WEBVTT

00:00:00.514 --> 00:00:07.366
- We're going to get started for the Read Amount Commission meeting of December 15th, 2025. We'll start

00:00:07.366 --> 00:00:14.352
- with our meeting with a roll call, please. Lori McRobbie, present. Cece Campbell-Lurie, present. Marina

00:00:14.352 --> 00:00:21.070
- Cassidy, present. John Wedge, present. Deborah Meyerson, present. And staff available, please. Anna

00:00:21.070 --> 00:00:27.855
- Gillian Beathen, present. Christina Finley, and Amy Casperl, present. Jane Cougarsmith, economic and

00:00:27.855 --> 00:00:29.534
- sustainable development.

00:00:31.906 --> 00:00:42.442
- Dana Kerr, legal department. Where did you see staff? Mass Winning Hand Department. Thank you. OK. So

00:00:42.442 --> 00:00:53.700
- the first item on our agenda is the minutes from December 1, 2025. Any comments or questions, commissioners,

00:00:53.700 --> 00:00:58.142
- on the minutes? Move for approval. Second.

00:00:58.562 --> 00:01:07.313
- We've got a first and a second. All in favor say aye. Aye. Any opposed? Motion passes unanimously. Next

00:01:07.313 --> 00:01:16.063
- item on the agenda is examination of claims registers for December 5th, 2025. Any questions or comments

00:01:16.063 --> 00:01:24.814
- from commissioners on this item? Yes, I have a question. On page 44, number 223, can you remind me what

00:01:24.814 --> 00:01:27.422
- we own at 105 West 4th Street?

00:01:31.362 --> 00:01:40.807
- Is that a 4th Street garage? I'm not sure. That could be. I just couldn't remember the address. I'm

00:01:40.807 --> 00:01:51.103
- thinking it's the 4th Street garage commercial spaces. Yes, it is. All right. Thank you. Any other questions

00:01:51.103 --> 00:02:00.926
- or comments from commissioners on the claims registered from December 3? One question on the first one.

00:02:01.218 --> 00:02:09.648
- let alone one in general, on the neighborhood grants, just on Bluestone and Andrew Mars. That was a

00:02:09.648 --> 00:02:18.163
- combined grant to the Bentley homeowners for the 9,067. So it was broken up into actual physical and

00:02:18.163 --> 00:02:26.594
- then consulting. Well, one of them appears to be consulting, and one of them is actually the actual

00:02:26.594 --> 00:02:27.774
- installation.

00:02:28.130 --> 00:02:34.845
- Yeah, the Mars is consulting. So we're about even in regards to consulting the actual fiscal approval.

00:02:34.845 --> 00:02:41.430
- Yeah, and that's through our neighborhood improvement groups, which are not to funding. Right. Yeah,

00:02:41.430 --> 00:02:48.015
- I just wanted to clarify the difference between the two. Thank you. Thank you. If there are no other

00:02:48.015 --> 00:02:54.665
- questions or comments, I will enter the motion for the claims register of December 5th. Move approval

00:02:54.665 --> 00:02:57.534
- for claims register for December 5th, 2025.

00:02:57.730 --> 00:03:03.808
- Second. We've got a first and a second. All in favor say aye. Aye. Any opposed? Passes unanimously.

00:03:03.808 --> 00:03:10.311
- Next item in the agenda, examination of payroll registers for November 26, 2025. Any questions or comments

00:03:10.311 --> 00:03:16.389
- from commissioners on this item? Make a motion as presented. Second. Second. First and two seconds.

00:03:16.389 --> 00:03:22.588
- All in favor say aye. Aye. Any opposed? Motion passes unanimously. Thank you. Next item on our agenda

00:03:22.588 --> 00:03:27.390
- is the report of officers and committees. We have a director's report tonight.

00:03:27.586 --> 00:03:35.199
- If you don't, I'm happy to answer any questions. Thank you. Lincoln Report? Nothing specific. I'm here

00:03:35.199 --> 00:03:42.590
- for any questions. OK. Thank you. A Treasurer's Report. I don't know if we even have the controller

00:03:42.590 --> 00:03:50.203
- here. OK. Well, anybody get in touch with the controller if you have questions. A Business Development

00:03:50.203 --> 00:03:56.190
- Update. Not this evening, but also happy to answer questions. Thank you so much.

00:03:56.578 --> 00:04:03.751
- Um, so next item on our agenda is under new business. Um, but, uh, okay, old business until the end.

00:04:03.751 --> 00:04:10.996
- Okay. There we go. So, uh, first item on our agenda under new business is resolution 25-141, approval

00:04:10.996 --> 00:04:17.743
- of agreement with adaptive commons for comprehensive and coordinated design of Hopewell Block,

00:04:17.743 --> 00:04:25.342
- West Block 4. Who'd like to speak to that? We actually have them online ready to, um, give a presentation.

00:04:30.530 --> 00:04:43.682
- Welcome. Turn the captions on, that would be helpful. Thank you. Sorry, we're having computer. Just

00:04:43.682 --> 00:04:57.886
- under more, there should be captions option. Can we just turn up the volume? Well, both is fine. Thank you.

00:05:02.114 --> 00:05:09.443
- OK, you guys are welcome to share your screen if you would like. There was a proposal that was included

00:05:09.443 --> 00:05:16.489
- in your package. Great. Are you able to see that? Yes. All right. So, well, hello, everyone. We are

00:05:16.489 --> 00:05:23.747
- Adoptive Commons. My name is Riley Gibson. And I'm your assistant. And we're really excited to present

00:05:23.747 --> 00:05:30.794
- our proposal, our scope of work, to begin the pre-development work for the redevelopment of Block 4

00:05:30.794 --> 00:05:31.710
- at Hopewell.

00:05:34.082 --> 00:05:40.452
- So to start off, my name is Renee Gibson. I come from a background in architectural design and community

00:05:40.452 --> 00:05:46.579
- engagement. I have, since my career, focused on involving community members and neighborhoods in the

00:05:46.579 --> 00:05:52.888
- shaping of their built environment. And I am super excited to work as the portfolio manager of Adaptive

00:05:52.888 --> 00:05:59.137
- Commons, where I oversee our pipeline of investment projects and workforce affordable housing projects

00:05:59.137 --> 00:06:00.350
- across the country.

00:06:01.122 --> 00:06:06.762
- And just by way of background, I'm a native New Yorker. I went to high school in a much more affluent

00:06:06.762 --> 00:06:12.678
- neighborhood, a public high school, and a college campus. So I know firsthand what it's like to experience

00:06:12.678 --> 00:06:18.593
- living in two worlds, if you will. And I like to share that context because it essentially has illustrated

00:06:18.593 --> 00:06:24.122
- the work I've done ever since. It has dictated the work I've done ever since. And so after graduate

00:06:24.122 --> 00:06:26.334
- school, I landed in Memphis, Tennessee.

00:06:26.530 --> 00:06:31.307
- And Community Development Corporation founded a single site charter school, which went on to do really

00:06:31.307 --> 00:06:36.084
- well out the gate. And I realized pretty quickly I was doing the same thing to our kids. That was done

00:06:36.084 --> 00:06:40.954
- to me in that they were getting a great education, but they still had to go home. And no one was focused

00:06:40.954 --> 00:06:45.870
- on the built environment. And so that's when I rolled up my sleeves and got into real estate development,

00:06:45.870 --> 00:06:50.694
- all with a socially oriented lens. And from that point, I ended up acquiring 43 acres of land, 24 which

00:06:50.694 --> 00:06:53.662
- is a planet apartment complex, 394 units collected for $37,000.

00:06:53.890 --> 00:06:58.893
- and worked to reshape that space to what is now a middle school performing arts center, single family

00:06:58.893 --> 00:07:03.848
- homes, and partnership with Habitat for Humanity. And then we hired a shopping class directly across

00:07:03.848 --> 00:07:08.949
- the street from that, which is now a medical clinic, a dental clinic, elementary school, a high school.

00:07:08.949 --> 00:07:13.952
- So the full K-12 continuing on with the wraparound infrastructure. And I've continued to do that work

00:07:13.952 --> 00:07:18.906
- for almost 20 years now. I was also involved as a senior with the one and a half million square foot

00:07:18.906 --> 00:07:21.310
- redevelopment of the old Sears building, Mendis.

00:07:21.410 --> 00:07:27.264
- which is a now urban village, which includes not only a school, but housing, YMCA, art facility,

00:07:27.264 --> 00:07:33.661
- art space. So just wanting to demonstrate the work that's happened over the last two decades and continue

00:07:33.661 --> 00:07:39.756
- to do that work. Adaptive College really came about about three years ago as I took a look back with

00:07:39.756 --> 00:07:44.222
- a couple of colleagues to think about what might this look like at scale.

00:07:44.674 --> 00:07:50.406
- particularly as we think about the lack of workforce and affordable housing that's happening across

00:07:50.406 --> 00:07:56.139
- the country. And at the same time, what does it mean to look at underutilized assets? And so that's

00:07:56.139 --> 00:08:01.928
- essentially how Yachter Commons was born. And we're excited to share a little bit more about the RY,

00:08:01.928 --> 00:08:07.718
- as well as the work I hope we'll ask Block 4. So really, as you all are aware, I'm sure teachers and

00:08:07.718 --> 00:08:13.966
- other essential workers can't afford to live near where they work. And municipalities, like school districts

00:08:13.966 --> 00:08:14.654
- and cities,

00:08:14.690 --> 00:08:21.603
- own many assets that are either vacant or legalized. And so there's an opportunity to use that to lean

00:08:21.603 --> 00:08:28.381
- into that older supply and to catalyze really easy creative financing, the opportunity for adaptable

00:08:28.381 --> 00:08:35.092
- use or reuse for workforce housing. So a little bit more about what we do. We kind of have two main

00:08:35.092 --> 00:08:42.206
- focuses. So first and foremost, we build strategic partnerships with municipalities in order to transform

00:08:42.306 --> 00:08:48.254
- vacant civic spaces into workforce affordable housing and the other up around infrastructure that's

00:08:48.254 --> 00:08:54.560
- needed to really create a complete community that is comfortable and livable along with being sustainable

00:08:54.560 --> 00:09:00.687
- and resilient for the future. And then secondly, we also invest in workforce affordable housing across

00:09:00.687 --> 00:09:07.230
- the nation by providing low cost debt through a philanthropically enhanced fund that's at the national level.

00:09:09.026 --> 00:09:15.900
- So diving a little bit more into what our strategic public partnerships look like, we work with public

00:09:15.900 --> 00:09:22.641
- entities, with philanthropic partners, with private developers and other private community groups as

00:09:22.641 --> 00:09:28.782
- well to jointly finance and implement high impact projects that focus on workforce housing.

00:09:28.782 --> 00:09:35.589
- By doing that, we help to identify civic sites that are ideal for adaptive reuse or redevelopment. We

00:09:35.589 --> 00:09:38.526
- then design site-specific or portfolio-wide

00:09:38.690 --> 00:09:45.284
- strategies to incorporate stakeholder input to unlock financing and address the local housing need,

00:09:45.284 --> 00:09:51.879
- both at a community level, at a neighborhood level, or even at a larger, more regional approach. In

00:09:51.879 --> 00:09:58.737
- doing that, we assemble local development, design, and construction partners in order to make sure that

00:09:58.737 --> 00:10:04.606
- we are tapping into local knowledge, providing local jobs, and also building place-based

00:10:04.738 --> 00:10:11.760
- real estate development that makes sense for the communities we work in. And then finally, we invest

00:10:11.760 --> 00:10:18.991
- in these projects. So we provide efficient low cost capital, which often is the missing piece that gets

00:10:18.991 --> 00:10:26.013
- these projects over the hurdle to becoming a reality and becoming a place where people live and work

00:10:26.013 --> 00:10:28.446
- and thrive. So in terms of how the

00:10:28.610 --> 00:10:35.278
- creative financing works for us as we think about projects at a much larger scale. We think about this

00:10:35.278 --> 00:10:42.205
- national fund that Bradley mentioned as a part of, paired with our strategic partnerships. So at a typical

00:10:42.205 --> 00:10:48.743
- development level where the developer goes out to develop, even if they were to borrow from a CBI or

00:10:48.743 --> 00:10:55.476
- a high-impact institution, they're likely borrowing these days 8% or higher in some cases in the double

00:10:55.476 --> 00:10:56.382
- digits, which

00:10:56.706 --> 00:11:02.154
- causing these projects to look great on paper, but to ultimately not pencil. And so this is where our

00:11:02.154 --> 00:11:07.603
- capital comes into play, if needed, to bring the cost of capital down. As we all know, time is money.

00:11:07.603 --> 00:11:13.051
- If you can actually get these projects off the ground sooner rather than later, you then overcome the

00:11:13.051 --> 00:11:18.499
- challenges that might come when construction costs increase, or you're sitting on a project while you

00:11:18.499 --> 00:11:23.894
- wait for another sort of public subsidy to come through, like low income housing tax credits. And so

00:11:23.894 --> 00:11:26.672
- we see this as an opportunity to get ahead of that.

00:11:26.672 --> 00:11:37.313
- and a way to be paired with our strategic partnerships that create the value add for us and our partners.

00:11:37.313 --> 00:11:41.630
- And so ultimately our goal, if not stated,

00:11:41.794 --> 00:11:49.061
- Earlier, it is to really implement 10,000 high-quality, attainable homes in the next 10 years by working

00:11:49.061 --> 00:11:56.051
- in partnership with municipalities like yours and others across the country. We see this as thinking

00:11:56.051 --> 00:12:03.110
- about adaptive reuse and the reuse of civic-owned land to see it both as an environmental opportunity

00:12:03.110 --> 00:12:10.238
- as well as a social and financial impact, the opportunity to have a 33% reduction in carbon emissions.

00:12:10.370 --> 00:12:15.848
- and through adaptive reviews, when you're actually activating these blocks, these spaces and places

00:12:15.848 --> 00:12:21.491
- that are right now vacant or are blighted, there's an opportunity, a high opportunity to reduce crime.

00:12:21.491 --> 00:12:26.969
- That first project that I mentioned that I did almost 20 years ago now, that was a site that no one

00:12:26.969 --> 00:12:32.886
- wanted to go on by day. I remember walking that site with architects, and once it was ultimately developed,

00:12:32.886 --> 00:12:38.364
- that was a space that, and still is a space that everyone's comfortable walking on around at night.

00:12:38.364 --> 00:12:40.336
- And so we see this as a high impact

00:12:40.336 --> 00:12:46.835
- opportunity, not just the financial level, but most importantly, the social level. So to dive into exactly

00:12:46.835 --> 00:12:53.213
- the opportunity that we see at Hopewell and specifically on Block 4, I know you all have likely reviewed

00:12:53.213 --> 00:12:59.409
- the scope of work that we've put forward, but these next few slides just kind of dive into how we see

00:12:59.409 --> 00:13:05.544
- that scope of work going, and we would be happy to answer any questions you all have about what this

00:13:05.544 --> 00:13:09.310
- means for Bloomington, what this means for Hopewell at large,

00:13:09.506 --> 00:13:15.569
- and all of the above. So within the scope of work, we do see some research and due diligence that is

00:13:15.569 --> 00:13:21.931
- necessary, mostly to make sure that we look at past efforts that have been put forth towards the progress

00:13:21.931 --> 00:13:28.054
- at Hopewell and making sure that we're in alignment with the community needs, with the local context,

00:13:28.054 --> 00:13:34.236
- with anything that's kind of emerged since community engagement was done. And in that research and due

00:13:34.236 --> 00:13:38.558
- diligence period, we also see ourselves beginning to identify potential

00:13:38.946 --> 00:13:45.003
- Partnerships on the local level that was built in the workforce housing and ownership, which I know

00:13:45.003 --> 00:13:51.059
- is something that's in a priority specifically for this portion of the site. In the pre development

00:13:51.059 --> 00:13:56.510
- and planning phase, we hope to engage local and regional design and development partners.

00:13:56.738 --> 00:14:03.638
- and really dive into the pre-development of Block 4. So that looks like a master plan of Block 4. That

00:14:03.638 --> 00:14:10.738
- looks like beginning to think about what it looks like from a 3D perspective, from a massing perspective,

00:14:10.738 --> 00:14:17.906
- and really making sure that we update the housing unit types and affordability levels that you all foresee

00:14:17.906 --> 00:14:21.054
- for Bloomingtonians at this site specifically.

00:14:21.346 --> 00:14:27.654
- And then the final portion of this initial scope of work would be a financial feasibility analysis with

00:14:27.654 --> 00:14:34.145
- the ultimate goal of having a proposed capital stack. This would involve looking at home ownership models,

00:14:34.145 --> 00:14:40.453
- this would involve looking at leasing structures, and it would ultimately result in a pretty clear plan

00:14:40.453 --> 00:14:46.762
- of how to finance this whole portion of the site going forward, which in essence is also how we foresee

00:14:46.762 --> 00:14:50.462
- kind of getting to the ground and getting the ground running

00:14:50.594 --> 00:14:58.748
- development happening by the middle of next year. So this is just kind of that timeline that I was working

00:14:58.748 --> 00:15:06.596
- through on the last slide, but as you can see, all of this leads to the idea that by July 26, we would

00:15:06.596 --> 00:15:14.750
- be headed towards development and having a very clear plan for what the 12th last block for it looks like.

00:15:19.298 --> 00:15:27.113
- And so piggybacking off of Riley, really we see in terms of deliverables, we know oftentimes these projects,

00:15:27.113 --> 00:15:34.425
- the way they work, someone comes with a great plan and there's no plan to execute. And so this really

00:15:34.425 --> 00:15:41.953
- lands on us executing on the plan that gets delivered. So versus that block four plan that we described,

00:15:41.953 --> 00:15:44.606
- producing semantic mass and options,

00:15:44.706 --> 00:15:50.398
- for updating the unit count, the unit mix, so that it actually aligns and it's complementary to the

00:15:50.398 --> 00:15:56.148
- work that is happening. And then also block four based on just what the current marketing conditions

00:15:56.148 --> 00:16:02.238
- are and the available capital sources that we also help to source and bring to the table. And then lastly,

00:16:02.238 --> 00:16:07.646
- that capital stack so that the project that is delivered is something that can be executed on.

00:16:10.498 --> 00:16:16.864
- So with that we're happy to answer any questions. We're also looking forward to working with all of

00:16:16.864 --> 00:16:23.676
- you and we're really excited about the energy that's already gone into the whole redevelopment of football

00:16:23.676 --> 00:16:30.233
- and we're looking forward to being a part of what that could look like next. Thank you. Thank you. Any

00:16:30.233 --> 00:16:35.390
- questions or comments from commissioners or anything further from staff as well?

00:16:36.258 --> 00:16:43.857
- I don't have anything other than we encountered Darwin. We met him at Harvard in our fellowship as well.

00:16:43.857 --> 00:16:51.240
- He was also a faculty member during that fellowship and we're really impressed with him and his work.

00:16:51.240 --> 00:16:58.622
- And actually, Darwin and Riley both came to Bloomington and toured Hopewell and really got a feel for

00:16:59.010 --> 00:17:07.352
- what we were targeting, have had long conversations with the mayor. Derwin even met with MCCSE as well

00:17:07.352 --> 00:17:15.612
- to understand what their needs were and the gap in employment versus where you are capable of living.

00:17:15.612 --> 00:17:23.873
- So we feel comfortable with their work. I know that this is new to you guys, but we would like to see

00:17:23.873 --> 00:17:28.894
- it happen. Thank you very much. Excuse me. This resolution is

00:17:29.986 --> 00:17:40.880
- adopt the agreement between the RDC and Adaptive Commons, the amount of the fee would be an amount not

00:17:40.880 --> 00:17:51.457
- to exceed $125,200. And that could be paid from the fund line that's listed there. And so again, it

00:17:51.457 --> 00:17:58.014
- is approving the agreement that's attached to the resolution.

00:18:01.570 --> 00:18:08.392
- Thank you. I think we'll have two different parts to our discussion. One may be questions specifically

00:18:08.392 --> 00:18:15.016
- for the adaptive commons team. And then we may then conclude their presentation and have additional

00:18:15.016 --> 00:18:21.839
- discussion among ourselves. So questions or comments from commissioners, please? I have a question for

00:18:21.839 --> 00:18:28.926
- adaptive commons about, can you say more about exactly how your relationship with Flintlock Lab will work?

00:18:32.162 --> 00:18:38.426
- Yeah, I can start off speaking to that. So we are aware of the work that Flintmont Law is doing in Hopewell

00:18:38.426 --> 00:18:44.341
- South, and we have reviewed their proposal. And we honestly see ourselves as supporting that work, as

00:18:44.341 --> 00:18:50.199
- potentially helping to finance some of that work, and to also make sure that we're coordinating with

00:18:50.199 --> 00:18:56.114
- them from a construction standpoint, from an urban planning standpoint, all of the above. I know that

00:18:56.114 --> 00:18:59.710
- with the portion of Law Corps that we are now focusing on and

00:18:59.842 --> 00:19:06.193
- the southern portion that they're focused on, there actually isn't a direct connection to the two sites.

00:19:06.193 --> 00:19:12.483
- But we do want to support the overall redevelopment of Hope Row and see this portion of Block 4 as just

00:19:12.483 --> 00:19:18.713
- one component of a larger mission and a larger idea of this kind of complete neighborhood. And we hope

00:19:18.713 --> 00:19:25.184
- to support the entire project as best we can, both from phasing perspective, from a financing perspective,

00:19:25.184 --> 00:19:27.422
- and from a coordination perspective.

00:19:28.642 --> 00:19:36.022
- Let me also just call out that block four is the Hopewell garage. And so this type of housing is very

00:19:36.022 --> 00:19:43.257
- different than one flip block has done. I have talked to Allie about this as well. And this is just

00:19:43.257 --> 00:19:50.782
- not her wheelhouse to do a denser, more commercial building. We're envisioning condos that are wrapping

00:19:50.782 --> 00:19:57.438
- the garage. Can I add something else, too? Yeah. What was really illuminating when adaptive

00:19:57.666 --> 00:20:05.084
- Commons visited the site. Two things really stood out to me. One, the deep experience that Derwin has

00:20:05.084 --> 00:20:12.356
- with just different financial vehicles, including New Market's tax credits, which we haven't used a

00:20:12.356 --> 00:20:19.774
- lot of in this community. So I think when they talk about financing, they're really bringing a lot of

00:20:19.774 --> 00:20:26.174
- experience to the table related to those types of tools. And then to Anna's point about

00:20:26.466 --> 00:20:33.121
- thinking about the garage. I think their vision when they came to the site truly understood the garage

00:20:33.121 --> 00:20:39.905
- as an asset to the overall site that can really anchor and drive the development rather than how I think

00:20:39.905 --> 00:20:46.948
- we've become accustomed to thinking about it. Just we as staff or you all as the redevelopment commissioners

00:20:46.948 --> 00:20:53.474
- writing the checks. So they really viewed the position of the garage as a strength, especially as it

00:20:53.474 --> 00:20:56.446
- relates to the grocery store and the beeline.

00:20:56.994 --> 00:21:02.489
- I don't know if you want to say anything more about that, but I just wanted to. No, I mean. I'm sorry.

00:21:02.489 --> 00:21:07.877
- I wanted to speak a little bit more to that as well. I think the garage we do see with an asset, and

00:21:07.877 --> 00:21:13.425
- we also see it as an opportunity, because of its height, to add some density in this area in a way that

00:21:13.425 --> 00:21:18.920
- might not be as comfortable on the southern side, where Allie and the Flint Black Lab team is working,

00:21:18.920 --> 00:21:20.894
- whereas in this portion of the site,

00:21:21.186 --> 00:21:26.801
- It does make sense to add housing that could be four to five stories tall, that could kind of address

00:21:26.801 --> 00:21:32.470
- a different type of need and a different demographic than is maybe being addressed in Hopeville South.

00:21:32.470 --> 00:21:38.140
- And we like the idea that we could not necessarily compete with Valley, but instead kind of have these

00:21:38.140 --> 00:21:43.369
- two components that speak to different portions of the population of Livington and really open

00:21:43.369 --> 00:21:48.158
- up opportunities for housing, lots of different diverse populations in your community.

00:21:49.890 --> 00:21:56.307
- I just have a quick question that's based on Director Cooper Smith's comment, which is, do you see new

00:21:56.307 --> 00:22:02.662
- markets tax credits as being part of the capital stack for Block 4? Yeah, there's a huge opportunity,

00:22:02.662 --> 00:22:09.266
- especially if you think about the new markets typically is for commercial use. Right, that's my question.

00:22:09.266 --> 00:22:15.870
- And what's interesting about workforce housing is there's a way to bring workforce housing to address the

00:22:15.970 --> 00:22:22.604
- The workforce component of the market, but more than anything, any commercial component that goes call

00:22:22.604 --> 00:22:29.302
- that the ground level. So, say, let's just imagine you build a five story building and the four stories

00:22:29.302 --> 00:22:30.590
- about your housing.

00:22:30.690 --> 00:22:36.195
- The bottom floor can be early child care or some other community amenity. You would not only utilize

00:22:36.195 --> 00:22:42.027
- new market tax credits for that, but you could also leverage new market tax credits for the infrastructure

00:22:42.027 --> 00:22:47.586
- that would help to make that project viable. So then you get to think about new markets, not just for

00:22:47.586 --> 00:22:53.200
- that building alone, but the infrastructure in and surrounding that. So there are really creative ways

00:22:53.200 --> 00:22:57.342
- to address using new markets in ways that typically aren't used. Thank you.

00:22:57.922 --> 00:23:06.495
- I got a question. So to further your comment about financing, if you use that kind of financing, does

00:23:06.495 --> 00:23:14.899
- it limit the type of commercial uses that would be available to us? I would argue that it, in fact,

00:23:14.899 --> 00:23:23.304
- encourages and enhances more community-oriented uses. New Market's tax credits essentially wants to

00:23:23.304 --> 00:23:26.750
- ensure that more jobs are being created,

00:23:27.170 --> 00:23:35.055
- you're bringing workforce back into a neighborhood. And so this opens up all kinds of opportunities

00:23:35.055 --> 00:23:43.097
- that otherwise might be overlooked because of the lack of access to capital and markets would then be

00:23:43.097 --> 00:23:51.219
- that workforce scenario that allows it to happen. Does that answer your question or? Well, yes and no.

00:23:51.219 --> 00:23:54.846
- I get your point, and I would agree with you.

00:23:55.106 --> 00:24:04.595
- Just say it was going to be a law office or an accounting firm or a hair salon. I mean, is there a approved

00:24:04.595 --> 00:24:13.557
- list of uses that have to go along with that, with the use of that capital? Or is it pretty much open

00:24:13.557 --> 00:24:23.486
- to whatever our zoning allows? It's not so much an approved list, but the amount of jobs that you were creating.

00:24:23.714 --> 00:24:29.898
- you know, if you were building, if this were an accountant office versus, you know, a 10,000 square

00:24:29.898 --> 00:24:36.391
- foot warehouse that only housed a single employee, you're likely not going to get new market tax credits

00:24:36.391 --> 00:24:42.575
- for the 10,000 square foot warehouse, but for the accounting firm that now is bringing called 25 to

00:24:42.575 --> 00:24:49.192
- 30 new employees to the neighborhood that would otherwise not be there but for the new market tax credits.

00:24:49.192 --> 00:24:53.150
- Okay. I don't envision that kind of commercial space there. So,

00:24:54.178 --> 00:25:01.481
- But I get what you're saying. Thank you. And I just want to chime in here and say, we've had some experience

00:25:01.481 --> 00:25:08.180
- with our public offerings that they're not specific enough to be successful. And we've wasted a lot

00:25:08.180 --> 00:25:15.282
- of time with those. By getting consultants or folks that can help us really hone in and carve out exactly

00:25:15.282 --> 00:25:21.982
- what we're trying to accomplish will help us be successful when it does come time to issue a public

00:25:22.786 --> 00:25:30.875
- That's why this work is very important to us. Can I trouble you to put some slides back up? There's

00:25:30.875 --> 00:25:38.963
- one about a third of the way in that showed a bar graph that divided up incentives versus financing

00:25:38.963 --> 00:25:42.846
- and so forth. Can you put that back up, please?

00:25:48.706 --> 00:25:55.601
- That's it. Yeah. And in particular, can you talk more about public subsidies? What have you seen in

00:25:55.601 --> 00:26:02.634
- the past? What do you envision being appropriate for this particular setting? Yeah. So if you look at

00:26:02.634 --> 00:26:09.597
- the dotted line, if you look at the two dotted lines, the one above the dark square and then the one

00:26:09.597 --> 00:26:16.492
- sort of in the middle of the dark square, at the top level, if you imagine without the right source

00:26:16.492 --> 00:26:18.078
- of creative financing,

00:26:18.338 --> 00:26:24.903
- So let's just step back. That first dotted line, the arrows that show that space between, that's capital

00:26:24.903 --> 00:26:31.155
- or public subsidy that would be needed if the Hopewell land was not available to be participated in

00:26:31.155 --> 00:26:37.845
- the project. So think about the land itself as public subsidy. So now we've already, we being Bloomington,

00:26:37.845 --> 00:26:44.285
- have brought the cost of development down because of the land being participated with. The other arrow

00:26:44.285 --> 00:26:46.974
- going up with that other dotted line shows

00:26:47.138 --> 00:26:53.404
- the space in between the public subsidy that will be needed, if you didn't have a five to six percent

00:26:53.404 --> 00:26:59.854
- cost of debt, but instead your typical eight percent higher, you would need to have more public subsidy.

00:26:59.854 --> 00:27:06.488
- So the public subsidy that light gray square would essentially take up, without the land being participated

00:27:06.488 --> 00:27:12.877
- and without the cost of capital being at a lower cost, you would essentially, that gray area would take

00:27:12.877 --> 00:27:15.518
- up the space in between both dotted lines.

00:27:15.906 --> 00:27:22.148
- What then would typically take the place of that public subsidy or what would be that public subsidy

00:27:22.148 --> 00:27:28.328
- is typically low income housing tax credits. And low income housing tax credits at that level would

00:27:28.328 --> 00:27:34.632
- likely be the 9% tax credits that give the highest level of subsidy and are also the most competitive

00:27:34.632 --> 00:27:41.121
- to come by and also take about two years to just even manifest if you get it and also cost a few million

00:27:41.121 --> 00:27:43.902
- dollars to get to that stage of application.

00:27:44.034 --> 00:27:48.510
- If not, the 9% tax credits is likely even the 4%.

00:27:48.802 --> 00:27:56.365
- bond slash tax credits, which are easier to come by, non-competitive if you will, but still that restrict

00:27:56.365 --> 00:28:03.928
- the kind of affordability we're talking about. As we understand it, this is open to workforce affordable.

00:28:03.928 --> 00:28:11.205
- So not big A, but little A affordable, which still can go below 80% AMI, but also includes that 80 to

00:28:11.205 --> 00:28:18.768
- 120 AMI, that missing middle that is often left out of the conversation. And so in order to address that,

00:28:18.768 --> 00:28:26.309
- then that public subsidy needs to be replaced. And so this is a way to create a way to replace that

00:28:26.309 --> 00:28:34.378
- public subsidy. That's helpful. Thank you. That was a good question. I was wondering how long has Adaptive

00:28:34.378 --> 00:28:36.414
- Commons been in operation?

00:28:37.602 --> 00:28:44.449
- Adaptive Commons as a business has been in operation for two and a half years. As I shared, I was a

00:28:44.449 --> 00:28:51.502
- loan fellow at Harvard three years ago now, and this was my main focus to lift up a firm that actually

00:28:51.502 --> 00:28:56.638
- focused primarily on workforce affordable housing, be that adaptive reuse.

00:28:56.866 --> 00:29:03.456
- Prior to that, the work I had done had been tangential to this. It involved adaptive reuse, it involved

00:29:03.456 --> 00:29:09.984
- housing, it involved school development, and I realized that the next 20, 30 years, I know I look like

00:29:09.984 --> 00:29:16.637
- I'm 12, but the next 30, 40 years, I want to dedicate my life and career to work for support for housing

00:29:16.637 --> 00:29:19.806
- via adaptive reuse. And while adaptive commons is

00:29:19.970 --> 00:29:26.958
- two and a half years old, collectively, between Riley, myself, my partner Margaret, and Mike, we make

00:29:26.958 --> 00:29:33.877
- up decades and decades of experience, both on the real estate and on the finance side. Thank you. So

00:29:33.877 --> 00:29:40.728
- the reason for my question is because I'm interested in, I appreciate your big picture presentation

00:29:40.728 --> 00:29:47.716
- about the mission of Adaptive Commons. I'm interested in seeing examples of your portfolio that would

00:29:47.716 --> 00:29:49.086
- be most parallel to

00:29:49.282 --> 00:29:56.741
- what's intended for Hopewell Block 4 and I just need some more information about that if you could help

00:29:56.741 --> 00:30:04.200
- me with that please. Yes, and I can, you know, we're actually currently in Denver working with a client

00:30:04.200 --> 00:30:11.802
- that I would say is we're working with the school district on adaptive reuse strategy for their workforce

00:30:11.802 --> 00:30:16.894
- housing. So that's currently in our portfolio, but that's a, you know,

00:30:17.090 --> 00:30:23.492
- we'll be able to speak to that as that continues to manifest. I would say the most between the Sears

00:30:23.492 --> 00:30:30.020
- Crosstown work or the other project in Memphis, that might be the closest, which is why we share those

00:30:30.020 --> 00:30:36.485
- projects. Those are likely the closest aligned with Bloomington when you're talking about vacant land

00:30:36.485 --> 00:30:43.013
- that is ground up development using creative financing like the parking stock credits and also working

00:30:43.013 --> 00:30:47.006
- for affordable housing. Those are the closest representations.

00:30:47.170 --> 00:30:53.413
- I know that we shared a collective CV of our firm's joint experience and work that I think it wasn't

00:30:53.413 --> 00:30:59.595
- shared with you all. I'm sure we can make sure that it gets shared with you so that you have access

00:30:59.595 --> 00:31:05.838
- to a larger overview with the details of past projects that team members have worked on. I will just

00:31:05.838 --> 00:31:12.144
- note that I did get to see that. And I was a little concerned because the projects that at least were

00:31:12.144 --> 00:31:15.358
- featured in there were from, I think, 2016 to 2020.

00:31:15.586 --> 00:31:20.295
- kind of, you know, a little older than maybe some of your more recent work. It also wasn't clear to

00:31:20.295 --> 00:31:24.817
- me which members of your team were involved with which projects that were presented in that CV.

00:31:24.817 --> 00:31:29.714
- So I just, I feel like I need some more information about your firm to like really see that it's a good

00:31:29.714 --> 00:31:34.424
- fit for this project. And I don't know, again, you may not have that available now. You may want to

00:31:34.424 --> 00:31:39.228
- pull that together from some of your current projects. But, you know, I think it's really fascinating

00:31:39.228 --> 00:31:44.031
- what you're doing. And I appreciate, again, the big picture. I'm just still trying to look for a good

00:31:44.031 --> 00:31:44.926
- connection between

00:31:45.026 --> 00:31:54.560
- your expertise, and what's needed here. OK. And I can say, just off of my head of knowing what we submitted,

00:31:54.560 --> 00:32:03.657
- I was involved directly in most, but for one of those projects, or two of those projects, it would have

00:32:03.657 --> 00:32:12.753
- been another one on teammates. But I was at least involved in a majority of them. Thank you. Good luck.

00:32:12.753 --> 00:32:14.590
- Question? Everybody?

00:32:15.682 --> 00:32:21.723
- Have you guys, have they been provided with any structural report for the garage? I believe we have

00:32:21.723 --> 00:32:27.825
- shared some of that. I don't remember if they've seen the most recent one, though. We've shared some

00:32:27.825 --> 00:32:33.927
- information. It's been several months. The reason I ask that is, as they're looking at everyone with

00:32:33.927 --> 00:32:40.149
- this capital stack knowledge of how those structural components, because based on what I'm seeing, and

00:32:40.149 --> 00:32:44.318
- we're talking about condominiums in regards to wrapping this garage,

00:32:44.546 --> 00:32:51.485
- that structural component cost figure would have to be included in regards to it. So with that and that

00:32:51.485 --> 00:32:58.158
- question, then as you brought up the new market tax credit and our financing, which is the creative

00:32:58.158 --> 00:33:04.897
- thing that we need to look at, where do we get the residential dollars to build that? The new market

00:33:04.897 --> 00:33:11.569
- tax credit, is that a straight conventional financing or is that something that your debt financing

00:33:11.569 --> 00:33:14.238
- takes into consideration because of the

00:33:14.722 --> 00:33:22.284
- difficulty of financing condominiums in a workforce environment. The debt financing would be that would

00:33:22.284 --> 00:33:29.700
- go towards the residential. The new market tax credit would be more towards the infrastructure that's

00:33:29.700 --> 00:33:37.698
- necessary to build out everything that we're describing. But the debt financing would be for the residential.

00:33:37.698 --> 00:33:43.006
- OK. And then everything from a land standpoint that this sets on in your

00:33:43.170 --> 00:33:50.776
- capital stack situation would be a subsidy that would help to offset the overall cost? Yes, and the

00:33:50.776 --> 00:33:58.687
- expectation is that Bloomington would retain ownership of the land, that this would not need to be sold

00:33:58.687 --> 00:34:06.445
- to a developer in order for this to be successful. And then it would go? So you're saying it would be

00:34:06.445 --> 00:34:11.998
- leased? Ground lease, yes. Ground lease, OK. Ground lease then would be?

00:34:12.674 --> 00:34:19.920
- part of the ownership basis, not a lease basis on the units themselves. I think that there is an opportunity

00:34:19.920 --> 00:34:26.767
- to potentially consider homeownership and leasing opportunities on this portion of the site and across

00:34:26.767 --> 00:34:33.414
- the well. So any sort of ground-based structure, I think, we would collaborate with you all to make

00:34:33.414 --> 00:34:40.394
- sure that both of those components work. But yes, there is an opportunity here to look at a ground-based

00:34:40.394 --> 00:34:42.654
- structure, but then a condominium

00:34:42.818 --> 00:34:50.880
- ownership model where some of the units or all of the units in a portion of the site are of ownership

00:34:50.880 --> 00:34:58.785
- but under some sort of like trust model in which the ground lease is still held by the city. Do you

00:34:58.785 --> 00:35:07.084
- have examples of where that's been able to accomplish that? We can provide them. Yeah, there are several

00:35:07.084 --> 00:35:12.222
- community trust models that work with this structure. Thank you.

00:35:13.122 --> 00:35:24.801
- Any other questions for our presenters today? Appreciate it. Appreciate your time. Thank you very much.

00:35:24.801 --> 00:35:36.030
- Thank you. Thank you. OK. So we do have in front of us, sorry, I'm just pulling the agenda back up.

00:35:38.210 --> 00:35:44.831
- Resolution 25-141, which is the approval and agreement with Adaptive Commons for a comprehensive and

00:35:44.831 --> 00:35:51.583
- coordinated design of Hopewell West Block 4. We had a chance to ask our questions directly of Adaptive

00:35:51.583 --> 00:35:58.203
- Commons. I am just now, as I mentioned earlier, opening this for a separate line of questioning just

00:35:58.203 --> 00:36:05.152
- among commissioners as opposed to with the prospective firm. Any comments or questions about the proposed

00:36:05.152 --> 00:36:07.774
- approval of this agreement? I have one.

00:36:08.514 --> 00:36:16.855
- in regards to, was this RFP put out to any other architectural? We have not issued an RFP. This is to

00:36:16.855 --> 00:36:25.115
- help us get an RFP together. OK. And the RFP would be for the? Any offering to help us get it built.

00:36:25.115 --> 00:36:33.619
- So this is to really laser focus in on how we're going to involve developers, builders, how we're going

00:36:33.619 --> 00:36:36.318
- to get this done. And with that,

00:36:37.922 --> 00:36:43.696
- selectiveness to try to get this in from a capital stack standpoint. And will this still create a situation

00:36:43.696 --> 00:36:49.095
- where we need to go back through into the planning, the UDO? Don't know yet. So this is a first step

00:36:49.095 --> 00:36:54.495
- situation that would still have to be looked at architecturally, engineering, and through a planning

00:36:54.495 --> 00:37:00.054
- process. And that's part of what they're going to do in their feasibility analysis, too. And the reason

00:37:00.054 --> 00:37:05.507
- I ask that is given the complexity as we have to move forward to try to actually get something built,

00:37:05.507 --> 00:37:07.806
- that schedule that they're looking at July

00:37:08.546 --> 00:37:15.442
- Next year. That's extraordinarily aggressive based on. Right. The longer you wait, the longer it's going

00:37:15.442 --> 00:37:22.075
- to take. Exactly. But, you know, given where we are on other projects in the process, how we change,

00:37:22.075 --> 00:37:28.905
- is this another situation where we have to go through a PUD? I don't know yet. I think, um, when Derwin

00:37:28.905 --> 00:37:35.998
- was here, you know, we've talked about the garage. It needs repairs. Is it, do we keep it? Do we let it go?

00:37:36.322 --> 00:37:44.404
- But in talking to him, it became very clear that it really is an asset. And it's an asset that a developer

00:37:44.404 --> 00:37:52.109
- could leverage to help get the product that we want, which is not student-centric housing. It's going

00:37:52.109 --> 00:37:59.738
- to be ownership models or a mix to accomplish more housing at Hopewell. And I don't have capacity to

00:37:59.738 --> 00:38:01.022
- do it on my own.

00:38:01.122 --> 00:38:08.283
- Further, Derwin has background in these creative financing methods that are really challenging to find.

00:38:08.283 --> 00:38:15.169
- And then based on the time frame and what they're looking at, is this part of my analogy, a soup to

00:38:15.169 --> 00:38:22.124
- nuts type situation where it's start to finish or do they need to engage other local partnerships in

00:38:22.124 --> 00:38:24.190
- order to do that and then the

00:38:24.290 --> 00:38:29.656
- continuation coming back and needing additional dollars on top of this. Well, I think that that's part

00:38:29.656 --> 00:38:34.971
- of this, is that they are going to be helping us engage with developers locally to try and figure out

00:38:34.971 --> 00:38:40.181
- what the next steps are. I don't think that this is one and done. I think this is the first bite at

00:38:40.181 --> 00:38:45.443
- the apple to get it done, get it going, get momentum, figure out what our zoning is, figure out what

00:38:45.443 --> 00:38:51.070
- the feasibility is, figure out what the capital stack needs to be, get a general master site plan together.

00:38:51.330 --> 00:39:00.107
- for that block, which is rather large, if you saw that on the platform. You already mentioned this,

00:39:00.107 --> 00:39:08.884
- but just so I'm clear, the current parking structure, the structural integrity of it, they're aware

00:39:08.884 --> 00:39:14.238
- of the current state of that parking structure and they have

00:39:15.522 --> 00:39:22.772
- They can work with what they know we have now. I think so. I think we talked when they were here about

00:39:22.772 --> 00:39:29.811
- the need to spend approximately $5 million on the structure itself. That was one of the last quotes

00:39:29.811 --> 00:39:37.273
- that I remember in that CE solutions analysis. But it's somewhere around there. But to replace the entire

00:39:37.273 --> 00:39:44.734
- parking garage is significantly more for sure. So it was worth the investment to try and get it fixed up.

00:39:44.898 --> 00:39:51.767
- We have that report that's available. To the point of block four and where the garage sits. And then

00:39:51.767 --> 00:39:58.908
- we have our open area, which has some environmental issues that we've discovered. That are being cleaned

00:39:58.908 --> 00:40:05.913
- up. Oh, no, we're in the process. Yeah, we're working towards that closure letter now. And we're very,

00:40:05.913 --> 00:40:12.850
- very close. So in fact, we had the covenants that were required to be recorded. And you guys saw them

00:40:12.850 --> 00:40:14.142
- earlier this year.

00:40:15.074 --> 00:40:21.635
- Yep, as we look through Block 4 and the pictorial that they brought in regards to condominiums

00:40:21.635 --> 00:40:29.162
- and surrounding the garage with residential housing, Block 4 also includes that area. So their creativeness,

00:40:29.162 --> 00:40:36.068
- they're looking at how they reutilize that lot, how this capital stack would work, and how we would

00:40:36.068 --> 00:40:42.974
- utilize residential or commercial mixed use in regards to the garage. That still leaves the area to

00:40:42.974 --> 00:40:44.286
- the east and north

00:40:44.482 --> 00:40:51.305
- It would still have to be determined what would go there. Correct. And that is not part of their scope.

00:40:51.305 --> 00:40:57.865
- Theirs is just block four. OK. Well, block four includes that area. So yes, they're master planning

00:40:57.865 --> 00:41:04.623
- the entire block. They would be master planning it with then just looking at the area. That's a pretty

00:41:04.623 --> 00:41:11.380
- significant area. Correct. That would be a big lot. A big lot that we'd have to look at what it is and

00:41:11.380 --> 00:41:14.398
- then what the community based on our previous

00:41:14.530 --> 00:41:23.314
- Needs are. Are they going to help decide that, or are we going to help direct them on that? I think

00:41:23.314 --> 00:41:32.185
- it's a little bit above. I also just want to say that the mayor has joined us, and she may have some

00:41:32.185 --> 00:41:41.232
- things she would like to comment on regarding the adaptive commons proposal. I'm happy to comment, but

00:41:41.232 --> 00:41:42.462
- I'm coming in

00:41:43.170 --> 00:41:50.852
- fresh to this particular conversation. I'll just say that we had a really pretty phenomenal site visit

00:41:50.852 --> 00:41:58.310
- with adaptive commons, and they were able to see things that really just hadn't been pointed out in

00:41:58.310 --> 00:42:05.022
- the past, some possibilities that we thought really were worth working towards, and there

00:42:05.602 --> 00:42:13.601
- Their ability to plan and tap different kinds of capital stacks for these kinds of things is really

00:42:13.601 --> 00:42:22.080
- an asset that I think we need in this community, and that especially if we're going to do some innovative

00:42:22.080 --> 00:42:30.639
- things that help while getting them on board is, I think, going to be a big asset to this overall project.

00:42:30.639 --> 00:42:34.718
- Thank you. Other questions from the commissioners?

00:42:35.682 --> 00:42:43.959
- Jane, can you just further explain to me why this is not a project for Flintlock? Yeah, I can. I think

00:42:43.959 --> 00:42:51.994
- because we're starting with block four, which is targeted for more density than what is appropriate

00:42:51.994 --> 00:43:00.030
- at South and what we're committed to for South. So this just isn't, it's not apples to apples. It's

00:43:00.030 --> 00:43:03.646
- a different animal and it requires different

00:43:03.746 --> 00:43:10.695
- financial modeling. So if you compare to what Flintlock's doing on South, for example, they're working

00:43:10.695 --> 00:43:17.577
- on baked-in affordability with maybe or maybe not contemplation of land value. But they're working on

00:43:17.577 --> 00:43:24.392
- just really increasing the affordability, reducing the cost through incremental decisions that we're

00:43:24.392 --> 00:43:31.206
- making, and making those improvements to the UDO, or making recommendations. Sorry, I'm out of line.

00:43:31.206 --> 00:43:32.286
- Sorry, the PUD.

00:43:32.930 --> 00:43:40.265
- baking that into the PV. So with adaptive commons, it's really site planning this block, planning for

00:43:40.265 --> 00:43:47.960
- density, and they're delivering us to a different phase of the development. So they're doing the strategic

00:43:47.960 --> 00:43:55.367
- thinking for the whole block, financial planning, and then we'll tee us up so that we can go after the

00:43:55.367 --> 00:44:02.846
- developers at the end of it. So I think what in that timeline when it said July, ready for development,

00:44:04.066 --> 00:44:11.008
- If we were a private entity, we would be like, yes, let's go break ground. But as they already see where

00:44:11.008 --> 00:44:17.751
- you would be at that moment is, let's go release a new public offering. So you've talked to Flintlock

00:44:17.751 --> 00:44:24.560
- about this. They've been. I have. All right. So they're aware. Absolutely. Flintlock has. And they can

00:44:24.560 --> 00:44:31.502
- be collaborative with. Flintlock is excited to work with. They know each other. Also, Ali was very clear

00:44:31.502 --> 00:44:34.014
- to say that this is not what we like.

00:44:34.690 --> 00:44:43.286
- More density is not there in the house as far as big multi-family structures or what we're talking about

00:44:43.286 --> 00:44:51.636
- here. She said she will not do it. That's not. Yeah, she said she will not do large-form residential.

00:44:51.636 --> 00:45:00.150
- She will support them. And so she's going to help by sharing her code analysis, by helping to prop them

00:45:00.150 --> 00:45:03.998
- up for success from what we've already learned

00:45:09.538 --> 00:45:16.007
- basis we're looking at because in Derlin, their past financial experience in regards to getting the

00:45:16.007 --> 00:45:22.928
- capital stack on unique sites and things is one of our primary goals while we're looking at hiring another

00:45:22.928 --> 00:45:29.461
- out-of-state firm. And then they would collaborate with some local firms in regards to architectural

00:45:29.461 --> 00:45:36.253
- and any other engineering things that are necessary. I believe, yes, it will be a collaboration. Because

00:45:36.253 --> 00:45:39.358
- in the past, we have went through out-of-state,

00:45:39.522 --> 00:45:46.007
- here's the idea, and then it's kind of fell flat. So it's in the past. It's in the past. We've fallen

00:45:46.007 --> 00:45:52.555
- flat with numerous RDCs. And it was prior to this administration, so I'm not putting anything out. I'm

00:45:52.555 --> 00:45:59.167
- just looking at the situation of another thing we're consulting, and we want to get to building. Right.

00:45:59.167 --> 00:46:05.716
- Well, and the RDC currently has an enormous number of projects. As you're well aware, by the fact that

00:46:05.716 --> 00:46:08.958
- we're in, what, 150 plus resolutions for the year.

00:46:09.346 --> 00:46:17.380
- We do not the staff does not have enough capacity to try and take this on as well. So if we want to

00:46:17.380 --> 00:46:25.815
- make measurable Momentum at hopeful we need someone that knows what they're doing They do refer to Under

00:46:25.815 --> 00:46:34.250
- financial feasibility as boots suppose this refers to financial entities, but they're they do talk about

00:46:34.250 --> 00:46:39.070
- identifying key partnerships as well as capital sources and

00:46:39.618 --> 00:46:49.770
- I was just looking to see if they're where they might reference community engagement, local professional

00:46:49.770 --> 00:46:59.536
- expertise. I don't particularly see it, but it's certainly something I imagine we can make clear. To

00:46:59.536 --> 00:47:06.014
- your point, Randy, that having more knowledge from potential other

00:47:07.682 --> 00:47:15.089
- entities that might participate in this. Having that knowledge early on is a benefit. I'm just going

00:47:15.089 --> 00:47:22.423
- to add, for me, I think it's truly exciting to hear from Adaptive Commons, some of their innovation

00:47:22.423 --> 00:47:29.831
- ideas. I'd love to see what that could bring to Hopewell. My main area of kind of hesitation is when

00:47:29.831 --> 00:47:35.038
- I went to their website, I did not see a portfolio of projects at all.

00:47:35.586 --> 00:47:42.005
- That was why I reached out to Anna to ask for a portfolio, and what I got was interesting, but did not

00:47:42.005 --> 00:47:48.549
- really fill in certain blanks for me. Again, interesting, but as I mentioned, I wasn't sure who on their

00:47:48.549 --> 00:47:55.155
- team had done what. I appreciate that Derwin had done some of them, but there's a wide range of projects,

00:47:55.155 --> 00:47:59.518
- not all of which are, at least in my mind, quite a fit with Hopewell.

00:48:00.226 --> 00:48:05.683
- I would appreciate the opportunity to get some examples of written deliverables from comparable planning,

00:48:05.683 --> 00:48:10.883
- pre-development engagements, in addition to the capital stack that they might want to bring to it. I

00:48:10.883 --> 00:48:16.032
- think it's great, the idea to think about bringing new markets tax credits into it, but I feel like

00:48:16.032 --> 00:48:21.283
- there's just some open-endedness. Again, I'm all for trying to move things forward, but I really want

00:48:21.283 --> 00:48:23.806
- to make sure it's being done with due diligence.

00:48:23.938 --> 00:48:31.336
- my comment at this point is about the due diligence of feeling like I want to know what they've done

00:48:31.336 --> 00:48:39.173
- that's really closely aligned with this project that would be an example of the portfolio that I'm looking

00:48:39.173 --> 00:48:46.645
- for to feel comfortable moving forward. I have the same concern as Deborah does and I did not look at

00:48:46.645 --> 00:48:53.310
- their website. This is purely from talking to them. I think they bring a lot to the table.

00:48:56.514 --> 00:49:05.550
- think having a firm like that or them would be beneficial. So I'm not opposed to having somebody on

00:49:05.550 --> 00:49:14.767
- board. But I also don't want to be their next resume builder. I want somebody that can really get the

00:49:14.767 --> 00:49:24.256
- job done. And so I wasn't convinced that they were ready for us, quite frankly. They talked a good game,

00:49:24.256 --> 00:49:26.334
- but I'm just not sure.

00:49:27.394 --> 00:49:34.747
- cheering response to that that might help us feel better? No. But I mean, I think that you guys have

00:49:34.747 --> 00:49:42.683
- a choice, whether you vote to approve, deny, or table it. Table it and allow us to get some more information

00:49:42.683 --> 00:49:50.327
- to use that we do feel comfortable. But the likelihood is that that's not going to come up until January

00:49:50.327 --> 00:49:56.734
- or February of 26. So that's completely your call. We can gather some more information.

00:50:00.290 --> 00:50:08.051
- Quick question. What's the first day of our next meeting? It is January 5th. January 5th. That's our

00:50:08.051 --> 00:50:16.119
- organizational meeting, however. So that'll be the meeting that we approve the calendar and be the 12th.

00:50:16.119 --> 00:50:23.957
- Well, that happens to fall on a holiday the following meeting. So I believe the meeting after that is

00:50:23.957 --> 00:50:29.182
- going to be the first week of February. I think so. Second meeting.

00:50:30.530 --> 00:50:39.303
- And also, your appointments are for one year. However, the code says that you continue to serve until

00:50:39.303 --> 00:50:47.989
- you're replaced by a qualified person. So it is always my hope that when the first of the year rolls

00:50:47.989 --> 00:50:57.192
- around that that could be done, appointments could be done from the mayor's office, from the city council,

00:50:57.192 --> 00:51:00.030
- so that we can make sure that we

00:51:00.258 --> 00:51:08.476
- We've got the team going forward. But it's the statute that holds you serve until you're replaced. There's

00:51:08.476 --> 00:51:16.464
- not a deadline on that, but sooner is better than later. So that actually works out fairly well because

00:51:16.464 --> 00:51:24.222
- that gives the time frame to ask any additional questions, have all the answers to whether it be the

00:51:24.222 --> 00:51:29.982
- group here or whether it be the next group so they have full understanding

00:51:30.210 --> 00:51:37.206
- and all of the questions that have been asked here, we don't have any issues. Now, I hate to put things

00:51:37.206 --> 00:51:43.933
- off anymore, but I will make a recommendation to table until that first available meeting to garner

00:51:43.933 --> 00:51:50.728
- all the information so that us or any new commissioners have everything to make the decision to move

00:51:50.728 --> 00:51:57.657
- this forward into a financing and a bill as soon as possible. So I'll put that as a motion. Riverdive.

00:51:57.657 --> 00:51:59.742
- We have a motion on the table.

00:52:00.898 --> 00:52:06.590
- We have a second. To table. The motion is to table. I'm just rephrasing to make sure it's clear.

00:52:06.590 --> 00:52:12.928
- To table, resolution 25-141, which is the approval of the agreement with Adaptive Commons for comprehensive

00:52:12.928 --> 00:52:18.913
- and coordinated design of both Boblock floor and West Boblock floor. I'll second. We have a first and

00:52:18.913 --> 00:52:24.957
- a second. All in favor, say aye. Aye. Any opposed? That motion passes unanimously. Thank you. With all

00:52:24.957 --> 00:52:28.830
- that information, it'd be fantastic. And then we'll just move it.

00:52:29.666 --> 00:52:37.525
- We have a comprehensive list of what information. We don't and I'm going to send you guys an email right

00:52:37.525 --> 00:52:45.160
- now. Please respond to that email individually to me with your questions. Thank you. OK, next item on

00:52:45.160 --> 00:52:53.169
- our agenda is resolution 25-151, which is the approval of the adoption of the Citizen Advisory Committee's

00:52:53.169 --> 00:52:58.334
- recommendations for the allocation of the 2026 Community Development

00:52:58.466 --> 00:53:04.986
- block grant funds, who would like to speak to that? This is also the public hearing portion. We're starting

00:53:04.986 --> 00:53:11.204
- the public hearing. We're starting the public hearing for this portion of the meeting for the approval

00:53:11.204 --> 00:53:17.603
- of the adoption of the Citizens Advisory Committee's recommendations for the allocation of 2026 community

00:53:17.603 --> 00:53:23.882
- development block grant funds. All right. Yeah, you guys should have known if I was here, we were going

00:53:23.882 --> 00:53:27.806
- to talk about CDBG. So I just thought you liked it. Some of you.

00:53:28.194 --> 00:53:37.945
- Anyway, I'd like to thank you guys for the opportunity to present tonight. I'm here to present the 2026

00:53:37.945 --> 00:53:47.322
- CDBG allocations that the CAC recently awarded based on the applications submitted and the guidance

00:53:47.322 --> 00:53:51.166
- that the new consolidated plan provided.

00:53:52.738 --> 00:53:58.952
- A little bit about CDBG. For the past 50 years, community partners have worked hand in hand with HUD

00:53:58.952 --> 00:54:05.412
- to deliver impactful change, especially for low to moderate income communities through CDBG. Since 1974,

00:54:05.412 --> 00:54:11.749
- HUD has invested over $170 billion in urban, suburban, and rural communities through the CDBG program.

00:54:11.749 --> 00:54:17.963
- HUD awards grants to entitlement community grantees, which the city of Bloomington has won, to carry

00:54:17.963 --> 00:54:22.270
- out a wide range of community development activities directed towards

00:54:22.370 --> 00:54:30.882
- revitalizing neighborhoods, economic development, and providing improved community facilities and services.

00:54:30.882 --> 00:54:38.999
- In order to receive funding, activities that are applied for by the applicants must meet a two-pronged

00:54:38.999 --> 00:54:46.880
- test. One, eligibility under federal regulation, and two, ability to meet a national objective. All

00:54:46.880 --> 00:54:52.318
- activities must meet one of the national objectives for the program.

00:54:52.578 --> 00:55:00.043
- which the three are benefit to low to moderate income persons, prevent or eliminate slum and blight,

00:55:00.043 --> 00:55:07.435
- and or meet an urgent need which fulfill community development needs that have a particular urgency

00:55:07.435 --> 00:55:14.901
- based on existing conditions that pose a serious or immediate threat to the health or welfare of the

00:55:14.901 --> 00:55:22.366
- community. A little bit about the process. Some of you actually were involved in the process, Randy.

00:55:22.530 --> 00:55:30.551
- Endeavor, we appreciate your willingness to serve and the work that you put in. So every year, we make

00:55:30.551 --> 00:55:38.339
- an estimate of what the allocation will be, and we base that on the previous year, what we received

00:55:38.339 --> 00:55:46.282
- as our actual allocation. For the 2026 funding year, which starts June 1st of 26 and runs through May

00:55:46.282 --> 00:55:51.422
- 31st of 2027, we estimate the total allocation would be $778,293.

00:55:52.578 --> 00:56:04.942
- Our allocation is always broken down as follows. 65% for physical improvements, which would be $505,890.45,

00:56:04.942 --> 00:56:16.734
- 15% for social services, which would be $116,743.95, and 20% for administration, which is $155,658.60.

00:56:16.734 --> 00:56:21.886
- In October, we start accepting applications.

00:56:22.018 --> 00:56:29.392
- Once they are checked for eligibility, they are presented to the CAC Citizens Advisory Committee. The

00:56:29.392 --> 00:56:36.837
- CAC examines the applications and listens to applicant presentations and then deliberates to determine

00:56:36.837 --> 00:56:44.500
- the allocations with contingency language for more or less funding once we find out our final allocation.

00:56:44.500 --> 00:56:51.006
- After the CAC, the allocations must be presented to the RDC and then to the city council.

00:56:51.650 --> 00:56:59.765
- As I said before, both the RDC and the City Council have representation on the CAC. We do this because

00:56:59.765 --> 00:57:07.723
- that is the way it is laid out in our Citizens Participation Plan, which we develop based on federal

00:57:07.723 --> 00:57:15.916
- regulations. I'm going to read through the projects that were presented, both the physical improvements

00:57:15.916 --> 00:57:17.886
- and the social services.

00:57:18.530 --> 00:57:26.430
- The Boys and Girls Club had a project for gym improvements and security access point upgrades. Life

00:57:26.430 --> 00:57:34.331
- Designs had a project for group home flooring. Middleway House is going to install a new fire panel

00:57:34.331 --> 00:57:42.231
- at 338 South Washington. My Sister's Closet has a major renovation project at the new location that

00:57:42.231 --> 00:57:45.470
- they've acquired. New Hope for Families.

00:57:45.634 --> 00:57:53.485
- is going to be doing HVAC work and a build out of the basement of the family shelter. And Summit Hill

00:57:53.485 --> 00:58:01.490
- Community Development Corporation is going to be redoing the Reverend Butler playground and surrounding

00:58:01.490 --> 00:58:09.264
- courtyard. The social services, I'll read that down through the list, but pretty much all of them is

00:58:09.264 --> 00:58:15.422
- mostly staff salaries and food distribution. We have community kitchen, beacon,

00:58:15.522 --> 00:58:23.293
- Hoosier Hills Food Bank, Boys and Girls Club, New Hope for Families, Middleway House, New Leaf New Life,

00:58:23.293 --> 00:58:31.212
- Courage to Change Sober Living, Pantry 279, Summit Hill Community Development Corporation, and My Sister's

00:58:31.212 --> 00:58:38.613
- Closet. So again, we are bringing you the 2026 CDBG allocations, which were voted on by the CAC, to

00:58:38.613 --> 00:58:43.646
- fulfill our federal obligation of fulfilling our citizens' position

00:58:43.746 --> 00:58:53.771
- participation plan. Easy for me to say. We do this every year. These are great projects. I never envy

00:58:53.771 --> 00:59:04.190
- the work that the CAC has to do to make these allocations. We typically get at least two times the amount

00:59:04.190 --> 00:59:11.070
- of request more than what we are awarded, so they have to do a lot of

00:59:11.298 --> 00:59:19.726
- hard work to determine who's going to get the funding and how much. So we really appreciate their efforts.

00:59:19.726 --> 00:59:27.760
- Available for any questions that you might have. I just note that exhibit A and B have the breakdowns

00:59:27.760 --> 00:59:35.873
- for each of the entities mentioned. And that is part of the resolution. Any questions or comments from

00:59:35.873 --> 00:59:37.054
- commissioners?

00:59:37.506 --> 00:59:45.962
- Quick question in regards to the allocations for the administration. That is for each individual recipient

00:59:45.962 --> 00:59:53.943
- for their administration of the grant and not 20% for taking care of or you having to administer. So

00:59:53.943 --> 01:00:02.083
- that 20% is for the city of Bloomington's administration of the grant. That's what I wanted to verify,

01:00:02.083 --> 01:00:05.086
- that it was to cover the costs of you

01:00:05.314 --> 01:00:11.555
- being able to administer these grants and verify that these projects aren't going to be done. Which

01:00:11.555 --> 01:00:17.921
- brings me to my second question. Based on what you see, Matt and Cody, and your experience there, you

01:00:17.921 --> 01:00:24.162
- feel as though these, not feel, but you know that these projects will be able to be done within the

01:00:24.162 --> 01:00:30.404
- time frame in order to hit the CBDG requirements. To the best of your knowledge. To the best of our

01:00:30.404 --> 01:00:34.398
- knowledge, the applicants did present timelines that would meet

01:00:34.722 --> 01:00:40.296
- what we need to to expend funds. Thank you. And I appreciate both of you guys' hard work on this.

01:00:40.296 --> 01:00:46.495
- Thank you. Any other questions or comments from commissioners? I'll just say, as somebody who's participated

01:00:46.495 --> 01:00:52.353
- in the Social Services Committee for several years, it is a hard work, but it's amazing the incredible

01:00:52.353 --> 01:00:58.154
- work that the nonprofits in our community do. And I appreciate having the opportunity to at least see

01:00:58.154 --> 01:01:03.102
- what they're doing and be part of supporting them in this way. But yeah, it's amazing.

01:01:03.554 --> 01:01:11.133
- you know, one small part of what they need. So I'm glad that this CDBG funds are available to support

01:01:11.133 --> 01:01:18.785
- them and that the city makes that happen. This is a public hearing. I'm looking for any public comment

01:01:18.785 --> 01:01:26.215
- on resolution 25-151 on the CDBG recommendations for 2026, either in person or online. Seeing none,

01:01:26.215 --> 01:01:30.302
- I will entertain a motion for this resolution, please.

01:01:30.530 --> 01:01:38.025
- I'll move approval of resolution 25-151. Second. I'll move a first and a second. All in favor say aye.

01:01:38.025 --> 01:01:45.447
- Aye. Motion passes unanimously, and the public hearing is now closed. Thank you very much. Thank you.

01:01:45.447 --> 01:01:53.161
- OK. Next item on our agenda is resolution 25-152, which is the approval of the conceptual, comprehensive,

01:01:53.161 --> 01:02:00.510
- and coordinated design of Hopewell South, blocks 8, 9, and 10 for rezoning. And I'll just note that.

01:02:00.674 --> 01:02:06.487
- The redevelopment commission was invited to be part of a city council convening with the mayor earlier

01:02:06.487 --> 01:02:12.130
- just before this meeting. And this is regarding that we did not have a chance to ask any questions,

01:02:12.130 --> 01:02:17.943
- which is fine. It was really the council's meeting. But I appreciate it being invited. But this is our

01:02:17.943 --> 01:02:24.094
- chance to discuss anything that may have come up in looking at the proposal as well as what's in our packet.

01:02:24.290 --> 01:02:30.533
- I will ask who's going to present this. I'm happy to talk about this tonight. So as you know, and you

01:02:30.533 --> 01:02:36.775
- learned earlier today or through this process, the Hopewell South site cannot be developed to achieve

01:02:36.775 --> 01:02:43.201
- the city's housing goals under the existing R4 zoning standards due to dimensional restrictions, minimum

01:02:43.201 --> 01:02:46.078
- lot area and width, and frontage requirements.

01:02:46.178 --> 01:02:52.197
- An analysis of development under the current zoning regulations allowed for only 28 homes to be constructed

01:02:52.197 --> 01:02:57.938
- at price points unattainable to a Bloomington resident earning the area meeting income. Hopewell South

01:02:57.938 --> 01:03:03.790
- plan unit development is designed to not only guide the redevelopment of these blocks, but to also serve

01:03:03.790 --> 01:03:07.134
- as a prototype for attainable urban housing in Bloomington.

01:03:07.458 --> 01:03:13.683
- The PUD seeks to demonstrate how smaller lots, context-based frontage, and simplified subdivision processes

01:03:13.683 --> 01:03:19.907
- can expand homeownership opportunities without compromising neighborhood form or environmental performance.

01:03:19.907 --> 01:03:25.786
- In doing so, it advances the city's broader objectives of fostering compact, connected, and inclusive

01:03:25.786 --> 01:03:31.550
- neighborhoods as outlined in the comprehensive plan and the Hopewell Master redevelopment strategy.

01:03:32.706 --> 01:03:39.897
- So what you guys are actually being asked to approve right now is the conceptual approval of what we've

01:03:39.897 --> 01:03:47.157
- filed for the plan commission, which is on January 12th. So in order to stay on track and to potentially

01:03:47.157 --> 01:03:54.693
- have approval this spring in order to hit the building season over the summer, we would need your conceptual

01:03:54.693 --> 01:04:01.054
- approval of what we have filed, the materials that were filed. They are also in the packet.

01:04:01.698 --> 01:04:09.639
- The project's overall aim is to deliver the homeownership opportunities and the PUD that is in front

01:04:09.639 --> 01:04:17.501
- of you can reduce the average home price by more than 30% and provide 70% more total homes than can

01:04:17.501 --> 01:04:23.870
- be built by right under the existing R4 zoning. This is not a final version yet.

01:04:24.066 --> 01:04:31.152
- Changes can be made. I think our last day to give the Planning Department changes on what we've filed

01:04:31.152 --> 01:04:38.446
- is December 29th. But we do need your approval to move forward to Plan Commission. And even at the first

01:04:38.446 --> 01:04:45.740
- hearing for Plan Commission, there are likely going to be changes and discussions as we gather community

01:04:45.740 --> 01:04:49.630
- input and hear how we need to zone in on what is right.

01:04:50.050 --> 01:05:01.582
- So this is just one of those steps that you're conceptually approving what we have filed. Thank you.

01:05:01.582 --> 01:05:14.142
- Open for questions and comments from commissioners on resolution 25-152, please. Go ahead. OK. Good question.

01:05:14.434 --> 01:05:23.064
- Okay, long story short, the PUD that's just been presented, we've looked through, Ali did a great job

01:05:23.064 --> 01:05:31.525
- at the council presentation. What's the number of homes we're presenting so the public has an idea?

01:05:31.525 --> 01:05:39.902
- I believe it's 98. Okay, so we're looking to go from 28 in the beginning to 98 in a walkable area.

01:05:40.482 --> 01:05:48.728
- close to our community that will generate more tax dollars. Yeah, and of course, these could change.

01:05:48.728 --> 01:05:57.137
- But right now, what we're targeting is ranging in sales price from $83,000 all the way up to $653,000,

01:05:57.137 --> 01:06:05.709
- only a couple of those units. With the very vast majority, I think at least 50% of the units being built

01:06:05.709 --> 01:06:08.158
- are going to be attainable to

01:06:08.482 --> 01:06:14.237
- 100% of our area median income, which is really incredible considering building costs, land costs. That's

01:06:14.237 --> 01:06:19.775
- really not something that we're going to see with new construction. And there's the process that goes

01:06:19.775 --> 01:06:25.258
- through, we'll have planning commission, and then based upon it being a PUD, then it will need to go

01:06:25.258 --> 01:06:30.796
- to common council. It does go to council. Everything moves forward. That is correct. And then there's

01:06:30.796 --> 01:06:36.225
- a platting process as well that will go back through planning commission. So your original estimate

01:06:36.225 --> 01:06:37.854
- of being able to break ground

01:06:38.050 --> 01:06:45.694
- before the season is over next year is a realistic possibility. Assuming that we have approval as this

01:06:45.694 --> 01:06:53.561
- moves forward. So we're guesstimating that we'll have at least two meetings with the Planning Commission.

01:06:53.561 --> 01:06:59.646
- So we'll see. Right now, including platting, I think we're looking at the end of.

01:06:59.746 --> 01:07:06.182
- April beginning of mid part of May before we'll be fully done with the plotting process, assuming that

01:07:06.182 --> 01:07:12.492
- everything gets in person. It's an assumption process. It could go longer. I'm trying to look at the

01:07:12.492 --> 01:07:19.240
- best case scenario based on the cooperative nature that everybody has to get additional affordable housing.

01:07:19.240 --> 01:07:25.800
- We have been listening to your demands for get this done. I want this done next summer. We need housing.

01:07:25.800 --> 01:07:28.862
- And so to stay on target, we need this approval.

01:07:29.474 --> 01:07:37.394
- I believe there's a few units that may be able to get started sooner because they can do some quick

01:07:37.394 --> 01:07:45.551
- lot line adjustments to be able to break around as well. So you may see dirt moving sooner. Before the

01:07:45.551 --> 01:07:53.470
- PV is approved? What do you mean? I'm sorry? What did you mean by sooner? Yes, there's a few of the

01:07:53.470 --> 01:07:56.638
- lots that if they change the lot lines,

01:07:56.962 --> 01:08:04.225
- which you can do through an administrative adjustment, then they could go ahead and start work. It would

01:08:04.225 --> 01:08:11.141
- still end up being part of the overall PUD, but it would meet the criteria at that point in time to

01:08:11.141 --> 01:08:18.196
- go ahead and to be able to get it going. I'm just going to quick mention that even though it's not in

01:08:18.196 --> 01:08:20.894
- the redevelopment commission's packet,

01:08:21.410 --> 01:08:27.350
- members of the public want to see the presentation. It's a great presentation. It's really, really impressed

01:08:27.350 --> 01:08:32.853
- with what Flint Lot Lab has put together. And I think I invite people to see it. It's actually under

01:08:32.853 --> 01:08:38.411
- the city council meeting packets for December 15th. I invite you to take a look, because it's a great

01:08:38.411 --> 01:08:43.970
- presentation and really kind of gives a really strong idea of what's being considered as it starts to

01:08:43.970 --> 01:08:49.473
- move through towards the planning commission. But if there's no other questions or comments from the

01:08:49.473 --> 01:08:51.326
- commissioners. Yeah, sorry, John.

01:08:54.050 --> 01:09:03.286
- I should always make sure I look to my right when I'm doing it. Overall, I have a lot of support for

01:09:03.286 --> 01:09:12.705
- this. But there's some pieces of this design that I'm struggling with. But I don't want to hold up the

01:09:12.705 --> 01:09:22.398
- works because of that. So you said, conceptually, this is what we're approving. So we're in this process.

01:09:22.498 --> 01:09:30.136
- Does the RDC have the opportunity to discuss or explore some specifics of the plan and not dwell on

01:09:30.136 --> 01:09:37.774
- it here to hold up some vote for the overall PUD process, which I would like to support? Well, time

01:09:37.774 --> 01:09:45.488
- is of the essence, of course. So any time between now and, I would say, our February plan commission

01:09:45.488 --> 01:09:52.286
- meeting, we can receive your input. But I would prefer it sooner than later because each

01:09:52.482 --> 01:10:00.023
- If there are changes that need to be made, we need to do it now. Well, changes that... And are you concerned

01:10:00.023 --> 01:10:07.288
- with the home types? Because that's not necessarily what we're approving right now. What we're approving

01:10:07.288 --> 01:10:14.622
- is the layout. Well, that's a good example. I would question the marketability of some of the home types.

01:10:14.622 --> 01:10:22.302
- Now, I don't know if they're there just as examples or by this vote, is this what we're trying to make happen?

01:10:23.554 --> 01:10:30.600
- question, you know, in some cases whether it's reality or not. That's just one example of something

01:10:30.600 --> 01:10:37.717
- that has come to my mind. Sure. Well, you're not approving the house types right now. You are simply

01:10:37.717 --> 01:10:44.974
- approving the PUD, the layout, and where the infrastructure is going. So those conversations will come

01:10:44.974 --> 01:10:48.286
- back up. Okay. Will it come to this body? Yes.

01:10:54.530 --> 01:11:01.587
- But I guess I would also point out that there are other bodies that involved in that as well. There's

01:11:01.587 --> 01:11:08.644
- going to be other conversations with Flintlock, with Planning Commission. I mean, there's going to be

01:11:08.644 --> 01:11:15.701
- obviously other conversations about the housing time. So I don't think that this body necessarily has

01:11:15.701 --> 01:11:18.814
- 100% control over that location. Understood.

01:11:21.922 --> 01:11:29.898
- Anything else from commissioners? Otherwise, I'm going to open it up for public comment, either in person

01:11:29.898 --> 01:11:37.875
- or online. Not seeing anything. I'll entertain a motion on resolution 25-152. Move approval of resolution

01:11:37.875 --> 01:11:45.776
- 25-152. I'll second. We have a first and a second. All in favor say aye. Aye. Any opposed? Motion passes

01:11:45.776 --> 01:11:47.582
- unanimously. Thank you.

01:11:48.386 --> 01:11:54.221
- Next item on the agenda is resolution 25153, which is approval of funding for change order package number

01:11:54.221 --> 01:11:59.781
- one for Hopewell West. Mr. Kenoki is here to talk to us about that. Yes, Kendall Kenoki, engineering

01:11:59.781 --> 01:12:05.451
- department. Thank you very much. So Hopewell West, just as a refresher, this is the first phase of the

01:12:05.451 --> 01:12:11.065
- infrastructure that's under construction now. So this is Jackson Street directly adjacent to the core

01:12:11.065 --> 01:12:16.680
- building, as well as Roger Street. This specifically is approval for the funding of a package of four

01:12:16.680 --> 01:12:17.726
- change orders that

01:12:18.402 --> 01:12:23.967
- occurred on the project. I'll just go through them one by one, and then I'll be happy to answer any

01:12:23.967 --> 01:12:29.588
- questions. So the first one is for the addition of a sanitary manhole structure. This is because the

01:12:29.588 --> 01:12:35.598
- stub we were connecting to was not at the elevation that it was supposed to be at. And that was a different

01:12:35.598 --> 01:12:41.218
- project, the first street project. So getting that through NDOT and going through, the easiest thing

01:12:41.218 --> 01:12:43.166
- to do is just drop a new structure

01:12:43.490 --> 01:12:50.410
- keep this project moving along. So that's where that $5,225 is coming from. Change order number three

01:12:50.410 --> 01:12:57.263
- is the addition of some side for some stabilization. Number four is some additional conduit. So this

01:12:57.263 --> 01:13:04.319
- was essentially to prevent Duke Energy from ripping up our new road. So we decided to drop some conduit

01:13:04.319 --> 01:13:11.239
- in so they could go through there to serve the new core building. And then number five is the biggest

01:13:11.239 --> 01:13:13.342
- one in this group, but this is

01:13:13.794 --> 01:13:22.203
- where our consultant prepares a quantity takeoff of the proposed design, and he did not quite pick up

01:13:22.203 --> 01:13:30.529
- all of these items, so I'll just list them quickly. A gate valve with valve box, sanitary lateral, a

01:13:30.529 --> 01:13:39.102
- storm inlet, and PVC conduit. So these were listed lower on the quantity takeoff that the bidders used.

01:13:39.234 --> 01:13:46.539
- than what was actually on the plan. So we are over on these quantities, and that's added an additional

01:13:46.539 --> 01:13:53.773
- $42,977.50. So I'll say the consultant had a great design and a great takeoff on all the other items,

01:13:53.773 --> 01:14:01.007
- but miscalculated on the amount of conduit and things. But this is cost that would have been included

01:14:01.007 --> 01:14:04.766
- in the original bid had the quantities been correct.

01:14:05.378 --> 01:14:14.068
- And that's why it's non-recoverable, which it says there, which means we can't go after the consultant

01:14:14.068 --> 01:14:22.843
- trying to get the money back. I think that's it. I'm happy to answer any questions. And for the record,

01:14:22.843 --> 01:14:30.942
- change order two was in the amount of $5,225. And change order three was in the amount of $870.

01:14:31.394 --> 01:14:41.927
- Change order four was in the amount of $2,560, and you've already heard the change order four. Yes,

01:14:41.927 --> 01:14:52.881
- questions, please. Maybe I'm just not following the resolution, but it looks to me like we're approving

01:14:52.881 --> 01:15:00.254
- change order package one, and it doesn't even refer to anything else.

01:15:25.090 --> 01:15:33.135
- It's a little confusing because the exhibits are described as exhibit A through B, although then within

01:15:33.135 --> 01:15:40.948
- the text, it's change order two, three, four, and five. And yeah, the text of the resolution doesn't

01:15:40.948 --> 01:15:49.303
- appear to reference. Number two doesn't really reference anything but package one, even though the exhibits

01:15:49.303 --> 01:15:54.718
- are. In the whereas clause, it says that the tax exhibits A through B

01:15:55.010 --> 01:16:03.143
- collectively, a change order package number one. So then in the therefore clause, it's change order

01:16:03.143 --> 01:16:11.358
- package number one, whereas clause has described as those four exhibits. Yeah, but I thought we were

01:16:11.358 --> 01:16:19.491
- doing two through four. It's change order two through four, then it's a package of change orders. I

01:16:19.491 --> 01:16:23.070
- didn't draft it, but I'm just saying that's

01:16:23.394 --> 01:16:36.530
- Legally, it covers it. Because that's what the package number one is, and then it says approved in that

01:16:36.530 --> 01:16:49.413
- package. All right. Thank you. Long story short, we've got 153,444 177 tests. Well, this change order

01:16:49.413 --> 01:16:52.318
- is only for 51,632 50.

01:16:52.770 --> 01:17:01.053
- Okay, I apologize. We already did the other one. It's like a $52,000 miss, but we'd have paid for it

01:17:01.053 --> 01:17:09.581
- anyway, correct? That's correct. The $42,000 is the big thing. It's a quantity miss. Yes. How we missed

01:17:09.581 --> 01:17:18.110
- it is... Yes, approximately $43,000. The other three are, you know, just changes, construction changes.

01:17:22.146 --> 01:17:29.406
- satisfied with it as a professional? And is everything moving along in your time frame and the quality

01:17:29.406 --> 01:17:36.806
- that your expectations are? Yes, the contractor is in liquidated damages, LDs, so they're running behind

01:17:36.806 --> 01:17:43.925
- schedule. So there's a few things that they ran out of time before the winter. So next spring, we're

01:17:43.925 --> 01:17:51.326
- going to get the full payment markings put down. They weren't able to put those down before it got cold.

01:17:51.970 --> 01:17:59.592
- But generally, I think we're probably going to be actually under the total estimated cost for the projects.

01:17:59.592 --> 01:18:06.861
- There'll be a balancing change order at the end. I think we'll be a little under that. That's all over

01:18:06.861 --> 01:18:14.130
- what our original projected cost was. Any other questions or comments from commissioners? I agree it's

01:18:14.130 --> 01:18:19.070
- kind of eventually legible in terms of how the resolution is written.

01:18:19.202 --> 01:18:24.249
- I would strongly agree because there's not even one place where the total is. It's like subtracting,

01:18:24.249 --> 01:18:29.345
- you know, changing the total to the total. There's not anything that adds up exhibits A through D. So

01:18:29.345 --> 01:18:34.591
- I'm just asking from a legal resolution, whoever in the legal department is drafting this stuff. I mean,

01:18:34.591 --> 01:18:39.638
- there's occasionally times where we do come up with or do notice errors in numbers and we want it to

01:18:39.638 --> 01:18:44.685
- be as clear as possible so that we actually can make sure that the numbers are written accurately in

01:18:44.685 --> 01:18:48.382
- the resolution. And I believe they are in this case. I'm just saying that

01:18:48.674 --> 01:18:53.797
- It takes a little while to make sure that that's the case. And to the extent that the resolution can

01:18:53.797 --> 01:18:59.022
- be written clearly to say, you know, Exhibit A is for this much. Exhibit B is for this much. It totals

01:18:59.022 --> 01:19:04.349
- this much. And this is the change order. That would be much more helpful to make sure that we're, again,

01:19:04.349 --> 01:19:09.624
- doing the due diligence of, is this being approved for what it is intended to be approved for? So just,

01:19:09.624 --> 01:19:14.697
- again, that's just mostly from a legal resolution drafting question. Put it really clearly in there

01:19:14.697 --> 01:19:16.574
- so it's really easy to be like, yep,

01:19:17.026 --> 01:19:24.346
- That's what it is. We can check the numbers and make sure that it is delivering what it's intended to.

01:19:24.346 --> 01:19:30.885
- So that's my last word. OK. Thank you. I appreciate that. Any public comment? Commissioner,

01:19:30.885 --> 01:19:38.205
- comment is closed. Anything from the public, either online or in person, seeing none, I will entertain

01:19:38.205 --> 01:19:43.038
- a motion for resolution 21-153. Move approval of resolution 25-153.

01:19:43.522 --> 01:19:50.448
- We've got a first and a second. All in favor, say aye. Aye. Any opposed? Motion passes unanimously.

01:19:50.448 --> 01:19:57.721
- Thank you. And our last item of new business for the evening is resolution 25-154, which is the approval

01:19:57.721 --> 01:20:04.786
- of a lease for the Fords with Bermudez Energetics LLC. Who would like to speak to that? Mr. Fernando.

01:20:04.786 --> 01:20:08.318
- OK. All right. Good evening. Thank you, everybody.

01:20:08.866 --> 01:20:16.791
- I think that memo I sent out, hopefully you had a chance to read, is pretty straightforward. This is

01:20:16.791 --> 01:20:24.716
- a proposed lease for possibly $2,400 swiffy on the first floor of the Forge. That's a company called

01:20:24.716 --> 01:20:32.954
- Prometheus Energetics. They're a company that's in the defense tech space that's a joint venture between

01:20:32.954 --> 01:20:37.662
- two really major players. So they're technically a startup.

01:20:38.466 --> 01:20:46.285
- But I guess in the startup world, you would consider a hyper growth startup. You may have read that

01:20:46.285 --> 01:20:54.104
- they're planning to build a very large scale manufacturing and engineering facility in Green County

01:20:54.104 --> 01:21:02.705
- as part of a large campus that's being developed in proximity to Crane. But they haven't started construction

01:21:02.705 --> 01:21:07.006
- yet. So they were looking for a space where they could

01:21:07.330 --> 01:21:16.236
- attract some of the professional staff, some of the engineering, some of the CEO and some of the other

01:21:16.236 --> 01:21:25.574
- executives so that they'd be able to have a good place to operate out of why they're doing the larger-scale

01:21:25.574 --> 01:21:34.220
- project. That's why this, unlike our previous lease, it's a three-year lease. Our prior leases were

01:21:34.220 --> 01:21:37.246
- all five. I felt that it was worth

01:21:37.986 --> 01:21:46.792
- compromising and doing a three-year lease with you know they have three options to renew at it for a

01:21:46.792 --> 01:21:55.598
- year because of the nature of the company the brand of the company it's a it's a pretty big addition

01:21:55.598 --> 01:22:04.317
- to our ecosystem I mean in that sector they're very well known and they're very well capitalized to

01:22:04.317 --> 01:22:05.886
- say the least the

01:22:06.850 --> 01:22:14.853
- The discussion I have with the leadership is that since we would be looking at a three-year lease rather

01:22:14.853 --> 01:22:22.857
- than a five-year lease, we'll work together on their tenant improvement plans to make them pretty basic.

01:22:22.857 --> 01:22:30.479
- Nothing hyper-customized so that it'd be much easier to re-tenant at the end of three years if they

01:22:30.479 --> 01:22:34.366
- decide that they don't want to exercise an option.

01:22:35.714 --> 01:22:43.952
- The only other difference in this lease is the rent you'll notice is just slightly higher than our previous

01:22:43.952 --> 01:22:51.656
- leases because we baked into all the leases a annual COLA or inflationary increase of two and a half

01:22:51.656 --> 01:22:59.284
- percent. So that's actually reflected in this lease since they would not begin paying rent until in

01:22:59.284 --> 01:23:05.310
- 2026. So it's 2153 is the base rent plus cams plus their own electric charges.

01:23:05.826 --> 01:23:14.465
- They also have a request in the lease for a first-ride refusal for the remaining 1,800 square feet on

01:23:14.465 --> 01:23:23.103
- the first floor. I don't know if they actually, you know, use that or not, but they were just curious

01:23:23.103 --> 01:23:31.658
- if they could have that just in case they decided they wanted it spanned. I did not include, as John

01:23:31.658 --> 01:23:33.182
- West pointed out,

01:23:33.762 --> 01:23:41.602
- defined term in terms of how long they have to consider that. Retrospect, that would have been a good

01:23:41.602 --> 01:23:49.441
- thing to do. I think given the relationship, we can include that in the notice that we're required to

01:23:49.441 --> 01:23:57.358
- give that give them a set deadline for responding. I wouldn't want to hold up the lease over that just

01:23:57.358 --> 01:24:02.046
- because it's a very corporate bureaucracy, to say the least.

01:24:02.178 --> 01:24:09.530
- that it will take several weeks to go through the legal department and do an amendment for something

01:24:09.530 --> 01:24:17.100
- like that. Just not because it's complicated, not because it's controversial, it's just their corporate

01:24:17.100 --> 01:24:24.379
- governance requires board approval of any of their leases and then it will require chasing down two

01:24:24.379 --> 01:24:31.294
- executive signatures, so it'll take a while. So I hope you just give me a little grace on that

01:24:31.426 --> 01:24:39.383
- trust that we'll be able to manage that process. So I'll stop there. I'm happy to answer any questions.

01:24:39.383 --> 01:24:47.646
- I guess the good news with this is that we started the year with a goal of 50% occupancy. If the commission

01:24:47.646 --> 01:24:55.450
- approves this, we'll be up to 86%. So we're doing pretty well. Thank you very much. Open to questions

01:24:55.450 --> 01:24:59.582
- and comments from commissioners on resolution 25-154.

01:25:01.826 --> 01:25:07.548
- Any questions or comments? I'd love to have the entire facility, but it's good to have what we got.

01:25:07.548 --> 01:25:13.384
- Yeah, no kidding. I mean, we don't, well, that's a whole different topic, Randy, about where we would

01:25:13.384 --> 01:25:19.220
- do that. But yeah, appreciate your effort on that. Thank you. I did want to say that this is based on

01:25:19.220 --> 01:25:24.484
- the model lease that you approved. Thank you. OK. If there's no other questions or comments

01:25:24.484 --> 01:25:29.118
- from commissioners, we'll open it for public comment either online or in person.

01:25:29.346 --> 01:25:38.058
- Seeing none, I will invite a motion for resolution 25-154. I'll move approval of resolution 25-154.

01:25:38.058 --> 01:25:46.857
- Second. First and a second, all in favor say aye. Aye. Any opposed? Motion passes unanimously. Thank

01:25:46.857 --> 01:25:55.569
- you very much. Congrats, Sean. Thank you. Thank you. One more item of business. It is old business.

01:25:55.569 --> 01:25:58.270
- And that is resolution 25-136.

01:25:58.850 --> 01:26:06.984
- supporting the convention center host hotel on color square property We have this again revisited, but

01:26:06.984 --> 01:26:15.119
- I'll open it to staff for any comments before we move forward because there's been some Changes in the

01:26:15.119 --> 01:26:23.016
- resolution since we last met I'll take it and offer a little intro in context. You all are familiar

01:26:23.016 --> 01:26:28.702
- with it at this point and then I'll pass to corporation council who can

01:26:28.962 --> 01:26:35.185
- do a deeper dive into the legislation and the changes that have been included this week. So the Monroe

01:26:35.185 --> 01:26:41.530
- County Capital Improvement Board, via the internal local agreement signed in February 2024, is empowered

01:26:41.530 --> 01:26:47.753
- to select the site of a hotel, oversee that partnership, and manage development and collaboration with

01:26:47.753 --> 01:26:49.022
- the city and county.

01:26:49.154 --> 01:26:54.902
- The project, the hotel, the convention center and the hotel project have a long history but I'll begin

01:26:54.902 --> 01:27:00.595
- in June 2024 when the CIB issued a request for proposals for a host hotel developer. I misspoke there

01:27:00.595 --> 01:27:06.622
- that's the beginning of the hotel project to be clear the convention center is the one with a long history.

01:27:06.786 --> 01:27:14.865
- The CIB received seven responses to that request for proposals and they heard presentations from three

01:27:14.865 --> 01:27:22.943
- developers in September 2024. They selected a developer in Dora Hospitality and they communicated with

01:27:22.943 --> 01:27:31.806
- Dora Hospitality about available but not necessarily gratis sites to the hotel developer. The developer selected

01:27:32.034 --> 01:27:40.283
- the RDC-owned property at 200 to 216 South College Avenue, which is called College Square or the former

01:27:40.283 --> 01:27:48.453
- Bunger and Robertson property. They selected that as their preferred location. And so they engaged the

01:27:48.453 --> 01:27:56.384
- city in discussions in late 2024 at the staff level. Additional staff and members of the RDC joined

01:27:56.384 --> 01:27:58.526
- those discussions in 2025.

01:27:58.818 --> 01:28:06.119
- From the beginning of those negotiations or discussions, the hotel developers described a significant

01:28:06.119 --> 01:28:13.563
- gap in order to deliver on the scope of the host hotel. When the city, on our side of the negotiations,

01:28:13.563 --> 01:28:21.007
- required full land value as was previously requested, that amount simply appeared as a required subsidy

01:28:21.007 --> 01:28:23.870
- in a different part of their pro forma.

01:28:25.154 --> 01:28:30.913
- So the city considered a range of partnership structures to determine how best to advance the project

01:28:30.913 --> 01:28:36.785
- at the site. And this body approved expenditures totaling $400,000 to advance investigation of the site

01:28:36.785 --> 01:28:42.487
- and design of the building while it continued negotiating with the developer. Initial site work like

01:28:42.487 --> 01:28:48.189
- soil borings has gone forward. No design work has advanced in the absence of a letter of intent with

01:28:48.189 --> 01:28:54.174
- the developer. City staff put forth legislation to the RDC for consideration at its December 1st meeting.

01:28:54.530 --> 01:29:00.958
- The RDC held a public work session on December 10th in order to provide additional public space to discuss

01:29:00.958 --> 01:29:07.447
- the project, and more specifically, to do that with members of the common council. That discussion informed

01:29:07.447 --> 01:29:13.514
- amendments to the legislation, which Margie will discuss momentarily. For members of the public, you

01:29:13.514 --> 01:29:19.702
- can find access to the meeting packet for that work session by Googling Bloomington RDC and navigating

01:29:19.702 --> 01:29:22.526
- to the work session on December 10th. Broadly,

01:29:22.690 --> 01:29:28.752
- Staff recommends consideration of the hotel project, which is a critical piece to a major economic driver

01:29:28.752 --> 01:29:34.642
- for our community. The hotel will fill critical demand gaps, allowing the convention center to operate

01:29:34.642 --> 01:29:40.646
- at its full capacity. It will drive outside revenue into the community, and it will generate tax revenue

01:29:40.646 --> 01:29:46.365
- via the food and beverage and keepers and property taxes. And with that, I'll pass to Margie. So at

01:29:46.365 --> 01:29:51.454
- your last meeting, you guys discussed this resolution, and several council members came.

01:29:51.746 --> 01:29:59.870
- to the meeting and reminded the Redevelopment Commission that they objected to this parcel being offered

01:29:59.870 --> 01:30:07.606
- to a developer for free or for a nominal cost. So based on that meeting, staff went back and edited

01:30:07.606 --> 01:30:15.652
- this resolution. And I know some RDC members provided some feedback. So the amended resolution is based

01:30:15.652 --> 01:30:19.134
- on some changes that you guys had requested.

01:30:19.778 --> 01:30:29.754
- I would point you to, well, let me just say this has 14 kind of whereas clauses to give background and

01:30:29.754 --> 01:30:40.117
- then four resolutions. The third resolution has been edited and essentially it says that the redevelopment

01:30:40.117 --> 01:30:48.350
- commission provides notice of its commitment to a host hotel project by making known

01:30:48.450 --> 01:30:56.789
- that the real estate at College Square, which is bounded by College and 4 and then 3rd Street on the

01:30:56.789 --> 01:31:05.127
- south, may be made available in some form to the Host Hotel Project at a nominal cost to the project

01:31:05.127 --> 01:31:13.796
- if it furthers the best interests of economic development. It also makes very clear what this resolution

01:31:13.796 --> 01:31:16.190
- does not do. This resolution

01:31:16.578 --> 01:31:24.146
- shall not be construed as approving the final development terms, a land conveyance, or a specific financial

01:31:24.146 --> 01:31:31.433
- structure, all of which shall require separate RDC review and approval. You are not negotiating in this

01:31:31.433 --> 01:31:38.580
- resolution a deal with a hotel developer. So let's just get that off the table. What you are doing in

01:31:38.580 --> 01:31:46.078
- this resolution, if you pass it, is signaling to the world, to the city council, to hoteliers, to the CIB,

01:31:46.274 --> 01:31:55.364
- that the roughly 2.4 acre bit of land that you own that is in need of redevelopment, it is an underdeveloped

01:31:55.364 --> 01:32:03.953
- property in downtown Bloomington, you are signaling that you think this is a good location for a hotel

01:32:03.953 --> 01:32:12.542
- and you may make it available at a nominal cost. Nominal meaning, by dictionary definition, very small

01:32:12.542 --> 01:32:15.294
- or below the real value or cost.

01:32:15.586 --> 01:32:23.459
- Not saying you are, just saying you might. And the CIB has chosen this hotel here that we've been trying

01:32:23.459 --> 01:32:31.332
- to negotiate an LOI. We do not have an LOI. However, the world needs to know whether this underdeveloped

01:32:31.332 --> 01:32:39.131
- lot in downtown is intended for a hotel and going to be made available for a hotel or not. And you guys

01:32:39.131 --> 01:32:42.430
- are the owners, and so here we are tonight.

01:32:42.562 --> 01:32:49.348
- please do, you know, three of you are appointed by the mayor, two of you are appointed by the council.

01:32:49.348 --> 01:32:56.134
- Council has made its wishes known. The mayor is here tonight. I would encourage you to take all of the

01:32:56.134 --> 01:33:02.919
- feedback and input that you have been given to date into consideration, and you get paid the big bucks

01:33:02.919 --> 01:33:09.837
- to make these sorts of calls. And so with that, I'll entertain any questions you might have. And I would

01:33:09.837 --> 01:33:11.550
- add, in addition to that,

01:33:12.034 --> 01:33:19.260
- where you mentioned that you would only do the project at the nominal cost and if they less than fair

01:33:19.260 --> 01:33:26.344
- market value, if it furthers the debate in the past interest of economic development in the city of

01:33:26.344 --> 01:33:33.428
- Bloomington, that means you would have to be convinced that that was the right project and whatever

01:33:33.428 --> 01:33:41.150
- concessions you might or might not make would be the right concessions in order to make that project happen.

01:33:41.602 --> 01:33:53.504
- It still gives you the authority to choose whether or not you feel it's an economic interest to have

01:33:53.504 --> 01:34:05.760
- any. So you're retaining that authority. I also want to just say for the record that to date the county

01:34:05.760 --> 01:34:07.646
- has contributed

01:34:07.906 --> 01:34:13.988
- about an acre and a half of land for the Convention Center where it is currently being built. The assessed

01:34:13.988 --> 01:34:19.671
- value of that land is about 1.7 million. We know that's low for an acre and a half, but that's just

01:34:19.671 --> 01:34:25.469
- the AV. There's not a current sales price to bring that up. Property that you guys own is worth about

01:34:25.469 --> 01:34:31.437
- seven to eight million based on appraisal we received and the sales price. The city has also contributed

01:34:31.437 --> 01:34:35.870
- to the Convention Center project in general, about $46 million worth of bond.

01:34:36.002 --> 01:34:43.251
- So there's been a land contribution by the county, there's been a giant bond contribution of food and

01:34:43.251 --> 01:34:50.570
- beverage tax dollars by the city, and you're here tonight to discuss whether you want to make this lot

01:34:50.570 --> 01:34:58.245
- available for a possible post-hotel site. Questions or comments from commissioners? I will note in addition

01:34:58.245 --> 01:35:04.286
- to the comments that people have, I have a proposed amendment to this, but I want to

01:35:05.090 --> 01:35:14.663
- make sure that people have a chance to say what they want to say before I charge ahead with them. If

01:35:14.663 --> 01:35:24.425
- there's nothing, I will introduce it. So I have hard copies if you want to look at it in front of you.

01:35:24.425 --> 01:35:32.766
- Feel free to. I've got seven copies here, so if you want it, you can take a look at it.

01:35:33.218 --> 01:35:40.140
- The two main areas that I'm proposing an amendment to are on page two of the resolution. Um, and they

01:35:40.140 --> 01:35:46.927
- both are kind of centered around that word nominal, um, because even though I fully appreciate, um,

01:35:46.927 --> 01:35:53.917
- the hard work that staff has done, um, that, um, the having the meeting, the work session earlier, uh,

01:35:53.917 --> 01:36:01.790
- last week, um, all good to hear from people to really collaborate, to get towards, um, a fruitful outcome for this.

01:36:02.114 --> 01:36:10.581
- Talking about giving away our nominal cost of land, again, we will have a chance to revisit that later.

01:36:10.581 --> 01:36:18.560
- So just I'll go over the specific amendment first and then just provide my commentary after that.

01:36:18.560 --> 01:36:23.934
- So again, this is page two. The last whereas, my proposal is that

01:36:24.066 --> 01:36:30.522
- this would read, whereas in addition to the incentives already mentioned above, the RDC has determined

01:36:30.522 --> 01:36:36.790
- that the real estate at College Square necessary for the host hotel may be made available in a form

01:36:36.790 --> 01:36:43.184
- and on terms to be determined by the RDC and structured to protect the city's best interest and limit

01:36:43.184 --> 01:36:49.515
- public risk. So it's taking out the at nominal cost and then provided that such participation is, it

01:36:49.515 --> 01:36:53.150
- was just to kind of tighten that up to make it clear that

01:36:53.602 --> 01:36:59.150
- Again, the RDC is prepared to make this available, but we are not stating the terms under which that

01:36:59.150 --> 01:37:03.710
- availability is being made yet. And then the comparable one is under clause three.

01:37:03.970 --> 01:37:09.750
- The Bloomington Redevelopment Commission hereby provides notice of its further commitment to the Host

01:37:09.750 --> 01:37:15.587
- Hotel project by making known that the real estate at College Square, if necessary for the Host Hotel,

01:37:15.587 --> 01:37:21.367
- may be made available in some form and on terms to be determined by the RDC and structured to protect

01:37:21.367 --> 01:37:27.090
- the city of Bloomington's best interest and limit public risk. Again, taking out the at nominal cost

01:37:27.090 --> 01:37:29.470
- to the project because it feels like it's

01:37:30.370 --> 01:37:34.654
- let it's reducing leverage capacity of this so.

01:37:34.850 --> 01:37:40.381
- Just again, this is based on concerns that we heard about fiscal discipline, use of public assets, and

01:37:40.381 --> 01:37:45.805
- maintaining appropriate oversight. I feel like these are legitimate concerns, and they matter to me.

01:37:45.805 --> 01:37:51.337
- So that's the reason for my proposed amended language, taking out the phrases like nominal cost, which

01:37:51.337 --> 01:37:56.975
- can be read as a pricing commitment. Removing that language helps ensure this resolution does not signal

01:37:56.975 --> 01:38:02.775
- a subsidy level before the RDC has fully evaluated a concrete proposal from a hotel developer that reflects

01:38:02.775 --> 01:38:04.816
- the anticipated sources of financing,

01:38:04.816 --> 01:38:10.911
- beyond what the RDC can offer. From my perspective, the purpose of this resolution is to confirm that

01:38:10.911 --> 01:38:16.947
- the RDC is willing to consider making College Square site available in support of a host hotel while

01:38:16.947 --> 01:38:23.102
- preserving our leverage and financial responsibility. The amendment documents that flexibility without

01:38:23.102 --> 01:38:29.257
- pre-committing the RDC to a deal. Importantly, this amendment does not change the resolution's intent,

01:38:29.257 --> 01:38:33.918
- and a binding decision still requires a separate vote by this body in public.

01:38:34.370 --> 01:38:41.410
- With the convention center expansion already underway, I do believe it's appropriate to vote on an amended

01:38:41.410 --> 01:38:47.989
- resolution tonight to create a pathway to move forward on a key component of this project. So thank

01:38:47.989 --> 01:38:54.634
- you for your consideration of this proposed amendment. So. Do you need a second for the amendment? I

01:38:54.634 --> 01:39:01.345
- think I'm introduced to it. I think we need a first and then a second. That's my understanding of the

01:39:01.345 --> 01:39:03.582
- procedure, but I'll defer to our.

01:39:04.002 --> 01:39:17.247
- We have a first and a second. Would we like to discuss further before I vote? Yes. Oh, I'm just saying

01:39:17.247 --> 01:39:31.134
- we have a first and a second, so it's on the table for discussion. Right. OK. So any questions or comments?

01:39:31.650 --> 01:39:38.191
- Either obviously the amendment or the amended version of the resolution, because the resolution as a

01:39:38.191 --> 01:39:45.121
- whole is what's on the table. Why don't we just talk about the amendment? OK. Move back to the resolution.

01:39:45.121 --> 01:39:52.050
- I would be interested in staff's take and in particularly John and Randy's take based on the conversations

01:39:52.050 --> 01:39:59.174
- you had. Is there still a valid point to this resolution with the softened language? Does it still accomplish

01:39:59.174 --> 01:40:01.182
- what we need it to accomplish?

01:40:02.402 --> 01:40:11.230
- given what hoteliers are looking for? And that's a sincere question. Anna? No pressure. In the executive

01:40:11.230 --> 01:40:19.637
- session that we had, you guys asked for the resolution that gave a ceiling to the amount of subsidy

01:40:19.637 --> 01:40:28.297
- that you were willing to provide because the gap was so significant. So by amending and taking out the

01:40:28.297 --> 01:40:29.726
- nominal cost bit

01:40:30.082 --> 01:40:38.152
- You are essentially not giving a ceiling. We are just back to the drilling boards. The land has been

01:40:38.152 --> 01:40:46.621
- made available already. So I appreciate and understand the input that has gone into this. It's ultimately

01:40:46.621 --> 01:40:54.771
- up to you guys to decide how you want to move forward. We know that there is no deal with DORA. There

01:40:54.771 --> 01:40:58.366
- is no deal with DORA with the land donation.

01:40:59.778 --> 01:41:09.175
- That's not going to fix the problem. This resolution isn't going to fix the problem. The amendment isn't

01:41:09.175 --> 01:41:18.571
- going to fix the problem. I will add that I agree. I think unless the RDC is willing to make a statement

01:41:18.571 --> 01:41:27.968
- of how much commitment they might be willing to make if it was the right project and if it had the right

01:41:27.968 --> 01:41:29.310
- terms, then it

01:41:29.442 --> 01:41:37.630
- really isn't impacting on any future negotiations. This is a great opportunity to kind of fix

01:41:37.630 --> 01:41:47.212
- some misperceptions that's out there. The RDC went into this and into these negotiations under the assumption

01:41:47.212 --> 01:41:56.446
- that they were going to be compensated for the land in some manner. Though that assumption stayed strong,

01:41:57.026 --> 01:42:08.283
- until we got deep into the negotiations. Then around June of this year, it became apparent that there

01:42:08.283 --> 01:42:19.431
- was a gap that the developer was looking for a subsidy to fill. So then the RDC took time to look at

01:42:19.431 --> 01:42:26.494
- a variety of structures of deals, a variety of funding sources,

01:42:26.946 --> 01:42:35.399
- most of which, if almost all of which are outside your control, these other funding forces. And finally

01:42:35.399 --> 01:42:43.689
- came to the realization that even if the RBC did the most that it could do, and whether it's offering

01:42:43.689 --> 01:42:51.411
- the land at a nominal amount would be the ceiling because there's nothing else the RBC can do.

01:42:51.411 --> 01:42:54.174
- Senate Bill 1, Senate Rule Act 1,

01:42:54.338 --> 01:43:04.979
- changed the world. Paris has changed the world. Things are different now than they were even a short

01:43:04.979 --> 01:43:16.462
- year ago. And so it was determined in the November executive session that the RDC didn't make any decisions.

01:43:16.462 --> 01:43:22.046
- It just said legal. And it put together a resolution

01:43:22.434 --> 01:43:31.345
- So we have something to consider because we need now that it's obvious that even if the land was part

01:43:31.345 --> 01:43:40.344
- of the deal, as Anna said, the door deal was not going to work. So it's like, OK, well, the deal's off

01:43:40.344 --> 01:43:49.080
- the table. So our confidential negotiations are over with. And now we need to bring into the public

01:43:49.080 --> 01:43:51.614
- realm what the RDC considers

01:43:51.906 --> 01:44:00.000
- the possibility of abusing the land. It was nothing was ever assumed that that was going to happen or,

01:44:00.000 --> 01:44:08.251
- you know, behind, you know, in executive sessions or anything else. It was determined by this body that,

01:44:08.251 --> 01:44:16.423
- hey, we need to get this out into the public sphere and we need to get input. So it was on the December

01:44:16.423 --> 01:44:21.374
- 1st meeting and input was received and enough input that said,

01:44:21.538 --> 01:44:31.394
- We need to look at this some more. So there was a work session on December 10th to make sure that everyone

01:44:31.394 --> 01:44:40.974
- was understanding where things were at. And so that, you know, I hope that clears up this misconception

01:44:40.974 --> 01:44:47.422
- that there was this plan to use this property. It was never the plan.

01:44:48.162 --> 01:44:56.636
- But in all of the negotiations we had in looking at all other projects that have host hotels and seeing

01:44:56.636 --> 01:45:05.274
- that nearly all of them have some sort of public existence, and some of them as much as 100%, we realized

01:45:05.274 --> 01:45:12.771
- that the RDC couldn't make the deal work because the RDC doesn't have the ability to do it.

01:45:12.771 --> 01:45:16.030
- Again, Senate-enrolled Act 1 has caused

01:45:17.442 --> 01:45:26.750
- the RDC funds to be needed for projects that may not that may have been funded in other ways prior to

01:45:26.750 --> 01:45:35.967
- that. So now the RDC has to be very careful with its if its funds and its revenues coming in. So but

01:45:35.967 --> 01:45:45.458
- this is an asset that is on the books. It is an asset that if this deal is going to be done if any deal

01:45:45.458 --> 01:45:46.462
- to be done

01:45:46.754 --> 01:45:56.425
- with the host hotel is going to require the significant contribution from public sources. And the land,

01:45:56.425 --> 01:46:06.281
- if that were a part of it, and again, you can structure the deal in many different ways to try to protect

01:46:06.281 --> 01:46:16.510
- the interests of the city, to try to control that the host host hotel maintains quality and things like that.

01:46:17.186 --> 01:46:25.871
- By doing this resolution, now we're turning it back to the CIB saying, look, we did it. We tried to

01:46:25.871 --> 01:46:34.555
- do it the best we could. We don't have the funds that DORA seeks to do this. Even with reduction in

01:46:34.555 --> 01:46:43.500
- the scope of work, we don't have the funds to do it ourselves. And they're going to require something.

01:46:43.500 --> 01:46:46.366
- But if you pass this resolution,

01:46:46.850 --> 01:46:56.250
- You're saying, as it's without the amendment, you're saying, look, we may go to a nominal amount. We're

01:46:56.250 --> 01:47:05.560
- not saying we will, but we may go to that amount if it's the right project, if it's the right economic

01:47:05.560 --> 01:47:12.158
- development, which the duties of the RDC is for the economic development

01:47:12.418 --> 01:47:22.537
- the health and welfare of the inhabitants of the city. And so that's your focus. And you were appointed

01:47:22.537 --> 01:47:33.143
- to these positions because your appointing person or body felt that you have the expertise and are qualified

01:47:33.143 --> 01:47:38.494
- to consider all these things and decide whether or not

01:47:38.946 --> 01:47:47.974
- you know, what you feel would be appropriate for you to do. Again, I feel that if you pass the amendment,

01:47:47.974 --> 01:47:56.576
- it really doesn't change much about where we're already at. We've already been in negotiations. It's

01:47:56.576 --> 01:48:05.603
- already been publicly acknowledged that the land is there. What this gives is the CIB now the opportunity

01:48:05.603 --> 01:48:08.414
- to say, OK, now I know that this

01:48:08.546 --> 01:48:17.417
- could be available. I'm not saying it is, but it could. Now we can use that in trying to figure out

01:48:17.417 --> 01:48:26.554
- what the best method going forward will be. And as Mr. Wieckar said, that could be going back the door

01:48:26.554 --> 01:48:35.603
- and seeing what they can do. Or if they're no longer interested, maybe going out for another RFP. But

01:48:35.603 --> 01:48:37.022
- it just became.

01:48:37.634 --> 01:48:46.509
- very evident that without a subsidy from the city or county or someone, the hotel will not be built.

01:48:46.509 --> 01:48:55.559
- I'm sorry, but it is that cut and dry. I'm trying not to make it clear. I'm just going to clarify that

01:48:55.559 --> 01:49:04.785
- this proposed amended language is not to take that possibility off the table. It's to keep options open.

01:49:04.785 --> 01:49:06.718
- And it feels that by,

01:49:07.042 --> 01:49:14.528
- continually inserting the nominal cost. That's, again, no matter what, that's still a possibility. But

01:49:14.528 --> 01:49:22.231
- it feels like it's preemptively putting that in here. And that's my feeling in terms of why I've proposed

01:49:22.231 --> 01:49:29.644
- this amended language. I think I can translate and then maybe help get us along a little bit. I think

01:49:29.644 --> 01:49:36.766
- to Anna's point about why staff feels it doesn't advance the project by tempering the language is

01:49:36.930 --> 01:49:43.696
- not really related to the deal with Dora that we've been discussing right now, but it's really, I think

01:49:43.696 --> 01:49:50.202
- what staff was trying to achieve was to move the negotiations along in the future. We really wanted

01:49:50.202 --> 01:49:57.359
- to signal to the CIB what the status is, and then they can, we can also collectively signal to the developers

01:49:57.359 --> 01:50:04.190
- what the limits are. But if the body is not comfortable with that, then that's a different signal that's

01:50:04.322 --> 01:50:11.602
- being sent, and we can understand that, too. But I think understanding that part of the purpose might

01:50:11.602 --> 01:50:19.024
- just be helpful in understanding where the differences lie. I think it has felt to me like we're trying

01:50:19.024 --> 01:50:26.660
- to accomplish two things that don't have to be at odds with each other. And I think, Debra, your amendment

01:50:26.660 --> 01:50:31.870
- helps bring them together. One is, what are we sticking with to develop?

01:50:32.226 --> 01:50:39.688
- And what are we signaling back to the CIB? And I agree with you that having the word nominal in there,

01:50:39.688 --> 01:50:47.223
- I'm not a hotel developer. I don't do anything like that. But I would be looking for any possible point

01:50:47.223 --> 01:50:54.686
- of leverage I could get. And if I see something like that, I think I can get those guys to give me the

01:50:54.686 --> 01:50:59.902
- land. I think the way this is structured now, it's much more ambiguous.

01:51:00.450 --> 01:51:07.986
- And to me, it doesn't give a little bit extra advantage to the developer to come in and demand that

01:51:07.986 --> 01:51:15.145
- we give them land away. We've still got a huge problem. But I think it does accomplish saying,

01:51:15.145 --> 01:51:22.832
- this is it. It's the land. Let's talk about whether there is a way to do this. And we've talked about

01:51:22.832 --> 01:51:27.806
- other options, land leases, land swaps. They may or may not work.

01:51:28.642 --> 01:51:35.705
- But it's not like we have completely exhausted all the possibilities, and that leaves that open. So

01:51:35.705 --> 01:51:42.839
- I support the amendment as it's written. Two things. I'd like to request procedurally that we take a

01:51:42.839 --> 01:51:50.044
- vote on the amendment and vote the amendment up or down before we actually vote on the resolution. So

01:51:50.044 --> 01:51:57.319
- just to be clear about that, because it does substantially change the resolution. Next, Marty, can you

01:51:57.319 --> 01:51:58.590
- redefine nominal?

01:51:58.690 --> 01:52:06.139
- Yeah, so just if it's not defined then you go to the dictionary and the dictionary definition nominal

01:52:06.139 --> 01:52:13.734
- is very small or far below the real value or cost. Far below the real value or cost. I'd love to change

01:52:13.734 --> 01:52:21.256
- the definition of nominal. I mean if you want to say, I mean if you don't want to go as low as nominal

01:52:21.256 --> 01:52:27.902
- and you want to say a reduced value you could use the word reduced. I mean there are other

01:52:28.258 --> 01:52:36.460
- adjectives or other words you could choose if you didn't want nominal in there. Again, you know, you

01:52:36.460 --> 01:52:44.581
- this body of RDC members didn't buy this land, but it was bought by your predecessors. And it is an

01:52:44.581 --> 01:52:52.701
- underdeveloped, very nice, nicely located bit of land. And the question is, and this came up at the

01:52:52.701 --> 01:52:58.142
- council work session with you guys, what do you want to see there?

01:52:58.786 --> 01:53:04.471
- You know, it looks like a prime location for a hotel going next to a convention center. Is that what

01:53:04.471 --> 01:53:10.155
- you want to see there? Do you want to see something else there? So I think that this resolution does

01:53:10.155 --> 01:53:15.840
- send a signal about what you're thinking about this. And that's a really important signal we need to

01:53:15.840 --> 01:53:21.524
- send now, because the convention center hotel's being built. Or the convention center's being built,

01:53:21.524 --> 01:53:27.378
- so. I kind of go one step further. With this amendment, I'm not sure why we need the resolution at all.

01:53:27.378 --> 01:53:28.222
- I would agree.

01:53:28.962 --> 01:53:35.229
- It doesn't change anything. It doesn't change anything. I believe it states, again, our interest in

01:53:35.229 --> 01:53:41.747
- the economic development of the community. Of course, that's the purpose of the RDC. I believe it makes

01:53:41.747 --> 01:53:48.327
- clear what our current engagement has been with this property. I think it just kind of level sets things

01:53:48.327 --> 01:53:55.095
- to move forward. Again, we still have all our options open with this amended language. It is not precluding

01:53:55.095 --> 01:53:56.286
- the option that is

01:53:56.450 --> 01:54:03.765
- currently in the resolution that the amended language seeks to broaden. So it's not changing that, it's

01:54:03.765 --> 01:54:11.150
- just not giving the concession before we have an actual pro forma on the table to say, this is how we're

01:54:11.150 --> 01:54:14.526
- going to plug that gap. We need you to do this.

01:54:14.690 --> 01:54:21.157
- So I want to see that as opposed to giving it away before we have that request. And I certainly understand

01:54:21.157 --> 01:54:27.323
- there have been lots of things, lots of hard work by staff. We've been part of these sessions to talk

01:54:27.323 --> 01:54:33.609
- about different options. But at this stage, this amended language is to make it clear that we are ready

01:54:33.609 --> 01:54:39.895
- to invest, but we need to hear what the investment need is. And also, I mean, obviously, all the public

01:54:39.895 --> 01:54:44.670
- discussion that's happened makes clear where that ceiling is, even if we don't

01:54:45.090 --> 01:54:54.420
- put the nominal language in the resolution. So I would argue that it helps to straddle a very fine line

01:54:54.420 --> 01:55:03.660
- with a lot of different vested interests. Obviously, the Convention Center is a very important product

01:55:03.660 --> 01:55:12.542
- for the community. And so it's trying to balance the various interests while still moving forward.

01:55:14.434 --> 01:55:26.541
- I just want to express where I am with this. I agree that the resolution, if we're trying to signal

01:55:26.541 --> 01:55:38.526
- a ceiling, the resolution as amended would not really do that. It just says we're open to talking.

01:55:39.522 --> 01:55:47.312
- It also doesn't say that we have really anything to offer yet. And I do think in order to negotiate

01:55:47.312 --> 01:55:55.181
- in good faith with whoever might be next, Dora's gap is too big at this point. In order to negotiate

01:55:55.181 --> 01:56:02.971
- in good faith with whoever's next, we have turned over every economic development incentive that we

01:56:02.971 --> 01:56:04.062
- can think of.

01:56:04.194 --> 01:56:12.659
- I don't think of providing the land at a nominal cost to be a gift. I think of it as an incentive that

01:56:12.659 --> 01:56:21.124
- would have to be in the economic best interest of the city. That means that we need to know it's going

01:56:21.124 --> 01:56:29.424
- to do more good for the city than what we're actually investing in it. And the only thing we have to

01:56:29.424 --> 01:56:32.958
- offer right now is the value of that land.

01:56:33.826 --> 01:56:43.333
- abatement, et cetera, none of that ends up making sense. So I'll just say, I think, I'm not sure why

01:56:43.333 --> 01:56:53.405
- the amendment would move forward with the amended language. It doesn't signal much. Matt? Does the reduced

01:56:53.405 --> 01:57:03.006
- language, I'm sitting here noodling about this reduced language, and that's pretty interesting to me.

01:57:03.106 --> 01:57:11.097
- Does that provide enough of a signal if we were to say nominal or reduced cost? The reason I think it

01:57:11.097 --> 01:57:19.323
- does send a signal is because there is inherent flexibility in the statute. Dana and I have talked about

01:57:19.323 --> 01:57:27.157
- this. The RDC has the ability, unlike other government entities, they have the ability to give land

01:57:27.157 --> 01:57:30.526
- to a developer for economic purposes or to

01:57:30.786 --> 01:57:39.606
- to do things at a reduced cost. So I think reduced matches the statute and nods to that flexibility.

01:57:39.606 --> 01:57:48.687
- The point of the redevelopment commission is to take blighted or underdeveloped properties and get them

01:57:48.687 --> 01:57:57.682
- back into a more productive state. And this property is purchased in 2019. We're not getting any taxes

01:57:57.682 --> 01:57:59.166
- on it right now.

01:57:59.714 --> 01:58:06.414
- You know, you got a couple acres in downtown to be used for something. So I think that you ought to

01:58:06.414 --> 01:58:12.979
- be thinking about using your tools and offering land at a reduced value in order to spur economic

01:58:12.979 --> 01:58:19.679
- development. And that's why you exist, to try to encourage economic development. So I think it does

01:58:19.679 --> 01:58:25.374
- send a signal, but I'd love to know what the redevelopment commission members think.

01:58:30.818 --> 01:58:41.852
- Would you consider revising your amendment to say reduced instead of nominal? I appreciate that proposal

01:58:41.852 --> 01:58:52.570
- to me, even reduced nominal. Again, to me, the purpose of this amendment is to take that leverage out

01:58:52.570 --> 01:58:54.462
- of this amendment

01:58:54.754 --> 01:58:59.954
- because I feel like that this amendment or this resolution opens up the opportunity for conversation.

01:58:59.954 --> 01:59:05.306
- Any developer worth their salt is gonna look at how to negotiate a deal, right? And that certainly could

01:59:05.306 --> 01:59:10.506
- include a concession of the land. It's not like they're not gonna ask because we didn't put it in the

01:59:10.506 --> 01:59:15.961
- resolution, right? They're gonna be like, okay, how do we put this deal together? The RDC owns it, they're

01:59:15.961 --> 01:59:21.211
- interested in economic development. Let's see what they'll come to with it for the table. I understand

01:59:21.211 --> 01:59:22.078
- the feeling that

01:59:22.178 --> 01:59:27.650
- Oh, the resolution isn't making movement if we take out the concessionary language. I don't feel like

01:59:27.650 --> 01:59:33.229
- it's the time to make that concession. We've already acknowledged that the the deal that Doris proposed

01:59:33.229 --> 01:59:38.594
- has a huge gap that we don't know how it's going to get filled and certainly conceding this land is

01:59:38.594 --> 01:59:39.774
- not going to fill it.

01:59:39.938 --> 01:59:45.431
- Okay. And so if we do that now, there's still a big gap to fill. So there may be need for we want to

01:59:45.431 --> 01:59:51.032
- keep this moving forward. This convention center needs a hotel and the RDC is always going to be there

01:59:51.032 --> 01:59:53.534
- with this land to say, how can we support it?

01:59:53.666 --> 01:59:59.095
- But we're not, I feel like this resolution is not the place to give that concessionary. Again, developer

01:59:59.095 --> 02:00:04.472
- can ask for it. They fully know that this land is here and the RDC has a role to play in the community.

02:00:04.472 --> 02:00:09.797
- I don't feel like we need to put that concessionary language in the resolution. And I guess, you know,

02:00:09.797 --> 02:00:13.054
- so anyway, so I appreciate the idea of trying to look at that.

02:00:13.346 --> 02:00:21.256
- I understand others may support that. I do not feel like I would be willing to, as someone wants to

02:00:21.256 --> 02:00:29.324
- propose an alternate amendment, I understand that. And I will be happy to participate in that part of

02:00:29.324 --> 02:00:37.312
- the business for my proposed amendment. To me, that concession, I prefer not to keep that in. That's

02:00:37.312 --> 02:00:40.318
- the point of my amended language. So.

02:00:41.154 --> 02:00:50.253
- And I guess I don't see it as concessionary language, given all the other tentative language that we

02:00:50.253 --> 02:00:59.353
- do have. So I think that the elephant in the room, when it comes to developing that property, is the

02:00:59.353 --> 02:01:06.110
- price of that land. It's the availability of land to actually build it on.

02:01:08.002 --> 02:01:15.593
- And I'm back to the notion of, if we don't even mention that, if we don't even acknowledge that, what's

02:01:15.593 --> 02:01:22.965
- the point of having a resolution? Are we signaling anything useful at all? If not, why are we voting

02:01:22.965 --> 02:01:30.264
- on it? But to me, it's not concessionary because there is so much other tentative language in here.

02:01:30.264 --> 02:01:34.206
- So that's the thought I would just offer in response.

02:01:39.618 --> 02:01:46.509
- All right, Margie, to your point, Leonard and Robertson, since the last time we paid taxes when we bought

02:01:46.509 --> 02:01:53.076
- it, we've lost $172,262 in tax revenue based on that. I want to take my feelings out of it because I

02:01:53.076 --> 02:02:00.032
- wear my feelings on my sleeve. I won't get down to the bath. Okay, and the math of it is we need a minimum

02:02:00.032 --> 02:02:03.998
- of a 200-room hotel, and that location is the best location.

02:02:04.738 --> 02:02:11.084
- But we also need to be able to hit a average room rate of $150 or less in order to bring in the 400

02:02:11.084 --> 02:02:17.494
- to 600 person conventions that we want to have on Monday through Thursday in order to help drive our

02:02:17.494 --> 02:02:23.841
- downtown economics, which also is part of bringing people in in order to help continue the food and

02:02:23.841 --> 02:02:30.314
- beverage tax. The county and the city of Bloomington, through your cooperative efforts, have made the

02:02:30.314 --> 02:02:31.710
- interlocal agreement.

02:02:33.634 --> 02:02:41.183
- bit of a miracle that it occurred and with that we got CIB appointed who has been negotiating in the

02:02:41.183 --> 02:02:48.806
- best possible way in order to achieve those goals that we have. The hotel selected person that was or

02:02:48.806 --> 02:02:56.280
- group that was selected came back with a a proposal that is unavailable for us to consider and that

02:02:56.280 --> 02:03:01.886
- was changed significantly as our community as a whole when SE1 was passed.

02:03:02.722 --> 02:03:10.464
- With that, we now, and I'm going to quote our mayor, have to do less with less. I think that was you.

02:03:10.464 --> 02:03:18.433
- I hope so. But what I'm looking at here is signaling. We've had multiple discussions. We've went through

02:03:18.433 --> 02:03:26.251
- executive committees. We've tried to keep everything so we didn't just throw out what we could do. The

02:03:26.251 --> 02:03:30.046
- math comes down. 200-foot room hotel, $150 under.

02:03:31.074 --> 02:03:38.433
- Land is available, and this is the best place for the hotel. Now the question is, how are we going to

02:03:38.433 --> 02:03:45.721
- get there? Now the amendment, nominal, as I said earlier, and try not to be in a joking way, it'd be

02:03:45.721 --> 02:03:53.297
- nice to change that term because it indicates in Webster's at a very low amount. And it's very difficult

02:03:53.297 --> 02:03:59.646
- to say that, say what we would do. Because when I look at what the hotels pay in taxes,

02:03:59.778 --> 02:04:08.798
- over and based on and I'm take I took the downtown hotels I took the seven hotels including the 45 foot

02:04:08.798 --> 02:04:17.732
- graduate on average you know total taxes years 1.69 to 777.8 million at the present moment which comes

02:04:17.732 --> 02:04:21.982
- down to approximately $1637 to per room in taxes

02:04:22.338 --> 02:04:28.448
- which gets us to a payback of our 6.85 day of 21.36 years average. Is that just property tax? That's

02:04:28.448 --> 02:04:34.739
- just property. You're not even counting in-keepers tax? No, I'm not counting in-keepers tax or anything

02:04:34.739 --> 02:04:40.909
- else. And the reason I say that is because our group is only based upon our incremental property tax.

02:04:40.909 --> 02:04:47.019
- I didn't want to get into the weeds because I get in the weeds. I'm sorry about that, but I just do.

02:04:47.019 --> 02:04:48.894
- So with that, how we get to it

02:04:49.090 --> 02:04:55.076
- with the developer to just be straight up. We've got 200 rooms. We've got to hit our room rate. Are

02:04:55.076 --> 02:05:01.062
- you able to do that? Because that property needs to be put back in service at the earliest possible

02:05:01.062 --> 02:05:07.048
- point. And had SE1 not come forth, we would have already been moving forward. We can't change that.

02:05:07.048 --> 02:05:13.034
- But what we can do is send the signals. Like, if anyone's looking from a developer standpoint, this

02:05:13.034 --> 02:05:14.590
- has been discussed a lot.

02:05:14.690 --> 02:05:20.462
- That's the place for the hotel. It's just a matter of how we're going to get there financially. And

02:05:20.462 --> 02:05:26.234
- unfortunately, the city, everybody thinks that a governmental entity has more money than we do. But

02:05:26.234 --> 02:05:32.006
- we have public safety. We have affordability. And we have economic development that needs to be put

02:05:32.006 --> 02:05:37.893
- forth, just like the Prometheus lease. That's bringing people into our town that aren't here to bring

02:05:37.893 --> 02:05:43.838
- our money in. So the convention center and the host hotel will bring that in. The matter is how quick?

02:05:44.098 --> 02:05:50.787
- And can we afford it? Because the other priorities that we have as a community to ensure safety, economic

02:05:50.787 --> 02:05:57.223
- success, and the vibrancy of our downtown, which is our heart, continues. And with that, I don't know

02:05:57.223 --> 02:06:03.849
- how we're going to get there unless we set a priority that says, we're not going to do a police station.

02:06:03.849 --> 02:06:10.222
- We're not going to work on affordable housing. And we're going to put a bunch of money to help close

02:06:10.222 --> 02:06:13.630
- the gap through a current hotelier. I honestly think.

02:06:13.954 --> 02:06:20.756
- between the city's administration, between John Weickart and the CIB, that we can come up with someone

02:06:20.756 --> 02:06:27.426
- to make this work. It's just a matter of how quickly. But sending the signal, we can't just give the

02:06:27.426 --> 02:06:34.492
- land away. But let's talk about what it is, whether it be $6.8 million or whether it be less. But nominal,

02:06:34.492 --> 02:06:41.822
- because of you, I greatly appreciate you putting that definition out. It indicates very low. And I don't know.

02:06:43.682 --> 02:06:54.938
- I'll put one on my sleeve. We're not a very low community. We're a high bar community. So thank you.

02:06:54.938 --> 02:07:06.194
- So are you supporting the amendment as it stands without changing to using the word reduced? To you,

02:07:06.194 --> 02:07:10.206
- it's OK. To me, it's potato potato.

02:07:10.626 --> 02:07:18.074
- Well, that's a fair question. Is reduced different than nominal? I think it is. So maybe that's the

02:07:18.074 --> 02:07:25.597
- second. Maybe that's another amendment. OK. So we have a first and a second for the current proposed

02:07:25.597 --> 02:07:33.194
- amendment. We have a possible other amendment, but that's separate. My question is, is public comment

02:07:33.194 --> 02:07:38.110
- only until we get to the resolution, or is it how does this work?

02:07:38.946 --> 02:07:44.770
- Because we've been asked to have this current motion be just about the amendment, not about the resolution.

02:07:44.770 --> 02:07:50.217
- So I'm asking for clarification in terms of point of order. Yeah, if you want to have public comment

02:07:50.217 --> 02:07:56.149
- on the amendment, you can ask for public comment. OK, that's the stage. But it has to focus on the amendment.

02:07:56.149 --> 02:08:02.081
- On the amendment, OK. And that's fine. So again, just because we've had the motion, we've had the discussion,

02:08:02.081 --> 02:08:07.635
- we're going to public comment before the vote. So we have public comment. And I understand that you've

02:08:07.635 --> 02:08:08.606
- heard me read it.

02:08:08.962 --> 02:08:18.772
- I have hard copies I gave to commissioners and provided by email to staff. But if you would like to

02:08:18.772 --> 02:08:29.268
- look at the hard copies, it's available. Anyway, so opening for public comment either online or in person.

02:08:29.268 --> 02:08:38.686
- And I'll give my seat up for in person. John Fernandez, I just have a comment on the amendment.

02:08:40.482 --> 02:08:48.019
- I've not been privy to all the discussions, but I'm just looking at this from an outsider's perspective

02:08:48.019 --> 02:08:55.338
- and someone who's been involved with lots of economic development deals. It was my understanding the

02:08:55.338 --> 02:09:02.803
- whole point of the original resolution was to send a signal that the city and redevelopment commission

02:09:02.803 --> 02:09:09.470
- was open to some pretty aggressive discussions regarding the land cost as part of the deal.

02:09:10.530 --> 02:09:19.567
- If you pass this amendment, you're going to send a message. I mean, the whole point of the resolution,

02:09:19.567 --> 02:09:28.516
- I think, was almost like a messaging bill to give the CIB a little bit more room to maneuver in their

02:09:28.516 --> 02:09:37.289
- conversations. I think passing this amendment is just the wrong messaging bill because, I mean, the

02:09:37.289 --> 02:09:38.430
- fact is that

02:09:38.882 --> 02:09:46.752
- you know, even if they had the flexibility to provide the land at a fairly aggressive discount, you'd

02:09:46.752 --> 02:09:54.622
- still have to go through, you know, a whole economic development proposal that would come back to the

02:09:54.622 --> 02:10:02.414
- Redevelopment Commission for your review. So you're not taking your ability to say no off the table,

02:10:02.414 --> 02:10:07.198
- but the message that you're sending is, if I'm the developer,

02:10:08.098 --> 02:10:15.656
- I'm saying, okay, so the land, you know, is, you know, an investment of the land by the redevelopment

02:10:15.656 --> 02:10:23.213
- commission is essentially off the table because that's the message because all the conversations that

02:10:23.213 --> 02:10:30.622
- have led up to this proposed resolution is basically looking for a signal from the city that that's

02:10:30.622 --> 02:10:33.438
- an option if it's a good enough deal.

02:10:34.210 --> 02:10:40.579
- And if you take that off the table, you might as well not pass the underlying resolution because you're

02:10:40.579 --> 02:10:47.009
- just basically going to be on a status quo. So I don't know. There's other people I've been in the room,

02:10:47.009 --> 02:10:53.194
- but I'm just looking at it from a messaging perspective. I would perceive this as probably to be the

02:10:53.194 --> 02:10:55.582
- wrong message. That's just my opinion.

02:11:09.282 --> 02:11:16.717
- John Weickart with the Capital Improvement Board. And thank you for the many opportunities you've given

02:11:16.717 --> 02:11:23.938
- me to communicate with you about this. And I'm certainly not here to speak against the chairperson's

02:11:23.938 --> 02:11:31.087
- amendment. But I do want to say, one of the things you did in your meeting of December 10th was you

02:11:31.087 --> 02:11:37.950
- changed the word would to may. The resolution that you looked at originally said that you would

02:11:38.498 --> 02:11:46.612
- offer the site at free or nominal cost, and you change it to May. May seems to me to give you all the

02:11:46.612 --> 02:11:54.886
- flexibility that you need in terms of negotiating with a hotelier. And I'm certainly not here to speak.

02:11:54.886 --> 02:12:03.398
- I'm not here carrying Dora's water in any fashion. Your resolution talks about a host hotel, and certainly

02:12:03.398 --> 02:12:07.614
- I know what that means. But if the goal is to signal

02:12:07.938 --> 02:12:17.756
- the CIB, DORA, or any other potential hotelier if we have to reopen the RFP. And I'm not sure what the

02:12:17.756 --> 02:12:27.955
- resolution does as amended. You signaled what you've already agreed to do, which is the design assistance,

02:12:27.955 --> 02:12:35.294
- the schematic design. I think you've already done the site preparation work.

02:12:35.938 --> 02:12:43.951
- So your resolution becomes historical. It becomes retrospective. It becomes this is what we've done

02:12:43.951 --> 02:12:52.365
- so far, really the perspective, like here's where we would see ourselves going. If the resolution passes

02:12:52.365 --> 02:13:00.378
- as amended, I don't know how the ball is moved down the field. I just don't see how it's happening.

02:13:00.378 --> 02:13:02.622
- We know that there's a gap.

02:13:03.170 --> 02:13:10.250
- We became involved in late October to see how large that gap was. We had not been involved in those

02:13:10.250 --> 02:13:17.542
- negotiations. We saw that gap. We agreed to consider what we could do to help close that gap. We don't

02:13:17.542 --> 02:13:25.047
- have financial incentives. So we agreed that we could make design changes to help close that gap. There's

02:13:25.047 --> 02:13:32.268
- still a gap. The resolution as not amended says you may consider some other things to assist with the

02:13:32.268 --> 02:13:33.118
- development

02:13:33.314 --> 02:13:40.639
- of a host hotel. If it comes back to us, and I'll tell you, we've certainly learned something through

02:13:40.639 --> 02:13:48.108
- this process as well. What we have done in working with that gap in terms of changing and reducing what

02:13:48.108 --> 02:13:55.506
- we would expect in the design of a host hotel, I've said before, is a bell that cannot be unrun. We've

02:13:55.506 --> 02:14:03.262
- already had an initial meeting of our hotel evaluation group to consider, what will our next RFP look like?

02:14:03.842 --> 02:14:10.137
- Because we have to be prepared for that if this doesn't work. Excuse me. And so what we've already agreed

02:14:10.137 --> 02:14:16.076
- to do is already becoming part of what we're looking at in our next RFP. How do we describe it in a

02:14:16.076 --> 02:14:22.134
- future RFP? This is what we need to have. This is what we'd like to have. But this is what we need to

02:14:22.134 --> 02:14:28.192
- have. And we've already made that reduction. And it was a $15 million reduction by Doris numbers. And

02:14:28.192 --> 02:14:30.686
- I said this the last time I spoke to you.

02:14:32.226 --> 02:14:40.405
- If you pass the resolution without amendment, saying you may make this part of your offer, and the deal

02:14:40.405 --> 02:14:48.427
- collapses, because at that point, you've signaled the CIB, you've signaled DORA, the current selected

02:14:48.427 --> 02:14:56.449
- hotel, how far you can go. We know how far we can go. And if DORA can't close the gap, then they need

02:14:56.449 --> 02:15:01.246
- to go home and provide us the opportunity to issue a new RFP

02:15:01.922 --> 02:15:09.638
- And that new RFP signals to a new host hotel developer or multiple host hotel developers, if they're

02:15:09.638 --> 02:15:17.278
- even out there, that this is what we can do in terms of reducing the scope, if you will, of design.

02:15:17.278 --> 02:15:24.918
- This is what the RDC and the city team are willing to do to assist. There's your incentive package.

02:15:24.918 --> 02:15:31.870
- That's it. That's all we have to offer. That's all you can offer. That's all we can offer.

02:15:32.130 --> 02:15:38.433
- But with the amendment, if the amendment passes, frankly, it doesn't signal anything to the CIB. It

02:15:38.433 --> 02:15:45.304
- doesn't give us any tool in our new toolbox to go forward with a new RFP to attract any new hotel developer.

02:15:45.304 --> 02:15:51.671
- They still don't know what's being offered. So I appreciate the conversation and discussion. This is

02:15:51.671 --> 02:15:58.163
- complicated. I congratulate and compliment again the staff. This has been hard work. And thank you for

02:15:58.163 --> 02:16:01.630
- the opportunity to say something to you again tonight.

02:16:13.154 --> 02:16:19.314
- So I have a memo that was written by four. My name is Daniel Bingham, a member of the public. I have

02:16:19.314 --> 02:16:25.412
- a memo that was, I believe, shared publicly that is from four city council members that was sent to

02:16:25.412 --> 02:16:31.572
- the RDC commission earlier today, but that people may not have time to read. And I think it directly

02:16:31.572 --> 02:16:37.853
- impacts on the amendment, so I'd like to read it into the record in case anybody missed it. And it was

02:16:37.853 --> 02:16:42.366
- sent by council members Flaherty, Piedmont-Smith, Rallo, and Rosenbarger.

02:16:43.330 --> 02:16:48.896
- We appreciate your service on the Bloomington Redevelopment Commission and your consideration of our

02:16:48.896 --> 02:16:54.573
- views expressed in this memorandum. We also appreciate you taking the time, along with the city staff,

02:16:54.573 --> 02:17:00.195
- to meet with city council members during a work session last week. Respectfully, we urge you to amend

02:17:00.195 --> 02:17:05.871
- the RDC's resolution 125-36 to remove or substantively alter the final whereas clause, which specifies

02:17:05.871 --> 02:17:11.934
- the College Square property, quote, may be made available at a nominal cost for a convention at a host hotel.

02:17:12.098 --> 02:17:17.946
- and Section 3, which similarly states the property, quote, may be made available in some form to the

02:17:17.946 --> 02:17:23.967
- host hotel project at a nominal cost to the project. One, in making this amendment, the RDC should make

02:17:23.967 --> 02:17:30.162
- clear that its expectation is to receive value for the property similar to its purchase price, $6,895,000,

02:17:30.162 --> 02:17:35.951
- in the form of payment or a land transfer from the Monroe County government. A long-term lease that

02:17:35.951 --> 02:17:40.062
- reflects the full market value of the property could also be explored.

02:17:40.258 --> 02:17:45.964
- Under no circumstance should the RDC sell, transfer, or lease the property for merely, quote,

02:17:45.964 --> 02:17:52.156
- nominal value. Two, we believe as a matter of due diligence that a second RFP should be issued by the

02:17:52.156 --> 02:17:58.227
- CIB to reconsider host hotel options given these cost constraints, since other hoteliers may find a

02:17:58.227 --> 02:18:04.479
- host hotel project to be economically viable without public subsidy. Three, we believe the CIB and the

02:18:04.479 --> 02:18:09.214
- RDC should explore in earnest other options for any additional public subsidy

02:18:09.538 --> 02:18:15.105
- for convention center expansion, including Host Hotel, especially funding sources that are expressly

02:18:15.105 --> 02:18:20.893
- for this purpose, unappropriated food and beverage tax revenues held by Monroe County, and Monroe County

02:18:20.893 --> 02:18:26.515
- Innkeeper's tax revenues and or land previously purchased using these revenues. Rationale for why the

02:18:26.515 --> 02:18:32.303
- RDC should take the steps outlined above. Bullet one, the City Council, which is the city's fiscal body,

02:18:32.303 --> 02:18:37.870
- established a formal policy position on this issue in a letter dated May 6, 2024, with eight of nine

02:18:37.870 --> 02:18:39.358
- members clearly specifying

02:18:39.618 --> 02:18:45.200
- Any land owned by the RDC that may be considered for an expanded Convention Center site must be purchased

02:18:45.200 --> 02:18:50.677
- by the CIB or other entity, for example, a hotelier, for, at minimum, the price the RDC paid to acquire

02:18:50.677 --> 02:18:56.365
- the property. Second bullet, the property's total purchase price would typically require the City Council's

02:18:56.365 --> 02:19:01.790
- formal approval and oversight, which we find meaningful and compelling, regardless of the fact the RDC

02:19:01.790 --> 02:19:07.319
- purchased the property without Council's approval, since the purchase was structured as two transactions

02:19:07.319 --> 02:19:08.478
- less than $5 million.

02:19:08.994 --> 02:19:14.646
- Their bullet directly counteracting the city council's established policy position on this issue will

02:19:14.646 --> 02:19:20.354
- reflect poorly on the RDC and the mayor's administration while undermining public trust in government.

02:19:20.354 --> 02:19:26.228
- The next bullet, to the best of our knowledge, the city has not meaningfully subsidized any other private

02:19:26.228 --> 02:19:32.158
- hotel developments in Bloomington. If this property was not already held by the RDC, it is hard to imagine

02:19:32.158 --> 02:19:36.702
- the mayor or RDC would propose using almost $7 million in tax increment financing

02:19:36.898 --> 02:19:43.115
- or other city tax revenues to subsidize a convention center host hotel. There are other viable alternatives

02:19:43.115 --> 02:19:49.275
- for any additional public subsidy, including Monroe County's unappropriated food and beverage tax proceeds

02:19:49.275 --> 02:19:55.089
- and innkeeper tax revenues or land purchased with those revenues. Unlike TIF revenues, these funding

02:19:55.089 --> 02:20:01.248
- sources are mostly or at least partially borne by visitors, i.e. non-residents, and are related to tourism

02:20:01.248 --> 02:20:05.278
- and a convention center. Mayor Thompson's pledge since the passage of

02:20:05.410 --> 02:20:10.585
- of Indiana State Enrolled Act SEA 1 has been we need to do less with less. A $7 million giveaway to

02:20:10.585 --> 02:20:16.018
- a private hotel, regardless of its usefulness for a convention center, belies this approach. The mayor's

02:20:16.018 --> 02:20:21.245
- prior position was that affordable housing is a more compelling use of these tax dollars, a position

02:20:21.245 --> 02:20:26.730
- we agree with. There are multiple ways to leverage this property to advance affordable housing and enable

02:20:26.730 --> 02:20:32.319
- downtown residency for those who otherwise could not afford it. These options include developing affordable

02:20:32.319 --> 02:20:33.406
- housing on the site,

02:20:33.538 --> 02:20:39.140
- exchanging the property for nearby land owned by the Monroe County government, and developing or even

02:20:39.140 --> 02:20:44.688
- preserving existing affordable housing there, or selling the property at market rate and reinvesting

02:20:44.688 --> 02:20:50.181
- the proceeds in affordable housing. Because the City Council did not have a regular session between

02:20:50.181 --> 02:20:55.673
- the December 10th RDC work session and the December 15th vote on Resolution 125-36, the Council did

02:20:55.673 --> 02:20:59.518
- not have time to formally reassert its policy position on this issue,

02:20:59.650 --> 02:21:04.870
- Five days is not an adequate amount of time for the city council to be meaningfully involved. However,

02:21:04.870 --> 02:21:09.938
- based on the council's formal policy position, May 2024 council member comments during the December

02:21:09.938 --> 02:21:15.006
- 10th work session and conversations with our colleagues, we believe the majority of council members

02:21:15.006 --> 02:21:20.378
- broadly share these views. Just wanted to make sure that got entered into the conversation. The council's

02:21:20.378 --> 02:21:25.699
- position on this is really relevant. And as a member of the public, I share it. I do not think we should

02:21:25.699 --> 02:21:28.030
- be offering additional public subsidy for the

02:21:28.130 --> 02:21:33.330
- for the convention center, for a convention center hotel. There are no guarantees that the convention

02:21:33.330 --> 02:21:38.479
- center is going to succeed. It is a business. Most businesses fail. We've already seen market forces

02:21:38.479 --> 02:21:43.628
- that have drastically offended the effect of the convention business, like COVID, which has actually

02:21:43.628 --> 02:21:48.727
- shut it down for several years. There's no guarantee that this is going to have the effect we want.

02:21:48.727 --> 02:21:52.958
- And $7 million is an enormous subsidy that we need to be spending on other things.

02:22:05.282 --> 02:22:10.927
- My name is Hugh Farrell, and I will say that as a member of the public, my head's been spinning since

02:22:10.927 --> 02:22:16.517
- the beginning of this month. I thought I'd understood the level of public subsidy for the Commission

02:22:16.517 --> 02:22:22.051
- Center and related projects. And I think, as with many people in city and county government and the

02:22:22.051 --> 02:22:27.752
- public, that's been changing really rapidly. I would speak in support of the amendment because I think

02:22:27.752 --> 02:22:33.950
- it allows us to establish a new baseline from whence a new plan for basically regulating the level of city risk

02:22:34.274 --> 02:22:40.072
- and public subsidy can be made. And then in particular, there's an opportunity here to address, I think,

02:22:40.072 --> 02:22:45.814
- multiple of the goals. And I wanted to speak as well in support of the land swap proposal that was made

02:22:45.814 --> 02:22:51.391
- last week. I was glad to be able to attend that meeting. And specifically say that in the context of

02:22:51.391 --> 02:22:57.244
- a very messy process around the convention center, there's also the orphaned property owned by the county

02:22:57.244 --> 02:23:01.054
- at 222 West Second Street, where there are 29 affordable apartments.

02:23:01.218 --> 02:23:08.115
- that had potentially been held, the Convention Center, and now are really, I think, suffering for being

02:23:08.115 --> 02:23:14.813
- held by the county and without a concrete plan. I would say I trust the city and city agencies to be

02:23:14.813 --> 02:23:21.577
- able to better manage those affordable housing units and that the possibility of a land swap in order

02:23:21.577 --> 02:23:26.750
- to secure those for the city would be a good way to do that, but we need time

02:23:26.850 --> 02:23:32.372
- so that our heads stop spinning and we can actually develop a concrete plan within which an RFP can

02:23:32.372 --> 02:23:36.734
- be made and which affordable housing can be preserved and expanded. Thank you.

02:23:52.130 --> 02:23:58.423
- And I just want to start by thanking everyone for all of the time and effort that they put into this

02:23:58.423 --> 02:24:04.716
- resolution. I was able to attend the meeting last week, and it was really extensive conversation. So

02:24:04.716 --> 02:24:11.133
- I just want to thank everyone for that. I'm here to urge the Redevelopment Commission not to give away

02:24:11.133 --> 02:24:18.174
- the College Square property without compensation. It's clear that unexpected costs have come up on this project.

02:24:18.818 --> 02:24:25.111
- And we're at a point where we're going to need to piece together funding to make the hotel and the convention

02:24:25.111 --> 02:24:30.947
- center viable. Those costs should not fall solely on the city nor on the county, but should be shared

02:24:30.947 --> 02:24:37.126
- by both. Several properties were purchased as potential locations for the hotel project. Making an exchange

02:24:37.126 --> 02:24:42.904
- for the property to the south that's currently owned by the county would relieve the county of their

02:24:42.904 --> 02:24:47.710
- current burden of maintaining affordable housing without a structure designed to do

02:24:48.706 --> 02:24:56.419
- More importantly, it would help divide the burden of these unexpected costs of this project between

02:24:56.419 --> 02:25:04.208
- the county and the city. So I think that the current amendment is a step in the right direction, but

02:25:04.208 --> 02:25:12.229
- I encourage you to explicitly include such a land transfer or other real compensation in the resolution

02:25:12.229 --> 02:25:15.006
- that you're considering. Thank you.

02:25:23.394 --> 02:25:28.700
- Hi, my name is T. Randall. I am a resident at the Seminary Square Apartments that have been discussed.

02:25:28.700 --> 02:25:33.852
- I'm here to argue against inclusion of language, which would give away the northern property or the

02:25:33.852 --> 02:25:39.210
- College Square property for a nominal fee. The property owned by the county to the south of the current

02:25:39.210 --> 02:25:44.465
- Convention Center was purchased with funds specifically for supporting the Convention Center project.

02:25:44.465 --> 02:25:49.720
- The county has expressed its apprehension for being a landlord of the Seminary Square Apartments, and

02:25:49.720 --> 02:25:51.678
- the city is interested in maintaining

02:25:51.778 --> 02:25:57.995
- and providing affordable housing. The land swap proposed by the council members is the most direct path

02:25:57.995 --> 02:26:03.972
- towards me and my neighbors having secure housing and truly affordable rents in a central location.

02:26:03.972 --> 02:26:10.009
- The swap would also support the continued existence of several beloved local businesses downtown. As

02:26:10.009 --> 02:26:16.047
- was expressed last week, if this downtown property is sold on the market, what else can we expect to

02:26:16.047 --> 02:26:19.454
- go in its place but another student apartment high-rise?

02:26:19.970 --> 02:26:29.857
- We all talk about the value of affordable housing. Here is a chance to protect affordable housing downtown.

02:26:29.857 --> 02:26:39.103
- My name is Barry Herbers. I think that transferring the College Square property for a nominal fee or

02:26:39.103 --> 02:26:48.990
- even implying that that is an option misses out on the opportunity to protect genuinely affordable housing.

02:26:49.570 --> 02:26:55.532
- The exchange proposed that we've been discussing last week by the City Council is the most direct way

02:26:55.532 --> 02:27:01.552
- to achieve genuinely affordable housing. The county has expressed anxiety in the past that they aren't

02:27:01.552 --> 02:27:07.455
- enthusiastic about being a landlord, and the residential and commercial space in the Seminary Square

02:27:07.455 --> 02:27:13.533
- block is a wonderful opportunity to keep Bloomington affordable for everyone who lives here. Thank you.

02:27:13.533 --> 02:27:16.222
- Any other in-person or online public comment?

02:27:18.882 --> 02:27:27.001
- Hi, yeah. I am online. I wasn't sure how the process was. I can't really see who's from the public is

02:27:27.001 --> 02:27:35.199
- here from the current view. Thank you. Could you just introduce yourself, please? Yeah. My name's Eve.

02:27:35.199 --> 02:27:42.522
- I'm a Wilmington resident. And I just wanted to start off by saying thanks to everybody for

02:27:42.522 --> 02:27:47.934
- this conversation, for the intentionality, again, to this decision.

02:27:48.674 --> 02:27:56.377
- want to echo the memo submitted by city council members to dive deeper into alternative options that

02:27:56.377 --> 02:28:03.470
- won't require this long-term subsidizing of a hotel. It feels like a failing strategy, which

02:28:03.470 --> 02:28:11.097
- it's demonstrated in other cities around the country who have continued to operate their convention

02:28:11.097 --> 02:28:16.894
- centers at a loss because of these sort of subsidies. I also want to speak.

02:28:16.994 --> 02:28:24.044
- in support of the proposal for the city and county to negotiate a land swap that allows the city to

02:28:24.044 --> 02:28:31.164
- assume ownership of the seminary square lot. Similar to the other public comments, I think this is a

02:28:31.164 --> 02:28:38.213
- great opportunity to continue prioritizing the development of and protection of existing affordable

02:28:38.213 --> 02:28:45.475
- housing, especially downtown, which is increasingly unaffordable for Bloomington residents, especially

02:28:45.475 --> 02:28:46.814
- the working class.

02:28:47.554 --> 02:28:55.360
- And let's see. Yeah, I feel like potentially compromising affordable housing while in the same breath

02:28:55.360 --> 02:29:03.167
- promoting the convention center as an economic development strategy feels misguided. And I would like

02:29:03.167 --> 02:29:10.820
- to see creative strategies to continue prioritizing affordable housing. And this feels like a great

02:29:10.820 --> 02:29:16.254
- opportunity to do so. So thank you so much. And sorry that I'm online.

02:29:17.570 --> 02:29:26.336
- Thank you. Any other online comments? It looks like we have one person with their hand raised,

02:29:26.336 --> 02:29:35.840
- Kevin Keough. Can you hear me? Can you hear me OK? Yes, thank you. Yeah, I'm Kevin Keough. And I guess

02:29:35.840 --> 02:29:46.174
- what's troubling, it's not about politics that concerns me most. It's the process and really the accountability

02:29:47.266 --> 02:29:55.530
- And respect for the public, but getting pity to it is, it seems something happened last week at your

02:29:55.530 --> 02:30:04.203
- meeting with the city council where there seems to be a disconnect. And which, as a member of the public,

02:30:04.203 --> 02:30:12.957
- it's got to be recognized and acknowledged. And what really is burning inside me when I'm hearing tonight,

02:30:12.957 --> 02:30:14.430
- there seems to be

02:30:15.554 --> 02:30:23.403
- So use the political capital. And there may be some people tonight spending their political capital

02:30:23.403 --> 02:30:31.253
- based on who gave them the ability to be on this board. And that's concerning, because I would hope

02:30:31.253 --> 02:30:39.337
- we're acting in the best interests of the community. And as such, recognizing in these communications,

02:30:39.337 --> 02:30:43.262
- especially with the public, it needs to be clear.

02:30:43.938 --> 02:30:51.311
- I always, it helps if you try to speak to us. Sometimes if you're speaking to a six-year-old, I think

02:30:51.311 --> 02:30:58.900
- it's good to try to make it simple. What are we really trying to accomplish here? So that's my key point

02:30:58.900 --> 02:31:06.128
- is this transparency, how we're communicating things with the public. And what are we really trying

02:31:06.128 --> 02:31:13.790
- to accomplish? And this is a large amount of money. I don't have a timer, so I probably should switch it.

02:31:14.338 --> 02:31:23.752
- Stop here, but I just wanted to make that point as a member of the public my concern about You know

02:31:23.752 --> 02:31:33.448
- this again spending of political capital tonight. Thank you so much Yeah, we have one more person Eric

02:31:33.448 --> 02:31:42.014
- there isn't a last name Good evening, can you hear me? Yes, thank you Yes, my name is Eric

02:31:42.178 --> 02:31:50.001
- And I wasn't going to make a comment this evening, but I did want to support everything that's been

02:31:50.001 --> 02:31:58.137
- said so far, particularly the comments by Ms. Meyerson and Mr. Keough. And I also wanted to make a note

02:31:58.137 --> 02:32:06.116
- that the doors to St. Paul are locked, which is a violation of the open door law. And if I could have

02:32:06.116 --> 02:32:12.062
- somebody come and open the door for me, I would appreciate that. Thank you.

02:32:14.018 --> 02:32:21.860
- I don't know that this is the time. I mean, really the public comment was really supposed to be related

02:32:21.860 --> 02:32:29.627
- to the amendment only. But it seems that the comments have been about the resolution period. And I did

02:32:29.627 --> 02:32:37.318
- receive an email that is asking me to read it into the record tonight because they could not be here.

02:32:37.318 --> 02:32:39.806
- I'm not sure what the rules are.

02:32:42.882 --> 02:32:58.944
- I think it's fine. Yeah. While we're at public comment. First of all, I didn't support the resolution

02:32:58.944 --> 02:33:11.070
- presented at the December 1 meeting as stated in the minutes of the meeting.

02:33:11.298 --> 02:33:17.589
- I support building the hotel on College Square site but don't support donating the site to a hotelier.

02:33:17.589 --> 02:33:23.696
- Second, to make the hotel more profitable and require less subsidy, change the requirement that the

02:33:23.696 --> 02:33:30.231
- hotel is prohibited from charging superior room rates when major events occur in Bloomington to preventing

02:33:30.231 --> 02:33:36.094
- them from charging superior rates only when events occur at the convention center. As proposed,

02:33:36.290 --> 02:33:41.264
- Resolution 25136 currently states the Bloomington Redevelopment Commission hereby provides notice of

02:33:41.264 --> 02:33:46.435
- its further commitment to the Host Hotel project by making known that the real estate at College Square,

02:33:46.435 --> 02:33:51.606
- if necessary for the Host Hotel, may be made available in some form to the Host Hotel project at nominal

02:33:51.606 --> 02:33:56.531
- cost to the project if it furthers economic development of the city of Bloomington. Enormal cost is

02:33:56.531 --> 02:33:59.486
- vague and subjective term. If you were to pull a commission

02:33:59.650 --> 02:34:05.890
- members, they would likely all have a different definition of nominal cost. In lieu of a nominal cost,

02:34:05.890 --> 02:34:12.130
- it would be defined now or stated as a cap, such as an amount no more than. I still prefer a long-term

02:34:12.130 --> 02:34:18.188
- lease, $1 per year for 40 years. The resolution goes on to say, nothing in this resolution shall be

02:34:18.188 --> 02:34:24.428
- construed as approving the final development terms. It appears the RDC still has to review and approve

02:34:24.428 --> 02:34:29.214
- the transfer of any property. Each commissioner probably has an amount in mind

02:34:29.346 --> 02:34:37.082
- that would be a deal killer. If they establish that number now, the public would know too. By not defining

02:34:37.082 --> 02:34:44.528
- nominal cost now, it appears the commission is just kicking that can down the road. That is from Jerry

02:34:44.528 --> 02:34:51.758
- Hayes. Thank you for sharing that. Was there any other? Just making sure we're good. Nothing online

02:34:51.758 --> 02:34:57.758
- in person. OK. So we've had comments from commissioners. We've had public comment.

02:34:57.858 --> 02:35:04.751
- Final questions or comments from commissioners before we take a roll call vote. On the amendment, we're

02:35:04.751 --> 02:35:11.446
- not doing the resolution yet. As requested, we're voting on the amended language. And then depending

02:35:11.446 --> 02:35:18.273
- on that in terms of how the full vote on the resolution will go. I would like to make one thing clear.

02:35:18.273 --> 02:35:21.918
- I think everybody agrees this is the site for a hotel.

02:35:22.274 --> 02:35:30.061
- That's not a discussion of what we've all collectively seen and very transparent on ours, too. It's

02:35:30.061 --> 02:35:37.926
- not a political decision. It's more of how do we get here from a monetary standpoint. And with that,

02:35:37.926 --> 02:35:45.791
- in previous times, even with the Hotel for the Trades District, we discounted the land, $300,000. We

02:35:45.791 --> 02:35:52.254
- gave them time to pay for it. In past history, which most people weren't involved,

02:35:52.642 --> 02:35:59.359
- The Hilton Garden Inn has paid over $4.4 million since they were opened in 2006, and they didn't have

02:35:59.359 --> 02:36:05.945
- any land cost at that time. So that happened. Just to make it very clear, I am trying to look at it

02:36:05.945 --> 02:36:12.596
- through a mathematical standpoint where it's going to best benefit the community. I think we've sent

02:36:12.596 --> 02:36:19.313
- a good signal of what the financial circumstances are. If we had the money, we'd already be done with

02:36:19.313 --> 02:36:20.894
- Dora. We appreciate it.

02:36:22.434 --> 02:36:29.888
- And I just want to clarify, too, because there's been a lot of discussion about a land swap. There's

02:36:29.888 --> 02:36:37.563
- nothing that would preclude further discussions like that. Plus, there's nothing to say that the county

02:36:37.563 --> 02:36:45.090
- wouldn't do that. But that could be something that could be pursued even with this resolution passed.

02:36:45.090 --> 02:36:51.806
- So I just want to make that known that that doesn't take a land swap off the table at all.

02:36:55.042 --> 02:37:01.693
- Others make my final word for I feel that the amended language helps to straddle various points of view,

02:37:01.693 --> 02:37:08.090
- many of which we've heard this evening, in addition to supporting the direction of moving forward. I

02:37:08.090 --> 02:37:14.678
- understand that some have some doubts about whether the resolution has merit with the amended language,

02:37:14.678 --> 02:37:21.012
- but I would argue that the amendment helps to find a middle ground that helps us move forward. So I

02:37:21.012 --> 02:37:23.102
- will encourage support for that.

02:37:23.458 --> 02:37:33.954
- Could you read the amendment? Yes I'll read it one more time. Okay so the amendment focuses on two elements

02:37:33.954 --> 02:37:43.673
- of the on page two if you have the hard copy of the packet or a virtual copy of the packet focusing

02:37:43.673 --> 02:37:49.310
- on the last whereas the last whereas as amended would say

02:37:49.506 --> 02:37:55.991
- Whereas in addition to the incentives already mentioned above, the RDC has determined the real estate

02:37:55.991 --> 02:38:02.922
- at College Square necessary for the host hotel may be made available in a form and on terms to be determined

02:38:02.922 --> 02:38:09.535
- by the RDC and structured to protect the city's best interests and limit public risk. The other amended

02:38:09.535 --> 02:38:16.274
- area is for clause three at the bottom of this page, and that is the Bloomington Redevelopment Commission

02:38:16.274 --> 02:38:19.390
- hereby provides notice of its further commitment

02:38:19.554 --> 02:38:26.874
- to the Host Hotel project by making known that the real estate at College Square, if necessary for the

02:38:26.874 --> 02:38:34.193
- Host Hotel, may be made available in some form and on terms to be determined by the RDC and structured

02:38:34.193 --> 02:38:41.584
- to protect the city of Bloomington's best interests and limit public risk. So those are the two amended

02:38:41.584 --> 02:38:47.198
- areas. Again, if you have the packet available, you can compare that language.

02:38:49.346 --> 02:39:00.646
- Are we ready for a roll call vote? It would seem so. Okay. Lori McRabbie, I vote in favor of the amendment.

02:39:00.646 --> 02:39:11.109
- See Scambillari? No. Randy Gastey, yes. John West, no. Deborah Meyerson, yes. Passes three, two for

02:39:11.109 --> 02:39:18.014
- the amended language. Now we return to the resolution as a whole.

02:39:18.498 --> 02:39:28.655
- with the amendment that was just approved by three members of the commission. So again, even though

02:39:28.655 --> 02:39:39.422
- we separated this out, are there further things for we're now opening up discussion for resolution 25-136

02:39:39.422 --> 02:39:46.430
- with the amended language as just presented and the amendment is now

02:39:46.914 --> 02:39:54.355
- presented as part of this resolution. Are there further things that commissioners would like to discuss

02:39:54.355 --> 02:40:01.724
- or comment on based on anything else that would be relevant before we take a vote? OK. Question I have

02:40:01.724 --> 02:40:09.093
- is who's going to be moving forward on negotiation with that? Is that going to go back out to the CIB?

02:40:09.093 --> 02:40:13.886
- Jane, you're going to be? So the process going forward, regardless

02:40:14.050 --> 02:40:21.419
- I think in the outcome tonight, there's no deal with the current developer. So staff will report at

02:40:21.419 --> 02:40:29.082
- the CIB meeting this Wednesday that there's no deal. And then the CIB will decide what their next steps

02:40:29.082 --> 02:40:36.524
- are. They can consider other sites with DORA, or they can decide to release a new RFP. Or they could

02:40:36.524 --> 02:40:40.798
- go back to one of the two other developers who responded.

02:40:41.250 --> 02:40:49.812
- We have to pass the ball back to them on Wednesday for those next steps to take place. So my position

02:40:49.812 --> 02:40:58.290
- on this, that side is the best thing for the hotel. We just need to get to the money map of how it's

02:40:58.290 --> 02:41:07.104
- going to work as soon as possible. Anything further from commissioners before we open for public comment

02:41:07.104 --> 02:41:09.790
- on the consideration of 25-136?

02:41:11.778 --> 02:41:21.261
- Okay, open for public, seeing nothing in person or online. Making sure, because you can see the online

02:41:21.261 --> 02:41:30.652
- folks better than I can. Okay. So, do we have a motion to adopt resolution 25-136 as amended? Second.

02:41:30.652 --> 02:41:38.110
- Okay, we have a motion and a second. We'll do another roll call vote for 25-136.

02:41:44.130 --> 02:41:53.214
- Sue Scamblery, yes. Randy Cassidy, yes. Debra Cribson. John West, no. Debra Meyerson, yes. So the resolution

02:41:53.214 --> 02:42:01.882
- passes 4-1. Procedurally, it will go back to the CIB, and then come back. After Wednesday, we'll report

02:42:01.882 --> 02:42:10.217
- to them Wednesday. I do want to compliment the staff and everybody for working diligently to try to

02:42:10.217 --> 02:42:11.550
- make this work.

02:42:11.906 --> 02:42:17.820
- I would appeal to our state legislators that may be listening to please take in consideration what the

02:42:17.820 --> 02:42:23.734
- bill has done to the communities as a whole in our state. And I'll leave that at that. Can we pass the

02:42:23.734 --> 02:42:29.648
- thanks back to you all for all the hours you've put into this and other projects? And the public, this

02:42:29.648 --> 02:42:35.504
- is a long meeting, and the work session was a long meeting. So yeah, thank you. Are you going to have

02:42:35.504 --> 02:42:39.294
- one last set of comments from the commissioners, or are you done?

02:42:39.714 --> 02:42:47.214
- We technically have other business before we adjourn, so just checking. Any other business before we

02:42:47.214 --> 02:42:54.938
- have a motion to adjourn? I have one thing to say. I want to thank the two people in the team that have

02:42:54.938 --> 02:43:02.661
- helped our economic movement throughout our community in the last two years. Hats off to Kurt Signetti,

02:43:02.661 --> 02:43:05.854
- Mendoza, and the FIU football team because

02:43:05.986 --> 02:43:17.621
- We've got a Heisman Trophy winner. We've got plenty. We've got plenty of enthusiasm nationally for Olmington,

02:43:17.621 --> 02:43:21.534
- Indiana. Motion to adjourn. So move.