WEBVTT

00:00:00.450 --> 00:00:08.312
- All right it's time to call our meeting to order this utility service board for May 4th of 2026. Our

00:00:08.312 --> 00:00:16.719
- first item on the agenda is communications and petitions. Is there anything from the public? Communications

00:00:16.719 --> 00:00:24.581
- or petitions? All right just a reminder that the City of Bloomington utilities mission is to enhance

00:00:24.581 --> 00:00:28.862
- the quality of life in our community by providing safe

00:00:29.218 --> 00:00:35.879
- sustainable and high-quality drinking water, wastewater, and stormwater services in a cost-effective

00:00:35.879 --> 00:00:42.605
- manner, promoting public health, economic vitality, and environmental stewardship. Our vision is that

00:00:42.605 --> 00:00:49.332
- CBU will be the leading municipal water utility organization in Indiana. And just to remind our board

00:00:49.332 --> 00:00:54.014
- members, if you have any personal or financial conflict or any issues,

00:00:54.338 --> 00:01:04.711
- or individuals on the agenda, then please be sure to recuse yourself during those portions of the meeting.

00:01:04.711 --> 00:01:14.986
- All right, the first item then is approval of minutes from our previous meeting of April 20th. All right,

00:01:14.986 --> 00:01:23.614
- it's been moved and seconded to approve the minutes of April 20th. Any other discussion?

00:01:24.962 --> 00:01:33.576
- In favor, say aye. Aye. Opposed? All right, the minutes are approved. Next is standard invoices. Review

00:01:33.576 --> 00:01:42.686
- invoices for today. I have a few questions. Yeah. OK, on page three, my first question is city of Bloomington

00:01:42.686 --> 00:01:51.217
- fuel charge. And I guess just thinking more about our fuel this month with gas prices that are up, how

00:01:51.217 --> 00:01:52.542
- are we charged?

00:01:52.706 --> 00:01:59.403
- when there's a delivery of fuel, and then we pay that rate until there's another delivery of fuel, and

00:01:59.403 --> 00:02:05.970
- then that's our rate. How do they determine our charge for fuel? That I don't know. I just know they

00:02:05.970 --> 00:02:12.537
- track it by batch number. So I'm not sure I think about what the price is really cheap. Like, oh, at

00:02:12.537 --> 00:02:18.714
- the end of the month, it's $4.99. So everybody pays $4.99. Or when you got your biggest loads,

00:02:18.714 --> 00:02:20.990
- it was $4.23. And so we pay $4.23.

00:02:21.698 --> 00:02:30.653
- At some point, could you inquire about that, please? Thank you. OK. Next question. Environmental Systems

00:02:30.653 --> 00:02:39.609
- Research Institute, also on page three, the small government enterprise subscription. What's that? Esri.

00:02:39.609 --> 00:02:48.564
- So Esri, that's our GIS. Oh, OK. Different letters. I didn't know that. Thank you. OK. And then my other

00:02:48.564 --> 00:02:50.782
- question. Let's see here.

00:02:55.330 --> 00:03:02.904
- Well, OK, on the page that my numbers cut off, but toward the back. And yes, it's page eight. Stantec

00:03:02.904 --> 00:03:10.405
- for the contract revision number two for rate design. For the water, I wasn't exactly sure what that

00:03:10.405 --> 00:03:18.127
- meant. So there's a couple of pieces to the water rate case. There's one, the revenue requirements need

00:03:18.127 --> 00:03:25.182
- to be defined. And we have a consulting company in Crow that defined our revenue requirements.

00:03:25.666 --> 00:03:30.681
- And then for proper cost of service study, we need a company like Stantec to dig into the details and

00:03:30.681 --> 00:03:35.844
- say, Kerr was saying we need this much money, and Stantec does the cost service study to say who's going

00:03:35.844 --> 00:03:40.761
- to pay their share. So this is just paying them for their continued work. This is the work they did

00:03:40.761 --> 00:03:45.728
- to get us prepared for the rate case that we're months into? Yes. Yes. OK. OK, thank you. I wouldn't

00:03:45.728 --> 00:03:50.645
- say it did the work they did to get us prepared. It's work they've done throughout, yes. Since that

00:03:50.645 --> 00:03:53.054
- we need to prove this is why we need this money.

00:03:57.538 --> 00:04:05.702
- Any other questions on standard invoices? Is that for a CDL requirement or something like that? Okay.

00:04:05.702 --> 00:04:14.267
- Just didn't have a dirt of that one before. And then for the entities that we have to do outfall sampling,

00:04:14.267 --> 00:04:20.670
- do we recover that cost from them or do we cover that for them on their behalf?

00:04:28.994 --> 00:04:39.735
- for outflow testing, like when we test for outflows, like do we recover that cost or charge that to

00:04:39.735 --> 00:04:50.582
- the entity or do we cover for him? Oh, okay. Cool. Thank you. Anything else on standard invoices for

00:04:50.582 --> 00:04:57.886
- approval? Any other discussion? All in favor say aye. Aye. Opposed?

00:04:59.106 --> 00:05:09.251
- Standard invoices are approved. Next are utility bills for the month. Total there is $19,952.34. Any

00:05:09.251 --> 00:05:19.798
- questions on utility bills? I move that we approve the utility bills. Second. All right. It's been moved

00:05:19.798 --> 00:05:28.638
- and seconded at all. Any other discussion on those? All in favor say aye. Aye. Opposed?

00:05:29.378 --> 00:05:55.596
- OK, utility bills are approved. Wire transfers in the amount of $667,091.43. Any questions on those?

00:05:55.596 --> 00:05:59.230
- I've got 606.

00:05:59.746 --> 00:06:13.053
- $7,091.43. I move that we approve the wire transfers. Second. Okay. Any other discussion? All in favor

00:06:13.053 --> 00:06:27.006
- of wire transfers, say aye. Aye. Opposed? All right. Wire transfers are approved. Next is customer refunds.

00:06:30.402 --> 00:06:39.417
- Discussion on customer refunds for this month. All right. I move that we approve the customer refunds.

00:06:39.417 --> 00:06:48.607
- Second. All right, it's been moved and seconded. All in favor say aye. Aye. Opposed? All right, customer

00:06:48.607 --> 00:06:56.222
- refunds are approved. Next is the special check run for stormwater fees to the county.

00:07:00.194 --> 00:07:07.359
- Discussion. Yeah. It's for taxes. Is this like property tax on these places? No, it's just a stormwater

00:07:07.359 --> 00:07:14.800
- fee for these locations. For these sites? These sites are in the county. Okay. And so it's their stormwater

00:07:14.800 --> 00:07:21.690
- fees. So it's labeled taxes because I think they're normally charged with property taxes. Okay. But

00:07:21.690 --> 00:07:23.550
- we don't pay those though.

00:07:32.930 --> 00:07:41.706
- All right, any other questions on stormwater fees for our facilities? I move that we approve the special

00:07:41.706 --> 00:07:50.315
- check run. Second. All right, it's been moved in. No, yeah, special check run. Moved and seconded. Any

00:07:50.315 --> 00:07:58.840
- other discussion? All in favor say aye. Aye. Opposed? All right, motion carries then. And next is the

00:07:58.840 --> 00:08:01.598
- consent agenda. Director Zeiger.

00:08:02.690 --> 00:08:08.810
- Good evening. I'm Catherine Zegar, utilities director. I'm presenting tonight's consent agenda,

00:08:08.810 --> 00:08:15.377
- totaling $23,300. The first contract is with commercial service of Bloomington Inc. for $5,125 for the

00:08:15.377 --> 00:08:21.880
- main building server room mini split replacement at Monroe Water Treatment Plant. Next is with Course

00:08:21.880 --> 00:08:28.510
- in Fire and Security for $3,175 for annual plant equipment inspections at Blucher, Dillman, and Monroe.

00:08:29.794 --> 00:08:36.387
- Last is with First Appraisal Group, Inc. not to exceed $15,000 for the appraisal of easements for six

00:08:36.387 --> 00:08:43.109
- properties associated with the Dillman Relief Sewer Project. Is there any member who wishes to consider

00:08:43.109 --> 00:08:49.702
- one or more of these items individually? Hearing none, if there is no opposition, these items will be

00:08:49.702 --> 00:08:55.454
- approved as recommended by staff. Hearing no opposition, the consent agenda is approved.

00:08:59.586 --> 00:09:08.521
- Thank you. Item six on our agenda is to request approval of the service agreement with Electric Plus

00:09:08.521 --> 00:09:17.544
- for the Monroe plant. Hello, I'm Dan Hudson, capital project manager for the city of Bloomington. I'm

00:09:17.544 --> 00:09:26.568
- filling in for Hector. He's not here tonight. About a year ago, we went under contract with a company

00:09:26.568 --> 00:09:29.310
- to do maintenance on our large

00:09:29.826 --> 00:09:36.899
- high voltage and medium voltage equipment. That includes taking the breakers out and cleaning them and

00:09:36.899 --> 00:09:43.766
- making sure everything works right and putting them back. But you have to shut down the plant to do

00:09:43.766 --> 00:09:50.771
- that. And in our planning process, we've decided that it's a good idea to keep our servers running so

00:09:50.771 --> 00:09:55.166
- we have data coming in and also keep the lab running because we

00:09:55.266 --> 00:10:05.429
- do laboratory analysis like every hour. And this may take like up to 10 hours to do. So we'd like to

00:10:05.429 --> 00:10:15.491
- hire Electric Plus to help us wire an existing generator that we have, a portable generator that we

00:10:15.491 --> 00:10:24.446
- borrow from T&D to run the servers in the lab. We also want to rent a portable generator

00:10:24.578 --> 00:10:33.914
- to run one of the pumps. One of the pumps we can run because it is a high level pump. It's on 480 volts

00:10:33.914 --> 00:10:43.609
- and we have a generator. We can run a generator to do that. The idea is we don't want to lower the pressure

00:10:43.609 --> 00:10:53.214
- in the system. So we have to have water notices during this time. So that's our plan for electric plus for

00:10:53.410 --> 00:11:04.280
- $8,813. Any questions? Yeah, thanks. And this is probably a good time to do this with the campus kind

00:11:04.280 --> 00:11:15.044
- of winding down as of this weekend. You probably thought of that. So usage should be down a bit with

00:11:15.044 --> 00:11:21.758
- the campus pretty much in a reduced state for the summer. Yes.

00:11:23.042 --> 00:11:37.796
- So do we kind of proactively top off all the tanks before we do this in case we have problems?

00:11:37.796 --> 00:11:50.686
- Oh, absolutely. Everything's topped off. The superintendent is here. Great. Sorry.

00:11:54.722 --> 00:12:04.715
- Yeah, so we topped the tanks off the night before. And so they're ready for the day. So if you looked

00:12:04.715 --> 00:12:14.709
- at last year's usage about this week, you'd know about how many gallons we'd go through on an average

00:12:14.709 --> 00:12:24.702
- day like this. Yeah, we pretty much so. Usually after graduation, we have a lull for about two weeks.

00:12:25.250 --> 00:12:33.845
- And it starts to pick up as people start filling their pools up for Memorial Day. Makes sense. Yeah.

00:12:33.845 --> 00:12:42.696
- So it is, it's really an advantageous time to do it. Good planning. Yeah. So we've got them all tapped,

00:12:42.696 --> 00:12:51.717
- topped off like that and you're down in production. How much water do we have in the tank? So many hours?

00:12:51.717 --> 00:12:54.270
- So usually as far as the, uh,

00:12:55.298 --> 00:13:04.316
- distribution goes to keep the fire suppression above the green line. We have about six hours. The actually

00:13:04.316 --> 00:13:12.829
- this we're only planning on this taking three. So, but in the meantime with pump five, we'll be able

00:13:12.829 --> 00:13:21.342
- to pump 8 million gallons to town. Still. That's the pump we're going to generate. That's what we're

00:13:24.578 --> 00:13:31.360
- You mentioned low pressure, potentially don't run that pump. Is it pretty much guaranteed to go below

00:13:31.360 --> 00:13:38.076
- that 20 PSI? It's going to be close. Okay. Close enough that we're worried about it. Yeah. You know,

00:13:38.076 --> 00:13:44.925
- the other option was to go the night before and that was, you know, it would have been another $15,000

00:13:44.925 --> 00:13:51.707
- add-on to the company and us doing the work. So, you know, we thought, well, probably the better idea

00:13:51.707 --> 00:13:53.502
- is to keep a pump running.

00:13:54.114 --> 00:14:02.212
- And so with this solution, we can do that. What was the date we were looking at? The 12th. Next Tuesday.

00:14:02.212 --> 00:14:10.156
- So let the fire department know you're going to do this? I sent them an email this morning. Very good.

00:14:10.156 --> 00:14:18.562
- Because if they have an issue, you need to know before anybody else does so that you can adjust accordingly.

00:14:18.562 --> 00:14:22.110
- We usually can tell if they do have an issue.

00:14:27.842 --> 00:14:36.174
- Good. Sounds like you don't do this very often, huh? No. I don't think it's ever been. Yeah. So. Preventive

00:14:36.174 --> 00:14:43.888
- maintenance. It's a good thing. All right. Other questions? Any other discussion? All right. I move

00:14:43.888 --> 00:14:51.834
- that we approve the contract with electric plus zinc. Second. I move and second. All in favor say aye.

00:14:51.834 --> 00:14:56.926
- Aye. Opposed? Motion carries. Thank you. Thank you for your time.

00:14:57.922 --> 00:15:07.159
- for coming tonight. Next on the agenda is item seven, request for approval of amendment number one to

00:15:07.159 --> 00:15:16.577
- the agreement with Wexler Engineering. Dan is back. Yeah, Dan Hudson, Capital Projects Manager. I don't

00:15:16.577 --> 00:15:25.814
- know if I need to state that again. Last board meeting, I went to you guys about Xylem project we had

00:15:25.814 --> 00:15:27.806
- about replacing these

00:15:28.226 --> 00:15:37.119
- devices in our flight pumps. And to do the whole project, it actually is going to take three contracts.

00:15:37.119 --> 00:15:45.841
- One is for Xylem, one for Wessler, and one for Electric Plus. That's what I'm doing here. The Wessler

00:15:45.841 --> 00:15:54.393
- part of it is to integrate, to take all the data, put it in our SCADA, and put it in the historian.

00:15:54.393 --> 00:15:56.958
- So Wessler has a project now.

00:15:57.186 --> 00:16:08.253
- at the headworks, and they're working on the SCADA system. So we just ask for an amendment for them,

00:16:08.253 --> 00:16:19.320
- and they are asking for $33,000 for a new not to exceed $288,000 to do that. Is there any questions?

00:16:19.320 --> 00:16:25.566
- That's good. Any questions or discussion for Mr. Hudson?

00:16:28.610 --> 00:16:35.231
- I move that we approve the first amendment to the Professional Service Agreement with Western Engineering.

00:16:35.231 --> 00:16:41.665
- Second. I move and second to any other discussion. All in favor say aye. Aye. Opposed? All right motion

00:16:41.665 --> 00:16:48.286
- carries. It's approved. And next then is the request for approval of service agreement with Electric Plus.

00:16:49.538 --> 00:16:59.955
- This is the third project. We need someone to hang the wires, to put the conduit up, and to wire everything

00:16:59.955 --> 00:17:09.891
- from the flight pumps to the, I don't know if it's an RTU or PLC, but to the device at the system that

00:17:09.891 --> 00:17:15.678
- picks up the data. And Electric Plus is asking for $15,950.

00:17:19.874 --> 00:17:31.603
- OK. Questions for Dan? I move that we approve the contract with Electric Plus. Second. Move and second.

00:17:31.603 --> 00:17:42.880
- Any other discussion? All in favor say aye. Aye. Opposed? All right. That request is approved. Item

00:17:42.880 --> 00:17:49.534
- nine is request for approval of the service agreement with

00:17:50.018 --> 00:17:59.401
- Thermoelectron North America, LLC. Kelsey. Hi, I'm Kelsey Thetonia, Assistant Director for Environmental.

00:17:59.401 --> 00:18:08.518
- This is a contract with Thermoelectron for a annual service plan for ICPMS instrument, which runs lead

00:18:08.518 --> 00:18:17.192
- samples for drinking water. I'm sorry, could you repeat what you said? Yeah. It was hard to hear.

00:18:17.192 --> 00:18:19.582
- I'm sorry. I heard annual.

00:18:19.714 --> 00:18:26.239
- service plan for what? It's a service plan with Thermo for just basic maintenance of our ICPMS instrument

00:18:26.239 --> 00:18:32.703
- in the lab. So that's analysis for lead? Yep. Does it do anything else for us or can you do other agents

00:18:32.703 --> 00:18:38.983
- with it? Right now we only use it for lead. We have an AA for iron and manganese. Is that what we use

00:18:38.983 --> 00:18:45.139
- when some like a customer if they get their lead service line they request? Yes, we're using it for

00:18:45.139 --> 00:18:48.894
- the lead service line. I know Justin said he had over 600 of

00:18:49.666 --> 00:18:56.480
- He has. Yes. Great. OK. That's a good. I hadn't heard a follow up number on that. Yeah. Quite a bit.

00:18:56.480 --> 00:19:03.361
- Yeah. A lot of interest in that program. We still have over 9,000 unknowns, but this is a step in the

00:19:03.361 --> 00:19:10.309
- right direction to be able to identify the areas where we need to do further investigation. Great. Any

00:19:10.309 --> 00:19:17.123
- other questions for Kelsey? All right. I move that we approve the contract with Thermoelectron North

00:19:17.123 --> 00:19:18.270
- America. Second.

00:19:18.978 --> 00:19:27.962
- Move and second it in the other discussion. All in favor say aye. Aye. Opposed? All right. Motion carries.

00:19:27.962 --> 00:19:36.358
- Thank you very much. Item 10 is the request for approval of resolution 2026-11 to designate surplus

00:19:36.358 --> 00:19:44.755
- property for auction. Matt Havy. I think there's one item on the list. It's a shelf that I'm trying

00:19:44.755 --> 00:19:46.014
- to get rid of.

00:19:46.978 --> 00:19:54.311
- Sardis are coming so often. This is the third time in a row. We were late on the first one. The second

00:19:54.311 --> 00:20:01.787
- one came on time, and we're doing this one early for some reason. So that's why they've been three times

00:20:01.787 --> 00:20:08.906
- in a row. So clear it out. And there goes the file cabinet. There it goes. Another file cabinet out

00:20:08.906 --> 00:20:16.382
- the door. They're multiplying. Yeah, someplace. Ready for it? Yep. I move that we approve the resolution

00:20:16.514 --> 00:20:25.741
- All right it's been moved and seconded. Any other discussion? All in favor say aye. Aye. Opposed? All

00:20:25.741 --> 00:20:35.692
- right resolution 2026-11 is approved. Next is item 11 request for approval of the memorandum of understanding

00:20:35.692 --> 00:20:46.366
- between the City of Bloomington utilities and our City Department of Public Works for utility infrastructure repairs.

00:20:46.850 --> 00:20:55.547
- Yeah, so this MOU that we're bringing is essentially a renewal of an MOU that we did last year where

00:20:55.547 --> 00:21:04.331
- we provide funding for four full-time DPW positions that provide repairs as needed upon completion of

00:21:04.331 --> 00:21:13.287
- CBU utility maintenance repairs and replacing infrastructure. So, for example, water main breaks, water

00:21:13.287 --> 00:21:15.870
- main replacements, et cetera.

00:21:16.066 --> 00:21:28.174
- They would provide the, you know, the paving curb work associated with it. And this is has shown to

00:21:28.174 --> 00:21:40.766
- be a mutually beneficial agreement. You know, they were so streets DPW is now using city works to track

00:21:40.930 --> 00:21:49.267
- their hours. They started using it at some point last year, so they didn't get a full year of tracking

00:21:49.267 --> 00:21:57.605
- in last year. But what they did track showed that, yes, these four positions use the majority of their

00:21:57.605 --> 00:22:05.780
- time to do follow up repairs on infrastructure following our utility repairs. So happy to answer any

00:22:05.780 --> 00:22:10.718
- questions. Yeah. Yeah. Why wouldn't we just hire them as our

00:22:10.914 --> 00:22:20.265
- I mean, if we're paying all the benefits, we're paying all this, why are they not positions just within

00:22:20.265 --> 00:22:29.346
- CBU? So they do. So these positions don't really do a lot of utility work. So they're not, you know,

00:22:29.346 --> 00:22:39.326
- actually repairing the mains, repairing the and we used to have just a I think we still do kind of have like a

00:22:41.602 --> 00:22:49.195
- Sorry, construction crew. But it works out better to have them follow behind us to do this paving, to

00:22:49.195 --> 00:22:56.937
- get it up to standard. And so, yeah. I'm assuming the equipment. I mean, the equipment. Yeah, they have

00:22:56.937 --> 00:23:04.679
- the equipment. They have all the equipment to do this. They have to deal with replacing that equipment,

00:23:04.679 --> 00:23:11.230
- maintaining that equipment. And we don't have to deal with any of that, which is great.

00:23:12.162 --> 00:23:21.362
- And we are funding these positions fully or are we doing a portion. This is full for full time positions

00:23:21.362 --> 00:23:30.125
- fully. Yes. Once I think it would be nice once we once they are using the data and we have it for a

00:23:30.125 --> 00:23:38.975
- year. I do think that if we come back to this MOU I will be asking the question of this is great and

00:23:38.975 --> 00:23:40.990
- let's show the data of

00:23:41.538 --> 00:23:50.376
- how much they are doing for us and how much they're doing. And I think we should look at a percentage

00:23:50.376 --> 00:23:59.214
- funding of those positions. Because correct me if I'm wrong, they're not 100% doing all work for CBU?

00:23:59.214 --> 00:24:08.225
- No, that's not right. They're helping us with the CBU project. So again, I think it would be beneficial

00:24:08.225 --> 00:24:11.518
- when we get to December of this year,

00:24:12.770 --> 00:24:20.474
- that we do request that data and then negotiate with them in terms of how much we are willing. I mean,

00:24:20.474 --> 00:24:28.103
- I think it's great. I think that we have this partnership and that we have funded it, but it may mean

00:24:28.103 --> 00:24:35.806
- in the future, perhaps we share in that expense. Of course, yes. I will say, and again, these are just

00:24:35.806 --> 00:24:42.014
- estimates because we didn't get the full year of data, that it did look like these

00:24:42.498 --> 00:24:50.227
- These positions were using upwards of probably 80% would be a good estimate of their time, which,

00:24:50.227 --> 00:24:58.350
- you know, if you consider the equipment cost and the maintenance costs that we're saving, I think that

00:24:58.350 --> 00:25:06.631
- still shook out to a pretty good deal. Sure. And again, this is, these are our rate payers and at, let's

00:25:06.631 --> 00:25:11.678
- just say 290,000. I could get my calculator to work times point

00:25:11.938 --> 00:25:22.511
- 20%, that's 58,000 that could be coming, the 20% would be 58,000 that could be supported by Public Works.

00:25:22.511 --> 00:25:32.485
- Does that make sense? Well, a little bit Amanda, except that, well I guess two questions. The first

00:25:32.485 --> 00:25:39.966
- thing I think as I understood it is we have to figure in the amount of the

00:25:41.474 --> 00:25:50.134
- the equipment used. So this includes... I could get on board with that. I could get on board with that.

00:25:50.134 --> 00:25:58.627
- You could pull that out of the 290 or whatever it is. I could get on board with that. And then I have

00:25:58.627 --> 00:26:07.120
- to ask the question if when they put the estimate together, did they estimate 80% or 100%? FTE. Yeah,

00:26:07.120 --> 00:26:08.702
- FTE for the crews.

00:26:09.250 --> 00:26:16.970
- I don't know. I believe this is 100%, yes. Well, then your point about this next year, once they figure

00:26:16.970 --> 00:26:24.466
- out they're hourly, we'd be more comfortable probably looking at it at 80% plus, you know, the usual

00:26:24.466 --> 00:26:31.592
- costs of equipment and pavers and we're paying for supplies for this. We're paying for asphalt,

00:26:31.592 --> 00:26:38.718
- the gravel, the concrete, the three, you know, all of that. The other part I like about this is

00:26:40.354 --> 00:26:49.508
- When we do a cut like this, it's gotta hit city standards, right? DPW standards. And if we were doing

00:26:49.508 --> 00:26:58.572
- it ourselves, there might be a little hesitation about, someone might ask the question, well, that's

00:26:58.572 --> 00:27:07.635
- not quite the city standard. But if they're doing it, we don't have to worry about that. I'm curious

00:27:07.635 --> 00:27:10.238
- how we were doing it before.

00:27:10.530 --> 00:27:19.495
- this? Were we just doing it in-house with our own workers? Yeah. Correct. Sorry. James Hall. Thanks.

00:27:19.495 --> 00:27:28.459
- James Hall, assistant director of TND. Yeah, we had a crew that would, as they were doing water main

00:27:28.459 --> 00:27:37.424
- replacement, they would kind of fall off and try to track back and do it. We've seen, again, part of

00:27:37.424 --> 00:27:39.998
- what you're talking about is

00:27:40.194 --> 00:27:46.566
- I used to answer a lot of calls about when is this going to be replaced? When is this now street department

00:27:46.566 --> 00:27:52.937
- handles all that? I'm like, you know, that's, they're going to fix that. You call down there, um, whatever.

00:27:52.937 --> 00:27:58.955
- Um, and so that's been a benefit for us as well. Um, and then as we move forward in our rate case and

00:27:58.955 --> 00:28:05.090
- hopefully into the future, those resources don't have to stop and go back and do that. We just continue

00:28:05.090 --> 00:28:08.158
- on doing water main replacement. So that's kind of.

00:28:09.698 --> 00:28:19.382
- without having to add crews. All right, any other questions on this MOU with city government? I move

00:28:19.382 --> 00:28:29.067
- that we approve the MOU between the city of Wilmington Utilities and the city of Wilmington. Second.

00:28:29.067 --> 00:28:39.614
- Been moved and seconded. Any other discussion? All in favor say aye. Aye. Opposed? All right, motion carries.

00:28:39.842 --> 00:28:51.622
- that MOU approved. Next item is any old business from the board. Item 12, I'm sorry. This is request

00:28:51.622 --> 00:29:03.401
- for approval of the MOU between CBU and the retreat at Switchyard. I've got my mind. We talked about

00:29:03.401 --> 00:29:08.766
- this in committee, but we'll hear about that.

00:29:09.090 --> 00:29:15.845
- Yes. Well, that was my question. Do we wait until subcommittee reports, or do we do this here? I guess

00:29:15.845 --> 00:29:22.797
- I don't know. Well, it's on our agenda for now, so we probably ought to. We could go either way, I guess.

00:29:22.797 --> 00:29:29.683
- I don't want to be in the way. As part of our discussion, we get the committee report. How's that sound?

00:29:29.683 --> 00:29:36.635
- All right. OK. Well, let's see. Matt, are you going to give a slowdown first? So the Retriever Switchyard

00:29:36.635 --> 00:29:38.078
- is a development here

00:29:38.722 --> 00:29:46.860
- corner of Miller in Walnut. It was an affordable housing project that's been going on for several years

00:29:46.860 --> 00:29:54.841
- now. And as part of this project, they hooked up to the sewer. And as developments do this, we charge

00:29:54.841 --> 00:30:03.058
- them proportionally to the size of the sewer that they're going to use, what infrastructure that they're

00:30:03.058 --> 00:30:08.222
- going to drive us to buy. And as part of this development, it was

00:30:09.186 --> 00:30:15.772
- get the numbers that grow to say it's a little over $50,000 for them to connect to the sewer. Um, and

00:30:15.772 --> 00:30:22.552
- I think there was some little confusion on both sides is that they thought that since they were building

00:30:22.552 --> 00:30:29.009
- affordable housing, that they, this fee could be waived. Um, but then we took them through the city

00:30:29.009 --> 00:30:35.467
- statute and pointed out to them that we can only waive fees for a single family residences for, for

00:30:35.467 --> 00:30:37.662
- their connection fee. Um, and so.

00:30:38.370 --> 00:30:45.149
- They explained to us they were having a lot of challenges with this development and financially and

00:30:45.149 --> 00:30:52.198
- operationally. And so. We again we communicated that we could not waive the fee and so we had a meeting

00:30:52.198 --> 00:30:59.248
- and talked with them and came to an agreement that CBU would agree to give them a payment plan for five

00:30:59.248 --> 00:31:06.705
- years with no interest to pay this connection fee off. That's what this MOU is is documenting that agreement.

00:31:06.705 --> 00:31:07.518
- Thanks man.

00:31:08.866 --> 00:31:19.832
- And yes, we did talk about this one in the finance committee meeting prior to this meeting. So this

00:31:19.832 --> 00:31:31.128
- might be a good time, Jim, if you could give the report on the vote that the subcommittee took sending

00:31:31.128 --> 00:31:36.830
- it forward. Yeah, the subcommittee approved the MOU

00:31:36.994 --> 00:31:47.534
- with the addition of an amendment that if the property were sold during the five-year period during

00:31:47.534 --> 00:31:58.075
- which the hookup fee would be paid, the new owner of the property would be required to pay whatever

00:31:58.075 --> 00:32:04.926
- debt to CBU was owed in full at the time of closure of the sale.

00:32:06.946 --> 00:32:21.702
- Well, what we may need to do is table this so that it can go back to legal and they can write that language

00:32:21.702 --> 00:32:35.774
- in and then we could act on it in two weeks. And it wouldn't have to be the new owner just at closing.

00:32:36.674 --> 00:32:47.280
- it would be paid in full if there's a change of ownership. Because that could happen. So the only other

00:32:47.280 --> 00:32:57.682
- comment I'd have on this is that I think it's good public policy for us to be flexible with a project

00:32:57.682 --> 00:33:05.534
- like this that's been worked on by city government downtown giving them this

00:33:06.466 --> 00:33:15.428
- assistance more or less in the time it would allow them, because it's an affordable housing project,

00:33:15.428 --> 00:33:24.478
- it kind of shows our support for helping those projects as they come along to us, because we all know

00:33:24.478 --> 00:33:33.173
- that's a community priority now. So I think that's a good thing for us to do. But we need a verb.

00:33:33.173 --> 00:33:36.190
- All right, and I can't remember a

00:33:36.578 --> 00:33:48.521
- Tabling is open for discussion. I have to look. Anybody remember? It is not? All right. I'll take your

00:33:48.521 --> 00:34:00.347
- word for it. All right. All in favor of tabling? Second? Thank you. All in favor of tabling, say aye.

00:34:00.347 --> 00:34:03.710
- Opposed? OK. We have tabled.

00:34:04.066 --> 00:34:16.225
- Item 12, that MOU with our comments in the minutes. OK. Now I think we're ready for old business. Is

00:34:16.225 --> 00:34:28.143
- there any old business by the board? Any new business from the board? Oh, old business from staff.

00:34:28.143 --> 00:34:32.958
- Thank you. New business from the board.

00:34:34.210 --> 00:34:41.093
- go for it first? You can go first. It's the same thing. Okay. Well, thank you for sending us out the

00:34:41.093 --> 00:34:48.180
- press release a few weeks ago about the bulk water station facility being down. I was surprised to read

00:34:48.180 --> 00:34:55.403
- that it was not like a mechanical failure. It's like a payment system failure. And so even more surprised

00:34:55.403 --> 00:35:02.558
- to see that we couldn't get that back up and running until 2027, which is like seven months from now. So

00:35:02.722 --> 00:35:09.733
- Can you explain that to us why that that that's going to take so long and and kind of what's like their

00:35:09.733 --> 00:35:16.677
- daily usage of that boat water station and then like explain? OK, what's the work around for right now

00:35:16.677 --> 00:35:23.756
- for people who do utilize that service? How are they able to access both water? Sure, yeah, so the issue

00:35:23.756 --> 00:35:30.565
- is it is the credit card reader. It needs to be replaced and updated. We need to do service contract

00:35:30.565 --> 00:35:32.318
- in place with our current

00:35:32.450 --> 00:35:39.160
- um, they would not allow us to not have the credit card fees charged us that they had to flow through

00:35:39.160 --> 00:35:45.738
- us and get paid, paid out another way. Um, so I talked to legal, but they said that we need to find

00:35:45.738 --> 00:35:52.579
- another way to do it. Um, and so we looked for another way to do it and the new provider, uh, estimated

00:35:52.579 --> 00:35:59.486
- it would be $18,000 to replace it at the moment. Um, and we felt that given our situation with the water

00:35:59.486 --> 00:36:01.854
- money and, and we're going into the

00:36:02.466 --> 00:36:09.299
- getting a rate case we wanted to wait until we got that kind of money. And as far as usage, it doesn't

00:36:09.299 --> 00:36:15.933
- get a whole lot of usage. I think last year's revenue was $3,000. But people do use it. $3,000 is a

00:36:15.933 --> 00:36:22.766
- lot of water, right? And currently our workaround is to go back to hydrometers. So if people need bulk

00:36:22.766 --> 00:36:29.401
- water, they can come and run a hydrometer and get hooked up to the hydrant and get their water that

00:36:29.401 --> 00:36:30.462
- way. Thank you.

00:36:30.594 --> 00:36:36.898
- Is that information like on our website? So if someone who maybe missed it and shows up down there,

00:36:36.898 --> 00:36:43.202
- is there like signage that says come here or what? There's signage down there that says it's out of

00:36:43.202 --> 00:36:49.633
- order and in the press release it did mention that the hydrometer. So down there where it says out of

00:36:49.633 --> 00:36:56.126
- order it says like come here. I'm not sure about that but. Or call this number. Okay. Okay, thank you.

00:37:00.194 --> 00:37:09.904
- Yeah, I was just curious. I had a note that there was a rate hearing on April 30th. Was I incorrect

00:37:09.904 --> 00:37:20.294
- in that originally? Or was it May 30th, maybe? My hearing? Yes. Is it currently scheduled for this Friday?

00:37:20.294 --> 00:37:28.062
- This Friday. Thanks. Thanks, Graham. Megan, any other items under new business?

00:37:34.658 --> 00:37:43.178
- Anything else on, yeah, subcommittee reports. Jim, I know the Finance Committee had another item on

00:37:43.178 --> 00:37:51.782
- the agenda. You can give us a report on it. There were two items on the agenda. One of them has just

00:37:51.782 --> 00:38:00.387
- been discussed with the MOU with Restore. The other item on the agenda was a presentation by Matt, a

00:38:00.387 --> 00:38:03.710
- financial summary of 2025. It included

00:38:05.090 --> 00:38:17.629
- our expenses, the projects that we had, and the assets that were still available for CBU. The committee

00:38:17.629 --> 00:38:29.927
- found the presentation to be extremely useful and helpful. It ought to help us when we go through the

00:38:29.927 --> 00:38:33.182
- budget hearings next year.

00:38:36.834 --> 00:38:47.021
- told us that they were planning to make such presentations quarterly now so that every three months

00:38:47.021 --> 00:38:57.411
- we would get a summary of our expenses and our revenues and our projects. And we all thought that was

00:38:57.411 --> 00:39:05.662
- a really good thing. I just want to add that I was really surprised at how close

00:39:07.106 --> 00:39:16.173
- actual budget was to the expected budget. And I said that our own household budget never gets that close.

00:39:16.173 --> 00:39:24.897
- So kudos to the administration for what they do. So again, we thought this was a great idea and we're

00:39:24.897 --> 00:39:32.766
- happy that it will be continued. Thank you, Jim. Any questions for Jim on the subcommittee?

00:39:38.210 --> 00:39:49.863
- to staff reports. Yeah, I'd like to congratulate Madison Abel for earning her Class 1 wastewater license.

00:39:49.863 --> 00:40:01.077
- Great. Yeah, fantastic. Alright, next item 17 is petitions and communications. Items from the public.

00:40:01.077 --> 00:40:05.694
- Anybody here to address any other issues?

00:40:09.090 --> 00:40:11.902
- Seeing none, we will stand adjourned.
