00:00:00.706 --> 00:00:08.022
- Okay, it's five o'clock. We'll call our meeting to order of the City of Luma Utilities Services Board

00:00:08.022 --> 00:00:15.410
- for August 24th. And just to remind everyone that our mission at CBU is to enhance the quality of life

00:00:15.410 --> 00:00:23.084
- in our community by providing safe, sustainable and high quality drinking water, wastewater and stormwater

00:00:23.084 --> 00:00:28.894
- services in a cost-effective manner, promoting public health, economic vitality,

00:00:29.410 --> 00:00:38.019
- and environmental stewardship. And our vision is to be the leading municipal water utility organization

00:00:38.019 --> 00:00:46.379
- in Indiana. And with that, our first item on our agenda is petitions and communications, which today

00:00:46.379 --> 00:00:54.657
- includes a formal appeal of service denial at 3704 South Judd Avenue. And is there somebody here to

00:00:54.657 --> 00:00:56.478
- discuss that project?

00:01:01.698 --> 00:01:11.088
- doesn't look like it well I'll tell you what we will we will move that to the possibility of the end

00:01:11.088 --> 00:01:20.665
- of our meeting for another petitions and communications time period and then the next item is approval

00:01:20.665 --> 00:01:30.334
- of the minutes of our previous meeting on August 10th 2026 everybody had a chance to review the minutes

00:01:31.426 --> 00:01:49.701
- Nicely done. All in favor say aye. Opposed? Okay. The minutes are approved. Next is approval of our

00:01:49.701 --> 00:02:01.214
- standard invoices totaling $1,237,062.59. Any questions on the

00:02:02.754 --> 00:02:18.535
- Invoices. Yeah, Steve. Yeah, Chris. Jim. I noticed that there's a fee of a hundred plus thousand dollars

00:02:18.535 --> 00:02:32.062
- for legal fees for when it's women. How's that coming? Hi, Chris Wheeler with City Legal.

00:02:34.114 --> 00:02:47.002
- I can tell you procedurally that there is a great deal of discovery that is ongoing at the moment. And

00:02:47.002 --> 00:03:00.265
- we conducted mediation that the court has received word was unsuccessful. And we are trying to reschedule

00:03:00.265 --> 00:03:02.142
- the trial date

00:03:02.402 --> 00:03:10.268
- for some time possibly in March. It was supposed to occur in November, but because of additional discovery

00:03:10.268 --> 00:03:18.281
- efforts, differences of opinion between the parties, which occurs quite often regarding discovery, everybody

00:03:18.281 --> 00:03:25.927
- has come to an agreement grudgingly that perhaps the trials should get moved out to some time more like

00:03:25.927 --> 00:03:30.558
- March. So that's the timeframe we're looking at at the moment.

00:03:31.298 --> 00:03:38.776
- for a trial date. Doesn't mean that we couldn't still find a way to reach a solution for agreement and

00:03:38.776 --> 00:03:46.472
- resolve the matter before trial. That may still happen, but at the moment, we're just right in the middle

00:03:46.472 --> 00:03:53.732
- of discovery and trying to move forward with depositions of all the key witnesses, and that's where

00:03:53.732 --> 00:04:00.702
- we are right now. The more time, the more legal fees, the more legal fees, the less it's likely

00:04:01.314 --> 00:04:09.530
- We're going to get a not going to see is. Yeah, you see some Nick. You see how you'll see. The nice

00:04:09.530 --> 00:04:17.829
- thing is that the statute does provide for the opportunity for the court to award us our legal fees,

00:04:17.829 --> 00:04:26.209
- so we do have that. We do have that opportunity. Hopefully as we move through the negotiations. Sure.

00:04:26.209 --> 00:04:28.510
- Anything else on that item?

00:04:31.106 --> 00:04:41.565
- Okay, other questions about our invoices for today? I move that we approve the standard invoices. Second.

00:04:41.565 --> 00:04:52.222
- Moved and second to approve standard invoices. All in favor say aye. Aye. Aye. Opposed? All right, standard

00:04:52.222 --> 00:04:59.326
- invoices are approved. Next is our utility bills for August 13th. 8,200

00:04:59.714 --> 00:05:09.778
- $19.24. I move that we approve the utility bills for August 13th. Second. I move and second. All in

00:05:09.778 --> 00:05:19.841
- favor say aye. Aye. Opposed? All right. Motion carries. Then next round of utility bills for August

00:05:19.841 --> 00:05:29.502
- 20th, $1,861.10. Any questions there? I move that we approve the utility bills for August 20th.

00:05:29.954 --> 00:05:44.208
- Second. Moved and seconded for approval of utility bills. All in favor say aye. Aye. Opposed? All right.

00:05:44.208 --> 00:05:59.006
- Next are our wire transfers. Totaling $562,000. $562,598. I move that we approve the wire transfers. Second.

00:05:59.522 --> 00:06:08.855
- Moved and seconded to approve the wire transfers. All in favor say aye. Aye. Opposed? All right. Wire

00:06:08.855 --> 00:06:18.463
- transfers are approved. Next are customer refunds in the amount of $2,920.72. Questions for the refunds?

00:06:18.463 --> 00:06:28.254
- We're clearing out some inactive accounts and others. I move that we approve the customer refunds. Second.

00:06:29.346 --> 00:06:39.590
- It's been moved and seconded. Do I hear any discussion? All in favor say aye. Aye. Opposed? All right.

00:06:39.590 --> 00:06:49.834
- Refunds are approved. Next is the special check run totaling $7,215.92. Any questions on those? I move

00:06:49.834 --> 00:06:58.686
- that we approve the special check run. Second. Moved and seconded. All in favor say aye.

00:06:59.458 --> 00:07:09.123
- All right, special check run is approved. All right, we have consent agenda, and who'll be presenting

00:07:09.123 --> 00:07:18.883
- that this evening? All right, Matt. I'm gonna present the consent agenda this evening with three items

00:07:18.883 --> 00:07:29.022
- totaling $18,816.83. The first one was with Macalester for $4,273 to do some generator repairs at Butcher.

00:07:30.018 --> 00:07:37.282
- The second is another Macalester for $2,543.83 to work on the block heater or to replace the block heater

00:07:37.282 --> 00:07:44.614
- for the West booster generator. And the final one is with KLM Engineering for $12,000 for tank inspections

00:07:44.614 --> 00:07:51.535
- at Monroe Treatment Plant and our Dilman Treatment Plant. Would any board member like to pull any of

00:07:51.535 --> 00:07:56.126
- these items from the consent agenda and discuss them individually?

00:07:58.914 --> 00:08:07.018
- Hearing none, if there's no objection, then the consent agenda will be approved as presented.

00:08:07.018 --> 00:08:16.070
- Hearing none, the consent agenda is approved, thanks. All right, thank you, Matt. Item six on our agenda

00:08:16.070 --> 00:08:24.778
- is requesting approval of an agreement, a water supply contract agreement with the state of Indiana.

00:08:24.778 --> 00:08:28.830
- Good afternoon, Chris Wheeler with City Legal,

00:08:29.154 --> 00:08:40.581
- The contract before the board is the renewal, essentially, it's the renewal of the existing Monroe water,

00:08:40.581 --> 00:08:51.578
- Lake Monroe water removal contract that we have with the state of Indiana. We have asked the state to

00:08:51.578 --> 00:08:58.046
- modify the agreement slightly. The terms that we have asked

00:08:58.178 --> 00:09:08.007
- to be modified are the amount of water that we can withdraw per day from the lake. The existing contract

00:09:08.007 --> 00:09:17.369
- is for 25 million MGDs per day. And we have asked for that to be increased up to 30 million MGD per

00:09:17.369 --> 00:09:27.198
- day. And that can be found in enumerated paragraph 1A of the agreement. And then we also asked to extend

00:09:27.330 --> 00:09:36.190
- the life of the contract from 20 years to 50 years. And that can be found in enumerated paragraph four.

00:09:36.190 --> 00:09:44.708
- Reviewing the contract and comparing it, you'll find that the key remaining terms are all the same.

00:09:44.708 --> 00:09:54.590
- They did add additional language that the state requires on their contracts, which are things like e-verify now and

00:09:55.074 --> 00:10:02.930
- So the city has to show that they're part of the E-Verify program. Different terms and conditions with

00:10:02.930 --> 00:10:10.633
- regards to like, I'm drawing a blank, sorry. But mostly it's stuff that would require us just to say

00:10:10.633 --> 00:10:18.260
- we're in compliance with state law and really has nothing to do with the actual withdrawal of water

00:10:18.260 --> 00:10:23.294
- from the lake. So it's just, in my opinion, a lot of boilerplate.

00:10:23.778 --> 00:10:30.023
- Some of it's not even related or relevant to what we're doing, but the state's required to put that

00:10:30.023 --> 00:10:36.642
- language in there just because that's what the state requires for all of their contracts. So the contract

00:10:36.642 --> 00:10:43.074
- looks longer when you compare the two, the original and the one that's before you, but for all intents

00:10:43.074 --> 00:10:49.756
- and purposes, the main crux of the agreement remains the same. And what we're asking today is for approval

00:10:49.756 --> 00:10:50.942
- of that agreement,

00:10:51.490 --> 00:10:58.331
- It is still going through the process of being reviewed and approved by the state. They have changed

00:10:58.331 --> 00:11:05.240
- a great deal of their processes. So they have a couple of reviewing bodies that still have to look at

00:11:05.240 --> 00:11:12.352
- the contract and approve it before it can be signed by all of the various authorities at the state level

00:11:12.352 --> 00:11:16.958
- who have to review and sign it as well. So the time frame right now

00:11:18.722 --> 00:11:27.332
- which could be subject to change, but the state is very hopeful will be the actual timeframe is to take

00:11:27.332 --> 00:11:35.859
- the agreement to the NRAC for first approval by their September 8th meeting and then to take it to the

00:11:35.859 --> 00:11:44.304
- NRC for approval at their September 15th meeting. So hopefully we will see their approvals go through

00:11:44.304 --> 00:11:46.622
- in September and get signed

00:11:46.978 --> 00:11:56.291
- a signed copy of the agreement back I would hope relatively shortly after that time so that we can then

00:11:56.291 --> 00:12:05.334
- have our mayor and Director Zeiger and President White sign the agreement as well and then we'll put

00:12:05.334 --> 00:12:13.662
- that contract to bed. Any questions? Chris, how does the Corps of Engineers fit in all this?

00:12:13.762 --> 00:12:20.609
- With regards to the withdrawal, that's strictly between us and the state who has the control over the

00:12:20.609 --> 00:12:27.389
- use of the water in that regard. Where we get in with the Army Corps is with regards to the location

00:12:27.389 --> 00:12:34.303
- of our facilities, making sure that we're within easements, making sure that because they own the land

00:12:34.303 --> 00:12:38.398
- around the lake, so we're sitting on property that they own.

00:12:38.978 --> 00:12:47.216
- So that's where we negotiate and have to deal with the Army Corps. But with regards to this contract,

00:12:47.216 --> 00:12:55.455
- the Army Corps doesn't have a say in the agreement. Okay, thanks. Any other questions? I move that we

00:12:55.455 --> 00:13:04.258
- approve the agreement with the state of Indiana. Second. It's been moved and seconded. Any other discussion?

00:13:04.258 --> 00:13:07.166
- All in favor say aye. Aye. Opposed?

00:13:07.842 --> 00:13:15.237
- All right, contract our end is approved. And you'll see it after the state has reviewed, approved and

00:13:15.237 --> 00:13:22.633
- signed as well. Thank you. Very good. Thank you. Next is requesting approval of the service agreement

00:13:22.633 --> 00:13:29.883
- with GAI consultants. Hi, Jane Fleig, utilities engineer. This is a request to approve an agreement

00:13:29.883 --> 00:13:37.278
- for professional services for the design of the replacement of the 6th Street limestone arch culvert.

00:13:37.378 --> 00:13:45.605
- It's in the 300 block of West 6th Street, pretty much adjacent to the parking lot for the Blooming Foods

00:13:45.605 --> 00:13:53.988
- business there along 6th. It was determined in the report that we received in January from GAI consultants

00:13:53.988 --> 00:13:58.846
- that it was in very poor condition and needed to be replaced.

00:13:59.042 --> 00:14:08.357
- So we have put together this contract with GAI to perform the design services, utility coordination,

00:14:08.357 --> 00:14:17.672
- prepare construction documents, et cetera, in the amount of $240,700. And I would be happy to answer

00:14:17.672 --> 00:14:27.079
- any questions. Yeah. Thanks, Jane. So if the design costs a quarter of a million dollars, how much is

00:14:27.079 --> 00:14:28.094
- the actual

00:14:29.026 --> 00:14:40.515
- Replacement on a cost. We don't have an actual engineers estimate yet, but It's going to be expensive.

00:14:40.515 --> 00:14:52.004
- It's going to be expensive, unfortunately. Anything else? I move that we approve the service agreement

00:14:52.004 --> 00:14:57.246
- with GAI consultants. Second. Moving seconded.

00:14:58.978 --> 00:15:07.753
- Any other discussion? Jane, I'm thinking for a minute, we do culverts, county does bridges, right? Okay.

00:15:07.753 --> 00:15:16.194
- Yeah, and this is a culvert. Actually, when GAI did the limestone culvert investigations, it was 6th

00:15:16.194 --> 00:15:25.470
- Street, 4th Street by Wonder Lab, and then there's one that I didn't know about until last year, Roger Street.

00:15:25.954 --> 00:15:33.548
- close to where the Army Navy surplus used to be. They inspected all of those and the 4th Street limestone

00:15:33.548 --> 00:15:41.214
- arch and the 6th and the Roger Street limestone arch are in much better condition. Roger Street needs some

00:15:42.082 --> 00:15:48.791
- retucking of the limestone inside, possibly some concrete pouring around the bottom. And that is actually

00:15:48.791 --> 00:15:55.437
- included in this design as well. We will have the same contractor while they're in town enter into there

00:15:55.437 --> 00:16:02.146
- and get that repaired, those repairs done. But I think we're in good shape for definitely for 4th Street.

00:16:02.146 --> 00:16:08.539
- And then if we would do these repairs for Roger Street, it'll be some time before we have to look at

00:16:08.539 --> 00:16:11.134
- those again. Okay, any other discussion?

00:16:13.410 --> 00:16:23.985
- for the question. Oh that's right we are all right it's been moved and seconded all in favor say aye.

00:16:23.985 --> 00:16:34.975
- Opposed? All right motion carries thank you Jane. All right next is the request of approval for a service

00:16:34.975 --> 00:16:40.574
- agreement with HNTB for water system design services.

00:16:41.602 --> 00:16:48.768
- Kevin white capital projects coordinator. I'm actually going to do number nine first. It'll make a little

00:16:48.768 --> 00:16:55.664
- bit more sense Okay So this one is for the HNTB the hydraulic modeling for a total contract amount of

00:16:55.664 --> 00:17:00.126
- two hundred eighteen thousand dollars and This will allow HNTB to

00:17:00.258 --> 00:17:06.590
- expand our current hydraulic flow model. We have one, but it hasn't been updated in a little while,

00:17:06.590 --> 00:17:13.112
- so we're going to be concentrating on water mains six inches and larger, and they'll update all of the

00:17:13.112 --> 00:17:19.444
- current information, tank information, some SCADA information into the flow model, which will allow

00:17:19.444 --> 00:17:21.534
- them to then create three future

00:17:21.666 --> 00:17:29.566
- Model scenarios that that kind of that show our demand so that will allow us to determine the system

00:17:29.566 --> 00:17:37.545
- resiliency and Also for potential locations to do any necessary upgrades to meet future demands Happy

00:17:37.545 --> 00:17:45.523
- to answer any questions related to that Okay, so you want us to approve item nine I Can go ahead with

00:17:45.523 --> 00:17:50.686
- eight if you want me to do eight now. I just that's fine. Okay, I

00:17:51.234 --> 00:18:01.548
- So item nine then is with HNTB for hydraulic modeling and system-wide improvements for $218,000, right?

00:18:01.548 --> 00:18:12.160
- Yes, sir, that's correct. OK. Good. Any questions for Kevin? All right. I move that we approve the service

00:18:12.160 --> 00:18:18.110
- agreement for the hydraulic modeling with HNTB Corporation.

00:18:19.906 --> 00:18:27.601
- Moved and seconded all in favor say aye. Aye. Opposed? All right it's approved we'll back up then.

00:18:27.601 --> 00:18:35.374
- Thank you. All right so the second one is also with HNTB for as needed water system design services

00:18:35.374 --> 00:18:43.147
- so as a result of the flow modeling any of the necessary locations that will need improvements this

00:18:43.147 --> 00:18:45.790
- will allow them to actively start

00:18:45.922 --> 00:18:55.411
- to actively start design without having to bring separate design contracts to the board. So this will

00:18:55.411 --> 00:19:04.807
- directly relate to the hydraulic modeling. Okay. And that is for a not to exceed amount of $250,000,

00:19:04.807 --> 00:19:13.086
- but would just be based on an as needed rate. Okay, any questions for Kevin on this one?

00:19:18.594 --> 00:19:27.530
- approve the as needed water system wide design services agreement with HNTB Corporation. Okay, it's

00:19:27.530 --> 00:19:36.376
- been moved and seconded. All in favor say aye. Aye. Opposed? All right, motion carries. Thank you.

00:19:36.376 --> 00:19:45.758
- Thank you. Okay, our next item then is requesting approval of the service agreement with CHA Consulting.

00:19:57.666 --> 00:20:08.171
- Hello, I'm Dan Hudson, Capital Projects Manager, CBU. CBU, we use the qualification-based procedure

00:20:08.171 --> 00:20:19.202
- RFQ, RFP process to identify the engineering firms best suited for the Blucher Pool Wastewater Treatment

00:20:19.202 --> 00:20:23.614
- Plant Rehabilitation and Upgrade Project.

00:20:23.938 --> 00:20:32.905
- After reviewing several firms' qualification, including the technical approach, wastewater treatment

00:20:32.905 --> 00:20:41.961
- experience, project team, understanding of CBU needs, we narrowed down to two firms, highly qualified

00:20:41.961 --> 00:20:51.550
- firms, and we asked them to submit a RFP. After the RFP review, we found that a firm called CHA Consultants

00:20:51.714 --> 00:21:02.699
- was the most qualified to do the job, and that was for $2.375 million for the professional engineering

00:21:02.699 --> 00:21:13.578
- services that included design, evaluation, and construction phase engineering. This 2.375 million CHA

00:21:13.578 --> 00:21:21.470
- engineering contract is essentially a roadmap for major rehabilitation of

00:21:21.602 --> 00:21:31.987
- It touches more than 30 major plant systems, infrastructure areas, from the headworks, clarifiers, through

00:21:31.987 --> 00:21:41.694
- sludge pumping, dewatering, and chemical feed controls, and site improvement. The goal was not only

00:21:41.694 --> 00:21:50.526
- to replace aging equipment, but to improve reliability, redundancy, and energy efficiency,

00:21:51.554 --> 00:22:00.760
- operator safety and maintainability. CHA will take this project from evaluation design through permitting

00:22:00.760 --> 00:22:10.313
- and construction phase engineering. At this point, I just want to remind everyone that this is a professional

00:22:10.313 --> 00:22:19.518
- engineering contract, not a construction contract. The construction contract is expected to be a separate

00:22:19.518 --> 00:22:21.342
- contract and will be

00:22:21.538 --> 00:22:37.014
- substantially larger than this. I'm open to questions. Okay. Questions? Good explanation. Thank you.

00:22:37.014 --> 00:22:49.886
- Is he here? Oh, by the way, Andy Scales from CHA Consultant is here if you have any

00:22:50.626 --> 00:22:58.892
- questions you'd like to talk to the consultant. Where are they located? Excuse me? Where are they located?

00:22:58.892 --> 00:23:07.390
- Indianapolis. I don't know the address. Hi, Andy Scales with CHA Consulting. So we're located in Indianapolis

00:23:07.390 --> 00:23:15.269
- downtown in the Capitol building and then we also have offices in Evansville and the Goatee. We about

00:23:15.269 --> 00:23:19.518
- a year ago did an acquisition of Midwestern Engineers.

00:23:19.970 --> 00:23:27.272
- So that group in Lagotia is also part of our team. So we've got in the Midwest area, roughly 60 or so

00:23:27.272 --> 00:23:34.788
- employees in the water waste water space. Thank you. Andy, could you tell us some other similar projects

00:23:34.788 --> 00:23:42.018
- you've done around the state? Absolutely. So we're doing very similar work right now for the town of

00:23:42.018 --> 00:23:48.318
- Jasper, Boonville, Indiana, the city of Boonville, the city of Washington. We are doing

00:23:48.738 --> 00:23:56.320
- some work up in Culver, getting ready to kick off with that. We've got a large project in Richmond,

00:23:56.320 --> 00:24:03.902
- Indiana that we're doing similar work for, so a lot of that here locally. And then CHA as a company

00:24:03.902 --> 00:24:11.712
- is mostly all parts of the eastern United States, so we're about 2,300 employees. We've got 46 offices

00:24:11.712 --> 00:24:15.806
- from New York down the coast, Pennsylvania, Virginia,

00:24:16.418 --> 00:24:23.825
- North and South Carolina, Florida, Texas, Indiana, Ohio. So we're well versed in this and across the

00:24:23.825 --> 00:24:31.745
- organization, we're probably about 250 water and wastewater staff and employees and engineers. So certainly

00:24:31.745 --> 00:24:39.519
- something we have capacity to jump into. And as a Bloomington resident, historically, I'm looking forward

00:24:39.519 --> 00:24:46.046
- to getting to work on this project. Great, thank you. Thank you. Any other questions for

00:24:46.402 --> 00:24:55.132
- Either of these gentlemen. Maybe a two part. So number one, what's our timeline on getting this going?

00:24:55.132 --> 00:25:03.607
- And number two, which might be a question over here, when we're ready for the construction, is that

00:25:03.607 --> 00:25:12.337
- dependent on a sewer rate case to be able to do the projects? We're working on one and it will be part

00:25:12.337 --> 00:25:15.134
- of that, yeah. Part of that, OK.

00:25:15.266 --> 00:25:23.450
- Design we expect this year soon within a month or so depending on the approval hanging to be able to

00:25:23.450 --> 00:25:31.552
- fund Yes, we do we have funds in the budget for this and actually we have budgeted the construction

00:25:31.552 --> 00:25:40.384
- too Okay, so we're we're ready to go. It's just a matter of Getting it going. I don't think the construction

00:25:40.384 --> 00:25:45.246
- is going to start until next year and It's maybe multi-year

00:25:45.378 --> 00:25:53.852
- a couple of your projects. It's a big project. Okay, thank you. Great. I move that we approve the service

00:25:53.852 --> 00:26:01.926
- agreement with CHA Consulting. Second. It's been moved and seconded to approve the service agreement

00:26:01.926 --> 00:26:10.400
- with CHA Consulting. All in favor say aye. Aye. Opposed? Motion carries. Thank you. Thank you. All right,

00:26:10.400 --> 00:26:13.438
- our next item is requesting approval.

00:26:13.666 --> 00:26:22.901
- A service agreement with Bluestone Tree Incorporated. Zach Bernworth, Assistant Superintendent of Blucher

00:26:22.901 --> 00:26:31.876
- Pool. I've been covering for Dillman Assistant Superintendent while they were searching for a new one.

00:26:31.876 --> 00:26:40.414
- We're taking on the job of getting the dam cleared down at the EQ basin at the Dillman Wastewater

00:26:42.306 --> 00:26:49.331
- trying to have Bluestone come in and do that. I walked out and forgot the agreement that had the pictures

00:26:49.331 --> 00:26:55.959
- on it and everything. My apologies. No problem. It's clearing the whole south. The south end of the

00:26:55.959 --> 00:27:02.719
- EQ basin is a dam, and they're wanting to clear the south side of it and the southeast side of it. So

00:27:02.719 --> 00:27:10.142
- Bluestone has the equipment, the manpower to do so, and the city doesn't have the equipment to do it, so. Okay.

00:27:10.722 --> 00:27:19.235
- Thank you. Any questions? Yeah. How many trees are we talk is a large swath of force. It's a pretty

00:27:19.235 --> 00:27:28.003
- good swath, but they're all like sapling size. Perfect. They're not. They're not big trees at all. OK,

00:27:28.003 --> 00:27:36.601
- I'd say the Max is probably 12 inch. If that yeah. Thank you and they will be spraying. To make sure

00:27:36.601 --> 00:27:38.814
- that it stays clear. Hmm.

00:27:40.642 --> 00:27:48.954
- Okay, any other questions? All right. Move that we approve the service agreement with Blue Stone Tree

00:27:48.954 --> 00:27:56.614
- Incorporated. Second. Okay, it's been moved and seconded. All in favor say aye. Aye. Opposed?

00:27:56.614 --> 00:28:04.844
- Motion carries. Thank you. Next then is requesting approval of service agreement with Christopher B.

00:28:04.844 --> 00:28:06.718
- Burke Engineering LLC.

00:28:13.954 --> 00:28:21.654
- I wore my tall shoes today too. I'm not quite tall enough. I'm Kelsey, the Tony Assistant Director for

00:28:21.654 --> 00:28:29.279
- Environmental. I'm presenting to you today a service agreement with Christopher Burke Engineering for

00:28:29.279 --> 00:28:37.278
- $517,270. So we went through a rigorous solicitation process for our Clear Creek Corridor Renewal Project.

00:28:37.410 --> 00:28:44.890
- which is going to be a reconstruction of the limestone block walls of Clear Creek. We're at Daylights,

00:28:44.890 --> 00:28:52.370
- just at First Street, all the way to Switchyard Park. It's a hundred-year-old construction back in the

00:28:52.370 --> 00:28:59.778
- WPA era, so the limestone block walls have been failing for some time in many locations. So this will

00:28:59.778 --> 00:29:06.750
- give us an opportunity to create a safer drainageway with better capacity. We have a vision for

00:29:07.330 --> 00:29:14.150
- you know, more flood storage, water quality treatment, and just a reinvigoration of the entire corridor.

00:29:14.150 --> 00:29:20.775
- So this is going to be a very large-scale project that will happen over a long period of time, but we

00:29:20.775 --> 00:29:27.530
- are really excited to take the first step to contract out a feasibility study. We had so many wonderful

00:29:27.530 --> 00:29:31.102
- firms submit proposals for this. We initially received

00:29:31.202 --> 00:29:37.246
- 10 proposals that were incredible just through the request for qualifications phase. We narrowed it

00:29:37.246 --> 00:29:43.653
- down to five. I was hoping we could narrow it down to fewer, but there were just so many great proposals.

00:29:43.653 --> 00:29:49.698
- So we had five firms come in, do presentations, just spent so much time and effort really trying to

00:29:49.698 --> 00:29:55.742
- get this contract. Kristerberg pulled ahead. They are partnering with Ratio Architects, who was the

00:29:55.742 --> 00:30:01.182
- original design firm for Miller Showers Park. The same architect will be on this project.

00:30:01.346 --> 00:30:10.224
- as well as other partners. And we had other department heads in these presentations as well, so we got

00:30:10.224 --> 00:30:19.102
- feedback from other folks in the city. So we're just really excited to get this large project started.

00:30:19.102 --> 00:30:27.807
- I'm happy to talk through more of the scope, or I'm happy to answer questions you might have. Anyone

00:30:27.807 --> 00:30:30.910
- have any questions? Yeah, go ahead.

00:30:31.458 --> 00:30:38.186
- Is, are these limestone arches, these culverts, correct? Is that what you said? It's an open channel,

00:30:38.186 --> 00:30:44.849
- actually. Okay, so is this, I guess, are these areas similar to what we have at Indiana Avenue, what

00:30:44.849 --> 00:30:51.445
- we ran into over there, or is this a completely different thing? This will be completely different,

00:30:51.445 --> 00:30:58.173
- because this is all an open stream channel, so it's not going underground. There are gonna be bridges

00:30:58.173 --> 00:31:00.350
- and other crossings to consider,

00:31:00.482 --> 00:31:07.716
- but this is the downstream section. Jane and everyone here at CB did an excellent job with that six

00:31:07.716 --> 00:31:15.673
- in Indiana where it went all the way underground and this is sort of the next phase where it's all daylighted

00:31:15.673 --> 00:31:23.269
- out in the open now, not underground infrastructure. So are we at risk of having someone designate these

00:31:23.269 --> 00:31:30.430
- structures historic? Yes. This is in the proposal that they'll be coordinating with state agencies

00:31:30.626 --> 00:31:41.663
- doing all the consultations needed, assuming that the limestone block walls will be designated as historic.

00:31:41.663 --> 00:31:51.066
- We are assuming that they will? We're prepared to do the work if determined necessary, yes.

00:31:51.066 --> 00:31:55.358
- And this proposal, I guess, at what point

00:31:55.490 --> 00:32:05.089
- If they are designated historic, as I recall, Jane's project required a large outlay of cash from CBU

00:32:05.089 --> 00:32:14.783
- to do this. I understand the need of fixing and repairing and planning for the future of this, but I'm

00:32:14.783 --> 00:32:24.382
- just concerned that we're going to get this designated historic and the number is going to quadruple.

00:32:24.962 --> 00:32:31.419
- I'm very concerned about that. This is going to be a large project and there are many things that could

00:32:31.419 --> 00:32:38.187
- make that cost increase. This is the initial feasibility study where they'll do the preliminary engineering,

00:32:38.187 --> 00:32:44.644
- preliminary coordination, just to give us an idea of what we're going to be looking at. So I guess then

00:32:44.644 --> 00:32:50.977
- for the feasibility study, does this come to light in the physical, like when we get this feasibility

00:32:50.977 --> 00:32:53.150
- study back, is it going to outline

00:32:53.986 --> 00:33:01.160
- what the cost of designating these areas historic is going to cost to either us or to somebody else

00:33:01.160 --> 00:33:08.980
- who's got to pay for it. Yes, so the final product we'll be expecting from this is a preliminary engineering

00:33:08.980 --> 00:33:16.584
- report with three design alternatives. So under phase two task three, they specifically spell out notable

00:33:16.584 --> 00:33:21.534
- historic buildings and limestone wall features. They'll consult with

00:33:21.794 --> 00:33:29.353
- the state's Division of Historic Preservation and Archaeology. Basically, they're going to look at those

00:33:29.353 --> 00:33:36.624
- three alternatives and do a preliminary analysis to basically bring it into the design phase to help

00:33:36.624 --> 00:33:43.967
- reduce the amount of mitigation that may be required and how much we would like to spend basically to

00:33:43.967 --> 00:33:51.166
- basically what the state tells us that would be required, trying to balance how much it would cost.

00:33:53.186 --> 00:34:05.668
- Thank you. It starts at First Street. There's a rally burger just southeast of the Seminary Square Kroger.

00:34:05.668 --> 00:34:10.334
- That First Street is where it opens up.

00:34:10.466 --> 00:34:16.784
- It goes through Dodd Street, Grimes, and we included the section south of Grimes Street because it's

00:34:16.784 --> 00:34:23.102
- still in that limestone block wall. So we're taking that whole corridor and we're going to design it

00:34:23.102 --> 00:34:29.545
- from start to finish because it makes sense to do all the modeling at once. Construction will probably

00:34:29.545 --> 00:34:35.987
- be phased since it's such a large area, but we're trying to do as much comprehensive study of the area

00:34:35.987 --> 00:34:39.678
- as we can at once so that it's more continuous as it goes.

00:34:40.066 --> 00:34:48.627
- Originally built. Um, a lot of the WPA era, um, it was in the thirties, so I don't, I haven't seen anything

00:34:48.627 --> 00:34:57.188
- on the blocks. I would say it. I've seen some other WPA era, um, limestone crossings around the Bloomington

00:34:57.188 --> 00:35:05.115
- or the county that had like a 1930, 1933 kind of etched in the limestone. So it's nearing a hundred

00:35:05.115 --> 00:35:08.286
- years. A hundred years. Isn't that bad.

00:35:09.154 --> 00:35:17.586
- We certainly, I mean, it did its job for so long, so. Yeah. OK. Other questions for Kelsey? I move that

00:35:17.586 --> 00:35:25.693
- we approve the service agreement with Christopher B. Burke Engineering LLC. Second. OK. And then do

00:35:25.693 --> 00:35:34.044
- we move and second it? All in favor say aye. Aye. Opposed? All right. Motion carries. Thank you. Thank

00:35:34.044 --> 00:35:35.422
- you all so much.

00:35:37.922 --> 00:35:46.003
- All right, next item is approval of the on-call service agreement with Deckard Land Survey. All right.

00:35:46.003 --> 00:35:54.240
- Good evening, Philippine Engineering. So what we've recognized is working with TND and with Brian Blake,

00:35:54.240 --> 00:36:02.242
- our land acquisition and easement person, as we look at easements and use of those easements, we need

00:36:02.242 --> 00:36:05.694
- to locate those before we get in and do any

00:36:05.794 --> 00:36:12.647
- land disturbance or tree removal, as well as some properties we own that also have trees and other properties

00:36:12.647 --> 00:36:18.876
- in close proximity that would affect where we can bring equipment in. So we saw a need here to just

00:36:18.876 --> 00:36:25.293
- have a land surveyor on call that we could have come out and stake a property line or an easement line

00:36:25.293 --> 00:36:31.584
- for us before we started any construction work. And a lot of times that needs to happen pretty quick

00:36:31.584 --> 00:36:34.014
- and it's hard to get back to the board

00:36:34.114 --> 00:36:42.675
- And then there are small amounts individual here and there. And so we just felt like this was perfect

00:36:42.675 --> 00:36:51.572
- for an on-call. Not to exceed $20,000. OK. Questions for Phil? I move that we approve the call of service

00:36:51.572 --> 00:36:59.881
- agreement with Decker Land Survey. Second. Moved and seconded. All in favor say aye. Aye. Opposed?

00:36:59.881 --> 00:37:03.070
- All right. Motion carried. Thank you.

00:37:04.834 --> 00:37:15.056
- All right, do we have any old business from the board? Old business from staff? All right, new business

00:37:15.056 --> 00:37:24.885
- from the board? New business from staff? All right. We haven't had any subcommittees since our last

00:37:24.885 --> 00:37:33.534
- meeting, I don't think. We do have a property planning subcommittee meeting planned for

00:37:34.114 --> 00:37:47.688
- September the 8th for our next meeting Staff reports Then this evening all right anyone here for public

00:37:47.688 --> 00:38:02.046
- comment petitions or communications Yes, I Don't think that the folks who wished to discuss the decision by a

00:38:02.722 --> 00:38:12.770
- the utilities department to deny their request for connection have appeared, but I did want to address

00:38:12.770 --> 00:38:22.818
- the board. We had some folks who own property outside of city limits located at 3704 South Judd Street

00:38:22.818 --> 00:38:30.622
- request that we allow them to connect to our sanitary sewer because they have a

00:38:30.786 --> 00:38:40.115
- septic system that's not functioning properly anymore. From their request, it appears that they have

00:38:40.115 --> 00:38:49.536
- the ability to rebuild the system, but it's going to be very costly for them. As you all may be aware

00:38:49.536 --> 00:38:55.262
- and can recall, we have very strict limited opportunities for

00:38:56.354 --> 00:39:03.817
- property owners out in the county to connect to our sanitary sewer and they are twofold. If you can

00:39:03.817 --> 00:39:11.279
- voluntarily annex into the city so that you are now a part of the municipal boundaries of the city,

00:39:11.279 --> 00:39:18.668
- then you can connect. Otherwise, you have to rely upon a finding from the economic and sustainable

00:39:18.668 --> 00:39:24.190
- development department that the development being proposed for a property

00:39:24.930 --> 00:39:32.307
- is strategic economic development that would do two things. It would contribute to job creation for

00:39:32.307 --> 00:39:39.758
- the community at large, not just the city, but even Monroe County, but to contribute to job creation

00:39:39.758 --> 00:39:47.357
- and wage growth, which has not happened with regards to this property. We don't have an administrative

00:39:47.357 --> 00:39:53.406
- remedy for the denial of a connection, so parties can feel free to go straight to

00:39:53.634 --> 00:40:00.115
- Court if they wish to to try and get a judge to weigh in So there's really nothing for the board to

00:40:00.115 --> 00:40:06.726
- do in these situations Because our rules and regulations have are pretty strict. They just say if you

00:40:06.726 --> 00:40:13.401
- don't have one of these two Things going on then you shall not connect the Brightline rule is Property

00:40:13.401 --> 00:40:20.142
- owners of the county shall not connect unless you have these two things and if you don't you just don't

00:40:20.142 --> 00:40:21.438
- get to connect so I

00:40:22.114 --> 00:40:29.255
- I wanted to bring those up as a reminder. We've referred to this as an appeal. It isn't really, it's

00:40:29.255 --> 00:40:36.891
- just an opportunity for them to come in and express their concerns with the board, but there isn't anything

00:40:36.891 --> 00:40:43.749
- really for the board to do. So I just wanted to remind the board of that role at the moment. So.

00:40:43.749 --> 00:40:51.102
- And Chris, that's because that property is not, not, it's not contiguous. Yeah, it doesn't share enough

00:40:51.298 --> 00:40:59.597
- It doesn't share any boundaries with municipal property, so it cannot establish that required one-eighth

00:40:59.597 --> 00:41:07.738
- contiguity of its property lines with the city to allow it to do a voluntary annexation into the city.

00:41:07.738 --> 00:41:15.721
- And the city is not looking to involuntarily annex that property, so there isn't an annexation going

00:41:15.721 --> 00:41:20.542
- on. And I'm assuming they're appealing because the line runs

00:41:20.802 --> 00:41:27.272
- in front of their property that they could just connect to? I've not asked GIS or anybody to show me

00:41:27.272 --> 00:41:34.127
- that. They are under the impression, and they could very well be right, that there is a sewer line running

00:41:34.127 --> 00:41:40.661
- in front of their property. They mentioned that they had neighbors who are connected, so I don't know

00:41:40.661 --> 00:41:47.259
- if we have sewer there, but that does not, it has no bearing on whether they can connect at this point

00:41:47.259 --> 00:41:50.142
- in time. I just think it's very unfortunate.

00:41:50.466 --> 00:41:58.795
- people might all very much agree with that. It'd be great if we could, but given the condition of annexation

00:41:58.795 --> 00:42:06.588
- these days, the lack of authority that waivers provide or sense of security that a municipality might

00:42:06.588 --> 00:42:14.459
- have for waivers, we just don't have a situation where we can allow connections right now. It's a good

00:42:14.459 --> 00:42:18.814
- discussion, Chris. I think it's one of those things that

00:42:19.554 --> 00:42:30.363
- We've been mindful of that our rules don't allow these kind of connections, but yet we believe that

00:42:30.363 --> 00:42:41.280
- for the best outcome for health in the community is oftentimes not a failing septic system. Correct.

00:42:41.280 --> 00:42:49.278
- The state would like to see septics go away and that folks get connected.

00:42:49.986 --> 00:42:58.727
- But the state also doesn't want to see the municipalities grow, so we're kind of in a weird position.

00:42:58.727 --> 00:43:08.154
- It's a very awkward position to be in, yes. The only way we could fix that is if we change our administrative

00:43:08.154 --> 00:43:16.981
- rules, right? Certainly, yes, and that would have to go through a process discussion with the director

00:43:16.981 --> 00:43:19.038
- and probably the mayor.

00:43:19.298 --> 00:43:28.712
- Not going to happen this evening. Yeah. So we're in the near future. Probably not. Since these were

00:43:28.712 --> 00:43:37.749
- just approved like in January, right? All right. Thank you for that update. Any other petitions

00:43:37.749 --> 00:43:45.374
- or communications? Any else? Okay, we will stand adjourned. Thank you very much.