WEBVTT

00:00:00.994 --> 00:00:07.198
- With you all approving both of those budgets, the CVC approving the operating center budget as well,

00:00:07.198 --> 00:00:13.401
- and we're onto the next steps and I'm happy to answer any questions. Yeah, the only other point that

00:00:13.401 --> 00:00:20.158
- I would add, and maybe Jeff said this and I just didn't pick up on it, although the council is looking at the

00:00:20.354 --> 00:00:26.676
- operating budget, none of the operating budget funding comes out of the city's funds. It's all from

00:00:26.676 --> 00:00:33.125
- the Convention and Visitor Center, from the innkeeper's tax, but the interlocal agreement was created

00:00:33.125 --> 00:00:39.448
- and has this approval by both bodies of those budgets. So that's why we're presenting that tonight.

00:00:39.448 --> 00:00:46.782
- And I would cordially invite any of you to join with us for item number seven of nine on the city council's agenda.

00:00:46.882 --> 00:00:53.224
- bring your toothbrush and your change of clothes and you're welcome to come with us to City Council

00:00:53.224 --> 00:01:00.010
- meeting. Any hands? Any hands? All right, seeing none, we'll move on. People in comment? Yes. Am I correct

00:01:00.010 --> 00:01:06.289
- in saying this is the last construction budget, 2027? Yes, this will be the last food and beverage

00:01:06.289 --> 00:01:11.870
- appropriation budget with the City Council. Okay. All right, thank you. Well done, Jim.

00:01:12.130 --> 00:01:19.430
- Item number five, construction. Oh, I'm sorry. Item number four, president's report, change authorizations.

00:01:19.430 --> 00:01:26.256
- Your agenda says those under $25,000. We had some that I sent to you late this morning that are over

00:01:26.256 --> 00:01:33.016
- $25,000. I sent an email to you last evening explaining why you were getting those. And I apologize

00:01:33.016 --> 00:01:38.558
- for getting a lot of this information out to you late before we had the meetings.

00:01:39.138 --> 00:01:45.445
- But in many cases, like these change orders, we're trying to keep to the construction schedule and make

00:01:45.445 --> 00:01:51.692
- sure we're not delaying anything. So sometimes timing is such that we get them out to you pretty close

00:01:51.692 --> 00:01:58.302
- to the time we actually meet. So we attempt not to do that, but in this case, we had to. So I'm going to let

00:01:58.402 --> 00:02:05.036
- turn this over to, I think Jay has held, but if I may, let me handle the first one and then we'll move

00:02:05.036 --> 00:02:11.929
- to the second one. So the first one is the change order under $25,000, which you've given me the authority

00:02:11.929 --> 00:02:18.756
- to approve that. I sent that out to you earlier. It's a change for steel tubes for the elevator brackets.

00:02:18.756 --> 00:02:25.262
- It's coded as item as number two, an error and omission. I forwarded that to you and I signed off on

00:02:25.262 --> 00:02:27.774
- that and that's already been approved.

00:02:28.002 --> 00:02:35.064
- If you have any questions about it, I'm happy to answer them. Okay. If I'm not seeing any, so let's

00:02:35.064 --> 00:02:42.408
- move to the line to those below the orange line, which are the approvals of over 25,000. And your first

00:02:42.408 --> 00:02:49.541
- question could be, well, wait a minute. One of those is $21,000. You will hear in the description of

00:02:49.541 --> 00:02:55.614
- it that it is actually an addition to one you approved last month. So the cumulative,

00:02:55.874 --> 00:03:03.493
- effect of what you approved last month, plus this one is a figure much greater than $25,000. So that's

00:03:03.493 --> 00:03:11.186
- why 21,168 is still on for your approval as a board today. So with that, let me turn this over to Jason

00:03:11.186 --> 00:03:18.804
- Larson, J.S. Held. Yeah, Mr. President, you took away the thunder for the most interesting part of the

00:03:18.804 --> 00:03:24.574
- conversation, but in terms of the under 25 or over 25, but it's under 20, 25.

00:03:25.186 --> 00:03:33.410
- I digress. Did I do okay? You did very well. All right. So thank you. Okay. So as mentioned, the CA

00:03:33.410 --> 00:03:41.634
- 59 is related to a change order that was addressed at the last meeting. This is additional cost for

00:03:41.634 --> 00:03:49.694
- the steel that is needed for the north feature wall. So in both 59 and 60 on these feature walls,

00:03:49.858 --> 00:03:58.798
- what was missed was the need for structural capacity to hold these limestone pieces in place. And that's

00:03:58.798 --> 00:04:07.568
- where these adjustments are coming in. CA 59 is specifically for the north feature wall. And I believe

00:04:07.568 --> 00:04:10.718
- this wraps up any intended costs for

00:04:11.042 --> 00:04:16.964
- or the North wall, correct? Yeah, so the original PCO of the 100,000 was based off of assumptions while

00:04:16.964 --> 00:04:22.773
- the SI, the supplemental instructions were being finalized. So we built a little bit of a contingency

00:04:22.773 --> 00:04:28.467
- in there. When the documents were released, we got final pricing, which put us at the 121,000 here.

00:04:28.467 --> 00:04:34.332
- So the additional 21,000 is where it comes into play. So that actually leads in then to the discussion

00:04:34.332 --> 00:04:39.742
- about CA 60, which is revisions for the West feature wall. That is the final numbers are still

00:04:39.874 --> 00:04:47.975
- under development. This 275, it feels like it's going to capture the extent of the changes. What this

00:04:47.975 --> 00:04:56.154
- does is give the ability to, assuming that your approval comes through, for Weddle Brothers to be able

00:04:56.154 --> 00:05:04.255
- to continue moving forward with the work once they receive that final number. But this 275, you could

00:05:04.255 --> 00:05:06.558
- think of as a not to exceed,

00:05:07.010 --> 00:05:15.066
- authorization so that way they can move forward. Whatever that balance is between the final number and

00:05:15.066 --> 00:05:23.043
- this 275 will come back into the contingency after it's identified. And we can provide that update at

00:05:23.043 --> 00:05:30.942
- the next meeting or as we get those updated numbers in. So this is changing, it is changing the wall

00:05:30.942 --> 00:05:32.350
- structure, sorry,

00:05:35.170 --> 00:05:42.464
- side is a similar situation. What's challenging about it is this is where the wall is also intersecting

00:05:42.464 --> 00:05:49.899
- with the bridge that is connecting from the new convention center over to the existing convention center.

00:05:49.899 --> 00:05:57.123
- So there's some additional details to be addressed with that. But it's a similar situation in that the

00:05:57.123 --> 00:06:03.646
- Anchorage, the structural support, was not adequately incorporated into the original design.

00:06:06.242 --> 00:06:12.392
- Yeah, and let's go ahead. Are there any other questions? I mean, normally we have a motion and then

00:06:12.392 --> 00:06:18.788
- we have the discussion, but let's go ahead and ask questions if you have them and then we can deal with

00:06:18.788 --> 00:06:24.999
- a motion. Yes, Mr. Cassidy. Are there concerns that the 275 allocated for that isn't enough? Because

00:06:24.999 --> 00:06:31.334
- it seemed like that $100,000 for the north wall was supposed to have that buffer. So are there similar

00:06:31.334 --> 00:06:35.454
- concerns here that that's not going to be enough? I think it's the

00:06:36.002 --> 00:06:44.694
- There was a swag blow on this one, low end to high end, and this splits it in the middle. So we believe

00:06:44.694 --> 00:06:53.051
- it's enough. And we've given buffer to really believe it's enough. So question. So in building with

00:06:53.051 --> 00:07:01.910
- limestone, that's pretty common in Indiana. And I'm just wondering why we've got $400,000 worth of missed

00:07:01.910 --> 00:07:05.086
- anchorage here. How does that happen?

00:07:07.202 --> 00:07:13.993
- Maybe that's a question for Mr. Layton. Yeah, I can answer that one. So I think it's partially the unique

00:07:13.993 --> 00:07:20.464
- details we're going for here. The size of the blocks are very unique. It's not a traditional stacked

00:07:20.464 --> 00:07:26.934
- masonry stone. In hindsight, we would have went with the masonry construction back up to begin with.

00:07:26.934 --> 00:07:34.238
- That's what we're changing to. And then I think on top of that, when we got the actual stones that were procured,

00:07:35.042 --> 00:07:43.734
- just the natural limitations of how they break the stone. Many of them are larger than we expected,

00:07:43.734 --> 00:07:53.034
- and that's kind of compounding the issue. You may recall that in February of 2025, we approved the design,

00:07:53.034 --> 00:08:02.334
- and we approved the quarry-type stone that would have different sizes, variegation color, and all of that.

00:08:02.658 --> 00:08:09.332
- So we are getting what we approved. We're getting what we asked for in the design. Obviously, what's

00:08:09.332 --> 00:08:16.071
- been missed is the weight of it, the size and the weight of it, and what that means to the structural

00:08:16.071 --> 00:08:22.745
- support that's required. So it was missed. So what we're dealing with is we're getting what we asked

00:08:22.745 --> 00:08:29.022
- for. If we had known these things in advance, this dollar figure would have been incorporated.

00:08:29.602 --> 00:08:36.234
- in the original budget for the stone and we would have decided we wanted to have that stone or we didn't

00:08:36.234 --> 00:08:42.677
- want to have that stone. But we are getting what we asked for and we're running into what we run into

00:08:42.677 --> 00:08:49.056
- from time to time, which is a review and looking at structural changes means it's going to cost more

00:08:49.056 --> 00:08:55.373
- than originally anticipated. So that's where we are. Any other comments or questions? Yes, Mr. Big.

00:08:55.373 --> 00:08:58.910
- Yeah, I think that's a fair point that if we would have

00:08:59.938 --> 00:09:06.329
- fully understood and articulated the weight of these blocks to begin with, the project would have been

00:09:06.329 --> 00:09:12.535
- $400,000 more expensive to begin with, right? And so it's not as if we've added anything. It's just

00:09:12.535 --> 00:09:18.864
- it comes as a shock because it's so unforeseen when 18%, approximately the entire budget for overages

00:09:18.864 --> 00:09:21.470
- are for two walls. It's just difficult to

00:09:21.634 --> 00:09:28.810
- difficult to swallow, and I think difficult to explain to folks as well. So unfortunate set of circumstances,

00:09:28.810 --> 00:09:35.333
- and I hope they're the nicest walls in town. Yeah. Unless there are other questions. Now let's have

00:09:35.333 --> 00:09:41.988
- a motion. So we need a motion to approve, and let's do it in one motion unless you want to break them

00:09:41.988 --> 00:09:48.903
- out. But let's have one motion to approve CA 59 and CA 60. So is there a motion for approval? It's moved.

00:09:48.903 --> 00:09:50.142
- Is there a second?

00:09:53.122 --> 00:10:00.230
- Second. I'm going to let Mr. Hannan get in the minutes and we'll accept his second and I'll catch you

00:10:00.230 --> 00:10:07.478
- up later, Mr. Bruce. All right, so it's been moved and seconded and now is there any further discussion

00:10:07.478 --> 00:10:14.099
- or any additional questions? If not, Mr. Parrish, would you take the roll? John Weichart? Yes.

00:10:14.099 --> 00:10:20.510
- Doug Bruce? Yes. Jim Silverstein? Yes. Jay Baer? Yes. Galen Cassidy? Yes. Kyle Hannan? Yes.

00:10:31.490 --> 00:10:39.956
- Somehow I'm turning my, I don't want to say I'm turning myself off, that would sound inappropriate,

00:10:39.956 --> 00:10:49.099
- but somehow my microphone keeps being muted. So let's move on then to the construction update from Weddell,

00:10:49.099 --> 00:10:57.564
- Mr. Sherry. Yes, thank you, John. Andrew Sherry, project manager with Weddell Brothers. So overall,

00:10:57.564 --> 00:11:01.374
- a ton of progress. Get this to blow up here.

00:11:01.538 --> 00:11:06.676
- So we'll go through the construction progress, upcoming activities, and then hit some highlight areas

00:11:06.676 --> 00:11:12.015
- like the connector and then the third street improvements that we're in the middle of. As far as exterior

00:11:12.015 --> 00:11:17.253
- concrete, so our east exterior work, our hardscapes are completed. Topsoil and planing is going to take

00:11:17.253 --> 00:11:22.542
- place in October. Our north exterior work on the north side of the building, our curbs are poured. Light

00:11:22.542 --> 00:11:27.730
- pole rough ends are in progress as of this week. And then sidewalks are starting between the curbs and

00:11:27.730 --> 00:11:29.694
- the building this week into next week.

00:11:29.794 --> 00:11:35.237
- Existing courtyard works, our sidewalks are completed, and then our paver bases have been poured as

00:11:35.237 --> 00:11:40.679
- of this morning to prep for all of our paperwork. So the picture here is the northeast entrance. So

00:11:40.679 --> 00:11:46.449
- as you can see, the ADA ramps are in place. The sidewalk heads to the south, and then we have our topsoil

00:11:46.449 --> 00:11:51.946
- area over here on the left-hand side of the photo. Next year of progress, masonry works, our feature

00:11:51.946 --> 00:11:54.014
- walls are completed in the south lot.

00:11:54.338 --> 00:12:00.442
- Our vision wall along the south lot and College Avenue is in progress. And then we're preparing to start

00:12:00.442 --> 00:12:06.662
- our column wraps at the connector right now. Our glazing systems, curtain wall systems have been completed

00:12:06.662 --> 00:12:12.360
- on the east and north and patio elevations. Curtain walls are in progress on the west elevations.

00:12:12.360 --> 00:12:18.405
- As of today, all openings have been released. We have one last opening that is currently being procured

00:12:18.405 --> 00:12:20.382
- at the southwest side of the job.

00:12:20.514 --> 00:12:25.896
- But everything has been released, field measured, glazing on site. And then glazing is being installed

00:12:25.896 --> 00:12:31.278
- in the frames on the patio in the west elevations as we speak. Here's some exterior photos. So the top

00:12:31.278 --> 00:12:36.503
- photos are the curtain wall systems on the patio. The top left, you can see the existing convention

00:12:36.503 --> 00:12:41.728
- center in the background. And then on the bottom here, these are the feature walls around the trash

00:12:41.728 --> 00:12:45.438
- enclosures with the brick laid and stuff in the south side of the lot.

00:12:47.170 --> 00:12:52.912
- Additional exterior photos, the photo on the left is the north side bus lane. So the bus lane has been

00:12:52.912 --> 00:12:58.543
- poured. The top right photo is the connector going into the expansion. And then again, another photo

00:12:58.543 --> 00:13:04.230
- on the bottom right hand side of the east elevation. So all the glazing in place, we have a couple of

00:13:04.230 --> 00:13:10.083
- pieces that need installed. The canopy system, the glass has been field measured to be procured, gutters

00:13:10.083 --> 00:13:14.878
- tied in, and then prepping to install all of our doors and everything in that corner.

00:13:16.194 --> 00:13:21.373
- Interior progress. So drywall and framing is continuing throughout the building. Miscellaneous bulkheads

00:13:21.373 --> 00:13:26.404
- and bump out framing. Whenever we say bump out framing, these are the bump outs around the large duct

00:13:26.404 --> 00:13:31.386
- in the exhibit hall. So frame the walls, hang the walls, install the duct risers, and then build the

00:13:31.386 --> 00:13:36.368
- bump outs around it. The exhibit wall has over 90% of the drywall hung and currently being finished.

00:13:36.368 --> 00:13:39.870
- And drywall finishing being completed on the second floor as we speak.

00:13:41.730 --> 00:13:46.199
- Ruff ins, all in wall inspections are completed on the project other than the elevator shaft. That's

00:13:46.199 --> 00:13:50.757
- a huge milestone. Overhead ruff ins continue throughout the entirety of the building and then overhead

00:13:50.757 --> 00:13:55.315
- inspections, a lot of our overhead inspections are completed, actually getting ready to start ceilings

00:13:55.315 --> 00:13:59.740
- and areas. And this photo right here on the right hand side is looking south out of the lot. So all

00:13:59.740 --> 00:14:04.298
- the conduits and everything going from the south lot and basically behind this picture is the overhead

00:14:04.298 --> 00:14:05.758
- door into the main exhibit hall.

00:14:08.962 --> 00:14:14.747
- Interior progress, all back of house masonry is completed. Our stair towers are completed as far as

00:14:14.747 --> 00:14:20.706
- the masonry walls. The divider wall in the mechanical room is in progress to allow our fire protection

00:14:20.706 --> 00:14:26.550
- equipment to be set. So we have our lines roughed into the building, field measurement taking place.

00:14:26.550 --> 00:14:32.798
- The photo right here is as of this morning set in the last stairs in Unit D, the south side of the project.

00:14:32.994 --> 00:14:38.483
- Back of house stairs are the only item in steel that we're showing to be in progress, and those are

00:14:38.483 --> 00:14:44.247
- going to be completed next week, which we'll then pour those and use those as access. Interior progress,

00:14:44.247 --> 00:14:49.955
- so painting continues throughout the project. Painting is completed in the east and the north corridors

00:14:49.955 --> 00:14:55.554
- on the walls. The mechanical mezzanines both north and south have been painted to allow for us to set

00:14:55.554 --> 00:14:56.158
- equipment.

00:14:56.258 --> 00:15:02.460
- Back of house block filler and first coat is completed. So the kitchen area the loading dock area Storage

00:15:02.460 --> 00:15:08.545
- rooms and then the painters are preparing to start painting in the exhibit hall and on the second floor

00:15:08.545 --> 00:15:14.572
- On the right hand side here. You'll see one of the office spaces on the first floor Basically finished

00:15:14.572 --> 00:15:20.891
- out ready for ceilings and flooring Paint around the door frames things like that trim out Tile so restroom

00:15:20.891 --> 00:15:25.630
- tile in the north restrooms is going to be completed next week. We have probably

00:15:25.826 --> 00:15:32.744
- 10 employees on site right now, laying tile in the North corridor, the North restrooms, and then progressing

00:15:32.744 --> 00:15:39.155
- to the West corridor and West restrooms. I have a photo coming up here on the top right. This is one

00:15:39.155 --> 00:15:45.565
- of the restrooms on the North side with all the tiles set. So we're moving forward to get our toilet

00:15:45.565 --> 00:15:51.976
- partitions, our carriers, casework, things like that. The bottom right hand side is the second floor

00:15:51.976 --> 00:15:53.118
- drywall progress.

00:15:53.282 --> 00:15:59.684
- as of this morning. And then on the left side here, that is all the large duct and overhead in the storage

00:15:59.684 --> 00:16:05.667
- room in the back of house near the kitchen. Here's some more interior photos. The left-hand side is

00:16:05.667 --> 00:16:11.650
- the loading dock area. The top right is the exhibit hall, so south wall on the right, the east wall

00:16:11.650 --> 00:16:17.813
- and the far portion of the photo, all the duct and everything on the ground. And then the bottom right

00:16:17.813 --> 00:16:23.198
- is all the tile backer board in the west corridor, where the tile go up in the corridors.

00:16:25.698 --> 00:16:31.437
- Upcoming activities, so partition wall installation starts this coming Monday. So we have deliveries

00:16:31.437 --> 00:16:37.518
- of our partition walls on Monday. They will hang those and put them into the recess pockets in the exhibit

00:16:37.518 --> 00:16:43.200
- hall. Casework and solid surface has been field measured and will be delivered in October. So we'll

00:16:43.200 --> 00:16:48.883
- start setting desk solid surface underneath the windows. Ceilings will start in the exhibit hall by

00:16:48.883 --> 00:16:51.838
- 1st of October in areas also in the East corridors.

00:16:53.090 --> 00:16:58.575
- Corridor tile will progress, so the wall tile in the corridors. Equipment to be set with final terminations

00:16:58.575 --> 00:17:03.755
- to start by October. So a lot of our equipment is going to start hitting next week for the mechanical

00:17:03.755 --> 00:17:08.479
- mezzanines that allow us to do our termination points for electrical ductwork, final piping,

00:17:08.479 --> 00:17:13.557
- things like that. And then our kitchen cooler is in progress of being procured. They field measured

00:17:13.557 --> 00:17:17.214
- and released the kitchen cooler. So again, just large milestones there.

00:17:18.498 --> 00:17:23.960
- Upcoming activities for exterior work. Our north sidewalks and light pole bases will be installed. Our

00:17:23.960 --> 00:17:29.263
- west curbs will be demolished with new curbs following in the next couple of weeks. Last section of

00:17:29.263 --> 00:17:34.991
- our exterior CMU to be completed at the southwest portion of the project. Exterior metal panels to progress

00:17:34.991 --> 00:17:40.400
- around the project. They're currently being installed on the east side, the parapet walls between the

00:17:40.400 --> 00:17:45.438
- low roof and the high roof. The north feature wall, based off of today's approval, will start.

00:17:45.538 --> 00:17:51.508
- And then exterior units to be set on the back of house roof. So we have a crane coming to site next

00:17:51.508 --> 00:17:57.478
- Wednesday to set the unit on the back of house roof, which is approximately 55 feet long. Connector

00:17:57.478 --> 00:18:03.628
- activities. So the photo here shows the sidewalks poured and then the bands here where pavers will go.

00:18:03.628 --> 00:18:09.717
- So the concrete's poured in that to prep for the paver to be released. Artwork connection points have

00:18:09.717 --> 00:18:13.598
- been installed. We are preparing to start on the connector roof.

00:18:13.858 --> 00:18:20.253
- and then metal panels will be installed on the bottom side of the connector also. Third street improvements.

00:18:20.253 --> 00:18:26.296
- This has been our biggest baby over the last few weeks. So storm systems and structures are installed.

00:18:26.296 --> 00:18:32.163
- The bus lane has been completed. The north curbs are completed along with the median, which you can

00:18:32.163 --> 00:18:38.206
- see in the photo here. Paving will take place tomorrow morning for striping to be completed on Friday.

00:18:38.498 --> 00:18:45.036
- We will then relocate our barricades, set up our pedestrian diversions, and reopen the road Friday afternoon.

00:18:45.036 --> 00:18:50.980
- So that's a huge milestone. Here's a photo looking towards the east. So the turn lanes with college

00:18:50.980 --> 00:18:57.043
- behind. Again, we get the pavement down, the pavement markings. All this will start to come together,

00:18:57.043 --> 00:19:03.284
- and then we'll button up the sidewalks on the north side of the job site. And then here is the bus lane.

00:19:03.284 --> 00:19:07.742
- So I thought this was a neat picture. And that is the construction update.

00:19:08.994 --> 00:19:16.269
- Very nice. Any questions or observations? Yes, Mr. Barrett. Is the column wrap material under the connector

00:19:16.269 --> 00:19:23.409
- the same brick as it is in other places or is it a different material? Yes, sir. Same to Mexico. I didn't

00:19:23.409 --> 00:19:30.145
- ask when the change orders went up. The change order percentage were about 54% into the contingency

00:19:30.145 --> 00:19:37.150
- fund with about 1.1 million still left. Where would you estimate we are into the construction activity?

00:19:37.570 --> 00:19:43.654
- Over 70%. I'd say the mid 70s for the expansion portion of the project. Okay, so we're about 70% complete.

00:19:43.654 --> 00:19:49.851
- We've used about 54% of the contingency and we still have a balance of about 1.1 million in that contingency

00:19:49.851 --> 00:19:55.935
- fund. Yes, sir. Can you give us an update on where we are with the demolition process? Yeah, so in regards

00:19:55.935 --> 00:20:02.133
- to Seminary Point, we have the environmental testing has taken place everywhere except for Jeff's warehouse.

00:20:02.133 --> 00:20:04.862
- We're waiting on the final reports and results.

00:20:04.962 --> 00:20:12.146
- BRCJ is working on compiling the construction set so that we can get that in plan review and continue.

00:20:12.146 --> 00:20:19.260
- And then we're still on track to start our demolition activities in the November timeframe to be done

00:20:19.260 --> 00:20:26.305
- by end of year. Okay. Thank you. Any other questions? Let me ask Mr. Layton, I asked him if he could

00:20:26.305 --> 00:20:33.419
- give us an update on where we are with our lead certification. So I'll turn to Mr. Layton and let him

00:20:33.419 --> 00:20:34.814
- tell us about that.

00:20:36.450 --> 00:20:44.654
- Yeah, happy to do so. So just a quick kind of update kind of where we were, where we are, where we're

00:20:44.654 --> 00:20:53.261
- going on the lead submission. So you might remember during the design phase, we were tasked with achieving

00:20:53.261 --> 00:21:01.385
- lead silver, which that requires 50 to 59 credits. At the time, we were targeting 53 as the items we

00:21:01.385 --> 00:21:05.246
- felt like we could get with a kind of targeting

00:21:05.442 --> 00:21:12.114
- A few key areas, having to do with the urban location, you get a lot of credits for that in regards

00:21:12.114 --> 00:21:19.120
- to public transit and ease of access, that sort of thing. Heat line reduction through roofing materials,

00:21:19.120 --> 00:21:26.125
- optimizing our water and energy use through selections of equipment. Enhanced commissioning is a process

00:21:26.125 --> 00:21:30.462
- that is part of the construction process that gets us in points.

00:21:30.562 --> 00:21:36.799
- a lot of the material selection using recycled or more environmentally friendly materials are the ways

00:21:36.799 --> 00:21:42.975
- that you would get credits. So we target all those items. Some of those have to do with the things we

00:21:42.975 --> 00:21:49.030
- picked during the design phase. Some of those even started before many of you were even involved in

00:21:49.030 --> 00:21:50.846
- the project. For example, the

00:21:51.074 --> 00:21:56.908
- We are getting an innovation credit or going after an innovation credit for community outreach

00:21:56.908 --> 00:22:03.049
- and involvement, which goes all the way back to 2018 when we started this process and getting doing

00:22:03.049 --> 00:22:09.313
- design shreds and that whole process of getting community engagement and that sort of thing. Just the

00:22:09.313 --> 00:22:15.455
- site that's selected helps with the density and diverse use credit access to transit. So, you know,

00:22:15.455 --> 00:22:16.990
- we are utilizing all the

00:22:17.090 --> 00:22:22.861
- Bloomington Transit lines to go around the city and the fact that we're right adjacent to the transit

00:22:22.861 --> 00:22:28.575
- station as a way to get some credits. And then bicycle facilities as well. You might remember we had

00:22:28.575 --> 00:22:34.403
- a lot of discussion around bike racks all around the building and a bike shelter. Those get us credits

00:22:34.403 --> 00:22:40.173
- as well and having the regional and state bike routes nearby are all data points that help us achieve

00:22:40.173 --> 00:22:41.022
- those credits.

00:22:42.946 --> 00:22:48.935
- During the construction phase, as just a screenshot of the process, Joey and Sam with Weddle are working

00:22:48.935 --> 00:22:55.210
- through how to submit those lead online. It's a little bit of an arduous process, but they all get submitted.

00:22:55.210 --> 00:23:01.142
- Even both the design and construction credits get submitted throughout the project phase. And then once

00:23:01.142 --> 00:23:07.131
- the project is complete, it gets reviewed and we get comments back and kind of see how we do. The things

00:23:07.131 --> 00:23:09.470
- we're tracking currently have to do with

00:23:09.666 --> 00:23:14.955
- landfill diversion, keeping materials out of landfill, recycling them. The enhanced commissioning is

00:23:14.955 --> 00:23:20.348
- definitely part of it. They're sitting in our owner meetings or doing site visits and testing and that

00:23:20.348 --> 00:23:26.003
- sort of thing. And then we are monitoring the products in the middle. So we may select the right materials.

00:23:26.003 --> 00:23:31.239
- We gotta make sure those materials end up in the project on the job site as well. So we're tracking

00:23:31.239 --> 00:23:36.632
- those environmental product declarations that they provide to show where materials come from, how much

00:23:36.632 --> 00:23:39.198
- they're recycled, for example, things like that.

00:23:39.746 --> 00:23:45.954
- And then Weddell is tracking all their tickets for trucks that leave the sites and where they're going,

00:23:45.954 --> 00:23:52.281
- how much of that weight is diverted from landfills and that sort of thing because there's targets towards

00:23:52.281 --> 00:23:58.250
- those numbers. So we're still on target for silver. It's a little unfortunate because we don't know

00:23:58.250 --> 00:24:04.398
- that for sure until LEED reviews it when we submit it. We just have to follow the rules and track that

00:24:04.398 --> 00:24:08.158
- out as long as we go. But so far, looking good. Any questions?

00:24:08.738 --> 00:24:14.877
- Yes, Mr. Bay. Is that final dispensation post-opening of the Convention Center, or we don't know? Yeah,

00:24:14.877 --> 00:24:21.252
- once construction is 100% complete. So I should say 100% complete for the expansion, because we're treating

00:24:21.252 --> 00:24:27.214
- the expansion as the lead project. So the renovation is not considered as part of that. So once that

00:24:27.214 --> 00:24:33.412
- phase is complete, we'll be able to submit all the information, and they'll review it, give us comments,

00:24:33.412 --> 00:24:37.662
- make any adjustments or responses. So don't order a plaque, apparently.

00:24:37.826 --> 00:24:48.958
- They'll be happy to sell you one. Yeah, sure. It feels a lot like a Michelin guy restaurant. Yeah. Yes,

00:24:48.958 --> 00:24:59.875
- Mr. Hanna. What is enhanced commissioning? So building commissioning is having a third party engineer

00:24:59.875 --> 00:25:04.478
- come out and review the functioning of the

00:25:04.642 --> 00:25:11.574
- different systems in the building. So that's the baseline thing that you'd expect in most projects.

00:25:11.574 --> 00:25:18.715
- Enhanced commissioning, which is more of a lead requirement, starts even during the design phase. They

00:25:18.715 --> 00:25:25.924
- review our specifications, they review the submittals as they come in, and third party oversight across

00:25:25.924 --> 00:25:31.678
- the entire project. Any other questions? OK. Thank you, Mr. Layton. Working group.

00:25:31.938 --> 00:25:39.350
- updates, anything from wayfinding this month, Mr. Layton? No, we're just working through the submittal

00:25:39.350 --> 00:25:46.619
- process and waiting for things to arrive on site. Okay, thank you. Furniture fixtures and equipment,

00:25:46.619 --> 00:25:54.031
- I know we have a presentation from JSL. Yes, I'll ask Mary Kropinski from the team to walk through the

00:25:54.031 --> 00:25:55.902
- latest regarding the FF&E

00:26:05.250 --> 00:26:15.099
- As you may remember, we have Reload Strategies as our FF&E consultant. So as they presented last month,

00:26:15.099 --> 00:26:24.854
- we received all the bid work. So that's any cumulative items over $150,000. This month, we are working

00:26:24.854 --> 00:26:31.294
- on the quotes, which are from materials that don't exceed $150,000.

00:26:31.458 --> 00:26:40.594
- That's what we'll be presenting today. We are required to get three quotes for each of the items that

00:26:40.594 --> 00:26:49.730
- we're searching. So with this, you have in front of you a list of approximately nine items that we've

00:26:49.730 --> 00:26:58.776
- gotten quotes on. This shows you the successful quote and the total amount. We had an early estimate

00:26:58.776 --> 00:27:00.478
- figure of 550,000.

00:27:00.738 --> 00:27:11.523
- for all the quote items. And we're coming in as a total of $532.129.05. Most of the items already include

00:27:11.523 --> 00:27:21.799
- shipping. There's one or two that don't. So there may be an additional small amount to adjust on the

00:27:21.799 --> 00:27:30.142
- stage drop figure for the stage 40 by 40. These items have all been reviewed with

00:27:30.242 --> 00:27:38.567
- the staff, as well as Jeff. Jeff's been involved in seeing the quotes ahead of time. If you turn to

00:27:38.567 --> 00:27:47.559
- the second slide, and we'll come back to this, but the second slide shows you, I know that's very difficult

00:27:47.559 --> 00:27:53.470
- to read at this level, that we did receive on most items three quotes.

00:27:53.570 --> 00:28:02.044
- We at least sought out three or more quotes on each. And so we are presenting those successful ones

00:28:02.044 --> 00:28:10.602
- to you. They all were the low quotes that we are bringing forward that you see back on slide one. If

00:28:10.602 --> 00:28:19.330
- we could go back there. Happy to answer questions as we can. I'm sure you're interested in the one ton

00:28:19.330 --> 00:28:22.974
- box truck. That's a Chevy product. It is a

00:28:23.106 --> 00:28:35.157
- 2027 Chevrolet Express commercial cutaway 3500 V8. White standard. And then you can see that the forklift

00:28:35.157 --> 00:28:46.868
- and scissor lift, those are both Toyota products. Stage drop for the stage and stage risers is someone

00:28:46.868 --> 00:28:51.870
- that the convention center has worked with.

00:28:52.162 --> 00:29:03.008
- give us a very favorable price on that. The other items, tabletop covers, dance floor and dance caddy

00:29:03.008 --> 00:29:14.174
- to carry all that material, rolling bars and rolling food break stations. So the box truck will have the

00:29:14.306 --> 00:29:21.193
- logo that we've approved, rather than any other logo that may be floating around in conversation right

00:29:21.193 --> 00:29:28.013
- now. That's been included yet. I think that comes out of operations, not sure. Mr. Baird, do you have

00:29:28.013 --> 00:29:34.832
- a question? Just one. I don't think we have quite the right total on the rolling bars, ice covers. 12

00:29:34.832 --> 00:29:40.382
- at 79 is not 97. OK. That's 95 something. Not a big deal, but that's a couple. No.

00:29:40.546 --> 00:29:48.415
- The difference that you would find between those is the shipping costs. So when you're looking at unit

00:29:48.415 --> 00:29:56.055
- prices, I knew you would be interested in that, but that also includes shipping costs. And so doing

00:29:56.055 --> 00:30:03.695
- quick math, it looks like this is coming in about, what, $18,000 under what we had budgeted for it.

00:30:03.695 --> 00:30:10.494
- Okay. So you're asking for our approval to move forward? We would like approval to award

00:30:10.722 --> 00:30:17.777
- the quotes to the lowest bidder in each of these categories so that we can move on to getting those

00:30:17.777 --> 00:30:25.396
- purchased. Okay. Do we have a motion to approve that recommendation? Is there a second? It's been seconded.

00:30:25.396 --> 00:30:32.521
- Any discussion or questions? All right. Seeing none. Mr. Paris? John Weichart? Yes. Doug Bruce? Yes.

00:30:32.521 --> 00:30:39.294
- Jim Silverstein? Yes. Joyce Poehling? Yes. Jay Baer? Yes. Galen Cassidy? Yes. Kyle Hannan? Yes.

00:30:40.226 --> 00:30:48.229
- Just to let you know, we will be back for items that are under $25,000 that are direct purchase. So

00:30:48.229 --> 00:30:56.473
- you'll see us again talking more about FF&E. But those don't come out of that $550. No, they had their

00:30:56.473 --> 00:31:04.556
- own budget. Thank you. Hard installation. We've got a couple of things from our bead advisory group,

00:31:04.556 --> 00:31:10.078
- and I'll turn this over to Mr. Cassidy. Thank you. I believe we have

00:31:10.434 --> 00:31:18.010
- a slide up here too. So yeah, today wanted to update you on the remaining 1% for the arts budget and

00:31:18.010 --> 00:31:25.586
- a policy recommendation regarding third party displays. So we can go forward. And just a reminder of

00:31:25.586 --> 00:31:33.237
- our committee members, which is on this next slide, our active members, including myself, are Malcolm

00:31:33.237 --> 00:31:37.662
- Abrams, Talisha Coppock, Dallas Evans, Jennifer Muezevich,

00:31:37.858 --> 00:31:45.767
- uh, Chad Rabinovitz, Ajaan Rose, Rob Shakespeare, Betsy Stewart, Steve Versaugh, and Holly Warren. Um,

00:31:45.767 --> 00:31:53.600
- Rob and Betsy are the, are the two newest members. And then Joyce and Jim are contributing CI members

00:31:53.600 --> 00:32:01.356
- to our group for this next phase of, um, selection. So, um, and onto the next slide, just to review,

00:32:01.356 --> 00:32:07.422
- um, the 1% gave us a total budget of 520,000. Um, we ended up using, uh, just,

00:32:07.682 --> 00:32:14.802
- under $432,000 for the large-scale installation you see pictured here. That also included the travel

00:32:14.802 --> 00:32:21.992
- expenses and auditoriums for the finalist in that number as well. That left us with just over $88,000

00:32:21.992 --> 00:32:29.393
- remaining in this budget, and the purpose of that will be the expansion of the permanent art collection.

00:32:29.393 --> 00:32:34.398
- And on to the next slide, just some details. So that remaining budget,

00:32:34.658 --> 00:32:42.296
- will be used to expand the Convention Center permanent art collection through local artists. That is

00:32:42.296 --> 00:32:50.086
- the priority there is local artists. Next steps include these following items and tentative timelines.

00:32:50.086 --> 00:32:57.724
- This is a little bit ambitious, but this is what we're going for. So we need to finalize and release

00:32:57.724 --> 00:33:03.774
- a call for artists. And then that process we plan on having it done in October.

00:33:04.802 --> 00:33:12.705
- which that will be open. And then by November, we would close that and begin a review and recommendation

00:33:12.705 --> 00:33:20.381
- process that would come back to the CIB for final approval with the hope that the art pieces would be

00:33:20.381 --> 00:33:28.058
- installed within January. So again, that is a tentative timeline. There's many more details with that

00:33:28.058 --> 00:33:32.574
- too, but our group is meeting to finalize all these things.

00:33:33.282 --> 00:33:41.244
- as well. So that is a brief update on the remaining budget. The next slide here. Gail, can I ask a question?

00:33:41.244 --> 00:33:48.622
- Sure. How does your group define local? We're talking about local art. How is local defined? We have

00:33:48.622 --> 00:33:56.000
- met on that and we have defined local as Monroe County in every county touching Monroe County. So if

00:33:56.000 --> 00:34:01.406
- you think of Monroe County as the donut hole, any county that is touching

00:34:01.538 --> 00:34:07.620
- Monroe would also be included in eligible for a local artist. Yeah. Okay. So Monroe and adjacent County.

00:34:07.620 --> 00:34:13.413
- So we're, yes. Okay. All right. Thank you. Sorry to interrupt. Go ahead. No, no problems. Are there

00:34:13.413 --> 00:34:19.206
- any questions before we move on to the, to the policy, are there any questions or comments? When we

00:34:19.206 --> 00:34:25.056
- do a call for artists in this part of the project, what are we asking for? Like, cause there's a lot

00:34:25.056 --> 00:34:26.910
- of different things that, that,

00:34:27.010 --> 00:34:33.410
- but there's only so many things that can go in a convention center. So how are we guiding the submissions

00:34:33.410 --> 00:34:39.870
- to make sense for something that could be installed here? Are we giving them certain areas of the building

00:34:39.870 --> 00:34:45.485
- to shoot at? What is the process? We are. We have been coordinating with Schmidt about those

00:34:45.485 --> 00:34:51.583
- art opportunities. But this leaves us with a lot of different opportunities in terms of the specific

00:34:51.583 --> 00:34:55.326
- media that goes in. Our group has talked about digital media.

00:34:55.426 --> 00:35:01.227
- They've talked about more permanent things, even sculptures. But this is something that our group is

00:35:01.227 --> 00:35:07.028
- still finalizing in the call for ours. But we don't really want to put a lot of limitations on this.

00:35:07.028 --> 00:35:12.945
- We want to be able to receive a lot of different kinds of art within the budget, of course, which will

00:35:12.945 --> 00:35:18.976
- be a big piece on how pieces are valued. But we're primarily looking at pieces that already exist. We're

00:35:18.976 --> 00:35:21.790
- not trying to commission new pieces due to time.

00:35:21.986 --> 00:35:28.163
- And we're also considering maintenance of these pieces too. So all those things need to be finalized

00:35:28.163 --> 00:35:34.523
- in a call for artists that will come back to the CIB before it is released too. Gail, and you mentioned

00:35:34.523 --> 00:35:40.883
- two new members, Rob Shakespeare and Betsy Stewart, is that? That's correct, yeah. And Rob is currently

00:35:40.883 --> 00:35:47.305
- on the Bloomington Arts Commission. I think Betsy is a former member of the Bloomington Arts Commission.

00:35:47.305 --> 00:35:50.974
- Betsy's on there as well. It has been a part of the current

00:35:51.650 --> 00:35:59.292
- And then we also have an art collection. So we wanted to make sure we had that representation on the

00:35:59.292 --> 00:36:07.011
- beat advisory group. Absolutely. Thank you. The next item is a policy recommendation to our board. We

00:36:07.011 --> 00:36:15.031
- in light of some requests we've received from third parties about display are the beat advisory committee

00:36:15.031 --> 00:36:17.150
- was asked to consider this.

00:36:17.794 --> 00:36:25.237
- And our group came to the conclusion, and I'll start reading here, that the CIB does not accept third-party

00:36:25.237 --> 00:36:32.197
- permanent displays in the Convention Center. Only the work the CIB owns or commissioned is displayed

00:36:32.197 --> 00:36:39.295
- at the building's permanent collection. So we may approve temporary art exhibits in designated gallery

00:36:39.295 --> 00:36:46.462
- spaces. The Convention Center right now is a part of the gallery walk and has some rotating art pieces.

00:36:46.818 --> 00:36:53.532
- that is a possibility in this policy, we may approve that, but it will be time-limited, confined to

00:36:53.532 --> 00:37:00.312
- a space designated for that purpose, and removed at the close of a approved exhibition period. Event

00:37:00.312 --> 00:37:07.294
- banners and client graphics in a rented room are permitted during this event, so this does not prohibit

00:37:07.294 --> 00:37:14.142
- those. And there's some examples at the bottom of this policy. Again, everything we own or commission

00:37:14.786 --> 00:37:21.851
- is allowed as well as temporary art exhibits approved by the Bloomington Convention Center and installed

00:37:21.851 --> 00:37:28.647
- designated gallery spaces and short-term decor that a paying client puts in a rented meeting room or

00:37:28.647 --> 00:37:35.376
- ballroom for an event. Of course, that is taken down after the event ends. What is not permitted is

00:37:35.376 --> 00:37:40.894
- third party that are not clients for standing or long-term displays. So our group

00:37:41.378 --> 00:37:48.152
- has asked that this policy be considered and would encourage approval from the CIB. Why don't we do

00:37:48.152 --> 00:37:54.927
- this? Why don't we take that as a motion from Galen? Is there a second? And there's a second. And I

00:37:54.927 --> 00:38:01.566
- want to point out that Jim and Joyce have also been involved with Galen as they've reviewed this.

00:38:01.858 --> 00:38:07.486
- So it's been moved and seconded. So is there a discussion about us adopting this as a policy, Mr. Baer?

00:38:07.486 --> 00:38:13.005
- Just one at the expense of being persnickety about it, because I think it could happen at some point.

00:38:13.005 --> 00:38:18.471
- We specifically say that event banners and client graphics in a rented room are permitted during the

00:38:18.471 --> 00:38:23.936
- event. We do not mention banners or graphics on the exterior of the convention center. And for large

00:38:23.936 --> 00:38:29.726
- events, that is not only possible, but likely. So I think we might consider looping that into this policy.

00:38:35.202 --> 00:38:40.486
- So I'm sorry, which one of the points where? It's the third paragraph there where it says event banners

00:38:40.486 --> 00:38:45.720
- and client graphics in a rented room are permitted during the event. I would suggest it would be event

00:38:45.720 --> 00:38:50.852
- banners and client graphics are permitted during their event without mention of where it is. Because

00:38:50.852 --> 00:38:56.187
- if you have a large conference, a thousand people, you're going to have a sign outside that says welcome

00:38:56.187 --> 00:39:01.573
- to the conference hanging off of the building. And that is not allowed based on the way this is currently

00:39:01.573 --> 00:39:04.926
- written. Is there any objection from the committee to making that

00:39:05.026 --> 00:39:11.622
- substitution? Is there anything that we would, is there an unintended consequence of doing this? So

00:39:11.622 --> 00:39:18.416
- the only problem I have with it is that if we had six different events going on in the building at one

00:39:18.416 --> 00:39:25.341
- time and they all wanted to put a banner on the front of the building, how do we prioritize that? That's

00:39:25.341 --> 00:39:27.518
- the issue that I have with that.

00:39:35.714 --> 00:39:41.682
- I'm not sure your microphone's picking up your comment, Joyce. Are there city regulations about signage

00:39:41.682 --> 00:39:47.420
- that we need to keep up? I don't know. Would you entertain this? Can we entertain passing this as a

00:39:47.420 --> 00:39:53.444
- policy and amending it, doing some more research and coming back if we need to and amending it? Oh yeah,

00:39:53.444 --> 00:39:59.355
- it's fine by me. I just want to make sure we don't get caught out and a big conference is going to ask

00:39:59.355 --> 00:40:01.822
- for it, for sure. Yeah, yeah. Why don't we

00:40:02.402 --> 00:40:10.173
- We have a motion and a second for the policy. Like any policy, we may find there were unintended consequences

00:40:10.173 --> 00:40:17.308
- that developed over time, and we'd have to amend it later on. So let's come back to this as a policy

00:40:17.308 --> 00:40:24.373
- for now. Are there any other questions or discussion about the policy as presented? Do you want the

00:40:24.373 --> 00:40:30.590
- committee to come back with more on this topic? No, I think this is our starting point.

00:40:31.170 --> 00:40:38.298
- As we live with it, we're going to know what we need to come back with, if anything. All right. Any

00:40:38.298 --> 00:40:45.497
- other questions or comments? So seeing none, if you would take the role, please. So to adopt this as

00:40:45.497 --> 00:40:52.910
- a policy. John Weichart? Yes. Doug Bruce? Yes. Jim Silverstein? Yes. Joyce Polling? Yes. Jay Baer? Yes.

00:40:52.910 --> 00:40:56.830
- Galen Cassidy? Yes. Kyle Hannon? Yes. Okay, thank you.

00:40:57.314 --> 00:41:04.128
- Thank you, and thank your committee for all the work that it puts in on this. It's much appreciated.

00:41:04.128 --> 00:41:10.942
- I know it's very time consuming. Item number seven, internet provider recommendation, Mr. Underwood.

00:41:11.362 --> 00:41:17.568
- Yes, we have talked in the past about AV and IT equipment, and we've got most of that on order. One

00:41:17.568 --> 00:41:23.898
- of the things that we need is an internet provider. We currently have that for the existing building.

00:41:23.898 --> 00:41:30.228
- So we solicited quotes to provide internet services for both the current and expanded building. Three

00:41:30.228 --> 00:41:36.559
- companies submitted proposals, AT&T, Comcast, and Smithville. The proposals were reviewed by ProBlue,

00:41:36.559 --> 00:41:40.158
- the current IT service manager for the convention center,

00:41:40.258 --> 00:41:47.629
- delicious coffee can her staff and myself and after reviewing that we are recommending approval of Smithville

00:41:47.629 --> 00:41:54.463
- as the primary provider with Comcast as the backup provider. This provides by having to this provides

00:41:54.463 --> 00:42:01.566
- continued service should one or the other service become available. This combination is the lowest price.

00:42:01.698 --> 00:42:09.471
- Smithville and Comcast are the incumbent providers now, and Smithville is obviously a local company.

00:42:09.471 --> 00:42:17.476
- You can see down at the bottom a summary of that. The two services between Smithville and Comcast would

00:42:17.476 --> 00:42:23.710
- be $1,650 per month combined. In addition, we would have fire alarm and elevator

00:42:23.778 --> 00:42:30.628
- line service monitoring as well. And that would be $114.36 provided by Smithville. And you can see what

00:42:30.628 --> 00:42:37.215
- the other two combinations were. I might note that if Smithville, if we would recommend an award to

00:42:37.215 --> 00:42:44.329
- Comcast and AT&T, there was a termination penalty for Comcast under the contract. So it would have affected

00:42:44.329 --> 00:42:50.982
- that number, but it doesn't really matter because we're recommending the low. I'd be happy to answer

00:42:50.982 --> 00:42:52.958
- any questions you might have.

00:42:54.050 --> 00:43:00.603
- So let's see if we have a motion to approve this and then we can have questions or discussions. So is

00:43:00.603 --> 00:43:07.412
- there a motion to approve? So moved. Second. Okay. So it's been, I'm sorry. It was, it was, let me guess.

00:43:07.412 --> 00:43:14.029
- Mr. Bruce isn't in the minutes yet. So it was moved by Mr. Bruce and seconded by Joyce Bowling. So any

00:43:14.029 --> 00:43:18.590
- questions or discussion about a motion to approve this recommendation?

00:43:18.914 --> 00:43:26.212
- Jeff, is this in addition to what the convention center is paying today for internet service, or is

00:43:26.212 --> 00:43:33.803
- this replacing? This replaces this. Yes. Do we know what the current fee is for that? I do not. I don't

00:43:33.803 --> 00:43:40.517
- know if Kalisha's in that room right now. She is. She might go offhand. Oh, here she comes.

00:43:40.517 --> 00:43:45.918
- Here she comes. Dun-dun-dun-dun-dun-dun-dun. Just half that amount. Yeah.

00:43:47.362 --> 00:43:54.952
- So, uh, and we've got great internet service right now and this will double it. And the question was

00:43:54.952 --> 00:44:02.466
- what, how much are we paying now? Yeah. Oh, I'm sorry. I missed that. Yeah. Uh, it's Smithville and

00:44:02.466 --> 00:44:09.755
- it's about six 50 a month and Comcast, which is like two 50 a month. Okay. Thank you. Thank you.

00:44:09.755 --> 00:44:15.166
- Is this, this is all, is this fiber or is the backup fiber? Yeah. Yeah.

00:44:17.346 --> 00:44:24.242
- Okay, any other questions? So we have a motion and a second. Mr. Paris? Just one real quick. Oh, yes.

00:44:24.242 --> 00:44:31.205
- It is... Alicia, I think in some cases, we would charge exhibitors or events to use the Wi-Fi. So this

00:44:31.205 --> 00:44:38.034
- isn't necessarily a sunk cost. Most of our office could actually be defrayed by fees paid by clients

00:44:38.034 --> 00:44:44.862
- over time. Right. If they use any of the AT or IV services, then they get charged directly for that.

00:44:47.234 --> 00:44:53.541
- All right. Anything else? Mr. Barrett, please take the roll. John Weichart. Yes. Doug Bruce. Yes. James

00:44:53.541 --> 00:44:59.544
- Soberstein. Yes. Joyce Pulling. Yes. Jay Barrett. Yes. Galen Cassidy. Yes. Kyle Hannan. Yes. Okay.

00:44:59.544 --> 00:45:05.730
- Thank you. Item number eight. We have a presentation from Visit Bloomington. Sean Ballard, Convention

00:45:05.730 --> 00:45:12.097
- Sales and Marketing Director is here and he's going to give us an update on information related to Visit

00:45:12.097 --> 00:45:14.462
- Bloomington and the Convention Center.

00:45:15.682 --> 00:45:22.732
- Yeah, thank you so much. Appreciate it. Thank you for the invite. Glad to be here and to share some

00:45:22.732 --> 00:45:29.923
- sales and marketing updates that we've been doing really this entire year, even go back to late 2025.

00:45:29.923 --> 00:45:37.184
- So I want to first just give an update on our team and who's doing the sales and marketing efforts for

00:45:37.184 --> 00:45:40.286
- the really entire Bloomington Monroe County

00:45:40.674 --> 00:45:45.914
- as far as hotels, meeting space, but specifically the convention center course as well. So again, John

00:45:45.914 --> 00:45:51.000
- already introduced myself. Thank you, John. We have Maddie Quiggins, who's our new convention sales

00:45:51.000 --> 00:45:56.189
- representative. She started in June of this year. She graduated from IU, the Kelly School of Business

00:45:56.189 --> 00:46:01.530
- in May. So we are thrilled that we were able to keep an IU student here in Bloomington. And again, she's

00:46:01.530 --> 00:46:06.719
- only been with us a few months, but has been absolutely fantastic addition to our team. And then many

00:46:06.719 --> 00:46:09.822
- of you probably already know Jean Coutt with the Bloomington

00:46:09.922 --> 00:46:15.644
- Blumenton Convention Center, excuse me, and she's still doing all the great work that she's been doing

00:46:15.644 --> 00:46:18.366
- for several years here at the Convention Center.

00:46:20.610 --> 00:46:25.336
- First, I want to start with some marketing updates. You know, we've talked to you all probably maybe

00:46:25.336 --> 00:46:30.248
- a year ago or so. And so a lot of it could be some repeat information, but I wanted to just put up there

00:46:30.248 --> 00:46:35.021
- many different types of marketing that we that we've been doing. When I started about five years ago,

00:46:35.021 --> 00:46:39.980
- it was really more kind of that traditional print marketing, which we're definitely still doing. However,

00:46:39.980 --> 00:46:44.799
- we've really shifted and done a lot more digital marketing. As many of us know, we can track that, see

00:46:44.799 --> 00:46:47.326
- who's clicking on our ads, where they're coming from.

00:46:47.906 --> 00:46:53.452
- We've been partnering with several companies to really target in specific groups that we are looking

00:46:53.452 --> 00:46:59.273
- for. And we're really focused on several things, but mainly this four hour driving radius to Bloomington.

00:46:59.273 --> 00:47:04.764
- And so if you kind of think about that for a second, that includes Chicago to the north, Nashville,

00:47:04.764 --> 00:47:06.686
- Tennessee to the south, St. Louis,

00:47:06.786 --> 00:47:12.803
- Columbus, Ohio, and a lot of major cities, which is a really great market for us. And we focus on that

00:47:12.803 --> 00:47:19.229
- because we know that that would be roughly a half day's drive for folks to get to Bloomington for conferences

00:47:19.229 --> 00:47:20.222
- and conventions.

00:47:20.738 --> 00:47:26.834
- We were able to do a few new things this year. One is ASAE, which is the American Society of Association

00:47:26.834 --> 00:47:32.755
- Executives. That convention is often called the Super Bowl of Meetings, and that was actually held in

00:47:32.755 --> 00:47:38.560
- Indianapolis this year for the first time ever. So we were able to attend that, and we were able to

00:47:38.560 --> 00:47:44.830
- do some digital marketing to attendees that were at the Indiana Convention Center in downtown Indianapolis.

00:47:44.830 --> 00:47:47.326
- About 6,000 attendees for that, and again,

00:47:47.618 --> 00:47:54.163
- mostly associations all throughout the country that came here. We had really great success. I'll mention

00:47:54.163 --> 00:48:00.459
- something about a little bit later. But really, at the end of the day, the most effective thing that

00:48:00.459 --> 00:48:06.942
- we do is kind of traditional sales calls, essentially, where Maddie and I and or I will set up meetings

00:48:06.942 --> 00:48:10.558
- with event planners and association management companies.

00:48:10.690 --> 00:48:16.879
- which we're thankful that Indianapolis is one close to us. And two, there's a lot of meeting and event

00:48:16.879 --> 00:48:22.767
- planners in the association space and also fraternal organizations too. So at least once a month,

00:48:22.767 --> 00:48:28.896
- if not more, we are going to Indianapolis. We are meeting with folks talking about Bloomington Monroe

00:48:28.896 --> 00:48:35.144
- County and definitely talking about the convention center expansion. Next slide, please. These are just

00:48:35.144 --> 00:48:36.286
- a few advertising.

00:48:36.386 --> 00:48:42.925
- advertisement examples for you all to see. A mix of prints and then the one in the middle is one of

00:48:42.925 --> 00:48:49.594
- our digital ones that we use for ASAE. Next. So trade shows, you can see the photo with IU's favorite

00:48:49.594 --> 00:48:56.329
- mascot, Hoosier the Bison. We were able to get him to attend. That's the Bison, right? Yes. That's the

00:48:56.329 --> 00:48:58.814
- mascot. That's right. Yes. Yes. Yeah.

00:48:58.946 --> 00:49:04.956
- And so myself, Maddie and Jean were able to attend. Again, this was in Indianapolis and it was super

00:49:04.956 --> 00:49:10.966
- successful. You'll see we received four to five quality. We're really always focused on that quality

00:49:10.966 --> 00:49:17.392
- of groups that are actually interested in Bloomington and what we have to offer. So again, super successful

00:49:17.392 --> 00:49:23.878
- event for us. And we usually go to about six to eight different trade shows throughout the year in different

00:49:23.878 --> 00:49:28.638
- markets, fraternal organizations, associations. You'll see Destination Midwest.

00:49:28.738 --> 00:49:35.774
- So Maddie and I were in Buffalo, New York last week for the Professional Fraternity Association Conference. We have

00:49:36.386 --> 00:49:42.314
- At least three, if not more, really strong leads for the Convention Center for future business opportunities.

00:49:42.314 --> 00:49:47.703
- And then next week, we're back on the road to Grand Rapids, Michigan for Destination Midwest, where

00:49:47.703 --> 00:49:53.146
- we will have individual appointments with 18 to 20 give or take event planners that plan meetings in

00:49:53.146 --> 00:49:58.750
- the Midwest, which of course, Luton is in the Midwest. So we are very excited about that one next week.

00:50:01.474 --> 00:50:07.189
- It's been a really exciting year, and I want to first thank Weddell Brothers as far as having them work

00:50:07.189 --> 00:50:12.740
- with us to provide Hard Hat Tours. It's been really great as the projects progress to, one, just see

00:50:12.740 --> 00:50:18.400
- the progress, but two, we've been able to bring several different event planners and potential clients

00:50:18.400 --> 00:50:23.511
- to the convention center for a tour. The group in the photo there is the Corden Group, which

00:50:23.511 --> 00:50:27.358
- is an association management company based in Indianapolis. They plan

00:50:27.714 --> 00:50:34.699
- and worked with probably 20 to 30 different associations, mostly in Indiana, which is really advantageous

00:50:34.699 --> 00:50:41.619
- for us. We have scheduled a VIP hard hat tour and lunch for, as you'll see, October 13th and 14th. We've

00:50:41.619 --> 00:50:48.538
- invited about 300 planners, mostly from Indiana, but several from out of state as well. And we are going

00:50:48.538 --> 00:50:55.326
- to show off the convention center and provide them lunch. And really, we're really excited about that.

00:50:55.426 --> 00:51:01.631
- probably have about 10 to 12 RSVPs so far. And that postcard just landed in folks mailbox probably within

00:51:01.631 --> 00:51:07.720
- the last week. So we're still early in that RSVP stage. We will send out an email on Monday reiterating

00:51:07.720 --> 00:51:13.808
- and also inviting more folks to that. And we do have, we have reached out to some media in the meetings

00:51:13.808 --> 00:51:19.779
- and events landscape to have them come. We do know Inside Indiana Business will be coming and writing

00:51:19.779 --> 00:51:22.238
- up something about the convention center.

00:51:25.442 --> 00:51:30.900
- give you an idea of some progress. Really the focus is that target group of 500 plus attendees and 100

00:51:30.900 --> 00:51:36.304
- plus peak rooms that is on hotel room nights. It's not a perfect science necessarily because you know

00:51:36.304 --> 00:51:41.815
- you might have a group of 200 people but they could have 100 exhibitors and you need that whole exhibit

00:51:41.815 --> 00:51:47.166
- hall space but you might have a conference that's 800 attendees and they don't have as many breakout

00:51:47.166 --> 00:51:48.862
- needs. So really the sweet spot

00:51:48.962 --> 00:51:54.888
- that we're looking for with this expansion, the 500 plus again significant hotel rooms. We're really

00:51:54.888 --> 00:52:00.990
- excited to partner with Dora with the new hotel coming and we look forward to working with them as that

00:52:00.990 --> 00:52:02.046
- project develops.

00:52:02.594 --> 00:52:09.073
- For 2027, we have five groups that have officially booked, and that number grows, honestly, probably

00:52:09.073 --> 00:52:15.551
- weekly at this point. Same with the opportunities that are kind of in this proposal stage still. For

00:52:15.551 --> 00:52:22.543
- an overview of the groups we are working with, mostly state associations, we also have several international

00:52:22.543 --> 00:52:29.150
- associations and Midwest as well, which has changed because now that we have more space, we're able to

00:52:29.282 --> 00:52:34.812
- to grow and get those more regional groups that are in the several hundred as far as attendance. And

00:52:34.812 --> 00:52:40.506
- that is the goal to fill the convention center space. And believe it or not, we actually have inquiries

00:52:40.506 --> 00:52:45.982
- as far as 2032. So I'm not terribly surprised on my end because bigger space, people book out a lot

00:52:45.982 --> 00:52:51.676
- farther, which is great. So that way we can really do some calendar planning and look forward to groups

00:52:51.676 --> 00:52:52.990
- coming in future years.

00:52:55.170 --> 00:53:00.666
- And then the last thing I mentioned in case there are any questions. If some of you have seen downtown,

00:53:00.666 --> 00:53:05.950
- we are moving our visitor center downtown. It will be in the 4th Street parking garage in the first

00:53:05.950 --> 00:53:11.287
- level. There's some signs down there kind of announcing that. So early next year, our visitor center

00:53:11.287 --> 00:53:16.624
- will be downtown. Currently, we're on North Walnut Street, kind of heading out of town towards I-69.

00:53:16.624 --> 00:53:22.119
- But we're excited to have that move downtown and be connected with the convention center. Any questions

00:53:22.119 --> 00:53:24.286
- from? Very well. Any questions for Sean?

00:53:27.010 --> 00:53:35.383
- Okay, thank you. Thank you for the presentation. All right, item number nine is old business and old

00:53:35.383 --> 00:53:43.923
- business to be brought before the board. Thought I'd mention very quickly that August 31st was the end

00:53:43.923 --> 00:53:52.213
- date for leases, both residential and for three of the four commercial. The residential tenants had

00:53:52.213 --> 00:53:55.198
- all moved out prior to August 31st.

00:53:55.426 --> 00:54:02.408
- of the four commercial tenants. All four of them have found new locations. Blue Tip Billiards actually

00:54:02.408 --> 00:54:09.864
- sold their business and it's being relocated by the new owner. But all four tenants have found new locations.

00:54:09.864 --> 00:54:16.710
- Jeff's Warehouse is still in their building. You may recall that Jeff's Warehouse had actually until

00:54:16.710 --> 00:54:20.574
- February of 2027 under their lease and they've agreed to

00:54:20.674 --> 00:54:28.060
- to be out of the building by September 30th or approximately September 30th and they've made significant

00:54:28.060 --> 00:54:35.586
- progress towards that. So we do continue to get our rather nightly reports from security about trespassing

00:54:35.586 --> 00:54:43.042
- in the apartment buildings and we'll deal with that until the apartment buildings aren't there. So that's

00:54:43.042 --> 00:54:48.318
- an update on where we are with those leases and what's happened with them.

00:54:49.058 --> 00:54:55.309
- Other old business, do we envision a hotel report next month? Pardon me? Do we envision a hotel agreement

00:54:55.309 --> 00:55:01.502
- report in the next meeting? Yes. In fact, I'm glad that you mentioned that. We do have our first meeting

00:55:01.502 --> 00:55:07.694
- with DORA set up for next Monday. So yeah, we'll have a report back October, even if the report is we're

00:55:07.694 --> 00:55:13.710
- making progress, but we'll have a report back. And you may recall that the letter of intent basically

00:55:13.710 --> 00:55:18.782
- said that once we begin these conversations, we're trying to wrap them up in 90 days.

00:55:18.882 --> 00:55:25.672
- So we will have a report for you in October. Thank you. New business. I would like to share with you

00:55:25.672 --> 00:55:32.596
- the Distinctly Bloomington brochure. And you can see the ad that we put in the Distinctly Bloomington,

00:55:32.596 --> 00:55:39.723
- which is our art installation. So that will hit all of the hotels and restaurants and all of our visitors

00:55:39.723 --> 00:55:46.781
- to Bloomington will be able to see what we're up to with the new Bloomington Convention Center. Comments

00:55:46.781 --> 00:55:48.126
- from board members.

00:55:48.258 --> 00:55:56.095
- Any comments from board members? Seeing none, our next board meeting, oh, I'm sorry, comments from the

00:55:56.095 --> 00:56:03.705
- public. Any comments from the public? Seeing none, our next board meeting is October 21st at 3 p.m.

00:56:03.705 --> 00:56:11.390
- here in the Convention Center. You don't have to go home, but you can't stay here. We are adjourned.