WEBVTT

00:00:02.594 --> 00:00:10.970
- I'll call to order the meeting of the Ellisville Planning Commission for July 9th, 2026. The first item

00:00:10.970 --> 00:00:19.103
- on our agenda is the Pledge of Allegiance. Ryan, would you please stand? Pledge of Allegiance to the

00:00:19.103 --> 00:00:27.157
- flag of the United States of America and to the republic for which it stands, one nation under God,

00:00:27.157 --> 00:00:30.942
- indivisible, with liberty and justice for all.

00:00:32.162 --> 00:00:40.533
- Okay, roll call please. David Drake. Here. Dan Swapper. Steve Hale. Here. Zach Michael. Here.

00:00:40.533 --> 00:00:49.526
- Kamala Samples. Ryan Skaggs. Here. Pat Weselowski. Here. First item on our agenda is approval of the

00:00:49.526 --> 00:00:58.876
- minutes for our meeting on June 4th. Motion to approve. Second. We have a motion and a second. All those

00:00:58.876 --> 00:01:01.726
- in favor say aye. Aye. Opposed?

00:01:03.298 --> 00:01:11.565
- Motion carries. Monthly conflict of interest statement. Does anyone have a conflict of interest with

00:01:11.565 --> 00:01:20.077
- the items on our agenda for this evening? Seeing none, we have no old business. New business, the first

00:01:20.077 --> 00:01:28.343
- item is the voluntary annexation of 5326 and 5328 West Woodyard Road, approximately 47.86 acres. The

00:01:28.343 --> 00:01:32.190
- petitioner is Dan Rary. The case number is PC.

00:01:32.354 --> 00:01:41.220
- 26-22. Good evening. First on our agenda this evening is petitioner Dan Rary's request to annex two

00:01:41.220 --> 00:01:50.264
- parcels totaling approximately 47.86 acres of land. And the parcels are located at 5326 and 5328 West

00:01:50.264 --> 00:01:59.397
- Woodyard Road. I will remind the plan commission that this is a public hearing about annexation of the

00:01:59.397 --> 00:02:00.638
- parcels only.

00:02:01.410 --> 00:02:10.241
- The proposed annexation area is 23% contiguous to the town of Ellsfield, and 100% of the property owners

00:02:10.241 --> 00:02:18.736
- are parties to the petition. The parcels are currently zoned AGR, agricultural residential by Monroe

00:02:18.736 --> 00:02:27.231
- County, and are recommended to be designated as agricultural upon annexation. The properties will be

00:02:27.231 --> 00:02:29.502
- located in Council Ward 5.

00:02:29.634 --> 00:02:36.953
- are serviced by water and sewer, the annexation should not require any capital projects to extend services,

00:02:36.953 --> 00:02:43.797
- and any costs for extension of utilities is borne by the petitioner. Town will provide police, fire,

00:02:43.797 --> 00:02:50.709
- EMS, and other governmental services immediately upon annexation. The Plan Commission action shall be

00:02:50.709 --> 00:02:57.621
- in the form of favorable, unfavorable, or no recommendation to town council, which takes final action

00:02:57.621 --> 00:02:59.518
- on the annexation petition.

00:03:00.514 --> 00:03:07.410
- Staff recommends a favorable recommendation be forwarded to town council with the recommendation of

00:03:07.410 --> 00:03:14.307
- zoning of agricultural upon annexation. I would ask that the favorable motion include the condition

00:03:14.307 --> 00:03:21.272
- that both Ellsville town council and the Richland Township Board agree with the annexation, that the

00:03:21.272 --> 00:03:27.134
- annexation move forward. The condition is requested because Ellsville reorganization

00:03:27.586 --> 00:03:36.675
- with Richland Township adopted the reorganization plan. Both the town and township will approve resolutions

00:03:36.675 --> 00:03:45.091
- agreeing to the annexations. The annexations will go before the town council on July 27th for their

00:03:45.091 --> 00:03:54.265
- approval. Petitioners present if you have any questions. Does anybody from the commission have any questions

00:03:54.265 --> 00:03:56.958
- for Denise? Okay, hearing none.

00:03:57.154 --> 00:04:05.397
- Dan, do you want to say anything? Okay. Um, I will open it up to public comment. Uh, the maximum is

00:04:05.397 --> 00:04:13.805
- three minutes per person, 15 minutes total. I would like to point out again that this is merely annex

00:04:13.805 --> 00:04:22.213
- proposed annexation of the property. There is no development plan. There is no anything to talk about

00:04:22.213 --> 00:04:23.614
- roads, drainage,

00:04:23.938 --> 00:04:33.277
- Anything like that that comes up at this point, that's all in later hearings if a development of some

00:04:33.277 --> 00:04:42.798
- type is proposed. I believe we got a letter about this. I would note that I don't see any way that this

00:04:42.798 --> 00:04:51.038
- property would connect up to even an opportunity to connect up to Forest Park and I think

00:04:51.362 --> 00:05:01.633
- That's all I have to say. So is there any, if anyone would like to comment on this, they can come up

00:05:01.633 --> 00:05:11.903
- and sign in at the podium. Okay, seeing none. Do we have a motion? I'll make a motion to approve the

00:05:11.903 --> 00:05:17.598
- PC2622, the voluntary annexation with the addendum that

00:05:18.562 --> 00:05:28.189
- With agricultural zoning? With agricultural zoning. And the condition of approval after both the town

00:05:28.189 --> 00:05:37.628
- council and the township board pass resolutions for the annexation to proceed. With the agenda that

00:05:37.628 --> 00:05:46.878
- the town council and township boards need to also do approval for the annexation as well. Second.

00:05:47.842 --> 00:06:00.419
- Okay, we have a motion and a second. Denise. Denise. Renee. David Drake. Yes. Steve Hale. Yes.

00:06:00.419 --> 00:06:13.790
- Zach Michael. Yes. Brian Skaggs. Yes. Pat Weslowski. Yes. Thank you. Almost. Welcome to Ellitsville.

00:06:15.394 --> 00:06:22.514
- Okay, the next item on our agenda is the development plan approval for the Ferris development plan at

00:06:22.514 --> 00:06:29.844
- 5010 North Lakeview Drive. The petitioner is Kevin Ferris. The case number is PC 26-24. Petitioner Kevin

00:06:29.844 --> 00:06:37.104
- Ferris is requesting approval of the Ferris development plan for a minor subdivision, not for the site,

00:06:37.104 --> 00:06:44.574
- development plan is for a minor subdivision consisting of four lots with single family homes, totaling 2.3

00:06:45.026 --> 00:06:53.180
- The minor subdivision is, I'll remind you, is zoned residential two. The residential two zoning district

00:06:53.180 --> 00:07:00.945
- allows a petitioner to design a minor subdivision around topographical constraints on the property.

00:07:00.945 --> 00:07:08.711
- The primary plat for the subdivision was approved by the Plan Commission on June 4th. The technical

00:07:08.711 --> 00:07:14.302
- advisory committee at that time reviewed the plans for the subdivision.

00:07:14.466 --> 00:07:21.813
- division and they reviewed the development plan as well and found no changes. Petitioner will be making

00:07:21.813 --> 00:07:29.019
- the following improvements to the Ferris storage minor subdivision, construction of a shared driveway

00:07:29.019 --> 00:07:36.154
- which will serve all lots, construction of a small pond slash water quality feature in the southeast

00:07:36.154 --> 00:07:43.006
- corner of the site which will serve all lots, and grade three lots for new houses. At this time,

00:07:43.234 --> 00:07:50.165
- Either lot two will be responsible for the maintenance of the proposed pond or all lots will enter into

00:07:50.165 --> 00:07:56.962
- a maintenance agreement. The Ferris development plan meets all minimum requirements of the Ellisville

00:07:56.962 --> 00:08:03.760
- town code. The plan commission is tasked with either approving, approving with conditions, denying or

00:08:03.760 --> 00:08:08.158
- continuing this development plan based on the following criteria.

00:08:08.994 --> 00:08:15.537
- Number one, compatibility of the development plan with surrounding land uses. Staff findings, single

00:08:15.537 --> 00:08:22.664
- family residential is found to the north, south, and west of the minor subdivision. Number two, compatibility

00:08:22.664 --> 00:08:29.531
- of the development plan with the recommendations of the comprehensive plan. Staff findings, single family

00:08:29.531 --> 00:08:35.038
- residential not fronting West State Road 46 is encouraged in the comprehensive plan.

00:08:36.418 --> 00:08:42.588
- Three, adequate provisions for internal management of traffic. Staff finding traffic will enter and

00:08:42.588 --> 00:08:49.128
- exit from North Lakeview Drive, and adequate traffic flow has been accommodated in the Ferris Development

00:08:49.128 --> 00:08:55.299
- Plan. The Fire Department has approved the common drive shown in the Development Plan. Number four,

00:08:55.299 --> 00:09:01.715
- analysis of the capacity of adjacent streets to ensure that adjacent streets can safely and efficiently

00:09:01.715 --> 00:09:05.726
- accommodate the additional traffic generated by the development.

00:09:06.594 --> 00:09:13.367
- Staff finding, all traffic should come from North Lakeview Drive. There is no reason for concern as

00:09:13.367 --> 00:09:20.275
- three additional single family lots will not generate a substantial increase in traffic. Number five,

00:09:20.275 --> 00:09:27.589
- adequate provisions for public facilities and infrastructure and provisions for extension of infrastructure

00:09:27.589 --> 00:09:34.429
- to adjacent developable properties. Staff finding, a minor subdivision does not require the creation

00:09:34.429 --> 00:09:36.190
- of public infrastructure.

00:09:36.930 --> 00:09:43.638
- Provisions for the allocation of land for streets, parks, schools, public and semi-public buildings,

00:09:43.638 --> 00:09:50.744
- homes, businesses, and industry as appropriate. North Lakeview Drive is maintained by a town at Ellsville.

00:09:50.744 --> 00:09:57.917
- And I wanna remind you, it's a four lot minor subdivision. Seven, adequate on-site management of stormwater

00:09:57.917 --> 00:10:04.625
- and erosion control. Staff finding, petitioner will be constructing a small pond slash water quality

00:10:04.625 --> 00:10:06.750
- feature in the southeast corner

00:10:06.882 --> 00:10:14.136
- of the subdivision, it will serve all lots. Number eight, adequate provision for green space and our

00:10:14.136 --> 00:10:21.174
- landscaping. Staff finding landscaping in green space is not a requirement of minor subdivisions.

00:10:21.174 --> 00:10:28.500
- Number nine, adequate provision for buffering to significantly reduce the visual impact of dissimilar

00:10:28.500 --> 00:10:34.174
- developments. Buffering is not a requirement of minor subdivisions. Number 10,

00:10:34.370 --> 00:10:41.314
- Adequate protection of existing limestone structures. Staff finding there are no limestone structures

00:10:41.314 --> 00:10:48.326
- indicated on the site. Number 11 and lastly, provision of pathways, trails, and our sidewalks were all

00:10:48.326 --> 00:10:55.202
- non-industrial developments. Staff finding, sidewalks, pathways, and trails are not a requirement of

00:10:55.202 --> 00:10:58.334
- minor subdivisions. Plan, commission, action.

00:10:58.914 --> 00:11:05.521
- on the development plan can be in the form of approval, approval with conditions, denial or to continue

00:11:05.521 --> 00:11:12.064
- the hearing. The plan commission has the final say in these matters. Staff recommendation, development

00:11:12.064 --> 00:11:18.608
- plan approval shall be predicated on the aforementioned criteria. If the plan commission does not find

00:11:18.608 --> 00:11:25.278
- that the Ferris development plan is in agreement with those items, the plan commission shall approve it.

00:11:25.954 --> 00:11:32.623
- Additionally, the plan commission may include any conditions they feel are necessary and relevant to

00:11:32.623 --> 00:11:39.755
- develop the property in an appropriate manner. It is staff opinion that the requirements of the development

00:11:39.755 --> 00:11:46.358
- plan pursuant to the town of Ellsville Unified Development Ordinance have been reasonably achieved.

00:11:46.358 --> 00:11:53.159
- Staff recommends the plan commission approve the development plan. Petitioner's representative is here

00:11:53.159 --> 00:11:54.942
- if you have any questions.

00:11:55.202 --> 00:12:08.384
- See if I get this to work, there. So this is the development plan. And there's already an existing house

00:12:08.384 --> 00:12:21.691
- here and then there'll be the ability to construct three new homes. Okay, does anybody have any questions

00:12:21.691 --> 00:12:24.830
- for Denise? Seeing none.

00:12:25.122 --> 00:12:43.544
- Does the petitioner want to say anything? Do we have any comment from the public? Okay, come on up,

00:12:43.544 --> 00:12:54.782
- sign in, and you've got three minutes. And what's your name?

00:12:55.106 --> 00:13:01.490
- We recently acquired the property north of this development site, 5020 North Lakeview Drive. I just

00:13:01.490 --> 00:13:07.938
- had a few questions. You've answered a couple already. Obviously, water flow. It sounds like they're

00:13:07.938 --> 00:13:14.577
- going to be something with a retention pond to take care of that. My next would be, will these be homes

00:13:14.577 --> 00:13:21.089
- built for sale or for rental? Next question would be single story, two story? And then is there going

00:13:21.089 --> 00:13:22.238
- to be any kind of

00:13:22.466 --> 00:13:35.146
- protection for privacy for my lot to the north of them. That's it. AJ, can you answer any of those?

00:13:35.146 --> 00:13:48.079
- That probably wouldn't hurt. My name is AJ Willis. I'm the engineer for this development representing

00:13:48.079 --> 00:13:49.854
- Kevin Ferris.

00:13:50.370 --> 00:13:57.967
- We don't know what the house plans are going to be at this time. They're going to be standard single-family

00:13:57.967 --> 00:14:05.213
- residential. There's not going to be anything special about them or out of the ordinary. The town will

00:14:05.213 --> 00:14:12.388
- review the building plans for building permits, so that will ensure that each building is per the UDO

00:14:12.388 --> 00:14:19.422
- and up to standards. For privacy, there's no privacy requirements between single-family residential

00:14:19.586 --> 00:14:31.988
- and single family residential. That's going to be completely up to the petitioner or the adjacent property

00:14:31.988 --> 00:14:44.158
- owners. We're not required to add any type of privacy buffer. Okay. Thank you. Okay. Anybody else? Okay,

00:14:44.158 --> 00:14:48.446
- I will make a motion that we approve

00:14:49.378 --> 00:15:02.630
- Case number PC26-24 for 5010 North Lakeview Drive. Second. Second. Okay, roll call, please. David Dre.

00:15:02.630 --> 00:15:13.566
- Yes. Steve Hale. Yes. Zach Michael. Yes. Ryan Skaggs. Pat Weslowski. Yes. Thank you.

00:15:15.746 --> 00:15:24.328
- So before we move on to the next one, just so that you were clear, we don't have building plans at this

00:15:24.328 --> 00:15:33.074
- point, that comes at a later stage. And that there's no requirement, that we don't typically put barriers

00:15:33.074 --> 00:15:41.491
- between single family houses. If you wanna put up your own fence, you're fine to do that. Okay. Okay,

00:15:41.491 --> 00:15:45.534
- next item on our agenda is primary plan approval

00:15:47.042 --> 00:15:57.692
- 24 lots, 29.64 acres in the Barberry State's phase three subdivision, 7691 West Reeves Road, gas number

00:15:57.692 --> 00:16:08.241
- PC26-17. This is a request by petitioner Josh Clark of Barberry Homes for primary plat approval of the

00:16:08.241 --> 00:16:16.638
- single family residential subdivision consisting of 24 lots totaling 29.64 acres,

00:16:16.962 --> 00:16:24.137
- The lots are zoned residential one, single family residential. Subdivision will be accessed from West

00:16:24.137 --> 00:16:31.312
- Reeves Road. Technical Review Committee met on May 19th. All items have been addressed. The lots will

00:16:31.312 --> 00:16:38.486
- meet all size and dimensional requirements of the UDO, Unified Development Ordinance. Plan Commission

00:16:38.486 --> 00:16:44.606
- action on the primary plaque can be in the form of approval, approval with conditions,

00:16:44.770 --> 00:16:52.208
- denial are to continue the hearing. The plan commission has the final say in these matters. It is staff

00:16:52.208 --> 00:16:59.574
- recommendation. It is a staff opinion that the proposed primary plat will meet all required zoning and

00:16:59.574 --> 00:17:07.011
- minor subdivision regulations. Therefore, staff recommends that the plan commission approve the primary

00:17:07.011 --> 00:17:13.662
- plat for Barbaria State's phase three subdivision. And I wanna go through various pages from

00:17:14.722 --> 00:17:25.415
- the primary plat. So this is an overall rendering of how it will look once all lots are in. And you'll

00:17:25.415 --> 00:17:36.316
- notice the ponds in the center. And I just wanted to go ahead and show you, this is the site and utility

00:17:36.316 --> 00:17:43.998
- plan and how the road will come in and it will also connect to this road.

00:17:46.306 --> 00:17:56.995
- And this is another site and utility page from site and utility plan. And this shows a little more of

00:17:56.995 --> 00:18:07.685
- the lots and the pond. And that connects out to Loudoun? Yes. So Reeves is this way and then it'll go

00:18:07.685 --> 00:18:15.230
- out to Loudoun. Wow, okay. And this is first page of the grading plans.

00:18:15.394 --> 00:18:24.784
- wanted to show you mostly this is for the pond, and the engineer can explain later erosion control around

00:18:24.784 --> 00:18:34.263
- the pond and the changes being made to the pond, which we're very pleased with. But there's some technical

00:18:34.263 --> 00:18:42.590
- detail in there, so I'm gonna let him explain it. This is another page from the grading plan.

00:18:47.714 --> 00:18:59.058
- This is the last page from the grading plan. So I'll be happy to go back to any of these if you'd like

00:18:59.058 --> 00:19:10.071
- to see them. Petitioner's representative is present to further explain the changes made to the pond

00:19:10.071 --> 00:19:14.366
- and erosion control, things like that.

00:19:17.794 --> 00:19:27.858
- Okay, you're up, again. AJ Willis again, Josh was unable to make it tonight. So just a few things I

00:19:27.858 --> 00:19:38.223
- wanna talk about with this plan. It's pretty much the same plan that you guys approved in 2024, except

00:19:38.223 --> 00:19:46.878
- we added 10 lots. The only changes from the previous plan set, we increased the tree,

00:19:47.042 --> 00:19:54.608
- plot width for the sidewalks to six feet. And then there were some stormwater changes because Ellsville

00:19:54.608 --> 00:20:01.882
- came out the new stormwater ordinance. So the stormwater changes are actually more conservative now

00:20:01.882 --> 00:20:09.448
- than they were back in 2024. So the existing lake in the middle of the site, it's just basically a farm

00:20:09.448 --> 00:20:15.486
- pond where it only had a dam and a spillway. So what we're doing is we're actually

00:20:15.682 --> 00:20:22.929
- incorporating a new riser structure. It's a six foot by six foot box that's going to hold the water

00:20:22.929 --> 00:20:30.320
- surface elevation. And then we have 4.2 feet of storage to the spillway of that lake. So essentially,

00:20:30.320 --> 00:20:38.219
- on a normal day, the water elevation will always be at 758 point whatever. That's where that riser structure

00:20:38.219 --> 00:20:43.582
- is set at. It's gonna hold that water surface elevation. And rain events,

00:20:43.682 --> 00:20:53.040
- providing 4.2 feet of storage above that normal pool elevation. And that's how we're able to reduce

00:20:53.040 --> 00:21:02.399
- the runoff rates from the site. So that lake actually takes in a total of 136 acres of runoff. It's

00:21:02.399 --> 00:21:11.102
- about 100 of that is offsite coming from the south and the east. So our lake design actually

00:21:11.234 --> 00:21:19.195
- reduces the runoff rates for off-site water as well. Per the storm water design manual, we're not required

00:21:19.195 --> 00:21:27.008
- to do that. But since it is just a large amount of water, we've incorporated the tension into our design

00:21:27.008 --> 00:21:34.746
- for the off-site runoff. In the 100-year storm event, the pre-development runoff rate is 230 CFS. We're

00:21:34.746 --> 00:21:39.582
- reducing it all the way down to 61 CFS out of the existing lake.

00:21:39.746 --> 00:21:47.339
- And then just north of the lake, there's a small stormwater and detention pond. That's for our 21 lots

00:21:47.339 --> 00:21:55.152
- that are actually draining below the lake. None of this new development actually drains into the existing

00:21:55.152 --> 00:22:02.524
- lake except for like one or two lots. And I'm more than happy to answer any questions. Does anybody

00:22:02.524 --> 00:22:03.998
- have any questions?

00:22:09.186 --> 00:22:19.806
- Don't go far. Okay, we are now open for public comment. If anyone would like to comment, you get three minutes.

00:22:39.522 --> 00:22:48.593
- My name is Rose Seguin, and I live in Barberry Estates. My husband and I have a home there. And since

00:22:48.593 --> 00:22:57.753
- we were actually the first residents there in that development, and we've not been told much about the

00:22:57.753 --> 00:23:06.646
- extension and the development, which we don't have a lot of problem with. We do have some questions

00:23:06.646 --> 00:23:08.958
- concerning the pond area.

00:23:10.210 --> 00:23:20.139
- We've had some drainage problems on our land and have had to do landscaping more than once, but we've

00:23:20.139 --> 00:23:30.165
- kept it up at our own expense. Our question about the pond is health reasons. We've not been told what

00:23:30.165 --> 00:23:37.758
- the expenses will be to keep it up, what the safety concerns are for children

00:23:37.858 --> 00:23:45.937
- There's so many children around there with the school. And Prominence Point has children. They're in

00:23:45.937 --> 00:23:54.016
- and out of the neighborhood riding their bikes. And children will be attracted to a pond, as well as

00:23:54.016 --> 00:24:02.335
- insects, bugs, little animals. But mainly the children. We haven't heard anything for safety. They will

00:24:02.335 --> 00:24:06.494
- be playing down there, no doubt. And another issue.

00:24:07.522 --> 00:24:15.993
- that I think, and ponds are nice. They're kind of an attractive nuisance, but they aren't an expense

00:24:15.993 --> 00:24:24.549
- as well. One of my other questions was we were told initially there would be an HOA, and then because

00:24:24.549 --> 00:24:33.272
- we have all kept up the common ground near our lots at our own expenses, they kind of let that go. Josh

00:24:33.272 --> 00:24:37.214
- and Lindsay did not collect it this past year.

00:24:38.306 --> 00:24:47.193
- How will the HOA be initiated again and how will it affect us that we're not anywhere near the pond

00:24:47.193 --> 00:24:56.168
- area where it's going to be, but yet will we have to pay for what maintenance will be done yearly or

00:24:56.168 --> 00:25:05.143
- what, and how will that affect our taxes? Will they keep it insured in case children are hurt there?

00:25:05.143 --> 00:25:07.454
- There's just things that,

00:25:08.514 --> 00:25:16.399
- We've not been told anything actually and we just had these questions and concerns. Thank you. Maybe

00:25:16.399 --> 00:25:24.439
- you can try to address some of those that are relevant to our things and then get with them afterwards

00:25:24.439 --> 00:25:32.402
- and answer some of the other things. Really the only thing I can really speak on that because I don't

00:25:32.402 --> 00:25:35.134
- really know how the HOA is set up.

00:25:35.554 --> 00:25:42.712
- is just the safety concerns for the pond. So anytime you have a wet pond, it's standard that anytime

00:25:42.712 --> 00:25:50.083
- you have a pond that's deeper than four feet, you kind of create a shelf on the embankment. So all that

00:25:50.083 --> 00:25:57.384
- storage that we're providing, that is, so the water surface elevation is gonna be four feet below that

00:25:57.384 --> 00:26:04.542
- spillway, then there will be a shelf. So that's if in a rain event, if somebody falls into the pond,

00:26:04.898 --> 00:26:11.137
- They're not trying to climb up a steep embankment. They have somewhere they can stand and get their

00:26:11.137 --> 00:26:17.376
- foot in to get out of the pond. And then every four feet, you just have that shelf in the bottom of

00:26:17.376 --> 00:26:23.864
- the pond. And that's usually about 10 feet wide. That's really the only thing you can do in a situation

00:26:23.864 --> 00:26:30.415
- like this, other than fence it. But when it's a pond, it's going to be used as an amenity. There's going

00:26:30.415 --> 00:26:34.782
- to be a walking trail around it in the future. That's kind of how you

00:26:35.650 --> 00:26:47.424
- account for safety. Okay. So so most of the questions that you had revolve around things that we don't

00:26:47.424 --> 00:26:58.969
- have control over that you'll have to talk to the whoever runs the homeowners association or the the

00:26:58.969 --> 00:27:03.198
- there isn't there an office for this

00:27:04.450 --> 00:27:12.769
- subdivision right there on Reeves Road? And those are, that's where you need to ask some of these other

00:27:12.769 --> 00:27:20.848
- questions. We can only control how they divide the property up and make sure that it fits within the

00:27:20.848 --> 00:27:28.927
- town's regulations. Those other questions are things that are really outside of our control that you

00:27:28.927 --> 00:27:34.366
- need to talk to the developer and the homeowners association about.

00:27:34.978 --> 00:27:42.400
- I don't see any way it would raise your taxes. Only the government can raise your taxes. So, I mean,

00:27:42.400 --> 00:27:49.749
- if you're paying homeowners or HOA fees, they could increase those to pay for some of those things,

00:27:49.749 --> 00:27:57.244
- but we don't have any control over that either. So you'll have to, he can maybe get you in contact or

00:27:57.244 --> 00:28:02.462
- tell you who to contact to get some of those other questions answered.

00:28:14.882 --> 00:28:27.120
- for the pond, is there like a year, like a lifespan? I'm not really sure. So that's kind of outside

00:28:27.120 --> 00:28:39.357
- of my purview as well. The petitioner has actually hired a geotechnical engineer that provided them

00:28:39.357 --> 00:28:43.518
- with plans on how to rebuild that

00:28:43.810 --> 00:28:53.279
- that dam and that spillway to ensure that it has the structural integrity to withstand all these rain

00:28:53.279 --> 00:29:03.304
- events in the future. So those dams usually have a clay core that have really high compaction requirements.

00:29:03.304 --> 00:29:12.030
- And it's usually like a trapezoid. It comes down at a 45 degree angle. So that's kind of just

00:29:13.410 --> 00:29:23.339
- That's really all we can do lifespan-wise is just to ensure that the dam and the spillway are constructed

00:29:23.339 --> 00:29:33.361
- properly. And that's why the petitioner hired a geotechnical engineer to actually give them specifications

00:29:33.361 --> 00:29:39.262
- on the design of that dam. So would they have that information

00:29:39.426 --> 00:29:49.750
- like more readily available as far as lifespan goes from and see if that's mentioned. I'm not sure if

00:29:49.750 --> 00:30:00.277
- it is or not. I will add that when all is said and done that our engineer will be inspecting it as well

00:30:00.277 --> 00:30:06.046
- before it's turned over to the future who pays for that.

00:30:07.682 --> 00:30:15.940
- I'm not sure who pays for it. That's kind of a difficult question because it depends what is wrong.

00:30:15.940 --> 00:30:24.611
- So what we've done with our riser structure, we actually have a 12-inch pipe that extends into the pond.

00:30:24.611 --> 00:30:32.869
- So let's say there is a breach in that spillway or a breach in that dam. They can actually drain, I

00:30:32.869 --> 00:30:37.246
- think it's like the first three or four feet of that

00:30:37.506 --> 00:30:43.438
- the normal pool elevation out of that pond through that 12-inch pipe. And then if that gets them to

00:30:43.438 --> 00:30:49.370
- the point where they can do their repairs, they can. If they have to drain it more, they'll have to

00:30:49.370 --> 00:30:55.658
- pump it from that point. But that 12-inch pipe, there's a gate valve in that box. So if there is a breach

00:30:55.658 --> 00:31:01.650
- or if there is a damn failure, they can start draining that and it will drain slowly. That's why you

00:31:01.650 --> 00:31:05.150
- extend a 12-inch pipe into the pond. You don't extend this

00:31:05.314 --> 00:31:16.038
- great big pipe so it just rushes out. So we do have some measures in our pond design for situations

00:31:16.038 --> 00:31:27.191
- where that pond does need to be drained rapidly. Okay, any more questions for AJ? And can you make sure

00:31:27.191 --> 00:31:34.590
- you talk to them after the meeting and tell them who to get hold of?

00:31:37.314 --> 00:31:52.132
- Do we have a motion? In that case, I will make a motion that we make approved, primary approval for

00:31:52.132 --> 00:32:06.654
- case number PC26-17. Second. Okay, roll call, please. David Drake. Oh, come on, I'm always first.

00:32:08.290 --> 00:32:18.612
- Pat Wesolowski. Yes. Ryan Skaggs. Yes. Zach Michael. Yes. Steve Hale. Yes. Thank you. I must be more

00:32:18.612 --> 00:32:29.036
- important. Planning Department update. Our next meeting is August 6th, and at this time I have no new

00:32:29.036 --> 00:32:36.190
- business. Okay, privilege of the floor. Planning Commission comments.

00:32:37.698 --> 00:32:38.910
- Seeing none, we're adjourned.