00:00:00.418 --> 00:00:09.034
- we got everybody we'll call the utility service board regular meeting or September 8th to order and

00:00:09.034 --> 00:00:17.649
- our first order of business is petitions and communications any any input from the public petitions

00:00:17.649 --> 00:00:26.782
- communications well I'll just remind everyone that CBU's mission is to enhance the quality of life in our

00:00:27.202 --> 00:00:34.722
- community by providing safe, sustainable, and high-quality drinking water, wastewater, and stormwater

00:00:34.722 --> 00:00:42.020
- services in a cost-effective manner, promoting public health, economic vitality, and environmental

00:00:42.020 --> 00:00:49.392
- stewardship. And our vision is that the City of Bloomington Utilities will be the leading municipal

00:00:49.392 --> 00:00:55.806
- water utility organization in Indiana. Okay, the first item on our agenda then next is

00:00:56.354 --> 00:01:05.053
- the approval of minutes for the previous meeting of August 24th. We're gonna have a chance to take a

00:01:05.053 --> 00:01:14.011
- look at the minutes. Are we good with those? Moved and seconded to approve the minutes of last meeting.

00:01:14.011 --> 00:01:23.486
- Any other discussion? All in favor say aye. Aye. Opposed? All right, meeting minutes are approved, thank you.

00:01:23.810 --> 00:01:35.978
- Next is approval of claims and we'll start with standard invoices in the amount of $1,349,577.70. A

00:01:35.978 --> 00:01:47.902
- chance for everybody to take a look at claims. A chance to review those. Any questions on claims?

00:01:57.122 --> 00:02:07.616
- been moved and seconded to approve standard invoices all in favor say aye opposed all right motion carries

00:02:07.616 --> 00:02:17.619
- and then utility bills are next for August 27th of nine thousand five hundred sixty seven dollars and

00:02:17.619 --> 00:02:21.150
- eighty one cents that's a short one

00:02:26.914 --> 00:02:37.852
- All right, moved and seconded, approve the August 27th utility bills. All in favor say aye. Aye. Opposed?

00:02:37.852 --> 00:02:48.481
- All right, utility bills for the 27th are approved. Next is utility bills for September the 3rd in the

00:02:48.481 --> 00:02:53.950
- amount of $184,207.73. Any questions on those bills?

00:02:57.410 --> 00:03:07.884
- Number third. Second. Great, moving to second for the utility bills. All in favor say aye. Aye. Opposed?

00:03:07.884 --> 00:03:18.657
- All right, next then with that motion carried then the next is wire transfers in the amount of $633,206.26.

00:03:18.657 --> 00:03:26.238
- Questions on the wire transfers? I move that we approve the wire transfers.

00:03:27.810 --> 00:03:35.865
- seconded to approve the wire transfers all in favor say aye opposed all right the wire transfers are

00:03:35.865 --> 00:03:43.840
- approved and then next is customer refunds and the amount of one thousand three hundred twenty four

00:03:43.840 --> 00:03:49.502
- dollars and thirteen cents pretty routine there any questions on those

00:03:57.474 --> 00:04:05.991
- Okay. Are there two different things here, or are they all part of the same? I think it's all part of

00:04:05.991 --> 00:04:14.342
- the same. It's just the... Because they both say 9-11. I think just the way the page cut it, it cut

00:04:14.342 --> 00:04:23.109
- them in half. I see, yeah. The total's the same. Yes. Approve customer refunds. Second. It's been moving

00:04:23.109 --> 00:04:26.366
- in a second. Approve customer refunds.

00:04:26.882 --> 00:04:37.235
- All in favor, say aye. Aye. Opposed? All right. Refunds are approved. Next is the consent agenda. Agenda.

00:04:37.235 --> 00:04:47.003
- Good evening. I'm Catherine Sager, utilities director, and I'm presenting tonight's consent agenda,

00:04:47.003 --> 00:04:49.054
- totaling $51,039.62.

00:04:50.146 --> 00:05:00.281
- The first contract is with Evoqua Water Technologies LLC for $20,420 for a travel water screen at Monroe

00:05:00.281 --> 00:05:09.934
- Water Treatment Plant. Next is with Aquatic Informatics Inc. for $9,269.62 for WIM software license

00:05:09.934 --> 00:05:12.926
- and support at all CBU plants.

00:05:13.922 --> 00:05:21.863
- Next is with Marshall Security LLC for $10,000 for encampment cleanup at Winston Thomas. Next is with

00:05:21.863 --> 00:05:29.726
- Affordable Fencing for $11,350 to replace damaged fence and gate at Monroe Water Treatment Plant. Is

00:05:29.726 --> 00:05:37.667
- there any member who wishes to consider one or more of these items individually? Yes. I would like to

00:05:37.667 --> 00:05:42.494
- discuss the cleanup of the encampment with Marshall Security.

00:05:43.778 --> 00:05:55.079
- I had a question about that. And then also, just additional explanation about A, I'd just like to know

00:05:55.079 --> 00:06:06.270
- more about it. I had A and C on my list, please. Excellent. OK. So let's see. Let's see. Is there any

00:06:06.270 --> 00:06:12.414
- others that people would like to consider individually?

00:06:14.274 --> 00:06:26.551
- Anything else? So I guess then we'll approve B and C. B and D. B and D, excuse me. Okay. So with the

00:06:26.551 --> 00:06:39.315
- exceptions of A and C, if there is no opposition to B and D, these items will be approved as recommended

00:06:39.315 --> 00:06:43.326
- by staff. Hearing no opposition,

00:06:43.906 --> 00:06:53.505
- items B and D on the consent agenda are approved. I'll start with A. It's first. Thank you, Kat. So

00:06:53.505 --> 00:07:03.295
- with the travel water screen, can you tell us more about what that exactly does and where does it go?

00:07:03.295 --> 00:07:13.566
- How does it travel? Yeah, so that's a great question. So what this is is a contract with divers to travel.

00:07:14.274 --> 00:07:20.642
- to the bar screen, so they will be underwater to do repairs and inspections on our bar screen at the

00:07:20.642 --> 00:07:27.009
- intake tower. So the screen is not moving? No. So people are traveling to the screen? I had the same

00:07:27.009 --> 00:07:33.503
- question earlier. Okay, different thing in my mind. That's why I wanted to talk about it. Okay. Hector

00:07:33.503 --> 00:07:37.790
- could actually give much better explanation. Oh, thank you, Hector.

00:07:43.426 --> 00:07:52.104
- these operations, so that is to, we have a travel, we have a screen that actually rotate, we call it

00:07:52.104 --> 00:08:00.696
- the bar screen also. They go like three different levels based on the intake, is that that, or this

00:08:00.696 --> 00:08:07.742
- is different? No, those are different. Okay. This is just to remove every debris,

00:08:08.354 --> 00:08:16.968
- material that is floating in the surface of the water so it won't damage any pump or anything. So we

00:08:16.968 --> 00:08:25.668
- have screens that they just rotated and one of them in the chain link, one of them is kind of jumping

00:08:25.668 --> 00:08:34.623
- the sprocket. The only way that we are able to do it is sending divers down there. Evoco was the company

00:08:34.623 --> 00:08:36.670
- that we used to install

00:08:36.802 --> 00:08:46.105
- Evoco is the manufacturer of the travel screen, so they are going to send their divers to inspect and

00:08:46.105 --> 00:08:47.838
- see what is wrong.

00:08:52.098 --> 00:08:58.571
- time to ask about since we're talking about our water I'm going to so Kat I feel like you just took

00:08:58.571 --> 00:09:05.432
- a deep breath so you know where I'm headed okay it's that time of year when it's hot and it hasn't rained

00:09:05.432 --> 00:09:12.163
- for a long time and so like are we seeing increase in algae growth and the other things that can affect

00:09:12.163 --> 00:09:18.701
- the aesthetic taste of our water I do plan on having a moment during new business to address some of

00:09:18.701 --> 00:09:20.254
- those seasonal concerns

00:09:27.106 --> 00:09:36.025
- can do, huh? No. OK. I just wanted to check. It will be fun, you know, getting the soup. And the tanks.

00:09:36.025 --> 00:09:44.602
- That would be great for a Christmas party. Send Frank out there with the cameras. I want to see it.

00:09:44.602 --> 00:09:52.835
- Actually, I think that would be kind of cool. Thank you. Let's see what suits the Kleindorfers,

00:09:52.835 --> 00:09:56.094
- don't they? Your question first on C.

00:09:59.106 --> 00:10:17.215
- Oh, it's me? Okay. Do you have to approve this one first? Yes. Moved and seconded to approve evoke a

00:10:17.215 --> 00:10:28.510
- water technologies contract for $20,420. All in favor say aye.

00:10:28.898 --> 00:10:38.401
- Opposed? All right, motion carries. Now, the last one. Tell me what's happening at Winston Thomas.

00:10:38.401 --> 00:10:48.095
- Oh yeah, so it says encampment cleanup at Winston Thomas. So there has historically been encampments

00:10:48.095 --> 00:10:58.558
- that show up along Clear Creek. We share a property border with the city, specifically the Parks Department.

00:10:58.914 --> 00:11:07.726
- along the, what is the name of the trail there? There's a trail. I'm blanking on the name of the trail.

00:11:07.726 --> 00:11:16.878
- The rail trail there, yes. And so we were notified that there was an encampment on our side of the property

00:11:16.878 --> 00:11:25.351
- that has been, so the city will do the eviction notice and work with providers to get people out of

00:11:25.351 --> 00:11:26.622
- the encampment

00:11:26.978 --> 00:11:36.747
- But because it's on our property, we need to do the cleanup of that afterwards. And that's what this

00:11:36.747 --> 00:11:46.903
- is for. Michael? How close is the encampment area to the new building site? Far, but it's not next door.

00:11:46.903 --> 00:11:56.478
- Other side of the creek. Yeah. It's on the creek north of where the building would be built. Yeah.

00:12:02.370 --> 00:12:11.036
- Yeah. Did Marshall take care of things like the bio waste and the sharps and things like that? They

00:12:11.036 --> 00:12:19.876
- haven't done it yet. We have to. Because sometimes that requires a separate contract to do that level

00:12:19.876 --> 00:12:29.235
- of cleanup because it's bio remediation at that point. That was the system you called out in the agreement.

00:12:29.235 --> 00:12:30.622
- It's not? Yeah.

00:12:30.786 --> 00:12:37.857
- The same company, though, that monitors our parks and then they do other right for for other encampments

00:12:37.857 --> 00:12:44.591
- as well. Right. That's what I was going to say. They've done cleanups for other encampments for the

00:12:44.591 --> 00:12:51.392
- city as well. I know that we clean this site in twenty twenty four. Internally, I don't think it was

00:12:51.392 --> 00:12:58.328
- the exact same site, but we had another site that was that was up north a little further north of this

00:12:58.328 --> 00:12:59.742
- one. I feel I think.

00:12:59.970 --> 00:13:07.313
- Well, it was still on our property in the same parcel. I believe it might have even been south of where

00:13:07.313 --> 00:13:14.444
- this one was identified. I was thinking one of it's up by Patterson that we had to clean up as well.

00:13:14.444 --> 00:13:21.858
- Oh, that was another one as well that we assisted with. So we can assist with like brush removal, things

00:13:21.858 --> 00:13:29.342
- like that, as long as I don't want our staff members to ever have to exit equipment. And that's why we're

00:13:29.986 --> 00:13:37.409
- doing this through a contract with Marshall, it's just not in the job descriptions of our crews to be

00:13:37.409 --> 00:13:44.759
- out cleaning up these encampments. As you mentioned, Kat, you mentioned that the city is taking care

00:13:44.759 --> 00:13:52.037
- of the eviction. Has that taken place already or are they? I believe so, yes. That is taking place,

00:13:52.037 --> 00:13:58.878
- so now we're left to clean it up. Okay, I just wanted it on the record as far as a cost that,

00:14:00.354 --> 00:14:07.761
- this continuing issue with the city is costing our, not only, it's costing our rate payers to clean

00:14:07.761 --> 00:14:15.168
- this up. So thank you. And I do appreciate us not utilizing staff for this. It is, having seen some

00:14:15.168 --> 00:14:22.723
- of these things get cleaned up, it is, we need the trained professionals in this area to clean it up,

00:14:22.723 --> 00:14:28.574
- and I don't, I would not wanna see our staff put it at any risk, so thank you.

00:14:32.002 --> 00:14:41.401
- then in spending $10,000 to clean up the site again, then what are we gonna do so it doesn't become

00:14:41.401 --> 00:14:51.083
- another encampment? And just to refresh my knowledge, so if we're thinking about the property and then

00:14:51.083 --> 00:15:00.670
- it's the creek and on the west side of the creek is the trail, correct? Okay, so what's our ownership

00:15:01.218 --> 00:15:07.610
- Is the entire creek as part of our property? Does it lead up to the creek and then the creek and the

00:15:07.610 --> 00:15:14.065
- trail is the city's property? Where is that line? Let me pull it up real quick. Thank you. We do have

00:15:14.065 --> 00:15:18.622
- most of the creek as I think in our property. I don't want to misspeak.

00:15:38.306 --> 00:15:46.804
- So, yes, it looks like the creek is almost entirely in our property. From, you know, the north end of

00:15:46.804 --> 00:15:55.219
- the Winston-Thomas property to the south end, yeah. I'm just thinking, like, I don't know how big of

00:15:55.219 --> 00:16:03.550
- a fence would make a difference. I don't know. I mean, I know that'd be another expense, too, but I

00:16:03.550 --> 00:16:07.966
- feel like just mitigating this size, cleaning it up,

00:16:09.410 --> 00:16:16.016
- and then it's just gonna happen again. I think there's less likely to be another encampment once there's

00:16:16.016 --> 00:16:22.433
- more activity in that area, like once the building is built. It's the activity that will decrease the

00:16:22.433 --> 00:16:28.787
- likelihood of additional encampments. I don't know if fences would be particularly effective. Right.

00:16:28.787 --> 00:16:35.582
- Did you say this is the second time we've had to clean this up, or did I not? This is the second encampment

00:16:35.582 --> 00:16:39.294
- that I'm aware of that we've had to clean up at this site.

00:16:39.618 --> 00:16:48.077
- and that one was also, was that one also about $10,000? That one we had some, that one we were still

00:16:48.077 --> 00:16:56.536
- working, it was the beginning of the administration, we were working with the city to try to partner

00:16:56.536 --> 00:17:05.078
- to clean up, but now we have more of a kind of a protocol. Okay, thank you. That involves contracting

00:17:05.078 --> 00:17:09.182
- outside. Any other questions about the, oh yeah.

00:17:09.346 --> 00:17:16.928
- So, like, can... not to, like, do light pollution for... because I know we have, like, neighbors that

00:17:16.928 --> 00:17:24.732
- live in that area, but are there any lights that we can put up or something that maybe would deter folks

00:17:24.732 --> 00:17:32.314
- from being in there even when we have construction going on? Will that part of the land be, you know,

00:17:32.314 --> 00:17:38.558
- cleared of... I don't know how dense it is, like, with trees and shrubs and things,

00:17:38.722 --> 00:17:48.588
- So one of the plans for our service center, so if we're primarily concerned with the service center

00:17:48.588 --> 00:17:59.145
- area, one of the aspects of that is that we would want to clear the invasives in that area in the riparian

00:17:59.145 --> 00:18:05.854
- zone as good stewards of the creek, as being environmental leaders,

00:18:06.338 --> 00:18:15.031
- But an added benefit is that there would be less cover that is more prone to having encampments. Yes.

00:18:15.031 --> 00:18:23.894
- Okay. That site runs, I don't know how long that would be, even though we're only building on what half

00:18:23.894 --> 00:18:33.099
- of the property. So is that something we would clear the length of our property or consider? It's something

00:18:33.099 --> 00:18:34.718
- worth considering.

00:18:34.978 --> 00:18:43.082
- Currently, we were only looking at the site plan for the Winston-Alma School Center. Thank you.

00:18:43.082 --> 00:18:51.778
- All right. Any other discussion on that contract? We're ready then to vote. I move that we approve the

00:18:51.778 --> 00:19:00.895
- contract with Marshall Security. Second. Moved and seconded to approve the contract with Marshall Security.

00:19:00.895 --> 00:19:03.934
- All in favor say aye. Aye. Opposed?

00:19:04.738 --> 00:19:15.483
- All right. Motion carries. Next is number six on our agenda to request approval of the service agreement

00:19:15.483 --> 00:19:25.717
- with Commonwealth Engineers Incorporated. Good evening, Phil Peden engineering. So this contract is

00:19:25.717 --> 00:19:31.550
- to do some work out at Griffey and with the dam. We do a

00:19:32.034 --> 00:19:39.238
- or we have it performed a biannual inspection of the dam. It's required for any high hazard dam through

00:19:39.238 --> 00:19:46.233
- the DNR. So we do that each year. That engineer provides us with a set of recommendations as part of

00:19:46.233 --> 00:19:53.160
- that report. Some of those are maintenance and we send crews out, the green team with environmental

00:19:53.160 --> 00:19:57.662
- to clear woody vegetation from the dam or the concrete spillway.

00:19:58.018 --> 00:20:05.431
- But there were some other aspects of this report that actually required some professional help, primarily

00:20:05.431 --> 00:20:12.565
- the outlet control and the design of the primary outlet. And so the engineer recommended that we have

00:20:12.565 --> 00:20:19.559
- that reviewed and make sure that it passes what they call the probable maximum flood. And so that's

00:20:19.559 --> 00:20:22.846
- one of those storms that's above the 100 year.

00:20:23.394 --> 00:20:29.974
- wanting to verify that the capacity is there within that primary spillway of the Griffey Dam. So that's

00:20:29.974 --> 00:20:36.492
- the major component of this contract, but some of the other components are going through the emergency

00:20:36.492 --> 00:20:42.819
- action plan, doing a tabletop exercise to make sure we walk through that in case there's emergency,

00:20:42.819 --> 00:20:46.046
- what do we do, and kind of running us through that

00:20:50.370 --> 00:20:58.795
- just a tabletop exercise, so we're doing it, it's a mock emergency, basically, to see if we can perform

00:20:58.795 --> 00:21:07.221
- what's in the EAP. Be happy to answer any questions, but that's what this contract's for. So they would

00:21:07.221 --> 00:21:15.403
- do the assessment of the emergency spillway, is that what you're saying? And then provide, we've got

00:21:15.403 --> 00:21:19.454
- an emergency action plan for that already, right?

00:21:19.650 --> 00:21:27.937
- Right, so they're gonna update it? They're gonna update that and they'll walk us through a tabletop

00:21:27.937 --> 00:21:36.805
- exercise where we perform that in a mock scenario and then make sure the staff understands how to operate.

00:21:36.805 --> 00:21:45.093
- Yes, thank you. The tabletop scenario then would be the activation of the emergency spillway or the

00:21:45.093 --> 00:21:46.750
- failure of the dam.

00:21:47.522 --> 00:21:54.491
- Well, actually the emergency action plan lays out multiple scenarios. So okay, this level of incident

00:21:54.491 --> 00:22:01.391
- is just where it overtops the primary spillway. And then when there's a breach of the dam, you know,

00:22:01.391 --> 00:22:08.292
- some other level where it's going to inundate the entire area below the floodplain. So they're gonna

00:22:08.292 --> 00:22:15.329
- update that inundation map which shows what happens if there's a breach. And my understanding is we'll

00:22:15.329 --> 00:22:17.310
- go through each one of those

00:22:17.538 --> 00:22:26.831
- of emergencies that could occur. We've done that before. Yes. We do it for lemon. No. Because that's

00:22:26.831 --> 00:22:36.125
- the conservancy district correct, but we still. We still own it. Yes, they maintain that and they're

00:22:36.125 --> 00:22:45.326
- the ones that they they are the ones that acquire the biannual inspection reports for that and then

00:22:45.326 --> 00:22:46.430
- perform the

00:22:46.818 --> 00:22:56.212
- emergency action plan exercises for that. That is done for lemon. I assume so. They have that responsibility.

00:22:56.212 --> 00:23:04.752
- Is there a requirement for us through state or Corps of Engineers or something to do this or? Well,

00:23:04.752 --> 00:23:09.534
- it ends up in that when you submit your biannual report

00:23:09.634 --> 00:23:17.846
- then they follow up and say, OK, we've read your report. Thank you for submitting it. You must do all

00:23:17.846 --> 00:23:25.978
- these recommendations to be in compliance. So whatever you put in your report, they basically accept

00:23:25.978 --> 00:23:34.190
- that, and then it's a requirement. Who gets the report? It's submitted to DNR. DNR. OK. This might be

00:23:34.190 --> 00:23:39.262
- an offshoot of Kirk's question. So with Griffey, though, Parks

00:23:40.322 --> 00:23:49.672
- We own it, but parks may, no. What's parks deal with Griffey? Parks, okay, so like, so we have no agreement

00:23:49.672 --> 00:23:58.330
- with parks for it? I mean, they have like the boathouse and access. We have an out of date MOU that

00:23:58.330 --> 00:24:07.247
- needs to be renewed with parks. Okay. I know, well that was what I was trying to get at because if the

00:24:07.247 --> 00:24:08.286
- conservancy

00:24:08.418 --> 00:24:23.255
- you know, does this part for Lake Lemon, then, you know, but okay. But Seth said that's for another

00:24:23.255 --> 00:24:32.158
- day. Okay. Okay. Other questions on this service agreement?

00:24:42.146 --> 00:24:51.042
- seconded. Any other discussion? All in favor say aye. Aye. Opposed? All right. Motion carried. Next

00:24:51.042 --> 00:25:00.205
- is number seven on the agenda requesting approval of a service agreement with CDS engineers. Hi there.

00:25:00.205 --> 00:25:04.030
- Kevin White, Capital Projects Coordinator.

00:25:04.194 --> 00:25:10.579
- Yes, this is for a professional engineering services including design bidding construction phase for

00:25:10.579 --> 00:25:16.901
- upgrades to an existing 10 inch sanitary sewer This is the old fell iron location. So there's a new

00:25:16.901 --> 00:25:23.349
- development that's Proposed to be going in there. They will be updating their sewer through that site

00:25:23.349 --> 00:25:25.182
- and this contract will allow

00:25:25.442 --> 00:25:34.122
- a CDS to start design to extend that sewer upgrade further south to Seventh Street. There's been some

00:25:34.122 --> 00:25:43.227
- ongoing overflows on Fairview and this should help eliminate that while also providing additional capacity

00:25:43.227 --> 00:25:51.822
- in the future. Contract amount is for $143,700 and it's roughly 1,200 feet of 10 inch pipe that will

00:25:51.822 --> 00:25:53.694
- need to be upsized to

00:25:53.858 --> 00:26:04.095
- I believe 15 inches is what they're calling out. Happy to answer any questions. It is for design, yes.

00:26:04.095 --> 00:26:14.232
- Where does that development areas stop in? Their site is just southwest of the beeline at 10th St and

00:26:14.232 --> 00:26:22.878
- it will go about a half a block and then into Rogers and that's where we will pick up.

00:26:23.554 --> 00:26:29.984
- And future design, it may go further down, straight down Rogers. That's not how it currently goes. It

00:26:29.984 --> 00:26:36.350
- currently goes down and jogs over east one block and then comes down to seventh. I'm blanking on the

00:26:36.350 --> 00:26:42.780
- name of that road. I forgot to look that one up today. But the design, you know, they may follow that

00:26:42.780 --> 00:26:49.273
- same route. They may say that it's more feasible to go straight down Rogers with the larger pipe. It's

00:26:49.273 --> 00:26:51.038
- still yet to be determined.

00:26:56.962 --> 00:27:05.391
- Okay, any questions for Kevin? All right. I move that we approve the contract with CDS Engineers. Second.

00:27:05.391 --> 00:27:12.785
- It's been moved and seconded. All in favor say aye. Aye. Opposed? All right, motion carries.

00:27:12.785 --> 00:27:20.737
- Thanks Kevin. Thank you. Next is requesting approval for an on-call service agreement with Bledsoe,

00:27:20.737 --> 00:27:23.838
- Rigert, Cooper and James Incorporated.

00:27:30.050 --> 00:27:36.504
- I think Brian's name's on there, but I said he could be excused since I did this one the last time.

00:27:36.504 --> 00:27:43.022
- This is, again, Philippine Engineering, but this is the same as what we had a couple weeks ago where

00:27:43.022 --> 00:27:49.605
- we used Eric Deckard. We just want multiple options. What you'll find on the survey world is that you

00:27:49.605 --> 00:27:56.510
- get to doing some research on a piece of property and you realize that Eric Deckard did a survey next door

00:27:56.642 --> 00:28:03.649
- He's got information about that property, those property corners, he can help with this property. If

00:28:03.649 --> 00:28:10.726
- you find BRCJ did a survey over here, that might be helpful. And in them performing the survey for us

00:28:10.726 --> 00:28:17.941
- at a lower cost also gives us flexibility on availability. So those are the reasons why we've went with

00:28:17.941 --> 00:28:23.838
- several different options. And again, another reputable survey company here locally.

00:28:26.690 --> 00:28:34.200
- Any questions? I know it was brought up during the Winston Thomas discussion. So would BRCJ, about the

00:28:34.200 --> 00:28:41.782
- 100 to 500 year floodplain, is that something that would be coming as its own contract or an extension,

00:28:41.782 --> 00:28:49.438
- and that would not be part of on-call services? Absolutely. And they're sub-consultant under Champlain's

00:28:49.438 --> 00:28:50.750
- contract already.

00:29:01.442 --> 00:29:13.003
- and James. It's been moved and seconded. All in favor say aye. Aye. Opposed? All right motion carries

00:29:13.003 --> 00:29:25.470
- thank you Phil. Next is requesting approval of the service agreement with Barnes and Thornburg. So as part of

00:29:25.986 --> 00:29:36.463
- the most recent water rate case, we did get approved to do some bonding for the water utility. So we

00:29:36.463 --> 00:29:47.148
- chose to engage Barnes and Thordberg to be our bond counsel for that bond issue. Questions then? Matt,

00:29:47.148 --> 00:29:55.966
- how much does this cover for us with Barnes? Well, bond counsel can get complicated.

00:29:56.450 --> 00:30:03.579
- Do we expect that, you know, this gives us so many hours worth of their services, or will we need another?

00:30:03.579 --> 00:30:10.509
- Yeah, there's not to exceed on it. So if it goes above that, then we'll have to come back, but I don't,

00:30:10.509 --> 00:30:17.371
- there's nothing that's come up in any meeting I've had about the bond that would suggest there's gonna

00:30:17.371 --> 00:30:24.034
- be any weird issues going out with it. Okay, I don't know if that answers your question or not. No,

00:30:24.034 --> 00:30:26.366
- that's good. Just to clarify this,

00:30:26.786 --> 00:30:38.128
- water that includes the sewer bonds. No, this is only water. Thank you. Okay. And we've used them before,

00:30:38.128 --> 00:30:49.042
- right? Yeah. I know that we approve the contract for a professional service agreement with Barnes and

00:30:49.042 --> 00:30:56.318
- Thornburg. It's been duly moved and seconded. Any other discussion?

00:30:56.866 --> 00:31:05.710
- All in favor say aye. Aye. Opposed? All right, motion carries. Next is requesting approval of resolution

00:31:05.710 --> 00:31:14.638
- 2026-15 to designate surplus property for auction or worthless surplus. Yes, this is our monthly cleanup.

00:31:14.638 --> 00:31:23.314
- We have a few items. Looks like there's some lab equipment, then a trailer, and then also a dozer that

00:31:23.314 --> 00:31:26.430
- we would like to try to auction off.

00:31:33.826 --> 00:31:44.055
- discussion or questions? Ready to roll. I move that we approve resolution 2026-16. Moved and seconded.

00:31:44.055 --> 00:31:54.186
- Any other questions, discussion? All in favor say aye. Opposed? All right. Surplus property it is. Is

00:31:54.186 --> 00:32:03.422
- there any old business from the board? Old business from the board? Old business from staff?

00:32:05.890 --> 00:32:12.274
- Okay, new business from the board. I'll say one thing real quick. So I had a water main break in my

00:32:12.274 --> 00:32:18.914
- neighborhood Friday afternoon. The crews were out there working hard in the hundred degree heat getting

00:32:18.914 --> 00:32:20.446
- it taken care of. I was

00:32:20.738 --> 00:32:26.981
- out for the evening, and when I got home, I noticed that my address was not listed as one that was under

00:32:26.981 --> 00:32:33.283
- a boil order, so I called in to ask the on-call center, and they were able to give me all the information

00:32:33.283 --> 00:32:39.229
- to know that my water was safe, and had any questions, I could call right back, so I just wanted to

00:32:39.229 --> 00:32:45.472
- thank everyone who was on that job Friday night, and I know that happens every day across our community,

00:32:45.472 --> 00:32:50.704
- so thank you again to our folks out there working. Well, okay, I know they're out there

00:32:50.704 --> 00:32:59.230
- working in the heat every day, and people are calling the center every day about something. So how about

00:32:59.230 --> 00:33:07.756
- that? That's fair. That's right. That's a good observation. Thank you. Let's see, any other new business

00:33:07.756 --> 00:33:16.363
- from staff? Yes. So I just wanted to let the board know that we have been receiving more customer reports

00:33:16.363 --> 00:33:18.718
- about some discolored water.

00:33:18.818 --> 00:33:26.331
- And so we encountered this last year, if you may remember, around the same time of year. And so the

00:33:26.331 --> 00:33:33.994
- change in this water, it's related to the seasonal conditions at Monroe Reservoir and the combination

00:33:33.994 --> 00:33:42.032
- of that and the adjustments that we're making at the water treatment plant to maintain effective treatment

00:33:42.032 --> 00:33:46.014
- while also managing disinfection byproducts or DBPs.

00:33:46.178 --> 00:33:52.601
- As these reservoir conditions change, CBU can draw water from different depths of the lake.

00:33:52.601 --> 00:33:59.722
- Like we discussed, we have the different levels of the gates. The current conditions of the lake have

00:33:59.722 --> 00:34:06.983
- required us to draw from a lower gate where you're gonna have naturally occurring manganese be a little

00:34:06.983 --> 00:34:11.870
- more prevalent. That's what is resulting in that water discoloration.

00:34:12.002 --> 00:34:20.783
- And so we have had crews flushing over the holiday weekend and today. So today, just today, we've flushed

00:34:20.783 --> 00:34:29.232
- over 35 hydrants in an effort to mitigate the impact that this is having to our customers. We've also

00:34:29.232 --> 00:34:33.374
- taken samples throughout the distribution system.

00:34:33.474 --> 00:34:41.158
- And all of those samples taken today were within all applicable EPA health advisory levels. We've also

00:34:41.158 --> 00:34:48.767
- just this evening put out a press release. We were waiting on those samples to come back to make sure

00:34:48.767 --> 00:34:56.526
- that we could make that statement. And so, yeah, you'll probably see that press release in social media

00:34:56.526 --> 00:35:02.718
- or wherever you get your news. I'd be happy to take any questions if you have any.

00:35:02.914 --> 00:35:10.807
- I decided to bring this to Cat's attention over the weekend and encouraged her to bring it up. The water

00:35:10.807 --> 00:35:18.550
- is safe to drink, it's a little discolored right now in some places a little bit more than others. The

00:35:18.550 --> 00:35:26.369
- one thing I do wanna say, at least in my area, is thankfully we haven't had the dirt taste in the water

00:35:26.369 --> 00:35:29.150
- this time of year, so knock on wood.

00:35:29.506 --> 00:35:35.957
- That's been good, but I do appreciate you getting the press release out. There's been a lot of, I should

00:35:35.957 --> 00:35:42.346
- say a lot, I've seen several things on social media of people taking pictures of their water and making

00:35:42.346 --> 00:35:48.613
- comments, so I thought it was very important for her to address this, and we need to get a little bit

00:35:48.613 --> 00:35:54.757
- more in front of it, so thank you. Absolutely. As soon as we can get information out, when we start

00:35:54.757 --> 00:35:57.214
- to see social media starting to bubble,

00:35:57.346 --> 00:36:04.960
- so to speak, that we need to get word out as fast as we can if there's a problem. Because I'll tell

00:36:04.960 --> 00:36:12.802
- you what, the rumors just go crazy. And people, you know, they start all the, well, here we are living

00:36:12.802 --> 00:36:20.567
- in Flint, Michigan stuff, and that's just wrong. But it's on us to get the word out that you're good.

00:36:20.567 --> 00:36:24.222
- Even though things may look a little different,

00:36:26.114 --> 00:36:34.368
- quality that are, it is safe to drink. And if we, as long as they realize they can trust us to do that

00:36:34.368 --> 00:36:42.541
- as fast as we can and tamp those things down, sometimes maybe it's even better to do it before we get

00:36:42.541 --> 00:36:50.715
- the latest test. We can say, here we are, we're, you know, give them as much as we can, as soon as we

00:36:50.715 --> 00:36:52.798
- can, and then keep going.

00:36:53.506 --> 00:37:00.472
- Absolutely, and you know it is a fine line between putting out kind of a more vague press release versus

00:37:00.472 --> 00:37:07.305
- one that can truly assure our customers that the levels that we have in our samples are below that EPA

00:37:07.305 --> 00:37:13.939
- health advisory level. I think statements like that, I feel confident in saying after we've had our

00:37:13.939 --> 00:37:20.639
- data. So sometimes it may take a little more time than how rapid social media kind of is. We're in a

00:37:20.639 --> 00:37:22.430
- very rapid news landscape.

00:37:22.530 --> 00:37:31.328
- And so I try not to let that very rapid news landscape dictate how quickly we respond to make sure that

00:37:31.328 --> 00:37:40.125
- we are responding correctly. It's not a bad idea for us to remind folks about our water supply. There's

00:37:40.125 --> 00:37:48.923
- probably a significant number of our customers who don't even know that we get our water from the lake.

00:37:48.923 --> 00:37:51.038
- And for some people that

00:37:51.778 --> 00:38:01.152
- that are familiar with bad lakes, that's not always a good thing. Then they're more suspicious. Well

00:38:01.152 --> 00:38:10.432
- water obviously has a different makeup than lake water. But on the positive side, our lake water is

00:38:10.432 --> 00:38:20.734
- unusually good. And when we compare it with other places, like the amount of, what is it, PFAS, is that level?

00:38:21.858 --> 00:38:30.857
- where there is more of that leaching into an aquifer, we don't have that problem because of the way

00:38:30.857 --> 00:38:39.855
- the watershed is with the lake. But we have different challenges. But the trick for us is to figure

00:38:39.855 --> 00:38:49.574
- out how to mitigate those challenges and we're doing that as pretty good as best we can. But it's different

00:38:49.574 --> 00:38:50.654
- as the year

00:38:50.850 --> 00:38:58.816
- goes around, and that's hard to explain to people. But it's not bad for us to remind folks now and then

00:38:58.816 --> 00:39:06.706
- that we're in pretty good shape. Absolutely, and that our water source tends to have seasonal changes.

00:39:06.706 --> 00:39:15.132
- Yeah. Unlike groundwater. Wouldn't you say we've made strides on that in the past couple of years, adjusting,

00:39:15.132 --> 00:39:19.038
- learning that the lake makeup changes? Absolutely.

00:39:20.962 --> 00:39:31.111
- We haven't always done the different levels of intake, right? No, actually exploring using these different

00:39:31.111 --> 00:39:40.595
- gates is a relatively newer tool in our toolbox, one that we had not been using before. This allows

00:39:40.595 --> 00:39:47.614
- us to manage the DBPs a lot better than we had had the ability to before.

00:39:53.378 --> 00:40:00.180
- issue that's happening now is because you're taking water from a lower level, and if it was being taken

00:40:00.180 --> 00:40:06.786
- from a higher level, then you would have the algae issue. Correct. So it's a trade off. Yes. It is a

00:40:06.786 --> 00:40:13.522
- trade off. Absolutely. So this is the first summer that you've taken it from that, no? No. Last summer

00:40:13.522 --> 00:40:18.558
- as well. Correct. When you received the calls, because I didn't notice that,

00:40:18.786 --> 00:40:24.550
- but I maybe now think I did notice it at school, I wonder. And so are you able to kind of like, you

00:40:24.550 --> 00:40:30.544
- have these pockets of areas that people are calling from or is it just sporadic all over the community?

00:40:30.544 --> 00:40:36.365
- We've been mapping all of the reports that we've been receiving to try to identify if there are kind

00:40:36.365 --> 00:40:42.186
- of like hot spots for it and where we can target our flushing. Have there been a pattern to it or is

00:40:42.186 --> 00:40:43.742
- it just sporadic? I think,

00:40:44.450 --> 00:40:53.291
- if I'm remembering the report from this morning correctly, is that we've mostly been seeing it on the

00:40:53.291 --> 00:41:02.305
- southeast side. I mean, this looks great. It tastes great, too. Does that distribution also happen with

00:41:02.305 --> 00:41:11.059
- the algae? If it was algae-flavored water, would we still be seeing a distribution like hot spots in

00:41:11.059 --> 00:41:12.446
- certain places?

00:41:20.322 --> 00:41:31.382
- There when it comes to the taste and odor compounds varying sensitivities to them. Yeah. Well, thanks

00:41:31.382 --> 00:41:42.767
- Kat for that report. Any other new business from staff or board? Take a minute to congratulate our staff

00:41:42.767 --> 00:41:47.646
- on I didn't recognize them as a silver tier.

00:41:48.674 --> 00:41:55.836
- with their Clint community program, recognized by the state. I've talked about this a couple times.

00:41:55.836 --> 00:42:03.141
- When I sat in on a couple meetings about a year ago, there was no other community higher than Silver,

00:42:03.141 --> 00:42:09.873
- so I don't know if that's changed, but I know we're near the top, if not at the top, so a lot

00:42:09.873 --> 00:42:17.822
- of congratulations, and I know there's a lot of talk about this current drinking water, but we are the premier

00:42:18.242 --> 00:42:26.228
- utility in the state. So thanks to the staff and congratulations. Great. Thanks for bringing it up.

00:42:26.228 --> 00:42:34.214
- Good job. Good point. All right. Anything else? We did have a subcommittee that met this evening at

00:42:34.214 --> 00:42:42.439
- this afternoon at four o'clock the property and planning subcommittee and we discussed the possibility

00:42:42.439 --> 00:42:47.710
- of continuing our design work for a new utilities service center.

00:42:48.130 --> 00:42:58.111
- at the Winston Thomas site. We discussed that there is about $41 million in bonding authority available.

00:42:58.111 --> 00:43:07.712
- That might not be enough to take care of the entire project. We reviewed the conceptual designs that

00:43:07.712 --> 00:43:17.598
- have been completed over the last couple of years, and we agreed that staff would continue to work with

00:43:18.338 --> 00:43:28.484
- contractors to get an update on what we expect the current cost would be if we decide to move forward

00:43:28.484 --> 00:43:38.828
- and come back to us for another property and planning subcommittee meeting on October the 5th. Anything

00:43:38.828 --> 00:43:46.686
- else that I missed there for those attending? Okay, there's subcommittees now.

00:43:47.682 --> 00:43:55.951
- And there's staff reports. Yeah. We have some folks we'd like to welcome to the utility. First we'd

00:43:55.951 --> 00:44:04.055
- like to welcome Mike Axum, Kyle Wilson, and Riley Perdue in TND who have all joined us as utility

00:44:04.055 --> 00:44:12.407
- specialists. We'd also like to welcome Graham McKean. As our hazardous material coordinator. Some of

00:44:12.407 --> 00:44:16.542
- you might know from his former role on the board.

00:44:17.730 --> 00:44:30.049
- Any other petitions or communications from the public? All right. Seeing none, we will be adjourned

00:44:30.049 --> 00:44:34.238
- till our next meeting. Thank you.