00:00:00.258 --> 00:00:07.603
- We are ready to call our September 21st Regular Utility Service Board meeting to order. And we'll do

00:00:07.603 --> 00:00:15.167
- that now. Our first order of business is to explain that our mission, the City of Bloomington Utility's

00:00:15.167 --> 00:00:23.021
- mission is to enhance the quality of life in our community by providing safe, sustainable, and high-quality

00:00:23.021 --> 00:00:28.766
- drinking water, wastewater, and stormwater services in a cost-effective manner

00:00:29.346 --> 00:00:36.899
- promoting public health, economic vitality, and environmental stewardship. And just a reminder for conflicts

00:00:36.899 --> 00:00:44.522
- of interest, if any board member has any personal or financial conflict with any of the issues or individuals

00:00:44.522 --> 00:00:51.659
- on our agenda this evening, then they should please recuse yourself from those portions of the agenda.

00:00:51.659 --> 00:00:56.094
- And we'll get started tonight with petitions and communications

00:00:56.322 --> 00:01:02.497
- This is our period of time at the beginning of the meeting. We have another period at the end of the

00:01:02.497 --> 00:01:06.654
- meeting for any public comment limited to five minutes per speaker.

00:01:22.466 --> 00:01:39.789
- We can, Eric. We'll try to turn your volume up just a little bit. Eric, could you hold just a moment?

00:01:39.789 --> 00:01:51.678
- We're still trying to adjust the volume a bit. You're coming in, but.

00:01:53.602 --> 00:02:01.379
- Try that again, Eric. All set now? Oh, yeah. You're coming in loud and clear. Over. All right. I apologize

00:02:01.379 --> 00:02:08.647
- I couldn't be there in person tonight, and I can assure you I won't take anywhere near five minutes

00:02:08.647 --> 00:02:16.133
- with my comments, but good evening, President White and Utility Service Board members. My name is Eric

00:02:16.133 --> 00:02:23.038
- Spoonwar, President of the Greater Bloomington Chamber of Commerce, and I'm speaking on behalf

00:02:23.586 --> 00:02:30.805
- of the chamber tonight regarding the appeal filed by Habitat for Humanity in Monroe County concerning

00:02:30.805 --> 00:02:38.377
- the withholding of water meters for homes under construction in phase two of the Osage Place neighborhood.

00:02:38.377 --> 00:02:45.595
- And I understand the board will consider this matter later in tonight's agenda, but I wanted to offer

00:02:45.595 --> 00:02:50.974
- the chamber's perspective during the public comment portion of the meeting.

00:02:51.138 --> 00:02:58.012
- The Chamber's interest in this issue is pretty straightforward. A healthy community depends on clear

00:02:58.012 --> 00:03:05.362
- rules, consistent processes, adequate housing supply, and constructive partnerships between public agencies

00:03:05.362 --> 00:03:12.167
- and organizations that invest in Bloomington's future. Habitat for Humanity of Monroe County is one

00:03:12.167 --> 00:03:15.774
- of our community's most important housing providers.

00:03:16.482 --> 00:03:23.264
- and through Osage Place Habitats, creating home ownership opportunities for working families who otherwise

00:03:23.264 --> 00:03:29.665
- they never have had the chance to purchase a home. Phase two includes 39 homes that are part of that

00:03:29.665 --> 00:03:36.130
- effort. The chamber isn't here to offer an engineering opinion on the drainage swale issue, and we're

00:03:36.130 --> 00:03:43.038
- not suggesting that utility standards or stormwater requirements should be disregarded, but what concerns us

00:03:43.554 --> 00:03:51.390
- is the apparent connection between an unresolved issue in phase one and the withholding of water service

00:03:51.390 --> 00:03:58.703
- for homes in phase two, which are separately permitted and bonded projects. So from the Chamber's

00:03:58.703 --> 00:04:06.390
- perspective, businesses, nonprofits, and community organizations all benefit when regulatory decisions

00:04:06.390 --> 00:04:11.614
- are transparent, clearly communicated, and tied to a defined process.

00:04:12.290 --> 00:04:19.115
- The appeal raises questions regarding notice, due process, and whether withholding water service is

00:04:19.115 --> 00:04:25.872
- an appropriate remedy under these circumstances. Those are matters that I think deserve thoughtful

00:04:25.872 --> 00:04:33.038
- consideration as the board reviews the appeals. Most importantly, the practical impact of delaying water

00:04:33.038 --> 00:04:39.454
- service falls on future homeowners and families waiting for affordable housing opportunities.

00:04:40.002 --> 00:04:46.478
- at a time when housing affordability remains one of Bloomington's most significant challenges. We believe

00:04:46.478 --> 00:04:52.649
- it's important to seek solutions that address any outstanding concerns while allowing homes that are

00:04:52.649 --> 00:04:59.064
- otherwise ready for occupancy to move forward. And accordingly, when the board does consider this matter

00:04:59.064 --> 00:05:05.356
- later this evening, I and the Greater Bloomington Chamber of Commerce would respectfully encourage you

00:05:05.356 --> 00:05:09.022
- to grant habitats appeal and allow water service to proceed

00:05:09.506 --> 00:05:16.528
- while any of the remaining issues are addressed through the appropriate process. So thanks for your

00:05:16.528 --> 00:05:23.902
- time and consideration. I appreciate it. Thank you, Mr. Spoonmore. We appreciate your comments on behalf

00:05:23.902 --> 00:05:30.924
- of the Chamber of Commerce. Thank you for joining us this evening. Are there any other petitions or

00:05:30.924 --> 00:05:36.542
- communications from the public here at the beginning of our meeting? All right.

00:05:37.122 --> 00:05:45.520
- Then we'll move along with item three, approval of the minutes of our previous meeting on September

00:05:45.520 --> 00:05:54.421
- the 8th. Anyone had a chance to review the minutes? Any corrections or edits? If not, we'll take a motion

00:05:54.421 --> 00:06:02.819
- to approve. I move that we approve the meeting minutes. Second. All right, let's move to second and

00:06:02.819 --> 00:06:06.430
- approve the minutes. All in favor say aye.

00:06:06.754 --> 00:06:17.921
- All right. Motion carries. Minutes are approved. Next is the approval of our standard invoices for this

00:06:17.921 --> 00:06:29.624
- evening. If you have a chance to take a look at those. Any questions for staff on any of these expenditures?

00:06:29.624 --> 00:06:35.422
- I move that we approve the standard invoices. Second.

00:06:36.226 --> 00:06:47.905
- All right, standard invoices have been moved and seconded to approve standard invoices. Any other discussion?

00:06:47.905 --> 00:07:00.222
- All in favor say aye. Aye. Opposed? All right, invoices are approved. Next is utility bills for September the 10th.

00:07:05.698 --> 00:07:15.265
- Discussion on utility bills? I move that we approve the utility bills. Second. It's been moved and seconded

00:07:15.265 --> 00:07:24.123
- to approve the utility bills for September the 10th. All in favor say aye. Aye. Opposed? All right.

00:07:24.123 --> 00:07:28.286
- Next are utility bills for September the 17th.

00:07:32.898 --> 00:07:40.858
- that we approve the utility bills for September 17th. Second. All right, it's been moved and seconded

00:07:40.858 --> 00:07:49.052
- to approve the utility bills for September the 17th. Any discussion? All in favor say aye. Aye. Opposed?

00:07:49.052 --> 00:07:54.046
- All right, utility bills are approved. Next are wire transfers.

00:07:59.938 --> 00:08:09.911
- September, totaling $581,217. I move that we approve the wire transfers. Second. All right, it's been

00:08:09.911 --> 00:08:19.395
- moved and seconded to approve the wire transfers. All in favor say aye. Aye. All right, opposed?

00:08:19.395 --> 00:08:26.142
- All right, motion carries. Next are customer refunds and today we're

00:08:27.522 --> 00:08:37.183
- Looking to approve $2,949.07 customer refunds. Most of these are inactive accounts. Any discussion on

00:08:37.183 --> 00:08:47.222
- the refunds? I move that we approve the customer refunds. Second. All right, it's been moved and seconded

00:08:47.222 --> 00:08:56.030
- and approved the customer refunds. Any other discussion? All in favor say aye. Aye. Opposed?

00:08:57.154 --> 00:09:12.307
- customer refunds are approved and next we have a special check run for September 16th totaling $12,070.68.

00:09:12.307 --> 00:09:24.062
- Any questions on those expenditures? I move that we approve the special check run.

00:09:24.994 --> 00:09:33.469
- All right, it's been moved and seconded to approve this special check run. All in favor say aye. Aye.

00:09:33.469 --> 00:09:42.360
- Aye. All right. Opposed? All right. Motion carries. And check run is approved. Next is the consent agenda.

00:09:42.360 --> 00:09:51.001
- Good evening. I'm Catherine Sager, utilities director. I'm presenting tonight's consent agenda totaling

00:09:51.001 --> 00:09:51.998
- $39,587.09.

00:09:52.834 --> 00:10:00.735
- First contract is with Bruce's welding and fabrication LLC for 19,500 and install access structures

00:10:00.735 --> 00:10:08.873
- for the pipe gallery at Monroe water treatment plant. Next is with Brie Hub Corporation for $6,115 and

00:10:08.873 --> 00:10:17.169
- nine cents for the replacement of the VFD for the solids feed pump at Dilman wastewater treatment plant.

00:10:17.169 --> 00:10:19.934
- Next is with Troy risk for $9,850.

00:10:20.770 --> 00:10:27.938
- for the Clear Creek Corridor Environmental Assessment. Next is for the Substation Electrical Testing

00:10:27.938 --> 00:10:35.247
- Company, or SETCO, for $4,122 to install fuses and transformer for the high voltage grounding resistor

00:10:35.247 --> 00:10:42.556
- at Monroe Water Treatment Plant. Is there any member who wishes to consider one or more of these items

00:10:42.556 --> 00:10:43.550
- individually?

00:10:48.482 --> 00:10:56.173
- Hearing none, if there's no opposition, these items will be approved as recommended by staff. Hearing

00:10:56.173 --> 00:11:03.713
- no opposition, the consent agenda is approved. Thank you, Director Zegar. Appreciate bringing those

00:11:03.713 --> 00:11:11.705
- to us, getting those approved. Then number six on our agenda is the appeal from Habitat, oops, I'm sorry.

00:11:11.705 --> 00:11:17.662
- Right here. Yes. Just for the records, I believe you said the total was 39,000

00:11:18.242 --> 00:11:26.140
- What did you say that total was on the consent agenda? It's an amended total. The amended total is the

00:11:26.140 --> 00:11:33.884
- 39,587. OK, thank you. Which is different from what we initially received. OK, thank you. That was a

00:11:33.884 --> 00:11:41.628
- late adjustment this afternoon. Thank you. I just wanted to make sure that gets corrected when we do

00:11:41.628 --> 00:11:48.222
- the minutes. Thank you. Sometimes we let those slip, don't we? Thank you. OK, thanks.

00:11:48.322 --> 00:11:58.562
- Next is the appeal from Habitat for Humanity, and I believe we have a speaker here that would like to

00:11:58.562 --> 00:12:08.701
- talk to us about this. Would you have some background material in our packet? Do I need to turn this

00:12:08.701 --> 00:12:18.238
- on or is it on? No, that microphone is just for public access. Your voice carries in the room.

00:12:18.818 --> 00:12:25.292
- All right, thank you for letting me know. I'm Cari Bennett. I'm the Operations Director for Habitat

00:12:25.292 --> 00:12:31.895
- for Humanity of Monroe County. Pursuant to Bloomington Municipal Code, Habitat for Humanity of Monroe

00:12:31.895 --> 00:12:38.434
- County is appealing the City of Bloomington Utility's administrative determination to withhold water

00:12:38.434 --> 00:12:44.972
- service from homes Habitat is building in phase two of Osage Place, which is our neighborhood on the

00:12:44.972 --> 00:12:46.526
- southwest side of town.

00:12:46.722 --> 00:12:53.869
- I have a procedural question for the board members. Were you given the exhibits that were identified

00:12:53.869 --> 00:13:01.015
- in our appeal letter? In addition to the four pages of the appeal letter, we also submitted a series

00:13:01.015 --> 00:13:08.445
- of exhibits. I just wanted to make sure that everybody got them. All right. They were not posted online,

00:13:08.445 --> 00:13:16.158
- so I just wanted to clarify that you did receive them. Those were the maps? There were maps and some emails.

00:13:16.354 --> 00:13:24.917
- communications. I think the pictures were submitted by CBU. I want to explain why Habitat is bringing

00:13:24.917 --> 00:13:33.480
- this appeal to you this evening. First, process matters, especially when a governmental entity denies

00:13:33.480 --> 00:13:42.463
- essential services. CBU has failed to give proper notice to Habitat. As a result, Habitat was not afforded

00:13:42.463 --> 00:13:45.150
- an opportunity to address CBU's

00:13:45.314 --> 00:13:52.047
- denial of water service until we attempted to obtain water service seven months after the apparent

00:13:52.047 --> 00:13:58.984
- determination. That is seven months that Habitat lost to resolve this issue before it became critical

00:13:58.984 --> 00:14:06.125
- to have water service available in homes that we are building for low income residents of our community.

00:14:06.125 --> 00:14:13.470
- While Habitat still does not know when CBU made the determination to withhold water service, it appears the

00:14:13.634 --> 00:14:21.652
- dates back to at least December 28th, 2025. That's when Assistant Director Peden sent an electronic

00:14:21.652 --> 00:14:30.150
- message to Katie Stein of Smith Design Group. That's Habitat's engineering firm. Nearly six months passed

00:14:30.150 --> 00:14:38.248
- before CBU verbally notified Habitat at a June 17th, 2026 meeting. At that time, Habitat requested a

00:14:38.248 --> 00:14:40.894
- written determination in writing

00:14:41.282 --> 00:14:50.193
- which was, that request was renewed again in an August 28th, 2026 electronic message from me to Director

00:14:50.193 --> 00:14:58.849
- Zager and Assistant Director Peden. On September 2nd, 2026, Director Zager responded to my electronic

00:14:58.849 --> 00:15:05.214
- message and attached the December 28th, 2025 message. That message states,

00:15:05.762 --> 00:15:13.146
- I know this is a thorn in your side, but I wanted to let you know that we will be withholding water

00:15:13.146 --> 00:15:20.604
- service applications in phase two, parentheses, meters, until the phase one swale is rectified. That

00:15:20.604 --> 00:15:28.210
- was the extent of the message. Second, notice matters, especially since the Bloomington Municipal Code

00:15:28.210 --> 00:15:35.742
- specifies required notice procedures. Director Zager's September 2nd, 2026 electronic message states,

00:15:35.970 --> 00:15:43.636
- Regarding the requested documentation for CBU withholding meters until the phase one swale was rectified,

00:15:43.636 --> 00:15:51.157
- we typically have these discussions with the engineer. Yet Bloomington Municipal Code specifies a clear

00:15:51.157 --> 00:15:58.751
- process for CBU to provide notice and an opportunity to appeal its determinations. That includes written

00:15:58.751 --> 00:16:05.694
- notice delivered to the property owner, in this case Habitat, in person or by first class mail.

00:16:05.922 --> 00:16:13.147
- The notice must provide 10 items of information, including the nature of the violation and what may

00:16:13.147 --> 00:16:20.950
- be appealed to the Utilities Service Board. I want to address two documents referenced in the memo provided

00:16:20.950 --> 00:16:28.030
- by Christopher Wheeler. First, there is a CBU walkthrough inspection letter dated April 16, 2024.

00:16:28.162 --> 00:16:34.965
- This document is clearly labeled as a notice of violation and specifically states that water meter requests

00:16:34.965 --> 00:16:41.264
- for phase two are being withheld until the noted deficiencies are corrected. However, that document

00:16:41.264 --> 00:16:47.627
- contains absolutely no issues related to the western drainage as well. Also, all of the deficiencies

00:16:47.627 --> 00:16:52.414
- that were identified in that notice of violation have since been corrected.

00:16:53.570 --> 00:17:01.770
- The second document is the pre-construction meeting packet for phase two of Osage Place, dated September

00:17:01.770 --> 00:17:10.049
- 17th, 2024. Item four and page five of the document contains a note stating, water services and or meters

00:17:10.049 --> 00:17:18.015
- may be held for any outstanding items noted below. However, none of the outstanding items noted below

00:17:18.015 --> 00:17:23.326
- concern the western drainage swale or any other items in phase one.

00:17:23.618 --> 00:17:33.086
- In the questions and comments section starting on page 12, there is a discussion of ditch line issues.

00:17:33.086 --> 00:17:42.370
- But it says nothing about withholding water service in phase two. Mr. Wheeler's memo states that CBU

00:17:42.370 --> 00:17:51.563
- has used normal protocol and has not deviated from normal practices. Whether or not that is true is

00:17:51.563 --> 00:17:52.574
- immaterial

00:17:52.802 --> 00:18:01.479
- to this appeal. Normal protocol and practices does not equal a legal and fair process as specified by

00:18:01.479 --> 00:18:10.070
- the Bloomington Municipal Code. CBU's normal protocol and practices are arbitrary and capricious and

00:18:10.070 --> 00:18:18.577
- did not afford habitat due process of law to contest denial of water service, which is an essential

00:18:18.577 --> 00:18:21.214
- necessity for home occupation.

00:18:22.018 --> 00:18:28.867
- I urge the members of this board to carefully review those documents with an eye toward what they say

00:18:28.867 --> 00:18:35.784
- and what they don't say. Third, evidence matters. To date, CBU has produced no evidence to support its

00:18:35.784 --> 00:18:42.969
- apparent determination that the western drainage swale is undersized. In fact, it was Habitat that pursued

00:18:42.969 --> 00:18:48.542
- approval of a redesign of the western drainage swale, not on the basis that it was

00:18:48.770 --> 00:18:55.959
- undersized, but to establish a drainage design in which vegetation would not wash away during intense

00:18:55.959 --> 00:19:03.007
- rain events and to provide a backyard environment that homeowners can safely maintain. CBU also has

00:19:03.007 --> 00:19:10.126
- not provided habitat with notice or evidence of other deficiencies. As a result, we've been given no

00:19:10.126 --> 00:19:17.315
- opportunity to understand the nature and legitimacy of this accusation. There's just no way for us to

00:19:17.315 --> 00:19:18.654
- correct or contest

00:19:18.882 --> 00:19:27.298
- this determination. Fourth, remedies matter. It is improper for CBU to withhold water service for homes

00:19:27.298 --> 00:19:35.551
- habitat is building in phase two of Osage Place based on CBU's unsupported claims about the status of

00:19:35.551 --> 00:19:43.886
- a storm water conveyance feature in phase one of Osage Place. These two phases of the neighborhood are

00:19:43.886 --> 00:19:48.094
- permitted and bonded as separate projects. Finally,

00:19:48.258 --> 00:19:55.850
- Fiduciary responsibility matters. Habitat for Humanity of Monroe County owes duty to its owners to spend

00:19:55.850 --> 00:20:03.154
- their funding wisely. This obligation is similar to the duty CBU owes to its ratepayers to prudently

00:20:03.154 --> 00:20:10.818
- spend their funds to maintain the water, sewer, and stormwater systems. Habitat is compelled to undertake

00:20:10.818 --> 00:20:13.566
- this appeal because CBU has failed to

00:20:13.826 --> 00:20:21.922
- Exercise a lawful and fair process with regard to its determination to withhold water service Bloomington

00:20:21.922 --> 00:20:29.561
- municipal code authorizes a stay of cbu's determination Habitat requests an immediate stay of cbu's

00:20:29.561 --> 00:20:37.657
- determination to withhold water service from homes habitat is building in phase two of osage place That's

00:20:37.657 --> 00:20:42.622
- the end of my prepared comments if it's appropriate for question

00:20:42.882 --> 00:20:56.772
- For questions. I'm happy to take them Yes Thank you for your comments and and let's see if we have questions

00:20:56.772 --> 00:21:09.516
- from the board at this stage any questions or observations All right, we may later so Thank you for

00:21:09.516 --> 00:21:12.574
- being with us We'll ask

00:21:15.106 --> 00:21:33.223
- Mr. Wheeler, our counsel, to provide some additional comments and background. Thank you. Chris Wheeler,

00:21:33.223 --> 00:21:43.326
- City Legal. What we're looking at is the process by which

00:21:43.970 --> 00:21:54.177
- CBU works with the developers to install the critical utility infrastructure during their development

00:21:54.177 --> 00:22:04.184
- process. So we had wastewater and storm infrastructure being placed in phase one and phase two. And

00:22:04.184 --> 00:22:12.190
- the documents that are being shared with the board are the procedural documents

00:22:12.290 --> 00:22:20.149
- that CBU uses with regards to its plan review, its process of overseeing the installation and ultimate

00:22:20.149 --> 00:22:28.009
- approval of the installation of critical infrastructure that's just been mentioned. In this particular

00:22:28.009 --> 00:22:35.868
- situation, with regards to the habitat development at Osage, plans were submitted that showed what the

00:22:35.868 --> 00:22:41.438
- storm infrastructure would look like. CBU reviewed those plans, I think,

00:22:42.242 --> 00:22:51.739
- If you look at the timeline that was submitted to the board, these plans would have been reviewed as

00:22:51.739 --> 00:23:01.706
- far back in time as 20 and 21. The plans that were submitted were reviewed and accepted by CBU. It wasn't

00:23:01.706 --> 00:23:09.886
- until later that CBU realized that the particular storm swell that we're talking about

00:23:10.146 --> 00:23:17.666
- was not built according to the plans that they had submitted. Habitat had submitted through their engineers

00:23:17.666 --> 00:23:24.698
- to CBU. So CBU needs to take the measures and the steps to notify them of the fact that they did not

00:23:24.698 --> 00:23:31.661
- follow their own plans that were submitted and approved to CBU and that they needed to correct that

00:23:31.661 --> 00:23:37.022
- storm swale to make it compliant with what they had said they would install.

00:23:38.018 --> 00:23:46.111
- and that became the crux of the issue between them with regards to this storm swale. Fast forward to

00:23:46.111 --> 00:23:54.444
- today and Habitat is still trying to figure out how to correct that storm swale because in the meantime

00:23:54.444 --> 00:24:02.537
- they went ahead and built around the area where that storm swale exists such that the original plans

00:24:02.537 --> 00:24:05.982
- that called for this storm swale no longer

00:24:06.146 --> 00:24:13.122
- they can no longer put in the storm swale they said they would put in because there are homes fixed

00:24:13.122 --> 00:24:20.098
- on either side of this storm swale. They can't be moved. They can't be raised or lowered. You can't

00:24:20.098 --> 00:24:27.074
- get the same kind of drop in the storm swale that would be necessary to effectively carry the water

00:24:27.074 --> 00:24:32.446
- through the neighborhood effectively. That becomes a problem. And so habitat

00:24:32.834 --> 00:24:40.692
- and CBU have been working together to try and correct this problem, but it has taken years for us to

00:24:40.692 --> 00:24:49.018
- get there. Habitat has presented several different plans as a proposal to correct what they had installed.

00:24:49.018 --> 00:24:56.954
- The most recent until last Friday was a set of a hybrid that would do some sort of grading as well as

00:24:56.954 --> 00:25:00.222
- putting in an underground pipe to try and

00:25:00.962 --> 00:25:08.217
- help to usher storm water through the neighborhood. CBU agreed to that plan, but would like, but still

00:25:08.217 --> 00:25:15.824
- needed to address a few encroachment issues with regards to this storm swell where owners of the properties

00:25:15.824 --> 00:25:23.009
- who are now living there were putting their sheds out into the encroachments. That's more between CBU

00:25:23.009 --> 00:25:29.982
- and the owners now, but they were hoping to try and correct that with habitat and said, Hey, this,

00:25:30.178 --> 00:25:36.912
- Plans look good, but we need to figure out what to do with these encroachments. In the meantime, however,

00:25:36.912 --> 00:25:43.265
- Habitat changed their mind and didn't want to do the hybrid approach. They now want to do solely an

00:25:43.265 --> 00:25:49.681
- underground pipe. That plan was submitted on Friday of last week. I'm sorry, that plan was submitted

00:25:49.681 --> 00:25:56.542
- and on Friday of last week, CBU was going to release or review and release its determinations on that plan.

00:25:58.050 --> 00:26:04.783
- determination with CBU on that plan was released as far as their comments today. And there are still

00:26:04.783 --> 00:26:11.449
- a few issues with the concept of putting that underground pipe in with regards to the potential for

00:26:11.449 --> 00:26:18.249
- clogging and creating flooding upstream of the swale. So there are still some issues that the parties

00:26:18.249 --> 00:26:23.582
- are trying to work out to try and make whatever alterations Habitat needs to do

00:26:23.906 --> 00:26:30.455
- to effectively allow proper stormwater management through the neighborhood. This is all just an ongoing

00:26:30.455 --> 00:26:37.004
- negotiation and a process between CBU and the developer. These are natural processes. And when you look

00:26:37.004 --> 00:26:43.364
- at the documentation that has been submitted, you can see in some of the documentation where we have

00:26:43.364 --> 00:26:49.851
- standard language that talks about the fact that if you have deficiencies, we may withhold the release

00:26:49.851 --> 00:26:53.566
- of your water meters. That's one of the things that as the

00:26:53.922 --> 00:27:01.805
- as the design and oversight and acceptance of installation of necessary critical utility infrastructure.

00:27:01.805 --> 00:27:09.989
- That is one of the things that the engineering department can utilize to try and make sure that deficiencies

00:27:09.989 --> 00:27:17.497
- get corrected is to withhold the issuance of water meters. This is not an unusual and new thing. It

00:27:17.497 --> 00:27:18.398
- is the same

00:27:18.722 --> 00:27:25.718
- an ordinary thing that CBU has always had in its protocols and procedures with regards to how it works

00:27:25.718 --> 00:27:32.781
- with developers. We haven't reached a point where we need to issue a notice of violation in this matter

00:27:32.781 --> 00:27:39.166
- because the parties have still been trying to amicably resolve this issue, and so we have not

00:27:39.650 --> 00:27:45.862
- issued a notice of violation because we don't see a violation right now. We see a deficiency in the

00:27:45.862 --> 00:27:52.260
- plans that they submitted versus what they've installed. And we're trying to reach a resolution there.

00:27:52.260 --> 00:27:58.782
- If Habitat turns around and tells us we're not going to put the storm swale in the way we said we would,

00:27:58.782 --> 00:28:05.180
- then we would be in a position where we might be forced to issue a notice of violation. And if we were

00:28:05.180 --> 00:28:09.342
- going to do that, we would follow the procedures that are in place

00:28:09.570 --> 00:28:16.909
- to issue a notice of violation and provide the notice with all of the bells and whistles that go along

00:28:16.909 --> 00:28:24.248
- with it. But we're not there yet. So I feel like this appeal is premature. However, here we are today.

00:28:24.248 --> 00:28:31.444
- We hope to have the opportunity to continue to work with Habitat to resolve, finally, the issue with

00:28:31.444 --> 00:28:36.574
- the storm swale so that all of the development can continue as expected

00:28:36.930 --> 00:28:42.966
- and the meters that are being applied for can be issued. Doesn't seem like a heavy lift, but it's taken

00:28:42.966 --> 00:28:49.177
- years to get there. And it's mostly because Habitat at the very beginning failed to put the infrastructure

00:28:49.177 --> 00:28:55.446
- in that they said they would. So here we are today. I ask that you deny the appeal and allow us to continue

00:28:55.446 --> 00:29:01.424
- to work with Habitat to try and resolve the storm swell issue and allow them to move on with OSH phase

00:29:01.424 --> 00:29:04.094
- two. I am happy to answer questions if I can.

00:29:06.594 --> 00:29:17.125
- Questions for Mr. Wheeler? Chris, I think we've got some options here. One would be an outright denial

00:29:17.125 --> 00:29:27.656
- this evening. We could table, not take action on it tonight, while things are continuing to get worked

00:29:27.656 --> 00:29:33.790
- out. Is that an option? Come back in a couple of weeks? OK.

00:29:36.770 --> 00:29:47.254
- So to do that, I mean, because what we want to do here, I think, is come to the best resolution for

00:29:47.254 --> 00:29:58.053
- all the parties involved. We represent the big picture in storm drainage, long term for the community.

00:29:58.053 --> 00:30:05.182
- But at the same time, we're committed to doing our best to help our

00:30:06.818 --> 00:30:16.992
- bring folks into our water and wastewater system. So as a board, I think where we should be headed is

00:30:16.992 --> 00:30:27.166
- a way for us to hopefully work these things out over the next couple weeks before our next meeting so

00:30:27.166 --> 00:30:34.846
- that we might come back with a resolution. Is that a direction we get ahead?

00:30:38.082 --> 00:30:47.345
- You can table this matter for two weeks, but I'm sure that Habitat wants to know the answer sooner rather

00:30:47.345 --> 00:30:56.258
- than later. I don't wish to speak for Habitat, but I suspect they would like to have an answer. Yeah.

00:30:56.258 --> 00:31:04.297
- Jim, did you have a comment? I wanted to ask a question of Habitat. Yeah, come on up. Yeah.

00:31:04.297 --> 00:31:07.006
- So thank you. I was wondering.

00:31:07.650 --> 00:31:19.066
- whether the underground pipe solution seems a reasonable one to habitat. Habitat is the entity that

00:31:19.066 --> 00:31:30.482
- requested to put in the underground pipe. So the answer to that question is yes. This appeal is not

00:31:30.482 --> 00:31:36.190
- about the underground pipe or the drainage swale.

00:31:36.738 --> 00:31:46.477
- This appeal is about withholding water meters. I understand. Chris? Am I able? Oh, you have a question

00:31:46.477 --> 00:31:56.216
- for him. I wanted to respond to, or maybe ask a question about what you do next. Okay. Chris, does the

00:31:56.216 --> 00:32:02.078
- underground pipe solution seem a reasonable one to you and to

00:32:03.330 --> 00:32:13.393
- I haven't seen the comments from CBU engineering as to the latest proposal. And when will that be available?

00:32:13.393 --> 00:32:22.625
- I think they went out today. So Ginger's here who might be able to speak on that. Hi, Ginger Davis,

00:32:22.625 --> 00:32:32.318
- utility engineer. Yes, we submitted, to answer your question, we did submit some revisions to the plans.

00:32:32.930 --> 00:32:39.658
- Um, our concern is that the inlets within this pipe that they propose are, um, in between houses, which

00:32:39.658 --> 00:32:46.126
- often get clogged. So our question back to the engineer or not, I'm sorry, not our question back to

00:32:46.126 --> 00:32:52.789
- the engineer, but our consideration for the engineer is what happens when these inlets do get clogged?

00:32:52.789 --> 00:32:59.646
- How will water flow? We did notice that some finished floor elevations were below the level of the swale.

00:32:59.842 --> 00:33:06.981
- adjacent. So if it does get clogged, water would move out of this whale and into these people's homes.

00:33:06.981 --> 00:33:14.189
- So our concern is for the homeowners along this whale to ensure that they don't get excess water during

00:33:14.189 --> 00:33:21.398
- flooding conditions. Is this a fixable problem? We have proposed to them a couple solutions of lowering

00:33:21.398 --> 00:33:29.022
- some inlets and regrading some things. There also is a velocity concern within the pipe that the pipe at this

00:33:29.282 --> 00:33:38.223
- current slope will cause water to come out above our standards. So we've asked for some redesign of

00:33:38.223 --> 00:33:47.164
- the pipe to meet our standards. But I do believe it is a fixable solution. And would that pipe with

00:33:47.164 --> 00:33:56.730
- the fixable solution have to be complete before water would be available, water meters would be available?

00:33:56.730 --> 00:33:57.982
- At what point

00:33:58.530 --> 00:34:10.457
- Would the city, would CBU be willing to okay the water meters? Chris? Yeah. Is there a point at which...

00:34:10.457 --> 00:34:16.478
- I can take a stab at this, but... Take a stab? Okay.

00:34:17.026 --> 00:34:24.505
- Our documents have clearly stated from the beginning in our pre-con notes, and this goes to any developer

00:34:24.505 --> 00:34:31.560
- in the community, that we do not release meters until all deficiencies are met. So as soon as these

00:34:31.560 --> 00:34:38.686
- deficiencies are met and the designer is out there designing to the plan as drawn, then we can start

00:34:38.686 --> 00:34:44.542
- to release some meters. But we have to have inspectors to verify that deficiencies

00:34:44.642 --> 00:34:52.146
- have been met, and so far our inspectors have not seen those deficiencies. So this is likely to take

00:34:52.146 --> 00:34:59.651
- a long time. Well, they have to install the pipes, they have to meet your inspection, so this is not

00:34:59.651 --> 00:35:04.926
- something that is done within a week or a month or... Okay, thank you.

00:35:13.218 --> 00:35:21.921
- wasn't sure when when you were talking with Mr. Wheeler what you were recommending could happen over

00:35:21.921 --> 00:35:30.969
- the next two weeks could I ask for some clarification on what what that would entail you've got a really

00:35:30.969 --> 00:35:40.017
- good question because our job but what's been brought before us is an appeal and that's really a process

00:35:40.017 --> 00:35:42.430
- question I think whether we

00:35:43.522 --> 00:35:52.360
- your appeal is questioning whether CBU followed its procedures or not. Correct. And I was thinking in

00:35:52.360 --> 00:36:01.112
- terms of how do we get the quickest resolution here so that we can get water meters to you, which is

00:36:01.112 --> 00:36:10.297
- a little different than just saying yes or no to an appeal, I think. But we may be in a spot where that's

00:36:10.297 --> 00:36:12.030
- what we have to do.

00:36:15.970 --> 00:36:27.156
- We thought very carefully about whether to appeal and what we were appealing. And we are appealing the

00:36:27.156 --> 00:36:38.233
- procedural issues related to the determination to withhold water meters. Okay. Just to be clear about

00:36:38.233 --> 00:36:45.726
- that. My feeling is that you've laid out a good case on your behalf.

00:36:46.306 --> 00:36:56.011
- and I'm gonna take input from the rest of our board, but I think what we need to do is dive deeper into

00:36:56.011 --> 00:37:05.436
- our own procedures because I don't feel like we have enough information tonight to be able to make a

00:37:05.436 --> 00:37:12.062
- good determination on this. Is that, yeah. What is it you want to ask?

00:37:12.546 --> 00:37:22.369
- I need to know specifically what are we asking that we would have in two weeks? Jim, I think our role

00:37:22.369 --> 00:37:31.999
- is to make sure that our staff, that the utilities department has followed its procedures according

00:37:31.999 --> 00:37:42.014
- to the municipal code that's been cited in the appeal. I don't have enough information on that tonight.

00:37:42.626 --> 00:37:52.532
- to be able to say yes or no? Well, I haven't heard from Chris any response to the procedural issues.

00:37:52.532 --> 00:38:02.536
- He talked about how they failed to meet the SWAIL requirements and didn't build it, but I didn't hear

00:38:02.536 --> 00:38:09.598
- any response to the failure to follow procedural issues. Good question.

00:38:18.594 --> 00:38:26.711
- I guess I thought that I had made a response to that, Mr. Sherman. My point was to say that Habitat's

00:38:26.711 --> 00:38:34.670
- complaining because we didn't follow a process or procedure with regards to notice of violation. We

00:38:34.670 --> 00:38:42.628
- did not issue a notice of violation because there isn't one right now. There is a deficiency in the

00:38:42.628 --> 00:38:46.846
- design plan that needs to get corrected. We have not

00:38:47.362 --> 00:38:57.081
- identified a violation, we're simply working with Habitat to correct a deficiency. Part of the process

00:38:57.081 --> 00:39:06.517
- of design and review and acceptance of installed utility infrastructure is to withhold water meters

00:39:06.517 --> 00:39:16.048
- if there are deficiencies in the installation of the utility itself. So when it comes to a notice of

00:39:16.048 --> 00:39:17.086
- violation,

00:39:17.506 --> 00:39:24.972
- I would agree with Kari Bennett that we haven't provided notice and all of the bells and whistles that

00:39:24.972 --> 00:39:32.439
- go with a notice of violation notice to Habitat. We haven't issued a notice of violation. We're simply

00:39:32.439 --> 00:39:39.833
- trying to amicably resolve an issue with regards to deficiency in the installation of infrastructure.

00:39:39.833 --> 00:39:45.342
- I understand now. However, whether you call it a deficiency or a violation,

00:39:46.818 --> 00:39:54.083
- the outcome is the same. There's no water meter. And with a deficiency, you don't have to provide

00:39:54.083 --> 00:40:01.497
- notification. So the outcome is absolutely the same. I mean, it seems to me if there's a deficiency

00:40:01.497 --> 00:40:09.282
- that needs to be corrected, there needs to be notification. I mean, maybe not by the law, but, you know,

00:40:09.282 --> 00:40:12.766
- the outcome is the same as if you had declared

00:40:12.898 --> 00:40:19.480
- a violation. It would have been better for Habitat had you declared a violation. Because then they would

00:40:19.480 --> 00:40:25.811
- have been notified. In the history of negotiating with Habitat, there have been meetings as you look

00:40:25.811 --> 00:40:32.080
- through the timeline. There have been meetings and there have been walk-throughs. There's been plan

00:40:32.080 --> 00:40:38.411
- review and design review. And along the way, there has been discussion about the fact that the storm

00:40:38.411 --> 00:40:40.542
- swale was not properly installed.

00:40:40.994 --> 00:40:47.445
- nature of it of that the work between CBU and the developer with regards to making sure that what get

00:40:47.445 --> 00:40:53.770
- what they say they're going to install actually gets installed at some point if they don't do it we

00:40:53.770 --> 00:41:00.285
- have to we get pushed to a point where we do need to issue a notice of violation but we've been trying

00:41:00.285 --> 00:41:06.926
- to work with habitat and we've never gotten to the point where a notice actually got issued I understand

00:41:06.926 --> 00:41:10.974
- thank you a notice of violation ever got issued okay then Chris

00:41:11.650 --> 00:41:18.229
- What are some options here at this stage in the game? Well, I believe that there's been a request for

00:41:18.229 --> 00:41:24.744
- this board to decide whether we follow process. If the board feels like it needs more information in

00:41:24.744 --> 00:41:31.452
- order to make that determination, then I suppose we're going to have to come back with more information

00:41:31.452 --> 00:41:38.031
- for you, unless you'd rather have a decision today, in which case the board's going to be required to

00:41:38.031 --> 00:41:40.030
- come up with a decision today.

00:41:40.866 --> 00:41:48.605
- Or at least to do as we discussed initially before the meeting started. Cara Bennett and I discussed

00:41:48.605 --> 00:41:56.267
- with you the idea that we would submit to the board the proposed findings for the board to consider

00:41:56.267 --> 00:42:03.929
- and then in two weeks come back with its decision in writing. That sounds like a pretty good option

00:42:03.929 --> 00:42:09.982
- to me if if if everyone agrees on that and come back in a couple of weeks with

00:42:10.178 --> 00:42:22.436
- some proposed solutions to the appeal. Proposed findings. Findings, yes. Proper term. Does two weeks

00:42:22.436 --> 00:42:35.422
- give staff and city legal and have it had enough time to mitigate this or should we be looking at a month?

00:42:36.994 --> 00:42:43.828
- I know there's a lot on staff's plate right now. The two weeks is to give both parties the opportunity

00:42:43.828 --> 00:42:50.596
- to submit to the board its proposal as to what the findings should be of this board and then also for

00:42:50.596 --> 00:42:57.431
- the board to review those proposals and come back in the two weeks and give its decision. It's not two

00:42:57.431 --> 00:43:04.066
- weeks for us to mitigate. Now, during the two weeks, it's very likely that we're going to be having

00:43:04.066 --> 00:43:06.654
- communications and maybe there is some

00:43:07.042 --> 00:43:14.203
- solution that occurs in the two weeks that renders moot the need for the appeals for this board to make

00:43:14.203 --> 00:43:21.296
- a decision on the appeal. But the two weeks that I'm talking about isn't for that necessarily for this

00:43:21.296 --> 00:43:28.388
- board. It's just to allow an opportunity for the two parties to present their findings and recommended

00:43:28.388 --> 00:43:34.654
- decision by the board. OK? That makes sense to me, because we need those sets of findings.

00:43:37.442 --> 00:43:48.639
- Habitat is okay with preparing our proposed findings and submitting them to the utility service board

00:43:48.639 --> 00:44:00.384
- so that you have them in front of you in your meeting in two weeks. We would not be supportive of delaying

00:44:00.384 --> 00:44:04.446
- a decision beyond that next meeting.

00:44:04.546 --> 00:44:12.250
- because we need some certainty to move forward. As I mentioned, we are not able to get water meters

00:44:12.250 --> 00:44:19.954
- right now. That is a critical issue for us. Of course. Thank you. We didn't talk about this. And so

00:44:19.954 --> 00:44:27.966
- if Habitat is okay with this proposal, I think it makes sense for us to be asked to submit our findings

00:44:27.966 --> 00:44:32.126
- and recommendation for conclusions within seven days.

00:44:32.354 --> 00:44:41.167
- so that you have another seven days to review those and come back at the next meeting to actually render

00:44:41.167 --> 00:44:49.728
- your decision. Does that sound reasonable? Yeah, Chris, tell me if this is wrong. It seems to me that

00:44:49.728 --> 00:44:58.289
- whether the city followed proper procedure or not is a legal issue rather than anything else. I don't

00:44:58.289 --> 00:45:01.310
- know how the board can decide that.

00:45:02.402 --> 00:45:11.403
- I know Habitat feels one way and you feel another way, but to me that sounds like a legal issue. I'm

00:45:11.403 --> 00:45:20.316
- not a lawyer and when I hear both sides, I'm not sure I could make a proper decision. It is a legal

00:45:20.316 --> 00:45:29.228
- decision, but you have to put your hat on and make a decision based upon what it is we've presented

00:45:29.228 --> 00:45:30.654
- to you and what

00:45:31.202 --> 00:45:38.564
- Kari and I are going, I'm sorry, I've known you too long. Ms. Bennett, what we would present to you,

00:45:38.564 --> 00:45:46.218
- you'll have to review that and make your decision based upon what you've heard today and what we present

00:45:46.218 --> 00:45:53.799
- to you in writing. If we grant the appeal, does that, that doesn't negate the fact that they still have

00:45:53.799 --> 00:46:00.286
- to meet all the requirements in order to get the water meters, right? They're requesting

00:46:03.490 --> 00:46:10.505
- They're appealing our decision, CBU's decision to not issue the water meters. If you grant the appeal,

00:46:10.505 --> 00:46:17.316
- correct me if I'm wrong, but if you grant the appeal, we would be compelled then to issue the water

00:46:17.316 --> 00:46:24.264
- meters. We would have to divorce the issuance of the water meters from the concerns that we have with

00:46:24.264 --> 00:46:31.415
- the existing storm swale the way it is. Is that fairly stated? I believe that is fairly stated. It would

00:46:31.415 --> 00:46:33.118
- separate the two issues.

00:46:33.410 --> 00:46:41.411
- If we were to be granted the appeal, we would be able to get water meters. We would still be working

00:46:41.411 --> 00:46:49.332
- with CBU on the Western Drainage Swale, which we are committed to do. And Chris, one more question.

00:46:49.332 --> 00:46:57.412
- What is the downside of issuing the water meters? Is there something disastrous that could happen? Or

00:46:57.412 --> 00:47:02.878
- is it just withholding it because they didn't agree to certain plans

00:47:03.074 --> 00:47:09.910
- but that's independent of any negative effects of installing water meters. I have not been involved

00:47:09.910 --> 00:47:16.882
- in all of the conversations that have happened over the years between CBU and Habitat that gets us to

00:47:16.882 --> 00:47:24.128
- the point we are today. I don't know how many different ways the parties have discussed trying to resolve

00:47:24.128 --> 00:47:29.118
- this storm swale issue. I just think that it's reached a point where CBU

00:47:30.178 --> 00:47:38.404
- really would like them to pay attention and get that done so that we can all move forward with OSH2

00:47:38.404 --> 00:47:47.041
- and not have to worry anymore about this lingering concern. But I'm not jumping into a speculation right

00:47:47.041 --> 00:47:55.514
- now. I'm asking the question about any possible negative effects of issuing. No, I don't think there's

00:47:55.514 --> 00:47:58.558
- a negative effect that the CBU would

00:47:58.882 --> 00:48:04.608
- would experience if it issues the meters. Except for the fact that we don't have the, we don't have

00:48:04.608 --> 00:48:10.448
- a storm swale that's properly installed at the moment. And then it would be based simply on the trust

00:48:10.448 --> 00:48:16.173
- of habitat to follow through and do it. We're gonna have to wait and see what happens, right? Based

00:48:16.173 --> 00:48:22.013
- on what Ginger said, it sounds like there are potential issues for the homeowners if those things are

00:48:22.013 --> 00:48:28.254
- not corrected. There are potential issues for the homeowners with regards to the storm swale, but that's got

00:48:28.386 --> 00:48:37.761
- nothing to do with whether water meters get issued. But if there's no water flowing, then they wouldn't

00:48:37.761 --> 00:48:46.955
- have an issue. Well, so the water meters are for the water pipes. The storm soils are for storm water

00:48:46.955 --> 00:48:56.420
- issuance. Would the issuance of water meters be done when you agreed on a solution or when that solution

00:48:56.420 --> 00:48:57.502
- is actually

00:48:58.050 --> 00:49:05.217
- actualized what I heard ginger say is that once the storm swale with the current with the current new

00:49:05.217 --> 00:49:12.244
- plans that have been proposed with the underground pipe if you can do the couple of things that cbu

00:49:12.244 --> 00:49:19.552
- has recommended to alter that their current plans cbu will accept those plans and then they will expect

00:49:19.552 --> 00:49:26.650
- the installation of that underground pipe with those inlets before they would issue the water meters

00:49:26.650 --> 00:49:27.774
- is what I heard

00:49:28.034 --> 00:49:35.987
- Ginger say. Whether CBU would change their minds and issue the water meters upon acceptance of the plans,

00:49:35.987 --> 00:49:43.639
- I don't know. But that doesn't sound like what CBU generally does. I understand. But would a possible

00:49:43.639 --> 00:49:51.141
- solution be that if both parties agreed on the plan, then we could... I would have to leave that up

00:49:51.141 --> 00:49:56.318
- to CBU and Habitat to determine. So we might have that as an option?

00:49:57.698 --> 00:50:13.151
- I would like to clearly state Habitat is appealing the procedures or lack thereof related to with CPUs

00:50:13.151 --> 00:50:26.654
- withholding of water service in phase two. We are not asking this board to help negotiate

00:50:27.650 --> 00:50:37.575
- what the Western drainage swale should look like or how that process should work. We are requesting

00:50:37.575 --> 00:50:47.898
- your review and decision on the process that was used to make the determination that CBU would not give

00:50:47.898 --> 00:50:55.838
- us water service. That's it. Fair enough. Can you explain to us why the project

00:50:58.370 --> 00:51:08.043
- We have never been given any evidence from CBU to support that claim. That was covered in the appeal

00:51:08.043 --> 00:51:18.195
- document that we wrote and that is part of the process that we are appealing now. It is fine for somebody

00:51:18.195 --> 00:51:27.198
- to say we think this is undersized, but there needs to be evidence presented to support that.

00:51:27.746 --> 00:51:37.123
- We still are looking for that evidence. Understand. I think we need to table. I do have one more question.

00:51:37.123 --> 00:51:46.412
- Aside from the water, are these two homes where the water has been withheld? Are they ready for occupancy

00:51:46.412 --> 00:51:55.876
- aside from water? They are not, but they will be in about two weeks. OK. Thank you. We've got some homework

00:51:55.876 --> 00:51:57.278
- to do, I think.

00:51:58.946 --> 00:52:08.489
- So I think it would be good to entertain a motion to table until our next meeting. If we are going to

00:52:08.489 --> 00:52:17.938
- be expected to review this, I would like to see from staff's perspective the outline of the timeline

00:52:17.938 --> 00:52:26.078
- and conversations that have happened. We have seen exhibits provided by Habitat, which

00:52:26.882 --> 00:52:36.162
- Again, not to say that anything is wrong or whatnot. It's just we've seen the one side of the communications.

00:52:36.162 --> 00:52:44.851
- I don't know that we have fully seen. I appreciate what Mr. Weaver has shared, but I just want to make

00:52:44.851 --> 00:52:53.287
- sure that we are truly hearing both sides. That's right. And that's what we'll need in our homework

00:52:53.287 --> 00:52:56.830
- session between now and our next meeting.

00:52:59.106 --> 00:53:08.513
- And now I will move to table, if I'm doing the correct thing, have I moved to table this appeal to a

00:53:08.513 --> 00:53:18.106
- future meeting? Second. Okay, it's been moved and seconded to table this appeal. Any other discussion?

00:53:18.106 --> 00:53:27.326
- It just doesn't need to specify the next CBU meeting on the 5th. We can do that. Is that the date?

00:53:30.434 --> 00:53:39.372
- October 5th. Fifth or sixth? Fifth. Fifth? Okay. Friendly amendment? Friendly amendment. All right.

00:53:39.372 --> 00:53:48.667
- Specify the date to be October 5th, 2026 at the next CBU meeting. Second. All right. Moved and seconded

00:53:48.667 --> 00:53:57.783
- to table two, October 5th. Any other discussion? All in favor say aye. Aye. Opposed? All right. We'll

00:53:57.783 --> 00:54:00.286
- get some work done on that.

00:54:01.346 --> 00:54:09.651
- Thank you everyone who attended and we appreciate you bringing those issues to our attention.

00:54:09.651 --> 00:54:19.282
- Thank you. Our next item is item seven requesting approval of resolution 26-16 for the salaries of appointed

00:54:19.282 --> 00:54:28.382
- officers non-union and ask me employees for CBU for 2027. Is Audrey here or is Chris going to do that?

00:54:32.098 --> 00:54:42.842
- Or you are on. Oh, I'm sorry. Yeah, we yes salaries. So this is. I believe that Audrey was here last

00:54:42.842 --> 00:54:53.692
- year to discuss this. She had an issue that prevented her personal issue that prevents her from being

00:54:53.692 --> 00:55:00.606
- here tonight. But basically this is a statutory requirement that

00:55:01.122 --> 00:55:08.317
- The state in statute and I believe Audrey provided her memorandum that shows the statute that we're

00:55:08.317 --> 00:55:15.512
- talking about requires that this board review and approve the salaries before they go up to council

00:55:15.512 --> 00:55:22.850
- for final adoption. And so Audrey Brittingham has presented the information to the board with regards

00:55:22.850 --> 00:55:28.894
- to salaries of appointed officers, non union and AFSCME employees for 2027 for CBU.

00:55:29.026 --> 00:55:38.799
- and would like this board to approve that resolution that's been presented so that then the city can

00:55:38.799 --> 00:55:48.669
- take this matter up to council for final approval. Okay. I believe somebody from HR is present online

00:55:48.669 --> 00:55:56.990
- if there are questions that you have that I can't answer and maybe they can help out.

00:55:58.626 --> 00:56:09.066
- Questions for Mr. Wheeler or City HR? I guess I assume folks in these positions feel like they are renamed

00:56:09.066 --> 00:56:19.116
- appropriately or reclassified appropriately. They're not new positions. They're just changes, correct?

00:56:19.116 --> 00:56:24.190
- I can't speak to that. I'm sorry. I don't know. OK.

00:56:28.962 --> 00:56:42.880
- Thank you. Yes. There are some adjustments that we made. Most of these adjustments were to align our

00:56:42.880 --> 00:56:58.590
- current practices. We aligned our current org chart to the salary ordinance. We've been working to clean that up.

00:56:58.722 --> 00:57:08.323
- over the last couple salary ordinances. Maybe at a future meeting, could you share with us your updated

00:57:08.323 --> 00:57:17.647
- ORC chart, please? Oh, yeah. Thank you. Yeah, absolutely. These are really, I think this was part of

00:57:17.647 --> 00:57:25.310
- the classification review, routine classification review that occurs periodically.

00:57:25.858 --> 00:57:34.573
- organizations. I'm glad that we do this in the city to review the complexity of the jobs and decide

00:57:34.573 --> 00:57:43.985
- whether classifications are appropriate. And then this then it's agreed upon between the the ASME employees

00:57:43.985 --> 00:57:52.962
- and our others. And HR then does the part for the non union employees as well. So we're just codifying

00:57:52.962 --> 00:57:55.838
- those right? That's right. Okay.

00:57:58.722 --> 00:58:14.539
- any other discussion on resolution 26 16 motion to approve all right it's been moved and seconded all

00:58:14.539 --> 00:58:28.030
- in favor say aye opposed all right motion carries thank you thank you and next item is

00:58:28.130 --> 00:58:36.701
- is item eight, approval of the easement for the Duke Energy Incorporated at the Winston Thomas site

00:58:36.701 --> 00:58:45.700
- for the National Guard Armory property. Yeah, hi Chris Wheeler, City Legal again. We see these easements

00:58:45.700 --> 00:58:54.357
- come about fairly regularly lately. This one reads the same as two previous easements we've reviewed

00:58:54.357 --> 00:58:56.414
- and approved with Duke.

00:58:57.538 --> 00:59:04.441
- Traditionally what they do is give us their standard boilerplate form and we ask them to make a couple

00:59:04.441 --> 00:59:11.276
- of changes with regards to staying within the easement and not being able to just change the location

00:59:11.276 --> 00:59:17.978
- of the easement because they wish to. So we lock them into knowing where the easement should be and

00:59:17.978 --> 00:59:24.680
- staying within that easement with their infrastructure. This is a situation where in order for Duke

00:59:24.680 --> 00:59:25.886
- to supply service

00:59:26.178 --> 00:59:33.592
- to the National Guard Armory for a couple of electric car charging ports, they have to cross a little

00:59:33.592 --> 00:59:41.296
- spit of land that we own. So there's a heavy box in the diagram that shows where the easement is actually

00:59:41.296 --> 00:59:48.855
- going to be located, and that crosses that tiny little spit of land that we own. We recommend approval,

00:59:48.855 --> 00:59:55.614
- as we've done in the past with Duke, and I'm happy to try and answer any questions you have.

00:59:56.674 --> 01:00:06.574
- Okay. Any questions for Mr. Wheeler? This easement grant. All right. Ready for motion to approve? I

01:00:06.574 --> 01:00:16.869
- move that we approve the easement with Duke. Second. All right. It's been moved and seconded to approve

01:00:16.869 --> 01:00:25.086
- the easement to Duke Energy at Winston Thomas. All in favor say aye. Aye. Opposed?

01:00:25.890 --> 01:00:32.496
- All right, motion carries, it is approved. Item nine then is requesting approval of change order number

01:00:32.496 --> 01:00:38.974
- one with Cocosing Industrial. And Kevin White's here. Kevin White, Capital Projects Coordinator. This

01:00:38.974 --> 01:00:45.643
- change order is with Cocosing Industrial related to the guaranteed savings contract for the lift station

01:00:45.643 --> 01:00:52.059
- improvement project that's been ongoing. That original project we basically rehabbed roughly 10 lift

01:00:52.059 --> 01:00:55.806
- stations. As part of the guaranteed savings there was some

01:00:56.642 --> 01:01:07.118
- some money left over for the project where they were Kikosin came in under budget. We're going to utilize

01:01:07.118 --> 01:01:17.199
- part of that savings and pair it with the change order increase amount of $1,300,200 for a new not to

01:01:17.199 --> 01:01:19.966
- exceed total of $7,807,437.

01:01:20.290 --> 01:01:29.081
- And the change order will allow CBU to completely rebuild the Westwood lift station, which is on Glen

01:01:29.081 --> 01:01:36.062
- Oaks Drive off of Curry Pike. So one of our top five largest flow lift stations.

01:01:36.226 --> 01:01:44.617
- And when it does go down or we have issues with the backup power there, it's very hard for our crews

01:01:44.617 --> 01:01:53.257
- to maintain with the VAC trucks. So this upgrade will include brand new pumps, brand new control panel,

01:01:53.257 --> 01:02:01.730
- an increase in the diameter of the incoming sanitary sewer pipe, and a new generator for the site. So

01:02:01.730 --> 01:02:04.638
- I'm happy to answer any questions.

01:02:05.250 --> 01:02:14.430
- either the install or upgrade here, you know, it Westwood. Yeah, it's been quite a while. I don't have

01:02:14.430 --> 01:02:23.520
- that 10 years 20 years. I'd say every bit of 20. James, I'd say every bit of 20. Okay. Thank you. Any

01:02:23.520 --> 01:02:32.254
- questions for Kevin White? Yeah, curiosity how much under budget, like some of this additional is

01:02:32.674 --> 01:02:40.062
- sure money right yes correct the one three is new so we had it was really closer to

01:02:40.674 --> 01:02:46.577
- one and a half million that they came in under budget. We've, uh, we added a couple of generators to

01:02:46.577 --> 01:02:52.538
- other sites, also purchased a mobile generator that we can use at Lyft stations. And then after those

01:02:52.538 --> 01:02:58.558
- purchases, we had 700,000, we liked the work that Cacosing was doing, approached the Lyft station crew

01:02:58.558 --> 01:03:04.753
- to see which Lyft stations they would suggest. Uh, rehabbing Westwood was at the top of the Lyft station.

01:03:04.753 --> 01:03:06.974
- And since we know that Cacosing does,

01:03:07.138 --> 01:03:14.072
- does good work. That's kind of the joy of the of the GSE contracts. And this contract delivery method

01:03:14.072 --> 01:03:20.870
- is that we can then proceed with Cokosing to do this work without having to go back out to bid. And

01:03:20.870 --> 01:03:27.872
- I appreciate the project. You know, we had a projects meeting over a year ago and you guys gave me the

01:03:27.872 --> 01:03:34.875
- gave us the full inventory of generators and where we had vulnerabilities. And we all agreed that that

01:03:34.875 --> 01:03:37.118
- was a place we needed to invest.

01:03:37.602 --> 01:03:46.682
- And so this looks like, you know, making this a priority because it's high volume. It's a good thing.

01:03:46.682 --> 01:03:55.583
- Absolutely. All right. Any other questions for Kevin or discussion? Ready for a motion? I move that

01:03:55.583 --> 01:04:04.841
- we approve change of order number one with Cocosine. Second. It's been moved and seconded. All in favor

01:04:04.841 --> 01:04:07.422
- say aye. Aye. Opposed? Okay.

01:04:08.738 --> 01:04:16.215
- Go to work. Thank you. All right. Next on the agenda then is item 10 requesting approval of the on-call

01:04:16.215 --> 01:04:23.692
- agreement with Woods Electrical Contractors. Matt, you're going to present this one. Yeah, this is just

01:04:23.692 --> 01:04:31.025
- another electrical option that we would like to have an on-call contract with that we can use when we

01:04:31.025 --> 01:04:38.142
- need to. So this is for on-call services. Total contract amount of twenty thousand dollars a year.

01:04:39.650 --> 01:04:48.731
- two additional one-year renewal periods. Got it. And they would provide on-call electrical telecom data

01:04:48.731 --> 01:04:57.811
- cabling services. Okay. All right. Any other questions or discussion? That we approve the contract with

01:04:57.811 --> 01:05:06.542
- Woods Electrical. Second. It's been moved and seconded to approve this on-call agreement with Woods

01:05:06.542 --> 01:05:08.638
- Electrical contractors.

01:05:09.282 --> 01:05:17.992
- All in favor say aye. Aye. Opposed? All right, motion carries. Next item is item 12 or 11, excuse me,

01:05:17.992 --> 01:05:26.531
- requesting approval of the service agreement with TY Lynn International. Dan Hudson's here. Hi, I'm

01:05:26.531 --> 01:05:35.582
- Dan Hudson, Capital Projects Manager for City Bloomington Utilities. The recently upgraded sewage hauling

01:05:36.034 --> 01:05:47.379
- rate structure emphasizes, and this was updated by the full use city board that did this recently, emphasize

01:05:47.379 --> 01:05:57.891
- an accurate measuring of the quantity of septics delivered to the Dillman wastewater treatment plan.

01:05:57.891 --> 01:06:02.366
- According to CBU regulations, haulers must

01:06:02.562 --> 01:06:13.306
- report the volume of the septics, and pay a fee based on an applicable structure. The proposed design

01:06:13.306 --> 01:06:24.578
- that TY Lynn is offering us is for a receiving station and a weighing station. That would give us accurate

01:06:24.578 --> 01:06:32.478
- billing and a revised rate. What was going on in the past is that we would

01:06:33.250 --> 01:06:44.067
- charge a company based on a tank, tanker, because we didn't know, we didn't have a way to measure how

01:06:44.067 --> 01:06:55.415
- much septic was being received. With this, we can do it based on weight. So that's what TY Lin is offering

01:06:55.415 --> 01:06:57.854
- a design for us to do.

01:06:58.050 --> 01:07:07.637
- Their cost for this design, excuse me, my throat is giving out, cost for this design is $114,940. I

01:07:07.637 --> 01:07:17.799
- ask the board to consider this proposal. Thank you. Dan, I guess my first question is, we had this system

01:07:17.799 --> 01:07:24.318
- in place we all talked about, though we thought it was fair or not.

01:07:24.802 --> 01:07:33.761
- Yes. Because you could have a 30,000 gallon tank and only have it with 10,000 gallons in it and we'd

01:07:33.761 --> 01:07:42.366
- still charge you for 30. Yes. What's the ROI on this? Do we feel like this is a good investment?

01:07:42.366 --> 01:07:51.325
- We have, as a group, we went to Kentucky to visit a site that had this facility that we were looking

01:07:51.325 --> 01:07:54.430
- at. And I asked him that question.

01:07:54.626 --> 01:08:02.132
- And they said it was about one year, which I'm struggling with that. I think it's going to take more

01:08:02.132 --> 01:08:09.713
- than a year to pay it off. But if it's two years, three years, that's really a pretty short return on

01:08:09.713 --> 01:08:17.368
- investment at that point. OK. Thank you. With the design and build, because that was also my question.

01:08:17.368 --> 01:08:22.942
- No, no. It's just the design, the build. I don't have a cost for that yet.

01:08:23.490 --> 01:08:31.309
- Yeah, that's good. I mean, right there. Obviously, the cost of the build would come but yes. Okay. Yeah.

01:08:31.309 --> 01:08:38.384
- Any other questions for Dan? Discussion? All right, we're ready for a motion. Okay. Thank you.

01:08:38.384 --> 01:08:46.054
- Thank you. I move that we approve the contract with T.Y. Lin. Second. I move and second to approve the

01:08:46.054 --> 01:08:53.054
- service agreement with T.Y. Lin International. All in favor say aye. Aye. Opposed? All right.

01:08:53.218 --> 01:09:02.427
- Motion carries, thank you. Item 12 on the agenda is requesting approval of the amendment number one with T.I.

01:09:02.427 --> 01:09:11.468
- Linn International. And Dan's still here. Still here, yeah. That's a current project that we have that T.Y.

01:09:11.468 --> 01:09:19.924
- Linn is looking at the capital plan for Dillman, the five-year and the 10-year, and they're updating

01:09:19.924 --> 01:09:21.598
- all the cost on it.

01:09:21.698 --> 01:09:32.590
- They're just asking for a little more time. So we're saying to the end of November. There's no additional

01:09:32.590 --> 01:09:42.968
- cost in that. OK. Very good. Any discussion, questions? Ready for motion. I move that we approve the

01:09:42.968 --> 01:09:50.366
- contract with TY Lynn. Second. All right. It's been moved and seconded.

01:09:50.466 --> 01:10:02.437
- to approve the Amendment 1 with TY Lin. All in favor say aye. Opposed? Motion carries. Thank you.

01:10:02.437 --> 01:10:14.896
- All right. I think that's all on our line items. Yeah, it looks like one got added and I didn't print

01:10:14.896 --> 01:10:17.950
- that one. Okay, this one

01:10:20.738 --> 01:10:30.491
- Is it still on the agenda? Troy risk. Yeah. Yeah. Okay. That's why it's that's why we're thinking it's

01:10:30.491 --> 01:10:39.961
- still there. Okay. And I think that's all of our action items in my tracking. Okay. All right. Then

01:10:39.961 --> 01:10:48.862
- next on our agenda is old business. Any old business from the board? Old business from staff.

01:10:51.362 --> 01:11:04.373
- a new business from the board. Business, the board, new business from staff. We thought there's been

01:11:04.373 --> 01:11:15.710
- this weekend. Yes, we've had a weekend. It's been a ride. So on Friday, September 18th,

01:11:16.418 --> 01:11:24.832
- The storm that came through very briefly caused a power outage at Monroe Water Treatment Plant approximately

01:11:24.832 --> 01:11:32.089
- around 6 p.m. We have a backup generator that's capable of running the plant at 50% capacity.

01:11:32.089 --> 01:11:39.808
- It was working, but there were some additional electrical issues at the intake tower that prevented

01:11:39.808 --> 01:11:45.598
- the plant from being able to treat and pump water for 10 and a half hours.

01:11:46.402 --> 01:11:57.261
- a very long time to not be treating water for our plant. One of the pumps that delivered, so in that

01:11:57.261 --> 01:12:08.443
- time, we worked to get the intake tower in a place where it was pumping water again. It was not pumping

01:12:08.443 --> 01:12:15.646
- at full capacity. I believe we were drawing maximum 18 MGD. Great.

01:12:15.938 --> 01:12:29.591
- And when we were able to draw water from the intake tower, one of the pumps that boosts our alum, which

01:12:29.591 --> 01:12:43.113
- helps the flock, which grabs the sediment, that was essentially burnt up by a power surge when it came

01:12:43.113 --> 01:12:45.214
- back on. So the

01:12:45.570 --> 01:12:53.303
- That was burnt up it. Um, actually we, um, replaced it and then it was burnt again. And then we were

01:12:53.303 --> 01:13:00.959
- able to have a, um, backup solution. So we now, so we have a temporary alum feeding solution. Um, I

01:13:00.959 --> 01:13:08.769
- want to give a lot of kudos to our staff, our operators and our maintenance staff who are on site who

01:13:08.769 --> 01:13:11.678
- are incredible, quick thinking, calm,

01:13:12.130 --> 01:13:23.537
- problem solvers who were able to get it done very quickly. So we had, due to this, we had a brief spike

01:13:23.537 --> 01:13:34.725
- in the turbidity at the plant. That brief spike in turbidity caused the turbidity readings to be over

01:13:34.725 --> 01:13:41.854
- one NTU, which is cause for the county-wide boil water advisory.

01:13:42.242 --> 01:13:51.425
- that was in combination with the low tank levels, which as you get lower, there's a chance of more sediment

01:13:51.425 --> 01:14:00.523
- in the water as well. So we went ahead and issued the county wide boil water advisory and began to collect

01:14:00.523 --> 01:14:09.026
- samples throughout the distribution system so that we could see what it was looking like there. And

01:14:09.026 --> 01:14:10.046
- those take,

01:14:10.626 --> 01:14:18.850
- 24, but we'd like to be conservative with our time. So 26 hours to run. Um, and so we took those samples,

01:14:18.850 --> 01:14:26.686
- the samples came back clear and we were able to lift it that lift the boil water order this morning.

01:14:27.266 --> 01:14:35.518
- We continue to have some issues with our water pressure throughout the system as our system is recovering.

01:14:35.518 --> 01:14:43.230
- Many of the tanks during that extended outage got critically low. And so we are currently refilling

01:14:43.230 --> 01:14:50.942
- the tanks. We now are pumping back up at a normal capacity. So we were able to restore other pumps,

01:14:50.942 --> 01:14:56.958
- so we're pumping at that higher capacity. I think we're still at 21, I think.

01:14:57.954 --> 01:15:08.035
- So now we're, and that is a very high, higher end amount. And so yeah, we are, the pumps are back up

01:15:08.035 --> 01:15:18.415
- and running. We're slowly filling the tanks and we have pressure in the system and the boil water order

01:15:18.415 --> 01:15:27.198
- has been lifted. So hopefully I didn't leave anything out. I'm happy to take questions.

01:15:27.554 --> 01:15:35.475
- board or further discussion. Also, for any technical details, we do have Hector here, our Assistant

01:15:35.475 --> 01:15:43.554
- Director of Operations who could potentially answer those more technical details. All right. Comments

01:15:43.554 --> 01:15:51.791
- from the board? Want to start on this end? Are you looking at me? No. Whichever. Who wants to go first?

01:15:51.791 --> 01:15:56.702
- Sure. OK. Number one, thank you to our team who is out there.

01:15:56.994 --> 01:16:03.744
- all night, all day, working on it 24-7 until we're able to lift the boil order. So thank you very much.

01:16:03.744 --> 01:16:10.364
- So a few questions. Number one, and this is kind of just like an explaining it to me because I'm just

01:16:10.364 --> 01:16:17.178
- the everyday person here. So when we lifted the boil order, then how do we know, because our water takes

01:16:17.178 --> 01:16:23.733
- time to get through the distribution line, so how do we know that people further down the line, that

01:16:23.733 --> 01:16:26.654
- in between time, how does that work, please?

01:16:27.682 --> 01:16:37.410
- So the readings at the and I might ask for a little backup on this, but the readings that we took to

01:16:37.410 --> 01:16:47.139
- issue the boil water were at the plant. Those quickly came back down. I think they were back down by

01:16:47.139 --> 01:16:55.326
- six PM. Yeah, they came up at five PM on Saturday and they were back down by six PM.

01:16:56.354 --> 01:17:03.193
- And so that went out into the system. We took our samples that next morning. So it was out in the system

01:17:03.193 --> 01:17:09.771
- just to confirm. And so that is the best way to tell that we could lift the boil water was that when

01:17:09.771 --> 01:17:16.349
- we took the samples, it was out in different points of the distribution system. Great. Thank you. My

01:17:16.349 --> 01:17:21.950
- other question is about our generators. And I know we've talked about this with like,

01:17:22.626 --> 01:17:30.113
- with our water rate case that has recently passed and starting to be implemented, how are generators

01:17:30.113 --> 01:17:37.525
- in that plan? Because power outages happen often, and especially out in a more rural area, like our

01:17:37.525 --> 01:17:45.382
- water treatment plant is located. And then also with the alum you mentioned that we burned up two, what's

01:17:45.382 --> 01:17:52.350
- to say that another power outage wouldn't burn up a third one? Because obviously there's some

01:17:52.482 --> 01:18:08.042
- trigger in that system there for that. So I'd be interested to hear more. Thank you. Heteroactive operations.

01:18:08.042 --> 01:18:19.358
- To your question, that was something that we learned in this storm. Usually our

01:18:22.338 --> 01:18:32.471
- Power generators, they have an automated transfer switch in most, you know, wastewater, other stations.

01:18:32.471 --> 01:18:42.604
- Unfortunately, in Monroe, it need to be manual controlled. We have SCADA and we have manually. It took,

01:18:42.604 --> 01:18:50.398
- the reason because it took too long, trying to trouble to where was the problem

01:18:50.562 --> 01:19:02.800
- And we found that the battery bank or battery backup was run out. And because of that, it's safe. The

01:19:02.800 --> 01:19:15.038
- last reading that we had, it was in the system. So we needed to power that backup. And like I say, as

01:19:15.038 --> 01:19:16.478
- a learning,

01:19:17.666 --> 01:19:26.639
- for next in the future, because that's how the system was designed, and that's how the system is built.

01:19:26.639 --> 01:19:35.525
- Our first, if we run out of battery now, we know what to do, or what to check. It just, that's how the

01:19:35.525 --> 01:19:44.670
- system was made, and at least we were able to identify it during this tour. That answer your question or?

01:19:44.802 --> 01:19:52.061
- Partially. Partially. Thank you. And I feel like this storm just popped up out of nowhere, too. So it's

01:19:52.061 --> 01:19:59.390
- not something where you're probably like, we know this is weather happening, and we can anticipate that,

01:19:59.390 --> 01:20:06.510
- which you know also contributed to that, probably. We didn't know that was a problem. I don't know if

01:20:06.510 --> 01:20:10.558
- that explained better. Because when we got the utilities,

01:20:10.690 --> 01:20:18.078
- the last reading that skater have in the system is like with the power generator is running and then

01:20:18.078 --> 01:20:25.392
- you run out. So then you can not have to feed to power feed at the same time. So that's why we were

01:20:25.392 --> 01:20:32.926
- not able to put utilities while we were having utilities or the power generator wasn't working because

01:20:32.926 --> 01:20:39.582
- it was the last reading was the power generator was running but now the power generator is

01:20:39.938 --> 01:20:49.040
- Receiving the same signal that the utilities is there. Yeah So it was I don't know. It's a little bit

01:20:49.040 --> 01:20:58.052
- complicated But I hope that answer and then the second part would be what what is our water rate? So

01:20:58.052 --> 01:21:01.086
- as far as like future funding for

01:21:01.538 --> 01:21:08.733
- Backup generators and also I think I'm going to touch on improvements to our electrical systems. So

01:21:08.733 --> 01:21:16.647
- that is a huge part of what we submitted as part of our rate case. Understanding that a lot of the electrical

01:21:16.647 --> 01:21:23.986
- equipment is aging and these are things that absolutely need to be replaced. We've identified this as

01:21:23.986 --> 01:21:29.310
- an ongoing issue at Monroe. We've had several power outages at Monroe and

01:21:29.666 --> 01:21:38.659
- we know that these are things that we need to invest money in. And so in our drinking water rate increase,

01:21:38.659 --> 01:21:47.232
- we have upcoming CIP projects that are specific to, and I have them pulled up. So we have four, looks

01:21:47.232 --> 01:21:55.973
- like four projects specific to the electrical and control panels. We have electrical upgrades and it'll

01:21:55.973 --> 01:21:58.494
- be in like parts one and two,

01:21:58.882 --> 01:22:06.253
- And then we also have planned full upgrades for all of our SCADA. And so that'll modernize all that

01:22:06.253 --> 01:22:13.845
- equipment. Some of the issues Hector was talking about, it was reading that it was getting energy from

01:22:13.845 --> 01:22:21.289
- utilities and from the generator at the same time, and that was causing the tripping and the issues.

01:22:21.289 --> 01:22:28.734
- Those are the kinds of things that these upgrades would resolve. We also, I wanted to highlight that

01:22:28.962 --> 01:22:38.478
- We were awarded the $2.3 million grant from the EPA specifically for backup generation and control system

01:22:38.478 --> 01:22:47.545
- improvements at the plant in addition to the money that we are planning on spending through our rate

01:22:47.545 --> 01:22:57.150
- case. So yeah, does that help answer? Thank you very much. Yes. We are planning on some large investments.

01:22:57.282 --> 01:23:06.022
- our electrical systems and backup generation. Thanks, Kat. I've got to depart in a few minutes to get

01:23:06.022 --> 01:23:14.763
- to campus or 48 faces are going to be looking at me wondering why I'm not there teaching. A couple of

01:23:14.763 --> 01:23:23.417
- comments. We had a close call in June of 23 where we dodged a bullet three years ago. We had a power

01:23:23.417 --> 01:23:27.102
- outage that happened because of the storm.

01:23:28.162 --> 01:23:37.419
- We did some after action review on that. I realize a lot of people have changed since then, but we really

01:23:37.419 --> 01:23:46.327
- did dodge one on that one because we were without power for a long time. Systems were working, but we

01:23:46.327 --> 01:23:55.147
- realized we just simply can't have enough generator power to run that plant full speed. We've got to

01:23:55.147 --> 01:23:57.854
- get Duke power back up in time

01:23:58.498 --> 01:24:06.095
- or we get into serious problems in a hurry unless we want to spend millions on a generator farm. And

01:24:06.095 --> 01:24:13.693
- our utility, Duke Energy, should be able to get us back online within 10 hours. That is a reasonable

01:24:13.693 --> 01:24:21.591
- expectation. And if we were, were we out for 10 and a half hours? How long? For about four hours without

01:24:21.591 --> 01:24:28.286
- Duke, without utilities. The other six was to figure out our troubleshooting the system.

01:24:28.418 --> 01:24:37.232
- OK, so what I think we need to think about is we just need to face this as it's a failure. It's a failure

01:24:37.232 --> 01:24:45.880
- of systems. It's not just one person or one piece, but it's the system. It's the intake with Duke. It's

01:24:45.880 --> 01:24:54.362
- our electrical systems, our generator systems, our SCADA systems, our electronic controlling systems.

01:24:54.362 --> 01:24:58.270
- That's what failed in 23, if I remember right.

01:24:58.498 --> 01:25:05.302
- There's a lot of pieces, as you say, it's very complicated systems and there's not everybody knows how

01:25:05.302 --> 01:25:11.909
- all the intricacies and we've got to call in people from outside that that have sold all this stuff

01:25:11.909 --> 01:25:18.845
- to us. And if they're not available just like that, it causes even more trouble. Yes. So what I'm saying

01:25:18.845 --> 01:25:23.998
- is we face this that smart organizations to get into trouble like this do do.

01:25:24.290 --> 01:25:31.175
- comprehensive after action reviews and figure out where the points of failure are. We document those

01:25:31.175 --> 01:25:38.264
- and we get them back into us into where we can exercise these things happening because we know now this

01:25:38.264 --> 01:25:45.286
- wasn't something we had to deal with years ago. We had pretty consistent electrical power but we don't

01:25:45.286 --> 01:25:52.443
- anymore and we can't take the risk of not knowing how to fix these things within the set amount of times

01:25:52.443 --> 01:25:53.534
- we have because

01:25:54.146 --> 01:26:01.312
- We all know there's 10 to 12 hours worth of water in the tanks, and once we get past that, we get into

01:26:01.312 --> 01:26:08.478
- trouble like this, and heaven forbid we have a fire during a system, a problem like that. So my point,

01:26:08.478 --> 01:26:15.435
- and the other piece that I wanted to mention was our communications plan in this, and I'm not gonna

01:26:15.435 --> 01:26:20.862
- diss anybody, but what I saw with the public was we told them there's a boil,

01:26:20.994 --> 01:26:31.028
- Water or they're not. When was the last time we had a countywide boil order water? I don't remember.

01:26:31.028 --> 01:26:41.260
- 24. 24. Was it countywide? Yeah. OK. Yeah. It was a turbidity issue as well. It was about a three day,

01:26:41.260 --> 01:26:49.406
- two or three day deal. We told folks we had issues, but we didn't explain to them

01:26:50.018 --> 01:26:56.810
- what they needed to do, how complicated this is. I saw some stuff, I think the health department put

01:26:56.810 --> 01:27:03.668
- out, but maybe we ought to have that stuff in the can. Is that where it came from? I saw that. We did

01:27:03.668 --> 01:27:10.729
- put out guidance. We did? Yeah. And the graphic stuff? The graphic I saw was from the health department.

01:27:10.729 --> 01:27:17.655
- It was like a shared post from January or something is the one that I repeatedly saw about how to boil

01:27:17.655 --> 01:27:18.462
- your water.

01:27:18.946 --> 01:27:26.434
- Yeah, I mean, that part from the CDU. There's that. But I think when you have an emergency, it's an

01:27:26.434 --> 01:27:33.997
- emergency like this when we've run out, we're not generating water. And that calls for a little more

01:27:33.997 --> 01:27:41.710
- aggressive communication with our customers. And we should have that stuff in the can. Here's what you

01:27:41.710 --> 01:27:47.326
- can do. So I think what I'm saying is, and I hope the board supports this,

01:27:47.874 --> 01:27:55.425
- We work with the staff to do a comprehensive after action review so that we can get our own standard

01:27:55.425 --> 01:28:02.976
- operating procedures in place when we have contingencies that happen like this because it just keeps

01:28:02.976 --> 01:28:10.677
- happening. And we owe that to our rate payers. And I wish I could stay, but I've got to get going. I'm

01:28:10.677 --> 01:28:17.854
- sorry for that. I will move the gavel to our vice president. Thank you. Thank you, Hector. Yep.

01:28:18.370 --> 01:28:25.391
- I'm just gonna jump on the communication line, just a question. Like how are people notified? I receive,

01:28:25.391 --> 01:28:32.212
- I'm assigned up for like Monroe County alerts. I think I received that text and then I got alert from

01:28:32.212 --> 01:28:39.032
- CBU all very timely like right on together. But say like a family member did not get notification who

01:28:39.032 --> 01:28:45.853
- is also a CBU water customer. So people who were not notified, what do they need to do so they can be

01:28:45.853 --> 01:28:48.126
- notified if there's a future need

01:28:48.290 --> 01:28:55.389
- for anything they need to know about their water or wastewater? Yeah, absolutely. So the way that we

01:28:55.389 --> 01:29:02.909
- notified customers this time, having taken some lessons from the fall of 24, the way we notified customers

01:29:02.909 --> 01:29:10.079
- this time was through the Everbridge system where we used all of our customer contact information. So

01:29:10.079 --> 01:29:14.366
- if the contact information for our customers was up to date,

01:29:14.882 --> 01:29:21.855
- Then they received the message. Um, we did quickly realize that there were, um, many customers who either

01:29:21.855 --> 01:29:28.697
- their information was incorrect or they're just not registered as a customer. So we then put the notice

01:29:28.697 --> 01:29:35.539
- out through the emergency management system as well. Um, which explains why there was the delay between

01:29:35.539 --> 01:29:43.038
- the notifications. Um, but the initial one was through our Everbridge system, which had all of our customer data.

01:29:44.002 --> 01:29:50.141
- So maybe in our next paper bills, because probably anybody that gets an electronic billing statement

01:29:50.141 --> 01:29:56.219
- is notified somehow. But it's probably customers who still get like a paper bill. So maybe we could

01:29:56.219 --> 01:30:02.479
- put a slip in there that says, did you receive notification during our most recent water boil? If not,

01:30:02.479 --> 01:30:08.617
- then maybe there's a QR code or a link or a phone number that they can visit to update that with us.

01:30:08.617 --> 01:30:13.662
- Because a lot of people still want a paper statement. They're not going to update.

01:30:14.018 --> 01:30:20.173
- but maybe are on like Aqua pay, maybe they auto pay, but they want a paper statement. So that might

01:30:20.173 --> 01:30:26.389
- be an opportunity also with communication. We've also been when we have received, um, cause we have,

01:30:26.389 --> 01:30:33.097
- um, received lots of responses from the public. And so when we receive these responses, especially responses

01:30:33.097 --> 01:30:39.375
- regarding communication, we are really trying to push and direct people towards where they can update

01:30:39.375 --> 01:30:43.006
- their information so that, um, in the, you know, event of,

01:30:43.266 --> 01:30:50.644
- Even just a boil water advisory that is, um, isolated to a neighborhood due to a main break, they'll

01:30:50.644 --> 01:30:58.242
- receive that notification. Thank you. Sorry, Amanda. Thank you. Well, actually I was going to also jump

01:30:58.242 --> 01:31:06.058
- on that too, just because I did think it was very effective if they were in, and it is up to our customers

01:31:06.058 --> 01:31:12.414
- to keep their information up to date. Now it did wake me up at 12 at midnight or 1240.

01:31:12.738 --> 01:31:22.209
- after the IU football win. But I do appreciate that that came through. And I thought that the follow-up

01:31:22.209 --> 01:31:31.681
- that was done with the press releases, there was multiple communications about it. And I think you guys

01:31:31.681 --> 01:31:41.790
- followed a very good protocol with it. So to all those people that are saying I didn't know or how did I know,

01:31:42.498 --> 01:31:51.079
- You could be in the know if you get in the know. Also, I wanted to kind of piggyback a little bit on

01:31:51.079 --> 01:32:00.084
- what Kirk was saying. And I do believe that we have made, we've gone through this because we have learned

01:32:00.084 --> 01:32:08.580
- in terms of what are we doing in emergency processes? What's the phone call train? What's this? Who

01:32:08.580 --> 01:32:12.318
- gets notified here? How do we move forward?

01:32:13.858 --> 01:32:22.101
- You can train and train and practice and do all of that. But when it happens, inevitably something that

01:32:22.101 --> 01:32:30.186
- you don't expect is going to happen. And that's what I think people have to understand is that we had

01:32:30.186 --> 01:32:38.430
- things under control, then we didn't have something under control because of another failure. You can't

01:32:38.430 --> 01:32:43.582
- anticipate every single thing that will go wrong in a situation.

01:32:44.162 --> 01:32:50.941
- And so I commend you guys and gals for getting it through, getting it through faster than anticipated

01:32:50.941 --> 01:32:57.852
- from the press releases. And we'll learn you, you continually learn from these experiences. And I think

01:32:57.852 --> 01:33:04.830
- we just have to continue to put our best foot forward and making the changes that we know need to happen

01:33:04.830 --> 01:33:11.742
- at the plants, making the upgrades that we know need to happen and continually training individuals and

01:33:12.290 --> 01:33:18.834
- who are who are fast. And one thing that we've always said about our folks here, they're fast on their

01:33:18.834 --> 01:33:25.506
- feet. They're collaborative and trying to come to a solution and, you know, that you guys work together.

01:33:25.506 --> 01:33:32.050
- And I think that's absolutely amazing. So thank you to everybody from the customer service people that

01:33:32.050 --> 01:33:38.531
- were taking phone calls to you guys that were down at the plant dealing with everything. I mean, it's

01:33:38.531 --> 01:33:39.230
- it's truly

01:33:40.130 --> 01:33:49.303
- You know, I think everybody in this organization is affected when this when this happens. So, you know,

01:33:49.303 --> 01:33:58.124
- keep up the good work. You know, I just if there are no other questions or comments from the board,

01:33:58.124 --> 01:34:07.121
- I just want to close with like kind of echoing what Amanda has said that, you know, we're I'm just so

01:34:07.121 --> 01:34:09.150
- grateful for this team

01:34:09.858 --> 01:34:18.498
- Um, every single team member jumped on what they knew they could do, how they could help, um, kept calm

01:34:18.498 --> 01:34:27.056
- during the whole thing. Um, you know, provided resources and just communicated so well. Um, some folks

01:34:27.056 --> 01:34:35.613
- who I just, I, you know, I, I think are our plant operators, our plant superintendent. Um, I just want

01:34:35.613 --> 01:34:39.518
- to give a shout out to a few people who really

01:34:39.714 --> 01:34:53.288
- were just did a lot. So, Shane Ira at the plant, our superintendent, just great problem solver and just

01:34:53.288 --> 01:35:07.646
- very quick thinker and just very, very glad that he was in that role. And also, just a big shout out to Frank

01:35:08.514 --> 01:35:18.688
- Frank's our communications manager and was all over it, was up late, making sure everything that we

01:35:18.688 --> 01:35:29.473
- said really conveyed the right information, that we were being clear as we could while also being timely.

01:35:29.473 --> 01:35:37.918
- Yeah, and all of our maintenance staff, Tony, Tony was out there, Tony Eads, gosh,

01:35:39.778 --> 01:35:47.364
- I hesitated to say names because there's so many names. All of our assistant directors, there was a,

01:35:47.364 --> 01:35:55.101
- I think a group chat of like eight of us, eight, nine of us where we were just constantly updates. How

01:35:55.101 --> 01:36:02.837
- is this going? Where's that at? What's the samples? And it just, you know, just very grateful for such

01:36:02.837 --> 01:36:06.142
- a strong and communicative team. So thanks.

01:36:12.226 --> 01:36:26.909
- more new business I hate to ask this but how are the manganese levels not bad okay just since I I think

01:36:26.909 --> 01:36:41.310
- I've still noticed them with that so I just wanted to see however status of them okay sorry thank you

01:36:41.986 --> 01:36:49.475
- when customer have brown water it because labels they are between 1.4 to 1.8 something like that just

01:36:49.475 --> 01:36:57.112
- to give you an example that a few they has been hanging around one so 0.7 0.8 go up go down but average

01:36:57.112 --> 01:37:04.748
- around one so you are talking they're almost they have less so we are able now they're up yes raw water

01:37:04.748 --> 01:37:10.622
- water raw water yeah coming from the lake okay good thank you so we expect that

01:37:10.914 --> 01:37:18.956
- Now that we're getting some more rain and cooler temperatures, that we shouldn't have any additional

01:37:18.956 --> 01:37:26.918
- issues. I don't know. I can't see the future. It's looking promising. Good. OK, things are trending

01:37:26.918 --> 01:37:34.880
- in the right direction. How about that? OK, thank you. Thank you. OK. Now, Molly. Sorry. All right.

01:37:34.880 --> 01:37:38.622
- No subcommittees today, so staff reports next.

01:37:42.978 --> 01:37:52.770
- So I just want to recognize Curtis Richardson, who's moved to an internal movement to engineering field

01:37:52.770 --> 01:38:02.751
- tech locator. And also, James White got their wastewater class four. Madison Abel also got her wastewater

01:38:02.751 --> 01:38:10.942
- class four. And then Adam Hutzler also got his wastewater class four. Congratulations.

01:38:14.466 --> 01:38:22.471
- Any more petitions and communications? Yes. Hi, guys. Hi. I'm Julie Roberts, member of the public and

01:38:22.471 --> 01:38:30.398
- a former utility service board member of 16 years. And I didn't think this was going to be the night

01:38:30.398 --> 01:38:37.854
- that I came back in to see you all, but it's really nice to see you all. And wow, what a week.

01:38:38.946 --> 01:38:44.260
- Holy cow, I don't think we ever had our hair on fire like that in the whole 16 years I was here. So

01:38:44.260 --> 01:38:49.680
- congratulations on getting through it. I just had a couple of suggestions that I think might help the

01:38:49.680 --> 01:38:55.365
- public. I am one of those paper bill people. I like to see the little charts and I like to get the inserts

01:38:55.365 --> 01:39:00.785
- because I feel like I get more information that way. My email inbox is so full that I just like blah.

01:39:00.785 --> 01:39:06.046
- So I like the piece of paper even though I'm a tree lover. I still got the phone call at midnight.

01:39:06.210 --> 01:39:12.068
- which didn't wake me up because I was scrolling and I saw it come in. But I didn't get the text message

01:39:12.068 --> 01:39:15.166
- until 9.19 in the morning and I was already at target.

01:39:15.682 --> 01:39:21.232
- And nobody in the Target staff, floor staff, they're all college kids. None of them had heard yet. They

01:39:21.232 --> 01:39:26.943
- found out because their boss told them. People didn't know that Starbucks was closed because they couldn't

01:39:26.943 --> 01:39:32.333
- boil their water, blah, blah, blah, blah, blah. So I was thinking back to, was it earlier this year?

01:39:32.333 --> 01:39:37.777
- Was it last year when we got that alert from the county and it like broke through my phone on silence

01:39:37.777 --> 01:39:41.406
- and basically said, killer tornado, dive under something right now.

01:39:41.506 --> 01:39:47.654
- I'd never seen it do that before. It broke through everything. I don't know if we could have some better

01:39:47.654 --> 01:39:53.920
- coordination with the county just depending on what kind of, because what we might have to do if something

01:39:53.920 --> 01:39:59.834
- like this happens is, if we only got 10 or 12 hours of water in the tanks, is to let the public know

01:39:59.834 --> 01:40:05.924
- to please start conserving. Don't wash your dishes, don't run the washing machine, don't wash your car,

01:40:05.924 --> 01:40:09.086
- don't water the plants to try to make it last longer.

01:40:09.186 --> 01:40:15.532
- and anything else that we can think of. And I think it's really important for people to get the action,

01:40:15.532 --> 01:40:21.816
- whatever Kirk called it, post-mortem is what we used to call it, where I used to work. So just explain

01:40:21.816 --> 01:40:28.101
- the fact that you did take samples all throughout the system. You didn't just arbitrarily, when it was

01:40:28.101 --> 01:40:34.508
- coming out of the lake and looking at it right here, go, oh, it's okay. Put out a press release tomorrow

01:40:34.508 --> 01:40:38.718
- so that people understand just how thoroughly this was investigated,

01:40:39.106 --> 01:40:44.824
- confident you were in the results. I didn't see any of the things that Kirk was talking about from the

01:40:44.824 --> 01:40:50.376
- health department. All I had was my text messages. I don't do social media, it makes me bananas. So

01:40:50.376 --> 01:40:55.983
- I would suggest exactly what he said, get some graphics going, make it super simple like third grade

01:40:55.983 --> 01:41:01.646
- level language. The only thing I saw in the links I followed through the text I got from you guys and

01:41:01.646 --> 01:41:05.310
- the press release had said things like oral hygiene and I'm like,

01:41:05.666 --> 01:41:10.956
- Brushing your teeth needs to be what's there instead of oral hygiene. There's a lot of people that don't

01:41:10.956 --> 01:41:16.196
- read that carefully, and there are people that can't read that carefully. So those are just some things

01:41:16.196 --> 01:41:21.285
- that I would suggest, like real tight coordination with the county so the minute something like this

01:41:21.285 --> 01:41:26.727
- is happening, everybody gets something. It doesn't have to be the killer tornado alert that wakes everybody

01:41:26.727 --> 01:41:31.967
- up. But I don't necessarily think that's a bad idea, because when you wake up in the morning and you've

01:41:31.967 --> 01:41:33.982
- got 75 text messages, half of them from

01:41:34.530 --> 01:41:40.704
- candidates asking you for money, you're not gonna check them all before you get up and brush your teeth.

01:41:40.704 --> 01:41:46.819
- So I think it's perfectly legitimate in the future if you had a situation like this to go to that level

01:41:46.819 --> 01:41:52.817
- of alert if you think there's any chance of waterborne disease. I mean, people don't understand. When

01:41:52.817 --> 01:41:58.815
- I was in Citizens Academy a million years ago, one of the things that they've emphasized when we came

01:41:58.815 --> 01:42:03.166
- to CBU was this is the bedrock upon which all other public safety stands.

01:42:03.618 --> 01:42:09.609
- Clean water is what gets you through a disaster. When the electricity is out, when everything else is

01:42:09.609 --> 01:42:15.659
- going on, you can still turn on your tap and get clean water. When you can't, that's when deaths start

01:42:15.659 --> 01:42:21.532
- to mount up in a natural disaster. And I understand generator power is super expensive. Sounds like

01:42:21.532 --> 01:42:27.934
- you already have plans in place to try to get that going. So I just wanted to come in and commend everybody.

01:42:27.934 --> 01:42:32.222
- And I was really fascinated to hear what had happened because I know how

01:42:32.482 --> 01:42:39.640
- well, we usually operate. And so it was very reassuring to hear that it was just a whole big kerfuffle,

01:42:39.640 --> 01:42:46.522
- and it'll have to be figured out later. So thanks, everybody. Good to see you. Nice to see you. Any

01:42:46.522 --> 01:42:48.862
- other petitions in communication?