:39.486
- not complete and full and that some information has not been made available because it is priority or

00:22:40.226 --> 00:22:47.298
- property of consultants or something? Nothing's property of consultants. We can't share all data just

00:22:47.298 --> 00:22:54.717
- because of our agreement with the state of Indiana, who is the keeper of all data. We can't share anything

00:22:54.717 --> 00:23:01.790
- that's personally identifying. We have to accept their rules. But all data is, a member of the public

00:23:01.790 --> 00:23:09.694
- could ask for that data, but just not through us, but through the state. OK. Thank you. Thanks for your response.

00:23:10.306 --> 00:23:17.299
- I can touch on the, can we use this money to fund Bloomington Transit? So last year when we changed

00:23:17.299 --> 00:23:24.432
- the name of this committee from Sidewalk Committee to the Pedestrian Safety Committee, there was like

00:23:24.432 --> 00:23:31.915
- a mission statement that went along with that. I don't have it in front of me, but it was fairly specific.

00:23:31.915 --> 00:23:38.558
- I mean, it was more specific than the ATF itself about what we were going to use the money on.

00:23:39.010 --> 00:23:46.613
- I would just say we could talk about it as a committee if we wanted to like make a change to our work

00:23:46.613 --> 00:23:54.366
- here. I'm of the opinion that the city has other money that could be used for transit and we don't need

00:23:54.366 --> 00:24:01.969
- to be taking funding that's for enhancing the pedestrian realm for transit. Like these are two things

00:24:01.969 --> 00:24:07.038
- that need to happen and they don't have to take from the other one.

00:24:07.138 --> 00:24:15.223
- Andy, it would be great to talk about funding BT in a different way because I think they do need more

00:24:15.223 --> 00:24:23.466
- money. Okay. I have a question. I think all the projects are very cool and I'm glad that we're pursuing

00:24:23.466 --> 00:24:31.392
- them. Just make sure you speak up. Oh, okay. I like the projects and I'm grateful for the work that

00:24:31.392 --> 00:24:36.702
- y'all have done. If we're just making an allocation of $500,000 to

00:24:37.122 --> 00:24:47.812
- this one kind of overarching goal. I'm not sure what the purpose of this committee is. That's not to

00:24:47.812 --> 00:24:58.608
- say that I'm not okay with the money going there. I'm just not sure what role will we play in helping

00:24:58.608 --> 00:25:06.334
- decide which specific projects it goes to or how we go about doing that.

00:25:07.074 --> 00:25:14.451
- I'm agnostic on the answer, so please don't interpret this as who's doing what with what money.

00:25:14.451 --> 00:25:22.365
- It's just, how can our committee be more helpful? I'm going to send this one to Ryan, because you have

00:25:22.365 --> 00:25:30.433
- attended previous committee meetings, which I have not. That's true. Actually, Neil probably will answer

00:25:30.433 --> 00:25:36.734
- better not to keep kicking my ass. I'll answer, too. I mean, I'm happy to accept.

00:25:36.866 --> 00:25:42.724
- I think you're... Either way, I'll go. So, I mean, a couple of things I'll note is that there have been

00:25:42.724 --> 00:25:48.469
- discussions about whether the committee should exist at all. Now that we've moved to a more objective

00:25:48.469 --> 00:25:54.101
- prioritization process, you know, kind of what is, so that was discussed in previous committees and

00:25:54.101 --> 00:25:59.734
- the committee still exists. And then one thing, last year there was some discussion, because again,

00:25:59.734 --> 00:26:05.592
- last year, majority of the funds, it was like, put it in this prioritization for these types of things.

00:26:05.592 --> 00:26:06.718
- And there was this,

00:26:06.818 --> 00:26:12.269
- discussion about how do we know, you know, what it is and how you're going to use it. And I think at

00:26:12.269 --> 00:26:17.882
- the time, part of the discussion was, well, let's see how it goes and see if you use it in the way that

00:26:17.882 --> 00:26:23.549
- you said you were going to use it and see if, you know, see if the projects are appropriate. And I mean,

00:26:23.549 --> 00:26:29.000
- I think David was demonstrating, we did, we used the funding as we, as we said we were going to. And

00:26:29.000 --> 00:26:34.451
- there's kind of that oversight that you're providing here to see that. But I think it probably is an

00:26:34.451 --> 00:26:35.422
- open question of,

00:26:36.194 --> 00:26:45.611
- Was that okay? I think too, I initially got on this committee in 2024 to dismantle it, the sidewalk

00:26:45.611 --> 00:26:55.029
- committee, because I didn't think it was necessary. And it seems like every year there's not enough

00:26:55.029 --> 00:27:04.446
- council members that think that. So it stays, you know, but it is always up for debate. I think it,

00:27:04.834 --> 00:27:11.264
- It was either earlier this year or last year. How does time work that we had a deliberation session

00:27:11.264 --> 00:27:17.693
- about what should the purpose be? Should it still exist? And it was kind of like, right, let's keep

00:27:17.693 --> 00:27:24.251
- doing it. And I think to right now with the safe streets for all, it makes a lot of sense to put that

00:27:24.251 --> 00:27:30.745
- money there. Some council members are worried if we don't have it, that that money will like kind of

00:27:30.745 --> 00:27:31.838
- get lost or will

00:27:32.258 --> 00:27:38.746
- kind of take the place of other funding, like that we would kind of lose the $500,000 somewhere else,

00:27:38.746 --> 00:27:45.362
- I guess. Like it feels separate, and then it's like, well, it just goes into a bucket. Does that bucket

00:27:45.362 --> 00:27:51.977
- stay the same, or does it increase $500,000, kind of? But I'm always up for the conversation, you know,

00:27:51.977 --> 00:27:59.038
- with staff or without them, too. I think if you're still thinking about potentially disbanding it, I wonder if

00:28:00.162 --> 00:28:07.642
- we could make a recommendation as a committee because I know that y'all are busy and I'm sure that preparing

00:28:07.642 --> 00:28:14.505
- for this meeting is not what the best use of your time either. And I wonder if we could just have a

00:28:14.505 --> 00:28:21.505
- discussion about how we could work it into a budget line just to make sure that that money still gets

00:28:21.505 --> 00:28:29.054
- spent on what we're hoping to get it spent on. I welcome feedback from staff, but you don't have to offer it.

00:28:29.410 --> 00:28:37.571
- if you don't have anything to add. Yeah, staff would be supportive of combining with engineering's budget

00:28:37.571 --> 00:28:45.579
- as a line item. It's kind of what we're proposing each year. I think that's something we would be happy

00:28:45.579 --> 00:28:53.663
- to do going forward in updating the law with how we spend the money. OK. All right. Don't have a problem

00:28:53.663 --> 00:28:58.206
- with that? Andy? Well, so I'm wondering, so the priorities

00:28:59.682 --> 00:29:10.917
- So where, as you said, as a periodic update on how the money is being spent, are we losing an opportunity

00:29:10.917 --> 00:29:21.516
- for input that could theoretically potentially happen now to this committee? Is that lost? Is there

00:29:21.516 --> 00:29:23.742
- some representation?

00:29:24.898 --> 00:29:34.234
- of council priorities and of the public through their council reps to attempt to be lost. Yeah, I think

00:29:34.234 --> 00:29:43.749
- it is a conversation for all of council, honestly, because I think people have strong opinions who aren't

00:29:43.749 --> 00:29:53.982
- here. And we could do that. We could put it on the agenda for when we talk about these recommendations, too, that

00:29:55.298 --> 00:30:02.905
- What is the point? I mean, this committee has, the purpose I think has changed over the years from more

00:30:02.905 --> 00:30:10.219
- of what residents say gets done to more of an equitable, like where do we have the highest need and

00:30:10.219 --> 00:30:17.680
- where can we enhance the pedestrian realm, which I think is pretty awesome in that space. And kind of

00:30:17.680 --> 00:30:21.630
- from like creating sidewalks that are so expensive to

00:30:22.690 --> 00:30:29.265
- doing more like bump outs and crosswalks and things that were like pedestrians are really at risk. I

00:30:29.265 --> 00:30:35.775
- remember when Isabel was last on it, we talked about is a crosswalk part of a sidewalk because it's

00:30:35.775 --> 00:30:42.286
- in a street, but that's where people tend to have, well, people have the most, pedestrians have the

00:30:42.286 --> 00:30:48.926
- most conflict with cars because cars don't tend to be on sidewalks, but they are. And I know it's not

00:30:48.926 --> 00:30:50.814
- good. People die. So I think

00:30:52.578 --> 00:30:59.499
- If you want to make a recommendation, we can, and we can vote. If you want to move to do that, we can

00:30:59.499 --> 00:31:06.352
- vote on it, and we can talk about it at council, I think. We wouldn't dismantle, I think, with these

00:31:06.352 --> 00:31:13.341
- recommendations, I think it would be a different kind of vote, probably in an ordinance. I don't know.

00:31:13.341 --> 00:31:20.126
- I also think if there are council members that feel strongly about the Pedestrian Safety Committee,

00:31:20.610 --> 00:31:26.800
- they should serve on the pedestrian safety committee. Sure, yes, yes. And we have had Council Member

00:31:26.800 --> 00:31:32.805
- Rallo was on it from inception, so for a very long time, and then he stepped down to give others,

00:31:32.805 --> 00:31:38.995
- you know, well, I think he was pursued other interests also. Okay. Because he was on it for probably

00:31:38.995 --> 00:31:45.246
- 15 plus years. Yeah. But yeah, we can do that too. Okay. I mean, it's not, it's not that I think that

00:31:47.106 --> 00:31:53.635
- If we're just going to allocate $500,000 to the Safe Streets for All plan, I think that's great. I don't

00:31:53.635 --> 00:32:00.039
- know that we need a full meeting to decide that that's what we're doing. I think that that could maybe

00:32:00.039 --> 00:32:06.256
- be incorporated into the budget discussions. And staff might like that too. We could even, a hybrid

00:32:06.256 --> 00:32:12.661
- would maybe be not every year. Yeah. Right. Go run with this for three years, right? Or like an ad hoc

00:32:12.661 --> 00:32:16.702
- committee check-in. What are we doing with Safe Streets for All?

00:32:17.090 --> 00:32:26.915
- Are we still on the same page? I do think. I mean, I know it's right. It's always a lot of staff people

00:32:26.915 --> 00:32:36.362
- here for what we're doing. It feels like a lot of time. I do feel good about where it was and where

00:32:36.362 --> 00:32:46.942
- it is now in terms of leeway for staff. But I'm with you. Any other comments from staff? Murphy Waters. OK. OK.

00:32:49.314 --> 00:33:02.093
- Okay, so is that the end of the presentation? Okay, yes, keep going. So as I mentioned, a lot

00:33:02.093 --> 00:33:15.823
- of opportunities for improvements on Fee Lane. It's a very heavy sidewalk use area, as well as buses

00:33:15.823 --> 00:33:18.270
- and potential for

00:33:19.010 --> 00:33:29.512
- protected bike lanes or for tree plots or sidewalk widening as a part of this larger project. So this

00:33:29.512 --> 00:33:39.808
- is a medium priority corridor and this is a big opportunity for staff to coordinate with IU on this

00:33:39.808 --> 00:33:48.766
- one as well as Public Works. So we've already kind of touched on that. I think this is

00:33:49.090 --> 00:34:00.843
- close to Briscoe, if not Briscoe, on the left. And then on the right is Fee and Law. So Fee and Law

00:34:00.843 --> 00:34:12.948
- has, I think, Neil, you mentioned that money will be encumbered this year sometime from 2026. And then

00:34:12.948 --> 00:34:18.942
- on 17th Street, that is also coming down the line.

00:34:19.170 --> 00:34:29.378
- If you remember, there has been a fatality here in recent memory. So this is an important corridor to

00:34:29.378 --> 00:34:39.787
- look at, especially with IU. And this will be, you know, Phi and 17th do intersect, and the 17th Street

00:34:39.787 --> 00:34:48.894
- intersection will be done as a part of the Phi lane in 2028, not with 17th Street in 2027.

00:34:49.762 --> 00:34:56.569
- Yes. 17th Street. Lingelbach Lane. I've never said that in my life. So there's no sidewalk there.

00:34:56.569 --> 00:35:03.792
- I mean, we're missing like that little bit, and it's just pretty treacherous. I do a run loop sometimes

00:35:03.792 --> 00:35:11.154
- there. I'm like, we're getting there. Is that part? I mean, this is intersections. Are we not considering

00:35:11.154 --> 00:35:17.822
- then like the sidewalk build out there and just intersection improvements? You're talking about

00:35:18.018 --> 00:35:25.515
- the east edge of 17th Street there, east of Lingelbach. Well, east and west, there's no, as you go up

00:35:25.515 --> 00:35:33.085
- that hill, you're just in a, it's just gutters. Yeah, from like, what is it, David Baker, is that what

00:35:33.085 --> 00:35:40.876
- it's called there? To the east, there's nothing. That's been talked about over the years, multiple times,

00:35:40.876 --> 00:35:46.462
- and I think it could be pursued, I'll say it's a very challenging corridor.

00:35:46.754 --> 00:35:52.462
- IU at one point was investigating it and determined from their perspective, it didn't seem feasible

00:35:52.462 --> 00:35:58.455
- with the grades and probably the number of trees. Right. I mean, there's no buildings. It is just trees.

00:35:58.455 --> 00:36:04.448
- Yeah. I don't know if, you know, if we would reach the same conclusion, but it would be a very expensive

00:36:04.448 --> 00:36:10.384
- project. It could be beyond the budget that we had. Well, this definitely, yeah. But it could be looked

00:36:10.384 --> 00:36:16.606
- at or should be looked at for sure. Cause there's nothing on either side of the street. Right. Okay. Thanks.

00:36:16.898 --> 00:36:25.489
- And then lastly, more spike, this is a medium low. Priority corridor, and this is just from College

00:36:25.489 --> 00:36:34.166
- Mall to Olcott. Potentially there's some opportunities for narrowing the road near intersections and

00:36:34.166 --> 00:36:43.100
- removing right turn lanes. There was one recently done on Winslow that's a good example to lower speeds

00:36:43.100 --> 00:36:44.990
- around turns and then

00:36:45.090 --> 00:36:53.571
- also through intersections near those crosswalks as well. Any questions on that one? Sorry, this is

00:36:53.571 --> 00:37:02.051
- Morse Pike from college. Oh, I see. Yeah, College Mall East all the way over to Olcott. My question

00:37:02.051 --> 00:37:10.617
- is, are we already at medium-low priorities? That feels really low. Yeah, so this one would not have

00:37:10.617 --> 00:37:14.942
- been included if it weren't in a repaving project.

00:37:15.522 --> 00:37:24.230
- This, again, I don't know where exactly this will fall on the priority list. It may not make it on there.

00:37:24.230 --> 00:37:32.609
- I just wanted to throw that out there. We'll see how much it costs when we repave. Eventually, you'll

00:37:32.609 --> 00:37:41.070
- be paving less asphalt if you remove the turn lanes. But there are just some parts where it gets quite

00:37:41.070 --> 00:37:45.342
- wide near intersections, which could be a conflict.

00:37:46.082 --> 00:37:52.541
- vehicles are speeding through there. So yeah, this is something to be evaluated. Maybe there's some

00:37:52.541 --> 00:37:59.001
- small changes that we can toss a couple of dollars that way when it gets repaid next year. It would

00:37:59.001 --> 00:38:05.589
- be helpful to me if you just put desert repayment on a bullet for next year, if we have it next year.

00:38:05.589 --> 00:38:12.242
- You know what I mean? To be like, that's why this is getting considered. Yeah, this 17th fee and more,

00:38:12.242 --> 00:38:13.534
- this whole section.

00:38:13.634 --> 00:38:21.739
- Oh, I see. Okay, was that you did put it on here? It's not on each slide, no. So would you do like the

00:38:21.739 --> 00:38:29.844
- South College Moores intersection? That one with like the triangle pedestrian situation? Probably not.

00:38:29.844 --> 00:38:37.948
- Okay, like so east of that. Yeah. It depends how far into the Olcott intersection we want to get into.

00:38:37.948 --> 00:38:43.614
- I think that's probably the most relevant one to look at where you have

00:38:44.354 --> 00:38:54.317
- It's kind of a raised crossing there. Um, it's probably 30 feet across. Um, yeah, because I see. Yeah.

00:38:54.317 --> 00:39:04.183
- And there's a, there's a right turn lane as well. And the, um, the distance is just a little much for

00:39:04.183 --> 00:39:13.662
- that area, but as I said before, it has a lower rating here, but if it's cheap. Um, so with that,

00:39:13.890 --> 00:39:23.159
- Our recommendation is $500,000 towards the Safe Streets Priority Network with allowing some flexibility

00:39:23.159 --> 00:39:32.606
- for the committee chair to authorize a minor change if needed. And that is all I have. Thank you. Council

00:39:32.606 --> 00:39:41.608
- comment right now. Then we'll go to public comment. Okay, let's go to public comment. Anybody in the

00:39:41.608 --> 00:39:43.390
- room? We're online.

00:39:44.546 --> 00:39:58.978
- If you have something, you can raise your hand. And you'll have three minutes looking. I'm surprised.

00:39:58.978 --> 00:40:12.702
- No one? Okay. Oh. We gotta wait. Okay, we'll go on a recess. Okay, here we are, recess finished.

00:40:13.186 --> 00:40:22.350
- Okay, great. You're okay, I think. All right. So I just want to say again, I think if anyone in anybody

00:40:22.350 --> 00:40:31.161
- wants to talk public comment, you're still free to do it. We're back, we're going to give that just

00:40:31.161 --> 00:40:40.766
- 20 seconds or so. During that time, I'll just say the next move is either making a recommendation today that

00:40:41.058 --> 00:40:49.892
- for Common Council to approve or not, or scheduling a second meeting if we feel like we have more matters

00:40:49.892 --> 00:40:58.560
- to discuss. Okay, looks like no public comment. I would be happy to move to recommend today to the full

00:40:58.560 --> 00:41:06.977
- body of council. Okay, Sydney recommends. Is there a second? Second. Okay, great. So let's do a roll

00:41:06.977 --> 00:41:08.894
- call vote to recommend

00:41:09.826 --> 00:41:19.424
- the 2027 funding for the Pedestrian Safety Committee at funds. Do I call role? Okay, Sydney? Yes. Andy?

00:41:19.424 --> 00:41:29.022
- Yes. Kate? Yes. So that is three zero these, we vote to recommend these to city council and an upcoming

00:41:29.022 --> 00:41:39.358
- meeting. We're kind of getting that on the agenda rather soon. So they have everything going into the new year.

00:41:39.874 --> 00:41:49.344
- Next item is other matters, any other matters? I'll just thank staff. I hope you don't take my comments

00:41:49.344 --> 00:41:58.540
- as disparaging. I'm very proud of the work that y'all do. I don't know that you need this extra step

00:41:58.540 --> 00:42:05.278
- to do the work. Okay, that is it and we can adjourn. Thank you everybody.
