- I'm going to call this meeting to order. Welcome to the redevelopment commission meeting for the city

00:00:07.279 --> 00:00:13.946
- of Bloomington for Monday, July 20, 2026. We will start the meeting with a roll call, please. Gordon

00:00:13.946 --> 00:00:21.009
- and Robby present. C. Scambler, present. Sam Flinger, present. John West, present. Randy Cassidy, present.

00:00:21.009 --> 00:00:27.676
- Deborah Meyerson, present. Staff present, please. Hannah Killian-Beasden, present. Christina Finley,

00:00:27.676 --> 00:00:28.798
- hand department.

00:00:29.410 --> 00:00:38.691
- Jimmy Caswell, president. Jeff McKim, city controller, president. Jane Coopersmith, economic and sustainable

00:00:38.691 --> 00:00:47.375
- development. Hannah Dragovich, economic and sustainable development. Dana Kerr, legal. Hi, everybody.

00:00:47.375 --> 00:00:55.038
- So the first item on our agenda is the minutes for, sorry, we're going to do the reports.

00:00:56.386 --> 00:01:02.389
- We'll do that later, sorry. I'm just out of practice. We've been out of session for a little bit. We're

00:01:02.389 --> 00:01:08.391
- gonna start with minutes for the executive session of June 15th, 2026, the regular meeting of also June

00:01:08.391 --> 00:01:14.279
- 15th, and then the executive session from July 14th, 2026. If you have any questions or comments from

00:01:14.279 --> 00:01:19.358
- commissioners, we can take these separately if needed. If not, I'll entertain a motion.

00:01:19.650 --> 00:01:26.562
- Move approval of the minutes for the executive session of June 15th, the regular meeting of June 15th,

00:01:26.562 --> 00:01:33.273
- and the executive session on July 14th. Second. We have a first and a second. All in favor say aye.

00:01:33.273 --> 00:01:40.185
- Aye. Any opposed? Passes unanimously. Next item on the agenda is the claims register from June 5th and

00:01:40.185 --> 00:01:47.165
- July 2nd, 2026. Any questions or comments from commissioners on either of these claims registers? Yeah,

00:01:47.165 --> 00:01:48.574
- I've got a question.

00:01:48.706 --> 00:01:57.560
- June 5th claim, page two, claim number 321, HFI bill. I just wonder what property that pertains to.

00:01:57.560 --> 00:02:07.210
- Wait, I'm sorry, tell me again where that is. Page, it's at the, June 5th. The replacement of the controller

00:02:07.210 --> 00:02:15.710
- for the chemical treatment systems. Oh, yeah, I can answer that. That's Showers West, and yeah,

00:02:15.810 --> 00:02:23.898
- It showers west and it's basically a system that makes sure that the fluid going to the HVAC doesn't

00:02:23.898 --> 00:02:32.066
- freeze. Any other questions from commissioners on either of these clean registers? If not, I will ask

00:02:32.066 --> 00:02:40.394
- for a motion. You're doing both at the same time. Well, again, they can be separated upon request. I've

00:02:40.394 --> 00:02:44.958
- combined them unless there's a request to separate them.

00:02:45.474 --> 00:02:55.644
- I'm just going to ask a question on the second. On July 2nd, page four, pay number 6M14. Kent, I just

00:02:55.644 --> 00:03:06.014
- need to be, we have a partnership agreement with Dimension Bill. Can you just review that real quickly?

00:03:11.458 --> 00:03:18.710
- Sorry, what's the question? How does our partnership agreement work? Well, it's a claim for hundreds.

00:03:18.710 --> 00:03:25.963
- That's a portion of our annual payment to them for the partnership agreement and for that they manage

00:03:25.963 --> 00:03:33.642
- basically the facilities and portions of all of our trans-district activities. Is that a rollover agreement

00:03:33.642 --> 00:03:40.894
- or do we renew it every year? It's multi-year and it will take me a second but I can look up when the

00:03:41.250 --> 00:03:52.802
- We renewed it in 2024, I believe. And I think it goes into 2028. All right. That was good. Thank you.

00:03:52.802 --> 00:04:04.127
- Any other questions on either of these claims registered from commissioners? If not, I'll ask for a

00:04:04.127 --> 00:04:09.790
- motion. I'll make the motion to approve as noted.

00:04:10.274 --> 00:04:16.660
- Got a first and a second, all in favor say aye. Aye. Motion passes unanimously. Next item of the agenda

00:04:16.660 --> 00:04:22.985
- is the payroll registers for June 12th, June 26th, and July 10th, 2026. Any questions or comments from

00:04:22.985 --> 00:04:29.311
- commissioners on any of these? Again, we'll take these collectively unless requested to separate them.

00:04:29.311 --> 00:04:35.206
- I move for approval for all three. Second. Got a first and a second, all in favor say aye. Aye.

00:04:35.206 --> 00:04:37.662
- Any opposed? Motion passes unanimously.

00:04:38.274 --> 00:04:45.655
- We'll go on to reports. I believe the director's report. No formal director's report. I do want to call

00:04:45.655 --> 00:04:53.320
- attention to a letter that we received from five council members related to the south parcels and potential

00:04:53.320 --> 00:05:00.560
- trade. I also do want to call attention that the capital improvement board did vote last week to move

00:05:00.560 --> 00:05:07.870
- forward on the parcels that the RDC actually transferred to the CIB, which were formerly parking lots.

00:05:08.098 --> 00:05:16.180
- for the host hotel. So I do have a question related to that. We did perform an appraisal on those parcels,

00:05:16.180 --> 00:05:24.263
- totaling $3.15 million. And I think that was actually really, I think we were missing one of those parcels

00:05:24.263 --> 00:05:31.816
- because we thought it was previously owned by Public Works. So we only did the appraisal on some of

00:05:31.816 --> 00:05:37.406
- those parcels, not realizing that we actually did own that fourth parcel.

00:05:38.306 --> 00:05:45.623
- So would it be OK with you guys? Would you have any objections for me to share that appraisal with the

00:05:45.623 --> 00:05:52.798
- CIB? Any objections? No? OK. We've already transferred the parcel. We've already transferred it, but

00:05:52.798 --> 00:06:00.257
- they may find that beneficial in utilizing those appraisals. Make sure they just know that it's on three

00:06:00.257 --> 00:06:02.814
- of the four. Yes, I certainly will.

00:06:03.682 --> 00:06:13.841
- Moving forward, happy to answer any questions. And Isabel, did you want to say anything about the letter

00:06:13.841 --> 00:06:23.807
- that was sent from the Common Council? Moving on. Legal report. I have nothing to report, but I'm here

00:06:23.807 --> 00:06:31.838
- for questions if you have. Thank you. We have a judge's report. So because of some

00:06:32.098 --> 00:06:38.684
- staff leave we do not have the the formal treasure or the formal rdc project status report we'll have

00:06:38.684 --> 00:06:45.141
- that by the next meeting but i did kind of want to call out just talk about the the fund balances a

00:06:45.141 --> 00:06:51.727
- bit just because we have now received our spring settlement i think i talked a little bit more detail

00:06:51.727 --> 00:06:57.022
- about that a couple of weeks ago but i just wanted to let everybody know what the

00:06:57.218 --> 00:07:06.675
- what the fund balances are right now. In the RDC fund, that's the 25-19 fund, we're at $1,475,935,

00:07:06.675 --> 00:07:16.227
- so $1.47 million. For the consolidated TIF, we are now up to $39.8 million. That's an increase from

00:07:16.227 --> 00:07:23.582
- the last report of $27 million after the spring settlement. We, the pro-TIF,

00:07:23.714 --> 00:07:31.225
- We've got 833,000. And the meridium tiff, the spider tiff, still has a fund balance of zero. And that's,

00:07:31.225 --> 00:07:38.377
- I also wanted to mention that I've been working with the assessor's office and the auditor's office

00:07:38.377 --> 00:07:45.602
- to try to sort out what's going on with that. I will just say the technical term is it's a mess. And

00:07:45.602 --> 00:07:51.038
- it'll take us probably, and apparently this is a mess that goes back years.

00:07:51.170 --> 00:08:00.406
- I managed to contact the former controller, and she was quite helpful in helping me understand how far

00:08:00.406 --> 00:08:09.374
- they got. But at some point, we need to see some of the increments show up in that spider tiff, and

00:08:09.374 --> 00:08:17.086
- it's not yet. That's still zero. So expect more soon, but we don't have anything yet.

00:08:17.922 --> 00:08:26.389
- Quick question just to verify, you say on the PROW TIF there was $838,000? $833,000. Which I said the

00:08:26.389 --> 00:08:34.689
- PROW TIF. It is the PROW TIF. I wanted to make sure. $833,000. And that has to be dealt with in the

00:08:34.689 --> 00:08:42.492
- next year. No, it just won't continue to grow. It won't continue to grow. Thank you. And then

00:08:42.492 --> 00:08:46.974
- the consolidated TIF, that's where the funds from the

00:08:48.450 --> 00:08:56.458
- Trades District went? Yes, ultimately. Okay, that's what I wanted to verify. It wasn't in the 2519 account.

00:08:56.458 --> 00:09:04.022
- Correct. Okay, thank you. Okay, any other questions? Thank you for that report. Do we have a business

00:09:04.022 --> 00:09:11.956
- development update? Yeah, just a couple updates. One, I wanted to let commissioners know that we submitted

00:09:11.956 --> 00:09:16.702
- our application for a designation for 2.0 Opportunity Zones and

00:09:17.122 --> 00:09:24.361
- we applied for the census tracts that include Hopewell East, Hopewell East, West and South. So we're

00:09:24.361 --> 00:09:31.743
- hopeful that that will be approved and we would find out about that in October. That would be approved

00:09:31.743 --> 00:09:39.269
- by the governor's office and then recommended to the feds. And then the second thing I wanted to mention

00:09:39.269 --> 00:09:40.702
- is that the city is

00:09:40.898 --> 00:09:47.784
- is really excited to be partnering again with the consortium group on a ready arts and culture grant

00:09:47.784 --> 00:09:54.601
- that we received in the amount of $3 million that will foster more development of an arts campus in

00:09:54.601 --> 00:10:01.487
- the trades district and will have some of that activity centered on the showers admin building which

00:10:01.487 --> 00:10:09.054
- was an original RDC redevelopment project way back when. So excited to see that continue to evolve and support

00:10:09.538 --> 00:10:15.902
- growth in the creative economy in the trades district. So essentially three million dollars will be

00:10:15.902 --> 00:10:22.329
- spent for programming for. It's pretty it's multifaceted probably more than I can summarize here but

00:10:22.329 --> 00:10:29.266
- it's a regional play so it'll help us invite regional artists into Bloomington and will facilitate different

00:10:29.266 --> 00:10:35.820
- disciplines and there are multiple sites across the community that are supported and then there's also

00:10:35.820 --> 00:10:38.366
- a resource hub that will be online just

00:10:38.530 --> 00:10:45.852
- for artists across the uplands region. Okay, so it's not just specifically here. Not just specifically

00:10:45.852 --> 00:10:52.962
- here, but key part of it is housed in the trade district. Okay, and just for everybody, what is the

00:10:52.962 --> 00:11:00.639
- REDI exactly? I cannot recite the acronym to you, but it's a state, yeah, it's a state economic development

00:11:00.639 --> 00:11:05.758
- transformative grant thinking opportunity that grew out of the pandemic

00:11:06.082 --> 00:11:13.566
- been really successful in transforming placemaking and quality of place across the state. And so it's

00:11:13.566 --> 00:11:20.903
- continued. Hopewell received a REDI grant for Jackson Street. There was another REDI grant received

00:11:20.903 --> 00:11:28.313
- in an earlier version, or REDI 2.0 in, sorry, REDI 1.0 for sewer extension, kind of adjacent to Novo

00:11:28.313 --> 00:11:35.870
- Nordisk. Summit has, Summit District has received a REDI grant, again, for infrastructure, $4 million.

00:11:36.066 --> 00:11:43.142
- And then this is kind of the newest, Arts and Culture was like another third round of grant making,

00:11:43.142 --> 00:11:50.219
- supported by Lilly. And the city of Bloomington has put those in, submitted, and been successful in

00:11:50.219 --> 00:11:57.932
- this. Yes, but this ready, this Arts and Culture grant, IU is the lead, so the city's really in a supportive

00:11:57.932 --> 00:12:05.150
- partner role, but not a lead role. Which is nice because we don't have to do all that administration.

00:12:05.570 --> 00:12:11.893
- During the 2.0 opportunity zones, what are the implications of that? That makes this grant eligible,

00:12:11.893 --> 00:12:18.466
- I assume? Yes. So that whole program exists to attract private sector development into highly distressed

00:12:18.466 --> 00:12:24.789
- census tracts. And so the hope would be, well, and what it does is for those private investments, if

00:12:24.789 --> 00:12:31.112
- they set up what's called a qualified opportunity fund and they invest in those pre-approved, highly

00:12:31.112 --> 00:12:34.430
- distressed census tracts, then they get a protection

00:12:34.754 --> 00:12:42.538
- tenure protection on capital gains. And so the idea is that those tracks hope well, and if there were

00:12:42.538 --> 00:12:50.627
- three total that we applied for, if they get approved, then they'll kind of be magnets for private sector

00:12:50.627 --> 00:12:58.487
- development. And they'll make it really easier for us to market those projects and parcels. Thank you.

00:12:58.487 --> 00:12:59.326
- Thank you.

00:13:00.706 --> 00:13:08.178
- OK. Well, thank you for those reports. We'll go on to new business. We have the bid opening for College

00:13:08.178 --> 00:13:15.506
- Square. Thank you. I have not opened any of these yet, so I'm going to unlock this folder. And I will

00:13:15.506 --> 00:13:22.978
- read out the names of who has proposed and see if I can find a brief summary in the order in which that

00:13:22.978 --> 00:13:28.510
- they were received. Let the record show at 5, 16 PM. I am opening the first.

00:13:35.842 --> 00:13:46.231
- It is a proposal from Concord Hospitality, TWG Development, Ratio Design, and Shield Sexton. Bear with

00:13:46.231 --> 00:13:56.620
- me. Let me see if I can find a brief summary. Our proposal recognizes the opportunity for both a hotel

00:13:56.620 --> 00:14:02.974
- that meets the functional needs outlined in the offering sheet

00:14:03.234 --> 00:14:10.549
- including approximately 160 rooms, full service amenities, and support for convention center activity,

00:14:10.549 --> 00:14:18.005
- and a complementary mixed-use residential component that supports downtown vitality, integrates housing,

00:14:18.005 --> 00:14:25.249
- including replacement of significantly affordable below market rate units, and activates the district

00:14:25.249 --> 00:14:32.990
- beyond event-driven demand. So what that means, we will need to do a deep dive into what these actually say.

00:14:33.570 --> 00:14:46.822
- And then the other offer received, bear with me, it's opening, is from Dora Hospitality and the Louder

00:14:46.822 --> 00:14:57.630
- Bag Group. They're submitting the proposal for the redevelopment of College Square.

00:15:00.834 --> 00:15:06.823
- The proposal delivers two complimentary projects on a single site, a 135-room boutique upscale hotel

00:15:06.823 --> 00:15:12.871
- on a southern portion of the project site along 3rd Street, and an approximately 100-unit market-rate

00:15:12.871 --> 00:15:19.037
- apartment community on the northern portion along 4th Street. Connecting them is a landscaped promenade

00:15:19.037 --> 00:15:24.967
- running through the interior of the block, a shared gathering space that activates the heart of the

00:15:24.967 --> 00:15:28.702
- site and draws pedestrians from College Avenue to the beeline.

00:15:30.722 --> 00:15:37.820
- So again, we haven't analyzed these. I don't have any other details. Those are the summaries. We'll

00:15:37.820 --> 00:15:44.990
- have to talk about what's going on. I'm getting messages that the audio is not working. And I wonder

00:15:44.990 --> 00:15:52.159
- if we might need to just check the audio. And then I don't know if we should reread those responses.

00:15:52.159 --> 00:15:56.702
- Yeah, I'd kind of like to hear the list of the proposers again.

00:15:58.050 --> 00:16:08.616
- Is it working? Is the audio working now? Who is saying this? Eric Ust was online and... Can you check

00:16:08.616 --> 00:16:13.278
- the chat, please? Or check the audio inputs.

00:16:28.994 --> 00:16:37.679
- All the mics are on. Who has the meeting? Tammy has it right now. So I would just check the audio, the

00:16:37.679 --> 00:16:46.110
- mic input, within Zoom. And then I would check the system settings. Let me see that. And if we need

00:16:46.110 --> 00:16:54.964
- to restart the hour, we can. Enough. How do you come through the volume that's just very low? OK, that's

00:16:54.964 --> 00:16:57.662
- helpful. We turn the volume up.

00:16:59.330 --> 00:17:08.453
- All right, can you tell us, is that better? Is that better? Someone says I can hear fine. Yeah. Dr.

00:17:08.453 --> 00:17:17.942
- Winston said she could hear, but it was a little fuzzy, but she's giving us a thumbs up now. Thank you.

00:17:17.942 --> 00:17:22.686
- All right. 516, I think it was. I opened the first.

00:17:23.778 --> 00:17:36.888
- offer that was opened in the order that they were received. I will go back to that again. So the first

00:17:36.888 --> 00:17:49.997
- offer received was from Concord Hospitality TWG Ratio Design and Shield Sexton. And it looks like it's

00:17:49.997 --> 00:17:52.670
- a two part strategy.

00:17:53.634 --> 00:18:00.338
- proposal recognizes the opportunity for both a hotel meets the functional needs outlined in the offering

00:18:00.338 --> 00:18:06.914
- sheet, including approximately 160 rooms, full service amenities and support for the convention center

00:18:06.914 --> 00:18:13.426
- activity, and a complimentary mixed use residential component that supports downtown vitality. And it

00:18:13.426 --> 00:18:20.130
- includes the replacement of significantly affordable below market rate units, and activates the district

00:18:20.130 --> 00:18:21.918
- beyond event during demand.

00:18:23.906 --> 00:18:36.031
- Other offer that was received is from Dora Hospitality and the Ladderback Group. And it delivers two

00:18:36.031 --> 00:18:48.276
- complimentary projects on a single site, a 135-room boutique upscale hotel on the southern portion of

00:18:48.276 --> 00:18:52.478
- the project site along 3rd Street,

00:18:52.642 --> 00:18:58.948
- and an approximately 100-unit market-rate apartment community on the northern portion along 4th Street.

00:18:58.948 --> 00:19:05.255
- Connecting them is a landscaped promenade running through the interior of the block, a shared gathering

00:19:05.255 --> 00:19:11.500
- space that activates the heart of the site and draws pedestrians through College Avenue to the Beeline

00:19:11.500 --> 00:19:17.867
- Trail. So again, we will have to do a deep dive as to what's in all of these offerings. I haven't looked

00:19:17.867 --> 00:19:20.414
- at it yet, and we'll have to report back.

00:19:23.170 --> 00:19:31.243
- Thank you. Next item in the agenda is Resolution 2646, which is the approval of an undulate artwork

00:19:31.243 --> 00:19:39.316
- concrete foundation construction agreement with the NB Paving LLC. Who would like to speak to that?

00:19:39.316 --> 00:19:47.551
- I can. So undulate art is the art that's been approved for Hopewell Commons and Hopewell East. Within

00:19:47.551 --> 00:19:52.798
- that contract that was approved in Resolution 2467, it says that

00:19:53.218 --> 00:20:03.377
- The city will take responsibility for site preparation. So we did a bid through our OpenGov procurement

00:20:03.377 --> 00:20:13.927
- system. For 30 days, the dates are escaping me right now, but we received three bids. The lowest responsive

00:20:13.927 --> 00:20:22.718
- and responsible bidder is EMB Paving. Their quote is for $48,295. Like I said, this would

00:20:23.266 --> 00:20:30.026
- laid concrete foundations in order for the artist to install the actual art sculpture onto them. As

00:20:30.026 --> 00:20:36.989
- a part of that bidding process, we made it very clear that the site is sensitive with the brick pavers

00:20:36.989 --> 00:20:43.952
- and all of that. And so we're being really specific about where they can access it and how to go about

00:20:43.952 --> 00:20:49.630
- accessing it. So we're very protective of the site as I'm sure you all are as well.

00:20:50.914 --> 00:20:57.803
- That's it. We're asking for that funding so we can get this art piece installed. Any questions or comments

00:20:57.803 --> 00:21:04.692
- from commissioners on resolution 2646? Have we done a, we're going to do a site evaluation of the existing

00:21:04.692 --> 00:21:11.323
- site prior to thing on this contract because the whole site was done by milestone previously. And this

00:21:11.323 --> 00:21:17.182
- was bringing another contractor in to make sure, as you said, protection of the site. Yes.

00:21:17.346 --> 00:21:23.729
- Once it's been awarded, we will do a site walk with the contractor as well as engineering department

00:21:23.729 --> 00:21:30.049
- and parks department have been heavily involved and are aware of all of those staff work that Miles

00:21:30.049 --> 00:21:36.811
- did. They have that historical knowledge. As you said, we want to make sure that we don't tear up anything

00:21:36.811 --> 00:21:40.350
- that we've already done. Exactly. All right, thank you.

00:21:42.498 --> 00:21:50.759
- Any other questions or comments from commissioners? If not, we'll put it up for public comment for resolution

00:21:50.759 --> 00:21:58.419
- 2646. Seeing anything in person or online, I will open it for a motion for this resolution. I'll move

00:21:58.419 --> 00:22:05.628
- approval of resolution 2646. Second. We've got a first and a second. All in favor say aye. Aye.

00:22:05.628 --> 00:22:11.486
- Any opposed? Passes unanimously. Thank you. Do we have a time frame for this?

00:22:12.322 --> 00:22:19.532
- I am pushing before the end of the year for the full install. Sorry, just to be clear. And this is all

00:22:19.532 --> 00:22:26.672
- just clarification. This is all part of our. Thank you. OK, the next item on our agenda is resolution

00:22:26.672 --> 00:22:33.812
- 2647, which is the acknowledgement of estimated costs of public infrastructure improvement design for

00:22:33.812 --> 00:22:40.882
- Sudbury Drive and South Adams Street within the summit district planning development. Who would like

00:22:40.882 --> 00:22:42.142
- to speak to that?

00:22:43.426 --> 00:22:53.738
- happy to discuss this one. This is just an acknowledgement. You have already approved a memorandum of

00:22:53.738 --> 00:23:04.050
- understanding and agreement with the Sudbury group as far as agreeing to pay for the design of public

00:23:04.050 --> 00:23:12.542
- infrastructure for Sudbury Drive and Adams Street that lies within the Sudbury PUD.

00:23:12.802 --> 00:23:24.244
- Our engineering folks have worked very diligently going through step by step with Stantec, who is the

00:23:24.244 --> 00:23:35.798
- engineering folks that Sudbury is using to be able to make sure that all of the design work that would

00:23:35.798 --> 00:23:40.958
- be paid for from funds by the RDC is only for

00:23:41.186 --> 00:23:48.446
- those things that are public infrastructure and necessary for the installation of public infrastructure.

00:23:48.446 --> 00:23:55.567
- So they've done a really good job of keeping that separate from what might be private. I know that was

00:23:55.567 --> 00:24:03.518
- a concern of the RDC to keep that separate. Again, engineering has been going through this with a fine-tooth comb.

00:24:03.650 --> 00:24:14.246
- But I felt for record keeping that it would be, and for your knowledge, of course, that it would be

00:24:14.246 --> 00:24:24.842
- nice to have an acknowledgement that the estimated project cost for that design work is $1,188,000.

00:24:24.842 --> 00:24:31.518
- And they are completing their estimate for the private design.

00:24:31.650 --> 00:24:39.698
- And then they'll be entering into a contract to be able to move forward with beginning that design.

00:24:39.698 --> 00:24:47.826
- So again, hats off to the engineering department who worked really diligently to make sure that they

00:24:47.826 --> 00:24:56.196
- separated out everything to make sure that public dollars were only being used with what was absolutely

00:24:56.196 --> 00:24:57.886
- necessary for public

00:24:58.050 --> 00:25:07.406
- designed for public infrastructure. So again, this is just an acknowledgement. And even the attachment

00:25:07.406 --> 00:25:16.490
- shows the breakout of the different classifications of the different areas. And you can see some of

00:25:16.490 --> 00:25:26.846
- the detail that they went into for that. So we just want for you to acknowledge that this is the amount that they

00:25:27.362 --> 00:25:35.377
- they have estimated, and that it's part of your record. OK, thank you. Well, I'd like to ask a question.

00:25:35.377 --> 00:25:43.009
- Oh, yeah, I'm going to open this question for you. Did you or did I? I am. It's open for questions.

00:25:43.009 --> 00:25:50.871
- This, I'm going to ask Dana, but Randy, you may want to weigh in on this. I'm not a huge fan of a time

00:25:50.871 --> 00:25:57.054
- material contract. Is this typical for this type of work? My understanding from.

00:25:57.442 --> 00:26:07.286
- Our focus on engineering is yes that it is because there are so many unknowns this early on to get an

00:26:07.286 --> 00:26:17.034
- exact amount that this is and not to exceed amount at this time. And so they would not be able to go

00:26:17.034 --> 00:26:26.782
- further without coming back to the table. At the end of the day it will be the five million rolling.

00:26:26.882 --> 00:26:35.473
- then not to exceed for all of the things that the RDC is looking at in that area, yes. But for the design

00:26:35.473 --> 00:26:43.658
- of these two roadways, this is what the RDC would be looking at. And this is for the engineering for

00:26:43.658 --> 00:26:52.492
- all of the public structure for Adams Street and Sudbury Drive. Correct, sir. Which connects the north-south

00:26:52.492 --> 00:26:56.382
- thoroughfare and then also creates an east-west

00:26:56.706 --> 00:27:04.792
- Yes, east-west connector between that and Wimmer Road or when they may be there. Yeah, at a future date.

00:27:04.792 --> 00:27:12.648
- And with that, given the time frame they're looking at, we're talking approximately a year. Yeah. OK.

00:27:12.648 --> 00:27:20.580
- Yeah. Request professional services is what this really comes down to. And then this will allow to get

00:27:20.580 --> 00:27:25.278
- an idea of what construction costs would be for that without

00:27:25.730 --> 00:27:33.973
- doing this, we would have no idea. Essentially, once this is done, we have a design for what is going

00:27:33.973 --> 00:27:42.136
- to be built for the public infrastructure in order to help construct hundreds of thousands of homes.

00:27:42.136 --> 00:27:50.460
- Yes, this is definitely public infrastructure, making connections that need to be made for North-South

00:27:50.460 --> 00:27:53.854
- thoroughfares. The other parts of this is

00:27:54.082 --> 00:28:03.945
- is just one part. The other parts in that area include looking at Vanguard connecting from Tap Road

00:28:03.945 --> 00:28:13.807
- up to Weimar in a straight line. It also includes offsite developments, looking at intersections to

00:28:13.807 --> 00:28:23.966
- improving intersections. So this will greatly improve the connectivity of that whole area that is very

00:28:24.674 --> 00:28:34.541
- underserved with roadways at this point. OK. Any other questions or comments from the commissioners

00:28:34.541 --> 00:28:44.902
- that's not open for public comment? Nothing in line or in person? I'll entertain a motion for resolution

00:28:44.902 --> 00:28:50.526
- 2647. I would like to make a comment prior to something.

00:28:50.690 --> 00:28:58.604
- I happen to be an adjoining property owner to this, so I'm going to abstain from voting because this

00:28:58.604 --> 00:29:06.596
- does impact a property, or could it potentially impact a property that I do own. It will or it won't.

00:29:06.596 --> 00:29:14.509
- Thank you for that clarification. OK, so with that one abstention, we have any motion for resolution

00:29:14.509 --> 00:29:18.270
- 2647. Move approval of resolution 2647. Second.

00:29:18.498 --> 00:29:27.881
- A first and a second. All in favor say aye. Aye. We've got any opposed? We've got four in favor and

00:29:27.881 --> 00:29:37.451
- one abstention. And the motion passes. That's the end of our new business on our agenda. Is there any

00:29:37.451 --> 00:29:47.678
- other items to bring before we adjourn? Not at this time. We're going to take the openings under advisement.

00:29:48.226 --> 00:29:54.244
- Yeah, I was tricked by the book, took them in as they were received, didn't look at them, kept them

00:29:54.244 --> 00:30:00.443
- in a locked folder until we just opened them this evening. So I don't know what's in there. Obviously,

00:30:00.443 --> 00:30:06.461
- with any offer, it's not just about purchase price. A lot of times, there can be other details that

00:30:06.461 --> 00:30:12.479
- can offset. So we're going to do a deep dive as to what each offer contains and try to come up with

00:30:12.479 --> 00:30:13.502
- your next steps.

00:30:16.482 --> 00:30:29.628
- Okay, well with that I'll take a motion to adjourn. The RDC doesn't take public comment for items not

00:30:29.628 --> 00:30:43.806
- on our agenda. That's our policy. There are not yet been even considered by the RDC, much less by the public.

00:30:47.170 --> 00:30:55.848
- will lean towards legal on how to proceed. We have to determine what we have first before we can even

00:30:55.848 --> 00:31:04.356
- have anything to talk about yet. But we'll look into them, and then we will present publicly what's

00:31:04.356 --> 00:31:13.204
- involved in those offers. I have a simple question. Does each of those projects have a financial number

00:31:13.204 --> 00:31:16.862
- attached to it? I didn't even go that far.

00:31:16.962 --> 00:31:23.564
- I mean, but do they? I didn't see that on the first two pages that I glanced at, so I have no idea what

00:31:23.564 --> 00:31:30.102
- they said. We hear the CIB offers those money attached to them, and I wondered if each of these offers

00:31:30.102 --> 00:31:36.514
- had a dollar fee. It wasn't in the project summary at the top, which is, that's the first. The RDC's

00:31:36.514 --> 00:31:42.862
- opening of proposals is not exactly the same as how CIB does it. Will your deep dive be done before

00:31:42.862 --> 00:31:44.766
- they bulldoze Seminary Point?

00:31:46.690 --> 00:31:54.263
- What is the? Is there a timeline associated with that? Yes. Would you like to know what it is? I'm happy

00:31:54.263 --> 00:32:01.475
- to stick around after the meeting and talk to whoever would like to talk. OK, so the meeting is now

00:32:01.475 --> 00:32:08.759
- adjourned. If there are other comments that people would like to make to individuals, they may do so

00:32:08.759 --> 00:32:13.086
- after the adjournment of the meeting. Meeting is adjourned.