WEBVTT

00:00:00.226 --> 00:00:07.466
- Well, good evening, afternoon, everyone. We'll call the meeting of the Utilities Services Board of the

00:00:07.466 --> 00:00:14.707
- City of Bloomington for May 18th to order. The first thing to remember is our mission, and that's that

00:00:14.707 --> 00:00:22.158
- our City of Bloomington utilities mission is to enhance the quality of life in our community by providing

00:00:22.158 --> 00:00:28.414
- safe, sustainable, and high quality drinking water, wastewater, and stormwater services.

00:00:28.898 --> 00:00:36.504
- stormwater appropriate today, in a cost-effective manner, promoting public health, economic vitality,

00:00:36.504 --> 00:00:44.260
- and environmental stewardship. And our vision is to be the leading municipal water utility organization

00:00:44.260 --> 00:00:52.314
- in Indiana. Okay, first, are there any petitions or communications from the public as we begin the meeting?

00:00:52.314 --> 00:00:57.310
- All right, hearing none, we'll go right to approval of the minutes

00:00:57.826 --> 00:01:07.297
- of our previous meeting on May 4th, 2026. They had a chance to take a look at the minutes. And I'm happy

00:01:07.297 --> 00:01:16.497
- to entertain a motion to approve. I move we approve the minutes from the previous meeting. Thank you,

00:01:16.497 --> 00:01:25.516
- Seth. Thanks, Jim. It's been moved and seconded to approve the minutes of May 4th. All in favor say

00:01:25.516 --> 00:01:27.230
- aye. Aye. Opposed?

00:01:28.194 --> 00:01:41.504
- All right, minutes are approved. Next are the approval of claims and we have standard invoices for this

00:01:41.504 --> 00:01:54.046
- two-week period in the amount of $969,873.72. Any questions about the items on standard invoices?

00:01:57.538 --> 00:02:05.956
- standard invoices second moved and seconded any further discussion all in favor say aye aye opposed

00:02:05.956 --> 00:02:14.711
- all right standard invoices are approved next your utility bills in the amount of twenty eight thousand

00:02:14.711 --> 00:02:23.382
- fifty five dollars and ninety four cents move we approve the utility claims okay so moved and seconded

00:02:23.382 --> 00:02:25.150
- any other discussion

00:02:26.402 --> 00:02:37.180
- All in favor say aye. Aye. All right. Opposed? Utility bills are approved. Next are wire transfers in

00:02:37.180 --> 00:02:47.958
- the amount of $594,229.96. I move that we approve the wire transfers. Second. Moved and seconded. Any

00:02:47.958 --> 00:02:56.094
- other discussion on wire transfers? Okay all in favor say aye. Aye. Opposed?

00:02:57.154 --> 00:03:06.707
- Wire transfers are approved. Everybody gets paid. That's good. Customer refunds in the amount of $1,492.42.

00:03:06.707 --> 00:03:15.552
- Anybody see anything on customer refunds or questions? I move that we approve the customer refunds.

00:03:15.552 --> 00:03:24.840
- Second. Moved and seconded. Any discussion further? All in favor say aye. Aye. Opposed? Customer refunds

00:03:24.840 --> 00:03:26.078
- are approved.

00:03:26.434 --> 00:03:37.912
- Next is the special check run for $3,816.85. I move that we approve. What was the total on that? $3,816.85,

00:03:37.912 --> 00:03:48.859
- I think. Yep, it is. That's the first one. Yeah. I move that we approve the special check run. Second.

00:03:48.859 --> 00:03:53.854
- Been moved and seconded. Any other discussion?

00:03:55.202 --> 00:04:05.278
- All right, and then we have, oh, yes. All in favor say aye. Aye. Opposed? All right, motion carried.

00:04:05.278 --> 00:04:15.255
- Item F, then, is the special check run for State of Indiana workforce in the amount of $1,180.50. I

00:04:15.255 --> 00:04:23.934
- move that we approve the special check run for the State of Indiana workforce. Second.

00:04:24.418 --> 00:04:33.792
- All right, it's been moved and seconded. Any discussion on that check run? All in favor say aye. Aye.

00:04:33.792 --> 00:04:43.258
- Opposed? All right, motion carries. Check runs approved. Next on our agenda, item five is the approval

00:04:43.258 --> 00:04:53.918
- of the consent agenda totaling $20,464.37. Director Zeiger. Good evening, I'm Catherine Zeiger, utilities director.

00:04:54.370 --> 00:05:03.281
- I'm presenting tonight's consent agenda totaling $20,464.37. The first contract is with Bledsoe, Rigert,

00:05:03.281 --> 00:05:11.768
- Cooper, and James Inc. not to exceed $15,000 to complete survey work and produce a preliminary plat

00:05:11.768 --> 00:05:14.654
- for 6570 South Old State Road 37.

00:05:15.554 --> 00:05:24.307
- Next is with Affordable Waste Solutions LLC DBA Affordable Septic and Repair for $4,764.37 for reseating

00:05:24.307 --> 00:05:33.143
- plant mixed liquor at Blucher Pool Wastewater Treatment Plant. Next is with Precision Compaction Services

00:05:33.143 --> 00:05:41.813
- LLC DBA Precision Odor Control for $700 for air pro-preventative maintenance at Blucher Pool Wastewater

00:05:41.813 --> 00:05:43.230
- Treatment Plant.

00:05:44.354 --> 00:05:51.958
- Is there any member who wishes to consider one or more of these items individually? Hearing none, if

00:05:51.958 --> 00:05:59.486
- there's no opposition, these items will be approved as recommended by staff. Hearing no opposition,

00:05:59.486 --> 00:06:07.014
- the consent agenda is approved. Very good, thank you. Item six on our agenda is to request approval

00:06:07.014 --> 00:06:12.510
- of consulting service agreement with Commonwealth Engineers Incorporated

00:06:12.962 --> 00:06:20.398
- and Kevin White is here to explain this project. Yep, Kevin White, Capital Projects Coordinator. Yes,

00:06:20.398 --> 00:06:27.760
- this is a project with Commonwealth Engineer to do a basis of design study for the sewer system that

00:06:27.760 --> 00:06:35.196
- runs through basically College Mall Road. We have an ongoing SSO in the area of Covenator and College

00:06:35.196 --> 00:06:35.998
- Mall Road.

00:06:36.130 --> 00:06:43.557
- So this basis of design will implement some flow meters that you'll hear another contract later tonight

00:06:43.557 --> 00:06:50.841
- with grip about. We'll set the flow meters out, study the system, figure out potential route and size

00:06:50.841 --> 00:06:57.982
- of pipe needed to be upgraded to alleviate this ongoing SSO. As part of that basis of design study,

00:06:57.982 --> 00:06:58.910
- they'll also

00:06:59.554 --> 00:07:08.741
- estimate the construction cost of the different options. So this is really just the very beginning stages

00:07:08.741 --> 00:07:17.494
- of what's going to be a much larger project down the road. Happy to try and answer any questions. It

00:07:17.494 --> 00:07:26.161
- is for the amount of $197,461 and no cents. Kevin, could you give us a little background on the SSO

00:07:26.161 --> 00:07:28.414
- issues in that region and

00:07:29.218 --> 00:07:36.177
- you know the development what we are trying to plan for here or catch up to yeah and I might defer to

00:07:36.177 --> 00:07:43.000
- Phil a little bit on this I know he's got a lot more history on it but I know that we've been we've

00:07:43.000 --> 00:07:50.096
- had we fought some undersized pipes in the area there and it's a pinch point to where two of the larger

00:07:50.096 --> 00:07:57.055
- pipes come together and we just need some more capacity in the pipe now Phil can speak to the ongoing

00:07:57.055 --> 00:07:59.102
- issue there if you don't mind

00:07:59.682 --> 00:08:07.824
- sure. Philippine engineering. So we had the corrective SSO corrective action plan from 2004 that detailed

00:08:07.824 --> 00:08:15.658
- a lot of the issues that we have in the southeast range basin or sewer basin. And so that area around

00:08:15.658 --> 00:08:23.492
- college mall, we've done a ton of rehabilitation, we've done a lot of lining, we've done grouting. So

00:08:23.492 --> 00:08:27.486
- we did connection remediation too. So I'm gonna say

00:08:27.586 --> 00:08:34.151
- over $5 million, maybe $10 million in rehabilitation in that basin, try to eliminate I&I. We

00:08:34.151 --> 00:08:41.210
- still occasionally still have the SSO there at Covenanter and College Mall Road. So as part of that

00:08:41.210 --> 00:08:48.552
- corrective action plan, it detailed upgrades to this system for more capacity all the way down to where

00:08:48.552 --> 00:08:55.823
- the sewer crosses Sayre Road. It's significantly undersized. We lined it to try to eliminate I&I along

00:08:55.823 --> 00:08:56.670
- the stream.

00:08:56.834 --> 00:09:05.692
- And that was years ago, but that didn't correct it, so. This happened during storm events, more or less?

00:09:05.692 --> 00:09:14.297
- Yeah, dry weather were okay, but rain events. Yeah. Well, I ask that because, you know, we're kind of

00:09:14.297 --> 00:09:23.070
- seeing some transition in that area and how we need to be ready for future uses and that sort of thing.

00:09:27.906 --> 00:09:34.705
- In terms of current SSO issues, is this like top three, number one priority that we have? Yeah, so the

00:09:34.705 --> 00:09:41.504
- biggest one that we had was right down here at Micro Motors at Grimes and Walnut, the most reoccurring

00:09:41.504 --> 00:09:48.238
- one, but then our sewer that we did, the South Central Sewer Interceptor, which is about two miles of

00:09:48.238 --> 00:09:50.878
- interceptor from Grimes to Moores Pike.

00:09:51.042 --> 00:09:57.710
- that corrected that one, it went through the switch yard park. So we eliminated our worst one, but College

00:09:57.710 --> 00:10:04.004
- Mall Road still occurs. Matt, do you know how frequently we've seen that one occur in the last year?

00:10:04.004 --> 00:10:09.675
- I'm not entirely sure. It's at least once a year, I think. Yeah. So the idea was we do all

00:10:09.675 --> 00:10:16.094
- this rehabilitation and try to eliminate I&I to push this down the road a little bit so we didn't have

00:10:16.094 --> 00:10:20.830
- to do the big project. But it's still happening. And like you said, there's

00:10:20.994 --> 00:10:28.182
- a lot of development happening in that area too. A lot of changes where we're seeing increased flow.

00:10:28.182 --> 00:10:35.298
- The goal is to get this estimate so that we can put this on the next rate case for sewer so we have

00:10:35.298 --> 00:10:42.841
- an accurate idea what the cost will be for the project. That's a good idea. Other questions or discussion

00:10:42.841 --> 00:10:44.478
- for our staff experts?

00:10:51.970 --> 00:10:59.085
- with Commonwealth Engineers. Second. All right it's been moved and seconded. Any further discussion?

00:10:59.085 --> 00:11:06.340
- All in favor say aye. Aye. Opposed? All right motion carries thank you. Item seven then is the request

00:11:06.340 --> 00:11:13.384
- for approval of the second amendment to our agreement with Commonwealth Engineers which pertains to

00:11:13.384 --> 00:11:17.822
- booster station improvements and Kevin is still at the podium.

00:11:18.082 --> 00:11:25.275
- Yep, Kevin White, capital projects coordinator still. This is, as Kirk said, related to the booster

00:11:25.275 --> 00:11:32.611
- station improvement and general guaranteed savings contract that we started a while back and then had

00:11:32.611 --> 00:11:37.790
- some funding issues. So we hit pause for a couple of years. We've since

00:11:38.178 --> 00:11:44.404
- Receive the one point two five million dollar grant from Congresswoman who chin and then so it's and

00:11:44.404 --> 00:11:50.692
- then we have the water rate case funding that's going to become available so this project starting to

00:11:50.692 --> 00:11:57.534
- pick back up the thirty nine thousand six hundred dollars and no sense that this second amendment is for is to

00:11:57.698 --> 00:12:06.366
- is to cover the fee rate increases from Commonwealth during that two year delay. And it is not a change

00:12:06.366 --> 00:12:15.202
- in material costs as it says on the summary of contract as pointed out to me from the controller's office

00:12:15.202 --> 00:12:23.870
- this morning. So I just wanted to make that clear. Happy to answer any questions. Any questions, Kevin?

00:12:26.722 --> 00:12:36.195
- second amendment to the agreement with Commonwealth engineer for the booster station improvements second

00:12:36.195 --> 00:12:45.487
- okay it's been moved and seconded any further discussion all in favor say aye opposed all right motion

00:12:45.487 --> 00:12:53.246
- carries thank you thank you next is item 8 request approval of the resolution 2026-12

00:12:53.922 --> 00:13:01.853
- which is the bid acceptance and contract award for the Dillon Wastewater Treatment Plant Filter Media

00:13:01.853 --> 00:13:10.406
- Replacement Project. Dan. Hi, I'm Dan Hudson, Capital Projects Manager for the City of Bloomington Utilities.

00:13:10.406 --> 00:13:18.182
- And back in April 30th, we had a special board meeting. It was open to the public where we accepted

00:13:18.182 --> 00:13:21.214
- bids for the replacement of the media.

00:13:21.346 --> 00:13:32.370
- at the Dillman Wastewater Treatment Plant. We received three bids and we found that Thenemann was the

00:13:32.370 --> 00:13:43.285
- lowest, most responsive and responsible of the three for $690,000. The engineering estimate for that

00:13:43.285 --> 00:13:50.526
- was $800,000. So I'd like the board to consider Resolution 2026-12

00:13:50.626 --> 00:14:02.118
- as an acceptance of their bid. Okay, thank you. Any questions for Dan? Nope. All right. I move that

00:14:02.118 --> 00:14:14.645
- we approve resolution 2026-12 with Deniman Construction. Second. Moved and seconded. Any further discussion?

00:14:14.645 --> 00:14:18.782
- All in favor say aye. Aye. Opposed?

00:14:19.618 --> 00:14:29.794
- motion carries thank you next as item 9 the request for approval of our public works agreement with

00:14:29.794 --> 00:14:40.174
- thenaman construction incorporated again this is the contract with the thenaman and us to perform the

00:14:40.174 --> 00:14:43.838
- work we previously talked about for

00:14:44.162 --> 00:14:54.951
- $690,000. I'd like the board to consider this contract so we can move forward with it. Okay. I move

00:14:54.951 --> 00:15:06.065
- that we approve the contract with Veneman. All right. Moved and seconded for approval of the contract.

00:15:06.065 --> 00:15:12.862
- All in favor say aye. Aye. Opposed? All right, motion carried.

00:15:13.250 --> 00:15:22.310
- Very good. Thank you. Thank you. All right. Item 10 is a request for approval of the service agreement

00:15:22.310 --> 00:15:31.458
- with GRIP, Incorporated. Matt. Hi, folks. I'm Matt Dabberton. I'm the environmental program coordinator

00:15:31.458 --> 00:15:41.310
- for the utility. This contract is related to item six that Kevin presented with the contract with Commonwealth.

00:15:41.506 --> 00:15:51.350
- RIP would be placing three sewer flow meters in the College Mall sewer basin, as well as installing

00:15:51.350 --> 00:16:01.883
- a couple of rain gauges. We would then be using that equipment once the flow study is concluded to replace

00:16:01.883 --> 00:16:11.038
- some of our old permanent flow meters that the utility owns, which have been failing lately.

00:16:11.650 --> 00:16:29.517
- I believe the contract is for around $47,000. I'm happy to answer any questions. Okay. Yes, $48,901.74.

00:16:29.517 --> 00:16:38.622
- Very good. Questions for Matt on this project. Okay.

00:16:39.650 --> 00:16:47.296
- that we approve this service agreement with GRIP, Incorporated. Second. All right, it's been moved and

00:16:47.296 --> 00:16:54.496
- seconded. Any further discussion? All in favor say aye. Aye. Opposed? All right, motion carries.

00:16:54.496 --> 00:17:01.993
- Thank you. Thank you. And next is item 11, request for approval of the amendment number three to our

00:17:01.993 --> 00:17:07.486
- agreement with Stantec Consulting Services. Matt. Yeah, so Stantec is the

00:17:07.906 --> 00:17:16.424
- that is doing our rate design for our current rate case. So hopefully this last amendment will get us

00:17:16.424 --> 00:17:24.942
- to the finish line with them. OK. Any questions? Discussion? All right. Yeah. Well, I'm just curious.

00:17:24.942 --> 00:17:34.462
- So it looks like it's like quadrupled since we started. Am I looking at the right page here? Well, this last one.

00:17:34.594 --> 00:17:42.617
- We just threw $49 on it again to make sure, but they billed by the hour. So if they don't use it all

00:17:42.617 --> 00:17:50.561
- day, we won't pay for it. Why originally did we expect that there'd be so much less work? I mean, I

00:17:50.561 --> 00:17:58.664
- guess we spent a lot. I thought we spent a lot of time going back through records to provide the data

00:17:58.664 --> 00:18:00.094
- that they needed.

00:18:00.322 --> 00:18:07.682
- Yeah, we did. So there was some data issues in the beginning that caused some doubling of work. And

00:18:07.682 --> 00:18:15.483
- then just as we've gone through this process, it's taken them more time to do the analysis and to prepare

00:18:15.483 --> 00:18:23.064
- testimony for the IURC. OK. And are we still hopeful to get on? Do we have a calendar date yet? We do.

00:18:23.064 --> 00:18:29.982
- We're at an evidentiary hearing on June 2. June 2. OK. Which is after our next meeting. Yeah.

00:18:30.114 --> 00:18:40.637
- Yes, okay. Okay, thank you. Okay, any other questions? All right. I move that we approve amendment number

00:18:40.637 --> 00:18:50.664
- three to the agreement with Stantec Consulting Services. Second. Okay, it's been moved and seconded.

00:18:50.664 --> 00:18:59.102
- Any other discussion? All in favor say aye. Aye. Opposed? All right, motion carries.

00:18:59.650 --> 00:19:09.841
- Item 11. Now we're up to item 12, requesting approval of the revised memorandum of understanding between

00:19:09.841 --> 00:19:19.547
- CBU and retreat at the switch yard. Yes. Catherine Sager, utilities director. I'm bringing back the

00:19:19.547 --> 00:19:28.670
- MOU between CBU and retreat at switch yard, which was considered at our last regular meeting.

00:19:29.442 --> 00:19:37.391
- It was suggested by the board that we added additional language that now reads, in the event retreat

00:19:37.391 --> 00:19:45.418
- decides to sell the property before the balance is paid in full, the retreat shall immediately notify

00:19:45.418 --> 00:19:53.525
- CBU and the remaining balance due and owing for connection fees shall be paid to CBU at closing on the

00:19:53.525 --> 00:19:56.830
- sale of the property. We have added that.

00:19:57.474 --> 00:20:05.328
- and are presenting this again to the board. All right, thank you. Any questions or discussion? Thank

00:20:05.328 --> 00:20:13.183
- you for adding that in there. My only question would be then it's on them to disclose, if they would

00:20:13.183 --> 00:20:21.426
- buy, which I know is a big hypothetical, but if they would sell, I mean, then it's up to them to disclose

00:20:21.426 --> 00:20:26.014
- that to us. There's no like, oh, we know before it happens

00:20:26.818 --> 00:20:34.574
- They have to be the one to tell us like there's not like a legal lien or something on the property that

00:20:34.574 --> 00:20:42.404
- we would be automatically notified if it would come up for sale. I don't think there's like an automatic

00:20:42.404 --> 00:20:50.085
- lien that we would be notified. But if it did change hands, we would likely know that you're about it.

00:20:50.085 --> 00:20:55.454
- But right. But what's the consequence if they don't collect this money?

00:20:58.722 --> 00:21:07.257
- legal avenue to collect this money, I guess. Since they'll be signing it. Yes. And they're responsible

00:21:07.257 --> 00:21:15.957
- for it. Yes. So if they would sell and not disclose it at closing and pay at closing, then this document

00:21:15.957 --> 00:21:24.409
- holds them liable for the full amount. Yes. OK. Hold on. Hold on. Hold on. I guess my question is, so

00:21:24.409 --> 00:21:26.398
- my question is, will we

00:21:26.562 --> 00:21:35.609
- file this with the, will this lien be filed then with the, I don't know which department it is. If you.

00:21:35.609 --> 00:21:44.396
- This is anything but MOU. Okay. Yeah, this is an MOU. This is not necessarily a lien. So once again,

00:21:44.396 --> 00:21:53.530
- how do we get this money if they sell it? That's, I mean, that was what we were talking about last week.

00:21:53.530 --> 00:21:55.966
- But I guess my, wouldn't it

00:21:56.194 --> 00:22:04.257
- be like, so it's a loan, so why wouldn't there be something filed with the, again, I don't know which

00:22:04.257 --> 00:22:12.242
- department it is, but if you buy a home or if you do something and somebody loans you money, because

00:22:12.242 --> 00:22:20.147
- we're essentially loaning the money, correct? I mean, we've worked out a payment plan with them, so

00:22:20.147 --> 00:22:25.918
- if someone were to loan you money on a property, then you file that with

00:22:26.146 --> 00:22:35.206
- And again, I don't know which department it is, so that there is this then legal document on file that

00:22:35.206 --> 00:22:44.091
- this is owed. So I guess. I don't see it as a loan. There's a charge for the connection, and it's to

00:22:44.091 --> 00:22:52.887
- be paid over time. It would be as if someone did work on your house, and you paid it off over time.

00:22:52.887 --> 00:22:55.966
- They're not loaning you the money.

00:22:56.578 --> 00:23:05.805
- It's just setting a time period for the payment of their connection fee. OK. Like we could, I assume,

00:23:05.805 --> 00:23:15.032
- send this to collections if they didn't. Like we have ways of collecting money if they weren't. Well,

00:23:15.032 --> 00:23:24.078
- and it would also be breach of contract. Yeah, also breach of contract. This is a contract. OK. But

00:23:24.078 --> 00:23:26.430
- I can certainly see that.

00:23:26.754 --> 00:23:35.813
- point of the discussion. Because we've seen lots of examples where things happen, and then four or five

00:23:35.813 --> 00:23:44.610
- years later, we forget about them. Or someone does. We would never forget, but. Let's not forget. We

00:23:44.610 --> 00:23:53.408
- won't forget. And then there it is. I can see how it's been billed, but they said they were not able

00:23:53.408 --> 00:23:54.366
- to pay it.

00:23:54.498 --> 00:24:02.579
- So we've performed the services. So I guess that's why I see it as more than like their bill that we've

00:24:02.579 --> 00:24:10.816
- agreed to let them pay over five years. It's the services have been performed. So like, um, like somebody

00:24:10.816 --> 00:24:18.897
- that go put on a new roof for a thousand dollars, they've performed the services are getting paid back.

00:24:18.897 --> 00:24:23.870
- Yeah, we also, I mean, I suppose we also have payment plans for

00:24:24.770 --> 00:24:31.852
- regular customers and they've used the water or the water has been used and then they are paying for

00:24:31.852 --> 00:24:38.863
- that service for that water over time. But they're not it's not a five year payment plan. For fifty

00:24:38.863 --> 00:24:46.295
- two thousand dollars. No no no this is a much larger example which is why we have an MOU and we're taking

00:24:46.295 --> 00:24:53.307
- this to the board. And they're getting into the agreement with us saying that they couldn't pay but

00:24:53.307 --> 00:24:54.078
- I digress.

00:24:56.706 --> 00:25:05.008
- I know I understand I'll just say I understand that I appreciate that our legal has looked over this

00:25:05.008 --> 00:25:13.393
- so I think we've all made our. Expectations and thoughts about it very clear and so what we expect we

00:25:13.393 --> 00:25:21.860
- hope that this is held holding them to that expectation yes. And future developments yeah. I move that

00:25:21.860 --> 00:25:22.846
- we approve.

00:25:23.298 --> 00:25:33.871
- revised MOU between CBU and retreat at the switch yard. Second. It's been moved and seconded. Any other

00:25:33.871 --> 00:25:44.038
- discussion? All right. All in favor say aye. Aye. Opposed? Okay. That MOU is approved. Now we go to

00:25:44.038 --> 00:25:51.358
- old business. Any old business from the board? Old business from staff?

00:25:52.450 --> 00:26:00.323
- New business from the board. New business from staff. Have we had any subcommittees meet in the last

00:26:00.323 --> 00:26:08.431
- two weeks? I don't think so. Now we're up to staff reports. All right. Got a few. So first, we're going

00:26:08.431 --> 00:26:16.226
- to welcome Colton Harden, apprentice master equipment operator in operations who will be working at

00:26:16.226 --> 00:26:19.422
- Blucher Pool Wastewater Treatment Plant.

00:26:20.546 --> 00:26:29.601
- We want to congratulate T&D crew members Brandon Bray and Joseph Gibson. They were promoted to utility

00:26:29.601 --> 00:26:39.096
- specialist too. We want to congratulate Alan Christie and Joshua Wathen in T&D who earned their collections

00:26:39.096 --> 00:26:49.118
- licenses. And also Parker Iles with environmental programs who earned his DSL. And I also want to just, you know,

00:26:49.410 --> 00:26:55.773
- Thank all the crews who were helping to clear inlets ahead of this storm to help lessen the impact that

00:26:55.773 --> 00:27:01.953
- our current aerial flooding is going to have on the city. I know we've been really, really busy with

00:27:01.953 --> 00:27:08.622
- a lot of other storm projects, and we've got a lot of projects happening right now because it's construction

00:27:08.622 --> 00:27:15.230
- season in Bloomington. So I just really appreciate all the crews who took that extra time to get out there.

00:27:15.426 --> 00:27:24.528
- And then finally, I wanted to present to this board a video that we're really proud of that Frank made

00:27:24.528 --> 00:27:33.630
- following the partnership we had with Eskenazi. They had this exhibit called Moliana Vital Ecosystems.

00:27:34.562 --> 00:27:41.505
- And what was cool about it is it used art and science to teach folks about the importance of keeping

00:27:41.505 --> 00:27:48.449
- our waterways clean and how it's all connected and how watersheds are connected. So yeah, enjoy this

00:27:48.449 --> 00:27:54.430
- video made by Frank. And sorry, the sound will be coming from this computer over here.

00:29:01.186 --> 00:29:13.466
- good example thank you all right thank you okay then any petitions or communications from the public

00:29:13.466 --> 00:29:25.502
- or others with us okay well no other business we will stand adjourned until next meeting thank you