00:00:00.610 --> 00:00:10.316
- call the utility service board meeting of January or July 13th to order. Mission our mission yes the

00:00:10.316 --> 00:00:20.598
- CBU mission for city Bloomington utilities is to enhance the quality of life in our community by providing

00:00:20.598 --> 00:00:29.054
- safe sustainable and high quality drinking water wastewater and stormwater services and

00:00:29.538 --> 00:00:37.775
- in a cost-effective manner promoting public health, economic vitality, and environmental stewardship.

00:00:37.775 --> 00:00:46.496
- And our vision for our utility is for it to be the leading municipal water utility organization in Indiana.

00:00:46.496 --> 00:00:54.974
- We'll start out with any petitions or communications from the public with us today. I see none, so we'll

00:00:54.974 --> 00:00:58.366
- move on to the approval of minutes of our

00:00:58.882 --> 00:01:10.328
- meeting of June 29th. Everyone had a chance to take a look at the minutes. All right it's been moved

00:01:10.328 --> 00:01:22.453
- and second to approve the minutes. All in favor say aye. Aye. Opposed? All right the minutes are approved.

00:01:22.453 --> 00:01:27.326
- Next is the approval of claims and we have

00:01:28.866 --> 00:01:43.803
- Long list of standard invoices. Any questions or discussion for the standard invoices for today?

00:01:43.803 --> 00:01:57.662
- All right, ready for a motion then. I move that we approve the standard invoices. Second.

00:01:58.658 --> 00:02:06.503
- all right it's been moved and seconded to approve the standard invoices totaling six hundred and seven

00:02:06.503 --> 00:02:14.272
- thousand five hundred fifty two dollars and three cents all in favor say aye opposed all right motion

00:02:14.272 --> 00:02:22.345
- carries next then is utility bills in the amount of one hundred ninety four thousand three hundred twenty

00:02:22.345 --> 00:02:28.286
- six dollars and eighty eight cents any discussion or questions on the utility

00:02:34.978 --> 00:02:45.118
- it's been moved and seconded to approve utility bills all in favor say aye opposed all right utility

00:02:45.118 --> 00:02:55.560
- bills are approved next is wire transfers in the amount of six hundred sixty two thousand three hundred

00:02:55.560 --> 00:03:04.094
- twelve dollars and eleven cents any questions or discussion there the wire transfers

00:03:04.578 --> 00:03:17.247
- Moved and seconded to approve wire transfers. All in favor say aye. Aye. Opposed? All right, the wire

00:03:17.247 --> 00:03:30.910
- transfers are approved. Next is customer refunds for a pay date of July 17th. The total on that is $4,535.68.

00:03:34.338 --> 00:03:41.577
- customer refunds. Second. It's been moved and seconded to approve customer refunds. All in favor say

00:03:41.577 --> 00:03:49.173
- aye. Aye. Opposed? All right customer refunds are approved. Next item on the agenda is the consent agenda

00:03:49.173 --> 00:03:56.842
- with four items it looks like totaling twenty two thousand eight hundred eighty one dollars. Good evening,

00:03:56.842 --> 00:03:59.422
- James Halls is the director of team

00:04:00.066 --> 00:04:09.636
- to present the consent agenda to you this evening totaling $22,881. The first item is Siemens industry

00:04:09.636 --> 00:04:19.113
- at $17,459 for a variable frequency drive maintenance at Dillman wastewater plant. The second item is

00:04:19.113 --> 00:04:23.294
- for course and fire and security for $4,922.

00:04:23.714 --> 00:04:30.690
- That's upgrading the intercom system and adding one and a three year subscription for two devices. And

00:04:30.690 --> 00:04:37.530
- then the third is for Young's trucking for $500 for lead paint disposal at Dillman wastewater plant.

00:04:37.530 --> 00:04:44.980
- Would any board member like to pull any of these items from the consent agenda and discuss them individually?

00:04:44.980 --> 00:04:51.550
- Hearing none, if there are no objections, then the consent agenda will be approved as presented.

00:04:53.890 --> 00:05:00.914
- Hearing none, the consent agenda is approved as presented. Very good, thanks James. Our next item then

00:05:00.914 --> 00:05:08.210
- is to request approval of the memorandum of understanding between city Bloomington utilities and milestone

00:05:08.210 --> 00:05:12.574
- contractors and Chris Wheeler is here to make the presentation.

00:05:30.242 --> 00:05:37.175
- Department has learned that in advance of such construction we should do well to run video down through

00:05:37.175 --> 00:05:43.841
- our lines to see the condition of our lines so that if any of our lines get damaged we can point to

00:05:43.841 --> 00:05:50.641
- those videos and say that our infrastructure is in good shape. If you look at the MOU you can see the

00:05:50.641 --> 00:05:57.707
- gist of what we're looking at here is the fact that Milestone did the work. We've had a good relationship

00:05:57.707 --> 00:05:59.774
- with Milestone over the years.

00:06:00.002 --> 00:06:06.672
- but we thought it was more probable than not that Milestone caused damage to our infrastructure because

00:06:06.672 --> 00:06:13.278
- we did video everything after the fact and found that there are a couple of points along the line that

00:06:13.278 --> 00:06:19.692
- have damage that appear to be consistent with heavy construction. Our understanding is there hasn't

00:06:19.692 --> 00:06:26.234
- been any heavy construction on that road for quite a while. We haven't videoed our infrastructure for

00:06:26.234 --> 00:06:28.094
- quite a while, and it's old.

00:06:28.738 --> 00:06:35.174
- So it's difficult for us to be able to prove positive and point our finger at Milestone. They can't

00:06:35.174 --> 00:06:41.675
- completely say they didn't do it. Litigation would likely be costly and time consuming. And so we've

00:06:41.675 --> 00:06:48.433
- reached this MOU, which we have subsequently changed the title to a settlement agreement. The settlement

00:06:48.433 --> 00:06:54.869
- allows us to go in and do the work. Milestone will compensate us for half of what we anticipate the

00:06:54.869 --> 00:06:56.414
- cost of the work to be.

00:06:56.930 --> 00:07:03.008
- which seems like a pretty reasonable solution here. Milestone was also going to provide materials, picking

00:07:03.008 --> 00:07:08.802
- those materials up from one of their sites to bring over to First Street when we're working. The only

00:07:08.802 --> 00:07:14.937
- issue that remains on the settlement agreement, I haven't been able to get a confirmation from the attorney

00:07:14.937 --> 00:07:20.617
- that I've been working with, but Milestone seems to be okay with it in principle, is this idea that

00:07:20.617 --> 00:07:25.502
- we're supposed to give 15 days advance notice of the work that we'd like to commence.

00:07:25.826 --> 00:07:31.081
- Well, we're going to start tomorrow. So I'm still trying to communicate with the attorney. I haven't

00:07:31.081 --> 00:07:36.493
- heard from her specifically, but we have heard from Milestone that they don't care, because we're going

00:07:36.493 --> 00:07:41.696
- to be the ones picking up the material. The whole idea was give them 15 days so that they know that

00:07:41.696 --> 00:07:46.900
- they can make their delivery, but they're not actually doing the delivery. So I don't think it's an

00:07:46.900 --> 00:07:50.334
- issue. I am asking the board to approve the settlement agreement.

00:07:51.362 --> 00:07:58.079
- If the 15-day thing becomes an issue, we'll have to work that out, but we're asking for approval of

00:07:58.079 --> 00:08:05.132
- the settlement as it is written, which includes the 15-day notification at the time. I'm happy to answer

00:08:05.132 --> 00:08:11.916
- questions. Yeah, Chris, I'm just curious what the original project was with Milestone and CBU. Well,

00:08:11.916 --> 00:08:18.901
- there wasn't an original project with Milestone. Oh, I understand. Milestone was working with the city,

00:08:18.901 --> 00:08:21.118
- with the engineering department,

00:08:21.666 --> 00:08:30.330
- to reworking of the road itself. So they took the cap off of the road, all the asphalt, whatever materials,

00:08:30.330 --> 00:08:38.513
- did reworking of the road, relayed asphalt and whatever else goes on. But our suspicion was that once

00:08:38.513 --> 00:08:46.616
- they removed that protective layer of the road and then drove heavy equipment around it, likely they

00:08:46.616 --> 00:08:48.862
- damaged our infrastructure.

00:08:49.250 --> 00:08:56.708
- The agreement was with city engineering, not our engineering. Okay, I got it. Thank you. It's still

00:08:56.708 --> 00:09:04.240
- a good lesson learned. When a city's doing work and we know they're going to be working over some of

00:09:04.240 --> 00:09:11.921
- our infrastructure, we ought to be looking at it in advance so that when something happens, we're able

00:09:11.921 --> 00:09:19.230
- to show a timeline that shows clean and healthy and then damaged. How did the damage show itself?

00:09:20.162 --> 00:09:27.222
- that we ran through the line after the fact and found areas that are dimpled where we can't get the

00:09:27.222 --> 00:09:34.494
- camera through, which suggests that sewage isn't gonna flow properly either. So did we know it because

00:09:34.494 --> 00:09:41.837
- sewer wasn't flowing and that's why we did the videos? We just did it as a matter of... I think we just

00:09:41.837 --> 00:09:47.838
- did it as a matter of to check it at the end to see what make sure that it was okay.

00:09:48.418 --> 00:09:56.487
- There was no leak, there was no... No, there's no flow on there right now. You know, I understand. So

00:09:56.487 --> 00:10:04.872
- it would be difficult to prove in court, is what I'm saying. If there was a clear, they're there, they're

00:10:04.872 --> 00:10:11.358
- doing construction, and all of a sudden there's a main break, that would be easy.

00:10:19.106 --> 00:10:25.431
- Yeah, I got it. I got it. So then thinking about all these construction projects that we have going

00:10:25.431 --> 00:10:31.820
- on around town, what constitutes like we're going to go check our line because we know this isn't to

00:10:31.820 --> 00:10:38.145
- anticipate this is going to be having work nearby or what out of what? Yes. Yeah, I think like what

00:10:38.145 --> 00:10:43.774
- Chris was saying, when they start removing, well, depends on where they're removing that

00:10:44.002 --> 00:10:49.949
- cap layer of asphalt and other surfacing material. Like on Second Street, they're doing a lot of that

00:10:49.949 --> 00:10:55.896
- work, but they're over on the edge. They're not over top of our sewer, but that's something we should

00:10:55.896 --> 00:11:01.959
- consider even because there's a lot of trucks moving in and out of there, right? So I think that's kind

00:11:01.959 --> 00:11:07.965
- of the threshold that we're at is what kind of work is going to take place? How much of that top layer

00:11:07.965 --> 00:11:12.862
- of pavement and surfacing material will be removed? And then when's the last video?

00:11:12.994 --> 00:11:20.155
- Right, if we have a video that's two years old, okay, maybe we don't have to go out there. But if it's

00:11:20.155 --> 00:11:27.176
- 10 years old, then we should probably. How do we get notified of the projects? I guess I don't think

00:11:27.176 --> 00:11:34.268
- about like projects that affect our lines that we're not doing. So we have a lot of internal meetings

00:11:34.268 --> 00:11:39.134
- with the other departments with engineering and DPW. Is that monthly?

00:11:40.130 --> 00:11:45.807
- monthly meetings and we kind of talk about projects that are coming up in areas that we're going to

00:11:45.807 --> 00:11:51.484
- be at. If that's time you'll know oh we got to go check this site. They have timelines usually like

00:11:51.484 --> 00:11:57.162
- look we're looking to start construction in this date or this time and so have we done any of these

00:11:57.162 --> 00:12:02.896
- checks since? Had a project yet that just came up yeah that met that kind of level again that second

00:12:02.896 --> 00:12:06.302
- street was close because they are removing you know partial

00:12:06.498 --> 00:12:15.691
- parts of the road, but it wasn't over top of our sewer, so. I understand this, and I know you said that

00:12:15.691 --> 00:12:24.708
- we'll be doing the work, but it will be our crews and not a contractor. Correct, yeah, we'll be doing

00:12:24.708 --> 00:12:33.901
- it. And then the street department will be milling and repaving the road. So it looks like there's some

00:12:33.901 --> 00:12:35.934
- substantial additional

00:12:36.386 --> 00:12:45.339
- that we're gonna be doing here besides this reimbursement? Most of it is in there. $40,000, yeah. The

00:12:45.339 --> 00:12:54.379
- milling and repaving that kind of came after we came up with this number from downtown asking us since

00:12:54.379 --> 00:13:03.420
- the road is fairly new, that's kind of the standard is that if you are going to cut into a road that's

00:13:03.420 --> 00:13:05.790
- less than three years old,

00:13:05.890 --> 00:13:15.715
- you'll mill the whole thing and and repave it. So that was kind of factored in afterwards. Those quantities,

00:13:15.715 --> 00:13:25.270
- though, of of surfacing material is included in there that we ask that we're asking milestone to provide.

00:13:25.270 --> 00:13:34.014
- So we're just providing the labor for that. Good. Any other questions for our attorney or staff?

00:13:35.746 --> 00:13:47.037
- discussion? All right. I move that we approve the memorandum of or the settlement agreement between

00:13:47.037 --> 00:13:58.328
- the CBU. I move and second to approve the MOU between CBU and Milestone. All in favor say aye. Aye.

00:13:58.328 --> 00:14:03.070
- Opposed? All right. Motion carries. Okay.

00:14:03.490 --> 00:14:11.383
- Is there any old business from the board? Old business from staff? Yeah, I'll go ahead and bring this

00:14:11.383 --> 00:14:19.354
- up. We had talked about the rate case and sorry, James Hall, Assistant Director of TND. We just wanted

00:14:19.354 --> 00:14:27.248
- to officially announce that August 1st, August 1st, the rate will be implemented for the customers at

00:14:27.248 --> 00:14:32.510
- their new rates, depending on what kind of customer class they are.

00:14:39.682 --> 00:14:48.681
- looking forward to all the projects that we're able to do with that rate increase and the support of

00:14:48.681 --> 00:14:57.857
- our community to see the betterment of our utility. I know that we've had some public announcement and

00:14:57.857 --> 00:15:07.034
- that sort of thing about what we'll be using some of the new funds for. Are we inserting anything into

00:15:07.034 --> 00:15:08.638
- the monthly bills

00:15:09.474 --> 00:15:15.684
- talk about why this is important what kind of projects will be taken on not everybody reads the city

00:15:15.684 --> 00:15:21.894
- news releases unfortunately but I don't know if we've had planned on doing that but that's something

00:15:21.894 --> 00:15:28.104
- we can do we can look at kind of overall like how much money we think we're gonna spend at the water

00:15:28.104 --> 00:15:34.375
- plant how much money we project to spend on water main replacement those are kind of big numbers from

00:15:34.375 --> 00:15:36.158
- the CIP that we could easily

00:15:36.258 --> 00:15:43.541
- and put in a, you know, in the memo of the bill and fit in there. Yeah. Or a separate printed insert

00:15:43.541 --> 00:15:51.040
- like we do. I know it's kind of short notice, but we're, I don't know, you guys might be thinking about

00:15:51.040 --> 00:15:58.251
- that already, but when people see a jump in their bill, they want to know why. And like I say, they

00:15:58.251 --> 00:16:05.822
- may not be following social media or the news releases or whatever, but they will see their monthly bill

00:16:06.306 --> 00:16:13.325
- And I feel confident that the kinds of things we're going to be doing with the rate increase are things

00:16:13.325 --> 00:16:20.478
- that they're interested in. We're going to maintain a safe water supply. We're going to make improvements

00:16:20.478 --> 00:16:27.294
- to the plan. We're going to make improvements to our transmission distribution system. If we can get

00:16:27.294 --> 00:16:34.718
- into some of those specifics, we're not getting into the technical details, but, you know, five or six points

00:16:35.714 --> 00:16:42.745
- That helps soften the blow a bit. Transparency like that just builds trust for a public entity. Yeah,

00:16:42.745 --> 00:16:50.189
- I think we can definitely put a letter together, like an insert letter with some of the capital improvement

00:16:50.189 --> 00:16:57.220
- projects at the plant and within the distribution and transmission system. It can be as simple as one

00:16:57.220 --> 00:17:04.182
- of those little one-third, eight-and-a-half by elevens that fits into the envelope. You don't want a

00:17:04.182 --> 00:17:05.630
- whole fold over with

00:17:06.434 --> 00:17:14.007
- All of that, that's more than they'll read probably. But you can put that detail on the website. Even

00:17:14.007 --> 00:17:21.431
- it's just as simple as saying go to the website to see how your dollars are going to be at work and

00:17:21.431 --> 00:17:28.855
- put it out there. You can do that too. There are a lot of folks who, I was dealing with a group the

00:17:28.855 --> 00:17:35.166
- other day and half of them didn't have email addresses. Some of our older customers.

00:17:37.538 --> 00:17:47.277
- Which is okay. They just communicate differently, but yeah. Our job is to communicate is reach the customer

00:17:47.277 --> 00:17:56.566
- where we can. Thanks for the update, James. Any other old business? Okay, new business from the board.

00:17:56.566 --> 00:18:02.878
- This might be the time for it. Yeah, we've got a change in our board.

00:18:03.202 --> 00:18:09.546
- Yes. So David Hiddle, who had been the city of Bloomington planning and transportation director, has

00:18:09.546 --> 00:18:16.078
- taken a new position in North Carolina and we didn't get a chance to wish him well. At his last meeting

00:18:16.078 --> 00:18:22.484
- with us two weeks ago, he served with us on our utility service board for the last two plus years and

00:18:22.484 --> 00:18:29.205
- been a valuable contributor with his expertise. And so we all certainly wish him well in his new endeavors

00:18:29.205 --> 00:18:32.094
- and we'll miss having him with us. Thank you.

00:18:32.866 --> 00:18:40.480
- I appreciate that. I'm glad we're able to get that in the record. Thanking David for his service to

00:18:40.480 --> 00:18:48.779
- the board and to the city. Thank you. Any new business from staff? Oh, wait. Sorry. I had one more question.

00:18:48.779 --> 00:18:56.393
- Okay. I'm sure I'm not going to pronounce it right. This like cyclosporosis. Is that something that

00:18:56.393 --> 00:19:01.342
- is measured in our wastewater when we're doing other labs? Okay.

00:19:04.226 --> 00:19:11.460
- likely a large produce supplier, given the number of widespread cases, but we do not currently track

00:19:11.460 --> 00:19:18.980
- it in our wastewater. It is a reportable illness in Indiana, but it is optional reporting at the federal

00:19:18.980 --> 00:19:26.572
- level. Okay, thank you. Should have just looked your way. Appreciate that, Graham. Good question, because

00:19:26.572 --> 00:19:33.662
- a lot of folks are interested right now. I'm glad we still monitor our wastewater for all kinds of

00:19:34.146 --> 00:19:42.251
- different infections, and that's been a great help to the general public health of the community with

00:19:42.251 --> 00:19:50.515
- the practitioners and hospitals and others that are able to keep an eye on what to expect to see. Okay,

00:19:50.515 --> 00:19:58.461
- let's see. Did I guess for new business from staff? You good? All right. Subcommittee reports. Yes,

00:19:58.461 --> 00:20:00.606
- the Finance Committee met.

00:20:02.498 --> 00:20:12.460
- Finance Committee met just before this meeting, and there were two items on the agenda. The first was

00:20:12.460 --> 00:20:22.422
- an initial presentation of the 2027 budget, which will, I believe, go before City Council sometime in

00:20:22.422 --> 00:20:32.286
- August. Before then, we'll have other meetings to update the proposal. This was just an initial one.

00:20:32.482 --> 00:20:43.779
- I'll just give a couple of highlights on the revenue side. The biggest change will be, as was just reported

00:20:43.779 --> 00:20:55.181
- a while back, the new water rates. We finally did get approval from the Indiana State Regulatory Commission,

00:20:55.181 --> 00:21:02.398
- and everyone will see a slight increase in their monthly water bill.

00:21:02.594 --> 00:21:15.179
- On the expense side, there are several new expenses that will be taken into account. The first has to

00:21:15.179 --> 00:21:26.654
- do with increases in the cost of gas and power and fuel, and I just can't help making my own

00:21:26.786 --> 00:21:37.952
- comment again about that, that I think we all know that the increase in fuel costs of the gas pump are

00:21:37.952 --> 00:21:48.900
- due to the never-ending war with Iran. Despite the increases, I just looked before the meeting today

00:21:48.900 --> 00:21:55.838
- at the profits of oil companies for the second quarter of 2026.

00:21:56.034 --> 00:22:07.454
- And the record-breaking and blockbuster are the adjectives to describe it. So if you have any complaints

00:22:07.454 --> 00:22:18.548
- about fuel costs, take it up with your politicians and with your oil companies. The other increase is

00:22:18.548 --> 00:22:25.726
- due to a lot of the water main replacements that need to be done.

00:22:25.858 --> 00:22:35.288
- I think you're all aware that water mains don't last forever. And if you leave them unattended,

00:22:35.288 --> 00:22:45.308
- it ain't good. So we'll be doing a lot of those in 2027. So there'll be an increase in either hirings

00:22:45.308 --> 00:22:55.230
- or overtime pay. The second item on the agenda was the quarter one and quarter two results for 2026.

00:22:55.938 --> 00:23:07.398
- I think it was good news in the sense that the revenues were slightly increased by about 1% for each

00:23:07.398 --> 00:23:19.198
- quarter. The expenses were under what we assumed they would be by 25% in quarter one and 16% in quarter

00:23:19.198 --> 00:23:25.438
- two, but it's likely that those expenses will catch up

00:23:25.890 --> 00:23:36.832
- in the second and third quarter and the third and fourth quarters. And I think that's about all I have

00:23:36.832 --> 00:23:47.986
- to say. Thanks, Jim, for the overview of the Finance Committee. We'll look forward to further discussion

00:23:47.986 --> 00:23:55.422
- on the 2027 budget as more things are finalized. Okay, staff reports.

00:23:57.058 --> 00:24:05.475
- the first we hired a new heavy equipment operator and in TND his name is Ted Prince it comes to us with

00:24:05.475 --> 00:24:13.730
- lots of years of experience and we're excited to have him join our team and then the other thing that

00:24:13.730 --> 00:24:22.227
- I have other two things congratulations and also sorrow for our TND department Paul Chastain is retiring

00:24:22.227 --> 00:24:25.950
- after 50 plus years with the utility he was a

00:24:26.146 --> 00:24:35.110
- Engineering field tech he started our CCTV program the trucks monitoring the sewer and stormwater So

00:24:35.110 --> 00:24:44.783
- that would be a big loss for us. He's been in that position for since I think he said 85 I believe somewhere

00:24:44.783 --> 00:24:46.558
- near 83 85 and then

00:24:46.850 --> 00:24:53.254
- The other person, he will retire on the 24th. So before our next board meeting is Kevin Housel. He's

00:24:53.254 --> 00:24:59.722
- one of my direct reports, one of my assistant superintendents. He's been here for over 40 plus years.

00:24:59.722 --> 00:25:06.189
- Been a assistant superintendent for close to 20 years. So being on call every six weeks for 20 years.

00:25:06.189 --> 00:25:12.911
- I really appreciate everything he's done for us and for the utility and the community. So we had a little

00:25:12.911 --> 00:25:14.686
- party for them last Friday.

00:25:15.138 --> 00:25:24.341
- I just want to thank both of those gentlemen. They didn't want to come here, but. But that's that's

00:25:24.341 --> 00:25:33.543
- all we have for the staff report. I see your do have a advertisement for a new AD, right? Assistant

00:25:33.543 --> 00:25:43.390
- Superintendent. Yeah. Yeah. For Kevin's position. Correct. Right. Yeah. Great. Thank you. Any petitions or

00:25:43.554 --> 00:25:52.126