- So we're going to follow the planning commission meeting to order. I'm going to go ahead and recall.

00:00:09.284 --> 00:00:17.984
- Thank you. Tron and Ray Randolph? Here. David Bush? Here. Jeff Morris? Here. Scott Farris? Here.

00:00:17.984 --> 00:00:27.131
- Rudy Fields? Here. Margaret Clements? Here. Julie Thomas? I'm going to try to stay as close as I can.

00:00:27.131 --> 00:00:29.822
- Julie, I'll come back to you.

00:00:30.626 --> 00:00:42.605
- I think the internet is freezing. David Henry? Here. Jovan Deventer? And then Steve Bishop? Here. Okay.

00:00:42.605 --> 00:00:54.815
- And I'll call Julie Thomas one more time. I am here. Okay. Eight voting members and one non-voting member

00:00:54.815 --> 00:00:58.846
- attendance in a quorum. All right.

00:00:59.298 --> 00:01:05.283
- First order of a business under the administrative business is the approval of the planned commission

00:01:05.283 --> 00:01:11.151
- meeting minutes from the October 22nd, 2026 meeting. I move to approve the meeting minutes from the

00:01:11.151 --> 00:01:17.137
- planned commission of October 22nd, 2026. Second. And everyone, did anyone have a chance to read over

00:01:17.137 --> 00:01:23.181
- that and have access to it? It was linked in the... Yes. Okay, great. I'll go ahead and call the roll.

00:01:23.181 --> 00:01:28.638
- Since this is an administrative business, we don't take public comment on minutes, so you'll

00:01:28.738 --> 00:01:39.984
- able to approve them here tonight. Yes is about to approve the meeting minutes from October 22nd, 2026.

00:01:39.984 --> 00:01:50.365
- David Bush? Yes. Jeff Morris? Yes. Scott Farris? Yes. Rudy Fields? Yes. Margaret Clements? Yes.

00:01:50.365 --> 00:01:57.502
- Julie Thomas? Yes. David Henry? Yes. Ronan Ragranda? I'm going to

00:01:57.634 --> 00:02:08.577
- So I didn't get a chance to read them. Okay. Motion carries seven to zero. Okay. And so with that, I'll

00:02:08.577 --> 00:02:19.098
- go ahead and move on to the next item, House and Rollback 1001 next steps. So I did want to include

00:02:19.098 --> 00:02:24.254
- just some items for your review and I apologize.

00:02:25.122 --> 00:02:32.960
- Get this into the packet. So there's two code components to the House and World Act 1001. They kind

00:02:32.960 --> 00:02:40.955
- of put them in two different places. So the first code component is what we did, which is the hearing

00:02:40.955 --> 00:02:48.794
- requirement. So that we will link to the board, what we're calling the board record. That'll be the

00:02:48.794 --> 00:02:50.910
- packet that was presented.

00:02:51.266 --> 00:02:58.368
- the two items that were introduced as evidence during that night's meeting that were part of the testimony,

00:02:58.368 --> 00:03:04.944
- and then the meeting minutes that you just approved. So those are set in stone. I do need, based on

00:03:04.944 --> 00:03:11.586
- this submission, when I look at it from the state, I do need some sort of vote or understanding from

00:03:11.586 --> 00:03:18.294
- you all. We can have a broader discussion. Based on the hearing, are there amendments that need to be

00:03:18.294 --> 00:03:20.990
- moved to the ordinance review committee?

00:03:21.090 --> 00:03:31.094
- That's part of the requirement that needs to be submitted to the state by December 31st. And I can show

00:03:31.094 --> 00:03:40.906
- you kind of what we'll have to submit. So there's a submission form. It'll say basically, this is the

00:03:40.906 --> 00:03:50.526
- how many version that'll be next. Thanks. Okay, so this is the requirement that we did the hearing.

00:03:50.754 --> 00:04:01.408
- um, the housing studies, and then it will say any newly adopted or amended UDO as discussed in section

00:04:01.408 --> 00:04:11.958
- three. So we have to upload something or leave this blank, um, as a result. And then, um, they do ask

00:04:11.958 --> 00:04:19.198
- just for any like general comments. So I'm guessing if this is blank,

00:04:19.650 --> 00:04:27.249
- that's going to flag them pretty quickly on different jurisdictions that didn't amend the code based

00:04:27.249 --> 00:04:34.999
- on the hearing requirement. I bring that to you just to let you know that that's how we have to submit

00:04:34.999 --> 00:04:42.523
- the record and then ask if you would all like me to put something in that box saying we're going to

00:04:42.523 --> 00:04:45.758
- be working on an ordinance amendment or if

00:04:45.858 --> 00:04:55.327
- would have liked to vote as a group to say, we heard the comments at the hearing and nothing is moving

00:04:55.327 --> 00:05:04.979
- us to make amendments to the CEO at this time. Yeah, there's a hand raised. However you want to proceed,

00:05:04.979 --> 00:05:11.230
- let's get the... Okay, I think Julie had a hand raised first. Okay.

00:05:11.362 --> 00:05:20.952
- I don't think that there would be any way possible to get anything passed, ordinance review, plan commission,

00:05:20.952 --> 00:05:29.671
- and board of commissioners before the end of the year. So I think in a way, we're pretty limited in

00:05:29.671 --> 00:05:38.389
- what we could do. I think it would be good to put in a copy of the ordinance, the ordinance reviews

00:05:38.389 --> 00:05:40.830
- that we are doing, the CDO,

00:05:41.218 --> 00:05:50.230
- amendments that we're looking at, the ones we have done and the ones we are doing next. I think if anything

00:05:50.230 --> 00:05:58.825
- comes up at any time, we can talk about it and determine a path forward. But I don't see how it's even

00:05:58.825 --> 00:06:07.337
- physically possible to do anything before the end of the year. Okay. Troy, you're next. I just needed

00:06:07.337 --> 00:06:10.174
- a couple of questions to clarify.

00:06:10.914 --> 00:06:20.659
- They're asking what we're working on, not what we can pass by January. Yeah, let's see what the letter

00:06:20.659 --> 00:06:30.309
- says. So like if we're going to put the prioritization list and other things that are being discussed

00:06:30.309 --> 00:06:35.134
- at the ORC. Developed or amended. Section three is

00:06:36.514 --> 00:06:45.586
- Section 3 is a requirement for the hearing if I didn't put it in here. Section 3, not later than January

00:06:45.586 --> 00:06:53.707
- 1, it must conduct a public hearing to review the UDL, which in our case is the CDO, entities

00:06:53.707 --> 00:07:02.433
- only regulations and land development rules with the goal of increasing housing development by using

00:07:02.433 --> 00:07:05.630
- the following factors. So looking at

00:07:05.954 --> 00:07:13.451
- Section three, it's these questions we ran through, one through nine. I guess, are you understanding

00:07:13.451 --> 00:07:21.170
- my question? So your question was, could we put in something like, say we're working on something? What

00:07:21.170 --> 00:07:28.592
- are they asking for things that we're going to look at that are going to be amended? And is there a

00:07:28.592 --> 00:07:35.198
- firm date, as kind of just stated, that we can only put things in that could potentially

00:07:35.362 --> 00:07:42.965
- be passed by like January 1st, or they're just wanting to know what we're going to put in. Yeah. And

00:07:42.965 --> 00:07:51.019
- that's just kind of half of- It says newly developed or amended. So I'm- So developed is like, conceptual,

00:07:51.019 --> 00:07:58.622
- working on potentially. Can we go up to the sentence that says what in fact we're going to do at the

00:07:58.622 --> 00:08:05.246
- very beginning? Okay. And let's just read that and follow the letter of the law per se.

00:08:06.210 --> 00:08:12.477
- I want to make sure I understand it. A unit conduct a public hearing to review the unit and zoning and

00:08:12.477 --> 00:08:18.805
- inland, et cetera, with the goal of increasing, et cetera. OK, so what we did here is I believe there's

00:08:18.805 --> 00:08:25.193
- nine items, right? Correct. Of those nine items that we answered questions of, are we planning to change

00:08:25.193 --> 00:08:31.339
- any things relating to those nine items? And so that's the question in my mind. OK, well, that's not

00:08:31.339 --> 00:08:35.902
- what I kind of heard about. Is there anything that compelled us to discuss

00:08:36.130 --> 00:08:43.675
- and upload on to what you were just referring to. Since any newly developed or amended CDO has a result

00:08:43.675 --> 00:08:51.221
- of the review under section three, which is what we just went through the nine questions, the unit must

00:08:51.221 --> 00:08:58.766
- provide a written description of the ways in which the CDO has changed and to support increased housing

00:08:58.766 --> 00:09:04.062
- development by using some or all the factors set forth in section three.

00:09:04.898 --> 00:09:11.409
- So I would look at the nine questions that were asked. Were there any holes in those nine questions

00:09:11.409 --> 00:09:17.985
- that we were not providing a satisfactory response to with respect to their question? And if that is

00:09:17.985 --> 00:09:24.626
- the case, then that would be something that we would want to take and identify. And then you guys can

00:09:24.626 --> 00:09:31.267
- take and debate this as well. But I mean, you would identify that as actionable. Now, I don't know if

00:09:31.267 --> 00:09:32.830
- that's the case or not.

00:09:33.794 --> 00:09:43.018
- I think you answered all nine questions. I do too. I guess I'm just trying to further the conversation

00:09:43.018 --> 00:09:51.974
- about what you mentioned about uploading something and those would have to be strictly based on the

00:09:51.974 --> 00:09:55.646
- nine questions. That's what I see. Okay.

00:09:56.002 --> 00:10:04.505
- My interpretation is a bit different or my understanding of adverse impact and overlap is a bit broader

00:10:04.505 --> 00:10:12.680
- than just the nine questions. Personally, I would like to discuss the septic and sewer and how that

00:10:12.680 --> 00:10:20.938
- restrains everything in our ordinance. That does include several questions that were discussed. I do

00:10:20.938 --> 00:10:25.598
- think that impacts it if we look at accessory dwellings.

00:10:26.274 --> 00:10:33.389
- You know, if we look at other lot sizes, there's a lot of different things that are conditioned due

00:10:33.389 --> 00:10:40.575
- to having septic and sewer and model next our ordinance. You've actually brought this up on numerous

00:10:40.575 --> 00:10:47.903
- occasions. Yeah. Yeah. So personally, I feel strongly that, you know, if the planning commission would

00:10:47.903 --> 00:10:52.030
- like to move that conversation back to the ORC to redress

00:10:52.194 --> 00:11:01.232
- re-address what we can potentially do with the septic and sewer, I think, relates to several of these

00:11:01.232 --> 00:11:10.625
- questions. It's a lot of adverse impact, but it does relate to them. So. So as it relates to the question

00:11:10.625 --> 00:11:19.486
- number two. Yeah. Accessory dwelling units, you want to bring up that to ORC as possible amendment?

00:11:19.682 --> 00:11:29.392
- just to have the conversation of what can we do with the requirement to have septic and that requirement

00:11:29.392 --> 00:11:38.825
- forcing large lot sizes or even not permitting some of these type of developments unless you can have

00:11:38.825 --> 00:11:49.182
- the sewer. So that's how I feel. I'm always going to feel that way until we actually address this conversation.

00:11:49.474 --> 00:11:57.175
- I guess my satisfactory that we've really tackled it in a way where I've seen any change. And I understand

00:11:57.175 --> 00:12:04.588
- that that is my position and I'm more than happy to always be out voted on that. But I think it's time

00:12:04.588 --> 00:12:11.857
- to have a conversation again. I will go back to what I said in the very beginning and we were tasked

00:12:11.857 --> 00:12:17.758
- to answer these questions. This is a data column by the staff of the legislators.

00:12:18.050 --> 00:12:25.100
- and it's going to result in some sort of language. And so they're looking, they're going out and they're

00:12:25.100 --> 00:12:31.815
- drilling down to see if there's issues that potentially could become new law. And so you need to be

00:12:31.815 --> 00:12:39.134
- really careful when you respond to a question and be absolutely crisp in your response and be very specific.

00:12:39.134 --> 00:12:45.849
- Be very careful about opening the door for other things that might down the road result in some new

00:12:45.849 --> 00:12:47.326
- legislation impacting

00:12:48.354 --> 00:12:57.979
- us, Margaret. Well, I had Jackie, she recommended because I thought it was very erudite, succinct and

00:12:57.979 --> 00:13:07.886
- perfect, you know, Jackie, repeat what you had stated initially that you could respond. Sure. So I think

00:13:07.886 --> 00:13:16.190
- that the next steps that we would like to vote on is whether, you know, we've taken the

00:13:16.354 --> 00:13:23.386
- the hearing and the public's comments under advisement, and we move to make no amendments to the CEO,

00:13:23.386 --> 00:13:30.418
- or we can start a process and look at one of the nine questions or some of the questions and start an

00:13:30.418 --> 00:13:37.313
- amendment process at the ORC and upload that as a start. Not that I'm suggesting this, but to build

00:13:37.313 --> 00:13:44.414
- upon what you just said, as some of us had this conversation right after the meeting, and that is that

00:13:44.738 --> 00:13:51.703
- we had X number of people come in and talk to us. Quite frankly, there were some things that were relevant,

00:13:51.703 --> 00:13:58.153
- some things were other. And so of those things that were discussed and people were concerned about,

00:13:58.153 --> 00:14:04.666
- was there any relevancy at all for things that need to be addressed within our ordinance? Or they're

00:14:04.666 --> 00:14:11.309
- just a blanket statement of whatever they were saying. So is there anything actionable in those things

00:14:11.309 --> 00:14:13.502
- that were discussed that we might

00:14:13.762 --> 00:14:21.785
- want to consider in our ordinance? I personally didn't think so, because our ordinance is relatively

00:14:21.785 --> 00:14:29.808
- new. And we heard some of the same things during the public hearing that we heard during this recent

00:14:29.808 --> 00:14:37.830
- public hearing. Next year, it may be different. But I didn't feel that there was anything compelling

00:14:37.830 --> 00:14:41.246
- there to make a change one way or another.

00:14:42.530 --> 00:14:49.239
- So I guess what I'm saying, was there anything actionable? I have my hand up in the room. I don't know

00:14:49.239 --> 00:14:56.014
- if you all see that. Yeah, I was trying to get to you. I'm sorry. Thanks. All right, Dave, you're next.

00:14:56.014 --> 00:15:02.853
- Thank you. Appreciate it. So Colonel Farris, I agree about keeping it to the letter, I think, as tightly

00:15:02.853 --> 00:15:09.758
- as we can. So the first part of the conversation as I heard it was that if we were to add things like the

00:15:10.050 --> 00:15:20.450
- current working list of updates to the CDO, that was not a result of the hearing, right? That's like

00:15:20.450 --> 00:15:30.747
- ongoing work. So, am I coming through okay? Yes. Okay. So, if the logic model and there were things

00:15:30.747 --> 00:15:35.998
- said and we're taking, then the argument would be,

00:15:36.482 --> 00:15:42.983
- you had to include those things that we heard in the hearing as future work. The ongoing work is not

00:15:42.983 --> 00:15:49.612
- something I would think to include in this to the House because it wasn't brought up as an output from

00:15:49.612 --> 00:15:56.370
- the meeting, right? So if it's for the sake of filling space, I wouldn't put that working list in there.

00:15:56.370 --> 00:16:02.999
- And it wasn't an output of the meeting. Now, I think to your point about was there anything actionable

00:16:02.999 --> 00:16:04.158
- from the meeting,

00:16:04.930 --> 00:16:09.993
- You know, I think given Commissioner Thomas's comment that we're probably short on time to address that

00:16:09.993 --> 00:16:14.861
- now, I don't think it's something we need to address now. But I most certainly think that there are

00:16:14.861 --> 00:16:19.924
- things that were in that meeting that will be coming up after January 1st for revisitation because they

00:16:19.924 --> 00:16:25.036
- keep coming up. And that's what's compelling about it is there may be some fatal flaws in that ordinance

00:16:25.036 --> 00:16:29.953
- that need to get further exploration. But at this point, I would leave it alone. I mean, we held the

00:16:29.953 --> 00:16:34.334
- hearing. There's nothing actionable coming out of it. There's nothing to embellish on it.

00:16:34.626 --> 00:16:48.149
- Keep it sweet, short and sweet. Thank you. One thing, and I just kind of want to clarify since I went

00:16:48.149 --> 00:17:01.671
- over the questions again, just my concern impacts question one, impacts question two, impacts. It can

00:17:01.671 --> 00:17:03.262
- even impact

00:17:03.522 --> 00:17:14.147
- three as far as the commercial building. If they want to do adaptive reuse and it was already existing

00:17:14.147 --> 00:17:24.464
- and now they want to try something else, it's going to trigger compliance and that compliance might

00:17:24.464 --> 00:17:32.510
- require a sewer or a commercial type septic. It also impacts. Where was that?

00:17:34.018 --> 00:17:42.554
- like a timely manner, you know, having it could eliminate a couple steps. Anyways, long story short,

00:17:42.554 --> 00:17:51.174
- I'm on board with moving it, but my real question goes back to director, Mr. John, you said something

00:17:51.174 --> 00:17:59.795
- about, like, we don't put anything in there that you thought that that might highlight our submittal.

00:17:59.795 --> 00:18:03.006
- And I guess I'm trying to understand,

00:18:03.618 --> 00:18:10.280
- Do we think that that would be a negative highlighting of not having anything that was uploaded? Or

00:18:10.280 --> 00:18:17.209
- do you think it would be neutral? Or do you think it would be positive? And if you don't want to answer

00:18:17.209 --> 00:18:24.005
- that question, that's fine. I guess I think part of the discussion is if we don't put anything in the

00:18:24.005 --> 00:18:31.134
- portal, is that going to bring extra attention from the legislators? Do we comply with House and World Act

00:18:32.034 --> 00:18:39.085
- 1001 in a good faith effort. And I think we did. So I'm fine with just kind of moving along and leaving

00:18:39.085 --> 00:18:46.068
- that blank. And I also want to just mention I support what Colonel Farris and Council Member Henry was

00:18:46.068 --> 00:18:53.050
- saying that like we shouldn't play anything that's outside of those nine questions in there. If we did

00:18:53.050 --> 00:19:00.169
- not hear anything from the hearing that is based on those nine questions that the team or the commission

00:19:00.169 --> 00:19:01.118
- has unanimous

00:19:01.442 --> 00:19:07.940
- you know, we are, we should move forward in this direction and change this thing about the CDO. Then

00:19:07.940 --> 00:19:14.567
- I wouldn't put anything in there that, you know, won't move. But if we want to put something in there,

00:19:14.567 --> 00:19:21.259
- it's like, we're going to, we, we do have on the board record at the end of this report, you know, they

00:19:21.259 --> 00:19:27.886
- ask the same question. We state any changes in the CDO following the public hearing will be determined

00:19:27.886 --> 00:19:30.974
- after October 27th, because it's just too soon.

00:19:31.106 --> 00:19:37.560
- I do want to say something since this has been kind of something I've been focused on for quite some

00:19:37.560 --> 00:19:44.207
- time. There were people that did come in and talk about lot size. There was the letter that was written

00:19:44.207 --> 00:19:50.725
- that talked about the difficulty of them putting an ADU on their property and some of the reasons why

00:19:50.725 --> 00:19:55.518
- I think are due to kind of the process and also lot size septic and sewer.

00:19:55.714 --> 00:20:02.514
- We did hear those comments. So as much as I've been talking about that, that was expressed at the hearing

00:20:02.514 --> 00:20:09.122
- by completely fine to move along. I just want to make sure people know this isn't just my position and

00:20:09.122 --> 00:20:15.793
- my opportunity to say if this was things we did hear at the hearing. So let's go back to the block that

00:20:15.793 --> 00:20:21.246
- we have to take and put comments on and read what it says. And it's sort of a short.

00:20:21.762 --> 00:20:29.036
- version of this, but any newly developed or amended CDO as a result of the review under section three

00:20:29.036 --> 00:20:36.310
- of this chapter, the unit must provide a written description of the ways in which the CDO has changed

00:20:36.310 --> 00:20:43.727
- to support increased housing development by using some or all of the factors set forth in section three

00:20:43.727 --> 00:20:51.358
- of this chapter. So we're going to have an ORC in December then? No. Do you see where I'm going with this?

00:20:52.322 --> 00:21:00.337
- Okay, and so we're not gonna have an ORC, so there's no form to have any discussion. Before they just

00:21:00.337 --> 00:21:08.273
- do. Before they just do. Okay, so we'll go down to the block that we're supposed to put our comments

00:21:08.273 --> 00:21:16.287
- in. We'll see what it says. And then it does give us another statement to say, using the space below,

00:21:16.287 --> 00:21:20.766
- please describe the ways in which the CDO was changed to

00:21:21.122 --> 00:21:28.929
- Yeah, and I think that's a slippery slope. I think that's a slippery slope to answer those questions

00:21:28.929 --> 00:21:36.813
- myself. I think you leave it empty. Yeah, it's too small. Do we need to vote on that? Is there anyone

00:21:36.813 --> 00:21:45.470
- in opposition of leaving it blank? I guess it would be better. Is there not a statement in there that says that

00:21:45.826 --> 00:21:53.416
- There's no, there's no reporter. I mean, blank looks blank, right? I mean, it looks like you didn't

00:21:53.416 --> 00:22:01.234
- fill it in. Is there a neutral statement? That might be fine. Colonel, that might be fine. I mean, no,

00:22:01.234 --> 00:22:04.574
- not at this time or no action at this time.

00:22:05.346 --> 00:22:14.370
- I think Jackie had a very clear statement that was very airtight. It said, based on the hearings and

00:22:14.370 --> 00:22:23.573
- our deliberation, no changes to the CDO are being entertained at this time. That's good. That's a good

00:22:23.573 --> 00:22:32.507
- one. I think that's good. Jackie, are those the words that you used? I certainly agree with some of

00:22:32.507 --> 00:22:33.758
- the comments.

00:22:34.338 --> 00:22:41.211
- that have been made, if we leave it blank, then it does. I would like to raise that question. I'm not

00:22:41.211 --> 00:22:48.016
- going to be able to support that. I understand that based off the timeline, we can't have subsidence

00:22:48.016 --> 00:22:54.821
- changes. That's fine, but I'm not comfortable with supporting that statement. OK, we'll get to that.

00:22:54.821 --> 00:23:01.694
- I have, I guess, a question or clarification as well. It seems to me we're premature on trying to put

00:23:01.694 --> 00:23:04.254
- anything in here. And if we do tackle

00:23:04.610 --> 00:23:11.348
- some of these questions that were raised at the public hearing, or if we, for whatever reason, if we

00:23:11.348 --> 00:23:18.087
- go down the path of tweaking the CDO in 2027, then this time next year, I think all that needs to be

00:23:18.087 --> 00:23:25.026
- put in there because it has changed at that point in time. Right now, nothing's changed. Right, I don't

00:23:25.026 --> 00:23:31.897
- know if that's, they're not gonna ask for it, I don't think. We submit this and then we close the book

00:23:31.897 --> 00:23:34.366
- on it. And this is the one and done?

00:23:34.498 --> 00:23:45.334
- That's what my understanding is. I thought that was every year. Yeah, it's annual. I know that they

00:23:45.334 --> 00:23:56.496
- want to roll another version of this out. I mean, there were also people at the hearing who said other

00:23:56.496 --> 00:24:04.190
- things that less density was required. Going down that, we deliberated

00:24:04.322 --> 00:24:11.353
- as a client commission, and we decided that no action was necessary at this time. You know. If you're

00:24:11.353 --> 00:24:18.384
- not going to have an ORC in December, there's no forum to even have a discussion prior to January. So

00:24:18.384 --> 00:24:25.553
- this is the progress report. So it says beginning January 1, 20.7, each local government that exercised

00:24:25.553 --> 00:24:30.654
- spending and zoning under this Indiana Code Authority, which includes us.

00:24:30.978 --> 00:24:38.255
- shall submit to the IHCBA and to the executive director a housing progress report. This will have to

00:24:38.255 --> 00:24:45.964
- be done every year. Yeah. Well, when do we have to do it? It says... Beginning January 1 for the preceding

00:24:45.964 --> 00:24:53.530
- year. So it's going to... It doesn't give a deadline right now. That's what I mean. There's no suspense,

00:24:53.530 --> 00:24:59.870
- although we submit that. January 1st, 2020. Steve. So this is an annual report. I think

00:25:00.034 --> 00:25:05.926
- Yeah, it hasn't been said out loud, but you're setting a baseline they're going to compare you against

00:25:05.926 --> 00:25:11.875
- every year following this. So whatever you put in, if you don't have demonstrable changes year to year,

00:25:11.875 --> 00:25:17.824
- they're going to notice it the first year. So I think it needs to be fully filled out in an actual good

00:25:17.824 --> 00:25:23.716
- faith effort because the next year is going to be different. And it doesn't say changes have to occur.

00:25:23.716 --> 00:25:29.150
- So to the comments maybe that we're talking about less density and things, you know, like that

00:25:29.378 --> 00:25:36.312
- That is as important as like the septic and sewer. What I'm saying is like, those are discussions that

00:25:36.312 --> 00:25:43.247
- we can have good faith effort doesn't mean it has to have ordinance changes. And I guess my main thing

00:25:43.247 --> 00:25:50.181
- is I'm fine with saying we can't get anything done in this type of a timeline, but I'm not okay saying

00:25:50.181 --> 00:25:53.278
- we're not going to work on that in like 2027.

00:25:54.050 --> 00:26:00.088
- Sorry, I know Julie has it, but Mr. Schilling wants to say something. As our legal rep, I think it's

00:26:00.088 --> 00:26:06.126
- important to hear what you have to say. I agree with Dave Henry and Scott that what came out of this

00:26:06.126 --> 00:26:12.105
- hearing, what changes were prompted by this hearing, and there are none to this day. They are going

00:26:12.105 --> 00:26:18.143
- to have the transcript of the hearing. They can figure that out for themselves if they think there's

00:26:18.143 --> 00:26:21.790
- a problem. But I just, you know, this is going to be getting

00:26:22.082 --> 00:26:28.299
- hundreds and hundreds of reports from towns and planning commissions all over the place. They've leaned

00:26:28.299 --> 00:26:34.277
- so heavily to AI and they've gotten awards for the amount of AI they use, the amount of data is not

00:26:34.277 --> 00:26:40.434
- going to matter. Yeah, but the quality is. I mean, there are places like Brown County where they can't

00:26:40.434 --> 00:26:45.694
- do anything. I mean, there's so many places, so many different environments that I just

00:26:45.890 --> 00:26:52.504
- I just think you just have to be honest and say, look, we just changed the CEO to promote housing and

00:26:52.504 --> 00:26:59.053
- we didn't hear anybody come and say that we didn't go far enough. So we're not gonna do it. My whole

00:26:59.053 --> 00:27:05.668
- thing is there is nothing we can do based off of this timeline, but it does compel me to want to have

00:27:05.668 --> 00:27:12.606
- those discussions, I guess, you know? So like, I think the statement I heard Jackie say makes it seem like

00:27:12.930 --> 00:27:19.110
- nothing from the hearing compels us to want to have discussions. And that's what bothers me with the

00:27:19.110 --> 00:27:25.290
- statement the most. I totally understand the timeline. We just can't get it done. And I support that

00:27:25.290 --> 00:27:31.592
- a hundred percent. And you can always add a sentence that we have a process, the World Workers' Review

00:27:31.592 --> 00:27:37.282
- Committee to take and address whatever. Exactly. We have a process in place to address them.

00:27:37.282 --> 00:27:40.158
- I see Commissioner Thomas has her hand raised.

00:27:40.706 --> 00:27:50.365
- No, that's all it is. Thank you. Thank you so much. So this is a, this is this whole thinking about

00:27:50.365 --> 00:28:00.217
- from a Republican majority legislature, super majority legislature, where about a third of the people

00:28:00.217 --> 00:28:06.206
- are developers. Okay. So, but there there's been an election.

00:28:06.306 --> 00:28:14.319
- and things are changing a bit. So I don't even know that this is coming back next year. I also would

00:28:14.319 --> 00:28:22.253
- say that as much as we can discuss the things that were said about density, we can also look at the

00:28:22.253 --> 00:28:29.790
- other things that were said about density that say don't fall into the city's trap. So I think

00:28:29.922 --> 00:28:37.940
- You know, yeah, we should talk about all of it, not just handpick a few things that were said. So yes,

00:28:37.940 --> 00:28:45.959
- we should look at it. So my suggestion is that we say something in that box as has been written so far

00:28:45.959 --> 00:28:54.055
- that adds, we will continue to review this in 2027. And just leave it at that. We don't want to be TMI.

00:28:54.055 --> 00:28:59.582
- Dave, I have a question for you. Yes. Dave, I have a question for you.

00:28:59.874 --> 00:29:06.131
- Dave Schilling. Since the commissioners asked the planning commission to do this, do we also, as the

00:29:06.131 --> 00:29:12.512
- board of commissioners, need to approve this before the end of the year? Yeah. The resolution that was

00:29:12.512 --> 00:29:19.326
- adopted said the planning commission was going to put this together and then pass it to you for consideration

00:29:19.326 --> 00:29:22.238
- of the commissioner. Great. Thank you so much.

00:29:26.434 --> 00:29:32.976
- So I would amend what Julie just said with respect to tackling the issues in the next calendar year,

00:29:32.976 --> 00:29:39.647
- but stipulate that we do have a process called the Ordinance Review Committee, where, in fact, we take

00:29:39.647 --> 00:29:46.125
- up on these issues and discuss them as part of the State Commission Four, et cetera, something like

00:29:46.125 --> 00:29:52.667
- that. You want to tell them you have a process within your own organization to address these issues.

00:29:52.667 --> 00:29:55.646
- No, that's important. I guess that's my take.

00:29:56.418 --> 00:30:04.569
- Very valid. It's not for just put down the back burner. It has to go through a process. Something like

00:30:04.569 --> 00:30:12.799
- that. So make it into English. You know, that I remained really proud of how we considered every single

00:30:12.799 --> 00:30:20.158
- comment that came in from the public when we did we're deliberated on the CDL. It was really

00:30:21.922 --> 00:30:32.919
- You planning staff did a wonderful job in guiding us through that. Thank you. Okay, so in very

00:30:32.919 --> 00:30:44.727
- few iterations, I can try and put something together for everyone's vote, if that's okay? Yeah. Okay.

00:30:44.727 --> 00:30:48.894
- So is the intention to vote on some

00:30:49.282 --> 00:30:59.416
- I think that's a good question. Is there an iteration of that tonight? Then Jackie, are you putting

00:30:59.416 --> 00:31:09.955
- that together for next time? Well, so the next step based on the resolution is to, uh, have the meeting

00:31:09.955 --> 00:31:16.542
- minutes approved by the commissioners on or before December 3rd.

00:31:17.122 --> 00:31:25.565
- We have a little bit of time, but not a ton of time. I would probably prefer we get something agreed

00:31:25.565 --> 00:31:33.925
- upon tonight. So what I've heard so far is we could state something such as no action will be taken

00:31:33.925 --> 00:31:42.535
- at this time. We will continue to review the CDO into 2027. Monroe County has a process for addressing

00:31:42.535 --> 00:31:46.046
- and reviewing text amendments to the CDO.

00:31:46.402 --> 00:31:53.686
- which is the ordinance review committee and their next schedule meeting is January 11th, 2027. Do you

00:31:53.686 --> 00:32:01.042
- want me to say something like that? So it's. That's pretty strict. I like it. It's not until next year

00:32:01.042 --> 00:32:08.255
- essentially. OK, it's clear, concise and factual. Is it necessary to plug in the next date? The date

00:32:08.255 --> 00:32:11.326
- of the next meeting if you wanted to just.

00:32:11.778 --> 00:32:20.021
- Basically state, we're out of time for the rest of the year. That's the only reason we put it in there.

00:32:20.021 --> 00:32:28.185
- I didn't know if we want it to be locked into a date when something happens. They don't really see it.

00:32:28.185 --> 00:32:36.428
- I prefer leaving out the constraints of time from the statement because it might create a reaction that

00:32:36.428 --> 00:32:41.342
- causes more response from us. It's like too much information.

00:32:41.698 --> 00:32:47.958
- Maybe they'll have us starting on this in July and have other items they want us to deliberate. We'll

00:32:47.958 --> 00:32:54.156
- never get the work at the client page, you guys. So just cut it off at Ordinance 30. Yeah, okay. But

00:32:54.156 --> 00:33:00.600
- no action is taken at this time. We will continue to review the CDO in 2027. Monroe County has a process

00:33:00.600 --> 00:33:06.798
- for addressing and reviewing text amendments to the CDO, which is the Ordinance Review Credit. Would

00:33:06.798 --> 00:33:10.910
- you support that? Yeah. Would you want to say the monthly process?

00:33:11.810 --> 00:33:20.811
- I think that shows that we're not just picking inside and it doesn't, as long as Ms. Holmans is over

00:33:20.811 --> 00:33:29.722
- there. I mean, I just think less is more than you're dealing with. Maybe you could just say regular

00:33:29.722 --> 00:33:39.614
- scheduled meeting. At the next regular scheduled meeting. I wouldn't even put next. I just put at the regular.

00:33:40.002 --> 00:33:47.912
- Yeah, at the regular scheduled meeting of the ordinance review committee. Yeah. All right. We're splitting

00:33:47.912 --> 00:33:53.086
- here. Yeah, I know. Good. I just don't want to get put in the corner.

00:33:53.506 --> 00:34:00.890
- Yeah. So will you give us the official rendering of what you decided we're going to say? No action will

00:34:00.890 --> 00:34:08.700
- be taken at this time. We will continue to review the CDO in 2027. Monroe County has a process for addressing

00:34:08.700 --> 00:34:16.013
- and reviewing text amendments to the CDO, which is the regularly scheduled ordinance review committee.

00:34:16.013 --> 00:34:23.326
- I make a motion that we approve that statement as stated. I'll second. It's been moved and seconded to

00:34:23.458 --> 00:34:36.435
- Approve that language to submit to the state under our obligation. Go ahead. Stockers. Yes. Rudy Fields.

00:34:36.435 --> 00:34:49.411
- Yes. Margaret Clemens. Yes. Julie Thomas. Yes. David Henry. Yes. Sean Enright-Randolph. Yes. David Bush.

00:34:49.411 --> 00:34:52.254
- Yes. Jeff Morris. Yes.

00:34:52.994 --> 00:34:59.630
- Motion carries 8 to 0. Now do we also have to present to the Planning Commission for us to take and

00:34:59.630 --> 00:35:06.465
- recommend approval to the County Commissioners, or is this it? The resolution already did that. So you

00:35:06.465 --> 00:35:13.234
- can go from this body to the County Commissioners. And then to the state. I just want to make sure we

00:35:13.234 --> 00:35:15.358
- all understand that. Touchdown.

00:35:15.746 --> 00:35:24.291
- So the other part of the House and World Act, just to let you know, is the housing progress report.

00:35:24.291 --> 00:35:33.091
- So we would like to bring this for your review. We're going to try and set a goal on January 5th. That

00:35:33.091 --> 00:35:41.636
- might be too quick. Well, I know we'll have the full numbers by then. It might be the first meeting

00:35:41.636 --> 00:35:45.310
- of February at this point to give you that

00:35:45.410 --> 00:35:53.129
- We want to make sure you agree. We might have some questions. So I highlighted in red some of the questions

00:35:53.129 --> 00:36:00.419
- that they're asking for which I may come back and say, here's what this source says. Here's what this

00:36:00.419 --> 00:36:07.567
- source says. Because I don't know. It doesn't exactly say use this source. Right. So everyone could

00:36:07.567 --> 00:36:09.854
- be using a different source. So

00:36:11.618 --> 00:36:19.746
- I just want to let you know that this is still something that we'll be talking about into 2027. I wouldn't

00:36:19.746 --> 00:36:27.646
- put the 5th of January. I'd say the January meeting, because you might change the date for some reason.

00:36:27.646 --> 00:36:35.774
- I know we're splitting. No, this is just for our working view. I'm not going to submit anything like this.

00:36:36.130 --> 00:36:43.531
- Well, they haven't given us a deadline, but I'm guessing it's not here. I'm guessing they might say

00:36:43.531 --> 00:36:51.005
- it's like January 31st. I thought I read that in one of our forms. I thought I did too, but it's not

00:36:51.005 --> 00:36:58.628
- on the form that they gave us to submit. I can go back to the form. There's no longer a super country.

00:36:58.628 --> 00:37:04.030
- But I don't want people to get up to speed. This will be on the... Yeah.

00:37:04.866 --> 00:37:12.588
- So yes. So I'll triple check our, um, I heard about 31st. I did too. Okay. So we will bring it back

00:37:12.588 --> 00:37:20.310
- to you. We want to do it quickly, but there, there are going to be some questions that we have. And

00:37:20.310 --> 00:37:27.877
- if you all have a chance to look at this and have thoughts on sources where we should agree upon,

00:37:27.877 --> 00:37:32.510
- you know, using that, cause we're going to have to do this.

00:37:33.026 --> 00:37:39.783
- at least for probably two years. And I guess maybe you may not, but we might want to be setting a good

00:37:39.783 --> 00:37:46.605
- template for ourselves to then iterate next year. Because if we use a certain source this year and then

00:37:46.605 --> 00:37:53.230
- switch sources, it doesn't give you room to talk and explain over it. Are you going to provide those

00:37:53.230 --> 00:37:59.134
- questions? Because it's not in the packet, correct? Yes, sorry. I meant to put this link.

00:37:59.298 --> 00:38:08.326
- this in the packet and so I can email this to you guys. That would be awesome. Thank you. Okay um but

00:38:08.326 --> 00:38:17.266
- it's not ready yet because I the starting point is to have all 2026 data and we don't have that yet.

00:38:17.266 --> 00:38:23.550
- So you need a breath are you ready to move on? We're ready to move on.

00:38:23.874 --> 00:38:34.539
- So the next item under the packet is the fee schedule. So this was continued from March of this year.

00:38:34.539 --> 00:38:45.204
- And we do have some spare copies, 31 in the room that wants to look. We are proposing some changes to

00:38:45.204 --> 00:38:50.014
- what's on the screen. So I'm going to pull up

00:38:50.914 --> 00:39:00.747
- The change most accurate I've printed off some paper copies for those in the room after working with

00:39:00.747 --> 00:39:06.686
- our staff this afternoon. One of the things that we did was.

00:39:06.978 --> 00:39:16.013
- because we were able to succeed in the council request and we did get a cost of living adjustment and

00:39:16.013 --> 00:39:25.048
- a re-grid for our positions. We plugged that into our labor analysis to make sure that these fees and

00:39:25.048 --> 00:39:34.084
- our hourly work to accomplish these different petitions and permits equal that. So this is reflective

00:39:34.084 --> 00:39:35.678
- of 2027 salaries.

00:39:36.162 --> 00:39:57.733
- Some of the changes that you'll notice off the bat from what's in the packet, we did separate out the

00:39:57.733 --> 00:40:02.174
- conditional use with

00:40:02.402 --> 00:40:29.950
- it being a home waste business conditional use and a conditional use just general. Okay, Devil's Epic.

00:40:31.906 --> 00:40:41.390
- That's the old. This is the one that's in front of you. And that's very funny. 25 B's as well. The ones

00:40:41.390 --> 00:40:51.422
- I'm looking at on mine are the new one you're asking us to vote for and this is the old ones. No, the one is.

00:40:51.682 --> 00:40:58.215
- Drafted new, but we drafted another version, which is in paper. So we want to kind of walk you through

00:40:58.215 --> 00:41:04.684
- it and then we can bring it to the next meeting. That was my devil's advocate question. These are the

00:41:04.684 --> 00:41:11.027
- new. This is the latest. Yeah, it's on the screen right now. And was there a paper that in changes.

00:41:11.027 --> 00:41:13.310
- Yeah, we could only seven just from

00:41:13.474 --> 00:41:20.198
- what's in the packet, which we weren't proposing to now what we are proposing, right? Is there a red

00:41:20.198 --> 00:41:26.922
- line or an old? I mean, I don't remember every single fee and I don't understand the increase amount

00:41:26.922 --> 00:41:33.846
- on each one. So I didn't want to redline every single thing because it would be a lot of red, but these

00:41:33.846 --> 00:41:40.636
- are the two new font-like categories that we added. So these were never in there before, but I can go

00:41:40.636 --> 00:41:43.166
- ahead and redline what the fees were.

00:41:43.682 --> 00:41:51.838
- And the next year, you can compare it. But I'll say just generally speaking, we're looking at about

00:41:51.838 --> 00:42:00.483
- 15 to 20% increase. We won't be able to change this for five years. So continuing with my levels advocate

00:42:00.483 --> 00:42:06.110
- question, if I look at these fees, because they're new and improved,

00:42:06.466 --> 00:42:13.462
- Is there a logic on the increases? I mean, like, could you do a 2% increase, a 5% increase across the

00:42:13.462 --> 00:42:20.457
- board? Are they selected in nature? I mean, what's the logic behind the fee increases? Because that's

00:42:20.457 --> 00:42:27.384
- the question that people are going to ask. Why did it go up? So we use the salaries as the basis for

00:42:27.384 --> 00:42:34.242
- increasing the fees across the board. So they're going to look pretty similar. I will say that some

00:42:34.242 --> 00:42:35.614
- of the changes that

00:42:36.162 --> 00:42:44.637
- we are struggling with the most are the ones that have this plus after the fee. So plus $100 per acre

00:42:44.637 --> 00:42:53.279
- of development or plus $25 per acre, or even the plus $75 per lot. And the reason we're struggling with

00:42:53.279 --> 00:43:01.588
- that is because you essentially have to predict how many lots you get up to a total average fee and

00:43:01.588 --> 00:43:03.998
- try to equal the labor cost.

00:43:04.386 --> 00:43:11.994
- So I'll tell you that for a major subdivision five lots or more, we estimate that takes about 20 hours

00:43:11.994 --> 00:43:19.750
- of staff time, which equals let's say $1,750. If we aren't getting at least that number of lots to reach

00:43:19.750 --> 00:43:27.285
- the $250 mark, then we have to increase the base fee. So we had to look at kind of an average of what

00:43:27.285 --> 00:43:33.342
- the number of subdivision lots that are being created under these different types

00:43:33.698 --> 00:43:42.799
- to be able to get to that salary analysis. But generally speaking, this number, the flat numbers, are

00:43:42.799 --> 00:43:52.524
- moving about 20% for most of them. I will say the permits are a little more streamlined and straightforward.

00:43:52.524 --> 00:44:00.286
- So those are seeing a smaller increase overall from what there is now. Like right now,

00:44:00.578 --> 00:44:07.751
- The reconstruction from damage to the disaster. This is $50 and it's changing to $75. Multi-family

00:44:07.751 --> 00:44:15.503
- residential, I think, is $25 per dwelling unit. That's changing to $50. So continuing the devil's advocate

00:44:15.503 --> 00:44:22.749
- question, part three. When I'm asked the question or you're asked the question of why the fees went

00:44:22.749 --> 00:44:29.342
- up, what is the answer you're going to provide to the petitioner or the public, et cetera?

00:44:29.826 --> 00:44:36.521
- Why the increase? I mean, that's the why question, as opposed to a 20% salaries or whatever, but is

00:44:36.521 --> 00:44:43.485
- the answer we're going to demand to the petitioners. I would say that all of these line items are based

00:44:43.485 --> 00:44:50.180
- on a calculated labor analysis that begins when the petitioner actually submits for the petition or

00:44:50.180 --> 00:44:56.943
- the permit. That doesn't count all the phone call time asking questions or talking with neighbors in

00:44:56.943 --> 00:44:58.014
- advance or even

00:44:58.434 --> 00:45:07.199
- you know, extra work related to some of those outlier cases. This is a labor analysis from the time

00:45:07.199 --> 00:45:16.052
- of application, averaging amount of staff time that it takes to carry a petition or a permit through

00:45:16.052 --> 00:45:24.993
- the process. Just one question under permits, ILP, there's multifamily residential. Yes. And I see my

00:45:24.993 --> 00:45:27.710
- interpretation of that is that

00:45:27.970 --> 00:45:37.889
- And please correct me if I'm wrong. But like if a triplex goes in, that would be less expensive in terms

00:45:37.889 --> 00:45:47.524
- of the fee than a two-family residential. So it would be $150. Am I reading that incorrectly? So what

00:45:47.524 --> 00:45:55.742
- I would say is that some of these, so for instance, a triplex would require additional

00:45:56.098 --> 00:46:05.843
- Permit review so it might involve a site plan review. I see which is I see. And add on yeah new site

00:46:05.843 --> 00:46:15.781
- plan is 1400 plus $100 per acre if that development requires landscaping parking. So they're doing the

00:46:15.781 --> 00:46:20.798
- multiple triplexes. It in multiple starts at three.

00:46:22.338 --> 00:46:31.362
- Multiple starts at three, yes. We have multifamily three to five and then multifamily five plus or three

00:46:31.362 --> 00:46:40.300
- to four and then five plus. Okay, that just stood out to me and I didn't understand all the background.

00:46:40.300 --> 00:46:49.152
- Thank you. So this never offsets the personnel expense and planning regardless of how many permits you

00:46:49.152 --> 00:46:51.902
- get throughout the year, right?

00:46:52.034 --> 00:47:01.032
- I would say that of the time we spend on a daily basis, I would say more than half of it is, yes, talking

00:47:01.032 --> 00:47:09.691
- to the public or answering just inquiries that aren't necessarily permits or petitions yet. Of those,

00:47:09.691 --> 00:47:18.350
- they may never become anything and we don't charge people to answer that question. Permits cover what

00:47:18.350 --> 00:47:21.406
- would you say like ballpark of your

00:47:22.050 --> 00:47:31.777
- personnel expenses. How much does it cover? Are you including insurance costs or not? Yeah. Okay. Because

00:47:31.777 --> 00:47:41.045
- it would be a lot less. Okay. So year to date so far, just to give you an idea, could we start a new

00:47:41.045 --> 00:47:47.102
- fee schedule this year? So we've collected as of today, $159,000.

00:47:47.202 --> 00:47:55.842
- And you want just personnel costs or do you want like office supplies? Just personnel. I did an analysis

00:47:55.842 --> 00:48:04.153
- the other day, including insurance for stormwater. But my whole point is, I understand the increases

00:48:04.153 --> 00:48:12.958
- to kind of help offset the costs of kind of increasing the salary for planning. It's really hard for me to

00:48:14.402 --> 00:48:24.282
- get a sense of where I'm at without seeing the before and after. So my one thing is if there was someone

00:48:24.282 --> 00:48:33.974
- that is out of compliant, like let's say that we change a zone and they now are at a five foot setback

00:48:33.974 --> 00:48:38.302
- or they were at five foot setback and now the

00:48:38.402 --> 00:48:45.569
- the new zone is a 10 foot setback and now they have to go through a variance for a setback. But it was

00:48:45.569 --> 00:48:52.596
- because of us rezoning it. Is there any type of variance here for something that's like pre-existing

00:48:52.596 --> 00:48:59.763
- non-conforming? Because I hate kind of just adding extra things when we make changes that put them out

00:48:59.763 --> 00:49:06.721
- of compliance and then they have to pay the same for folks that want to have a waiver. And I'm just

00:49:06.721 --> 00:49:07.486
- wondering,

00:49:07.778 --> 00:49:20.413
- have we ever considered a different type of fee for that? That's a good question. I will say, though,

00:49:20.413 --> 00:49:31.934
- that it will be hard to base the fee using non-performing status fee. What I mean by that is

00:49:33.954 --> 00:49:41.146
- So impervious cover is a good example. Setbacks, impervious cover, minimum lot sizes, a lot of things.

00:49:41.146 --> 00:49:48.826
- Right. So it takes quite a bit of research to determine, you know, was this legal pre-existing non-conforming

00:49:48.826 --> 00:49:55.809
- or is it just non-conforming? I understand. Which we do. And then to assess the fee upfront, we try

00:49:55.809 --> 00:49:59.998
- not to make it so that the planners have to expend a lot of

00:50:00.194 --> 00:50:07.696
- time and energy, but I do understand that point and I think it would be a relief valve for some people.

00:50:07.696 --> 00:50:15.486
- Especially when it's our actions that then make them non-compliant and just so we don't have that currently

00:50:15.486 --> 00:50:22.987
- and it hasn't. So I'm just offering that up as like some thought of like as we keep changing the zoning

00:50:22.987 --> 00:50:28.830
- and different standards, more people might find themselves out of compliance and

00:50:29.058 --> 00:50:35.810
- if you look at some of these variances costs, they're quite expensive for people on fixed income. So

00:50:35.810 --> 00:50:42.830
- I think if the county changes things that make them non-compliant, maybe we should consider a fee that's

00:50:42.830 --> 00:50:49.516
- less for them to get the variance, even though it takes the same amount of time, I understand that,

00:50:49.516 --> 00:50:56.335
- but it's because of our doing and not what they would wish to do, if that makes sense. To answer your

00:50:56.335 --> 00:50:58.942
- original question, John, extrapolating

00:50:59.074 --> 00:51:07.912
- this far, year-to-date costs, we cover 32% of our salary overhead. That's without. Which is another,

00:51:07.912 --> 00:51:16.750
- so it's really covering 15% probably. Okay, thank you. I also want to note there was a discussion by

00:51:16.750 --> 00:51:25.150
- staff if we're wanting to take up rezones of communities, we could leave that as a lower fee to

00:51:25.378 --> 00:51:33.351
- We wanted to line item rezone out of a PUV as a lower fee as a goal of the Planning Commission to reduce

00:51:33.351 --> 00:51:41.476
- the number of PUDs and get them into buy right zones. That could be something. Of course, if it's authored

00:51:41.476 --> 00:51:49.221
- by the Planning Commission, there would be no fee. But if we want the petitioner to come to us and do

00:51:49.221 --> 00:51:53.246
- the work, that could be something that we encourage.

00:51:56.770 --> 00:52:07.186
- I think that that cleanup on ILPUB probably should start with us, you know? I don't think it's necessary

00:52:07.186 --> 00:52:17.601
- to change the fee schedule for that then because we initiate it. Okay, yeah. Is there a process to alter

00:52:17.601 --> 00:52:26.430
- the fee structure when somebody is bringing something forward as a result of a variance?

00:52:26.914 --> 00:52:36.349
- We can waive the fee. When you take something to the Board of Zoning Appeals, is there a way to waive?

00:52:36.349 --> 00:52:45.693
- I haven't participated in that forum. Is there a fee waiver in that process as well? So we're talking

00:52:45.693 --> 00:52:55.678
- Plan Commission and Board of Zoning Appeals, right? And there have been instances where we've tried to waive

00:52:56.226 --> 00:53:04.851
- fees and we have to stop it by legal. And then there are other times when we've waived fees and it was

00:53:04.851 --> 00:53:13.560
- successful. And I don't remember the exact. My recollection is that there is another part of the county

00:53:13.560 --> 00:53:22.101
- code that says you cannot waive fees. Yes. But if somebody comes in and they've applied for something

00:53:22.101 --> 00:53:25.534
- that they didn't need, you return a fee.

00:53:25.890 --> 00:53:34.794
- for them. Yes. I think the commissioners if there's they'll waive a building department fee or a planning

00:53:34.794 --> 00:53:43.194
- fee if there's a natural disaster and people need to get going to do it in those situations. And in

00:53:43.194 --> 00:53:48.318
- the case of pre-existing income farming and they come in for

00:53:51.554 --> 00:54:00.638
- something else altogether and are forced to go through the other variances that they might need to get

00:54:00.638 --> 00:54:09.457
- the property in compliance, how would that fee structure be charged to them or could we waive it as

00:54:09.457 --> 00:54:18.452
- a body or not? I don't think we can. I mean, we did include on permits the reduced fee, which I think

00:54:18.452 --> 00:54:19.422
- is at $75.

00:54:19.650 --> 00:54:31.489
- It's for reconstruction after a natural disaster. We reduced it. It's almost smacked out in the middle

00:54:31.489 --> 00:54:43.444
- of the page right under permits and ILP for $75. It wasn't $50. I think one of the most important parts

00:54:43.444 --> 00:54:47.582
- here is these are locked in for 20,

00:54:48.098 --> 00:54:55.305
- or for five years and whatever we leave as is, is locked in for five years too. So, yeah. Once we get

00:54:55.305 --> 00:55:03.006
- to other numbers, I can actually tell you more. Do you want like to see a red line in the next? I personally

00:55:03.006 --> 00:55:10.071
- would. That kind of make a little, it'd make it easier for me as far as a numbers person and seeing

00:55:10.071 --> 00:55:17.278
- what kind of differences I can do rough math, you know, a thousand dollars, maybe it's a $250, right?

00:55:17.378 --> 00:55:23.043
- What I ended up doing is we could put the old, the current B schedule in and this one. And I just did

00:55:23.043 --> 00:55:28.985
- a downline like that. And it was, that's just as easy for me. Okay. I'm more concerned about the rationale

00:55:28.985 --> 00:55:34.871
- for the increases and the logic behind it. Because that's the answer that you could, or that's a question

00:55:34.871 --> 00:55:40.702
- you're going to have to answer from the public for why am I paying more? And so I'm more concerned about

00:55:40.702 --> 00:55:45.534
- our argument on why we're increasing it in the first place in the rationale. Okay. So.

00:55:46.594 --> 00:55:55.701
- When was the last time it was increased? We did increase it December 1st, 2025. And then before then,

00:55:55.701 --> 00:56:04.897
- it wasn't since 2012. OK. So what's our next step? Well, what's the next step of this? I think we were

00:56:04.897 --> 00:56:13.022
- going to continue this to the December admin meeting, and I'll produce a red line version.

00:56:13.250 --> 00:56:20.477
- Or side-by-side. Side-by-side would be good. Could you come up with a bumper sticker to explain the

00:56:20.477 --> 00:56:27.849
- rationale and the increase? And I think one of the biggest things is we're locked into it, so we have

00:56:27.849 --> 00:56:35.221
- to think proactive of what that cost might be five years out with other inflationary costs and what's

00:56:35.221 --> 00:56:37.534
- that middle ground where we can

00:56:39.170 --> 00:56:46.855
- go ahead and charge now. So we're not, you know, under recovery. Yeah, exactly. Um, as far as a statement,

00:56:46.855 --> 00:56:54.181
- I think Mr. Paris is right. I even helped him. Um, I think that's a good way to discuss as much as it

00:56:54.181 --> 00:57:01.435
- is, uh, increasing salary of planning because the, well, I guess you just brought it up and I wasn't

00:57:01.435 --> 00:57:06.750
- going to bring it up. It'll bring it up now. I've got a five year window.

00:57:07.586 --> 00:57:15.296
- and I've got a fixed set of fees right now, why aren't I taking and putting inflation factor in there

00:57:15.296 --> 00:57:22.931
- with those five years and having an inflationary schedule built based upon a five-year program? Now,

00:57:22.931 --> 00:57:30.868
- if we're gonna live with what we did in year one and year five, and we're not concerned about inflation,

00:57:30.868 --> 00:57:34.270
- or if you said 120% on some of these things,

00:57:34.690 --> 00:57:42.095
- Maybe the 20% has covered that inflationary period over five years, so much each year. I mean, you can

00:57:42.095 --> 00:57:49.428
- go on and on and on about this, but you're bringing up a point here. I think you're right. If there's

00:57:49.428 --> 00:57:56.689
- a way for us to consider a fixed increase every five years, so there is some type of metrics to this

00:57:56.689 --> 00:58:03.806
- whole increase instead of us kind of arbitrarily going through it. I know you guys didn't do that.

00:58:04.194 --> 00:58:11.222
- me I'm just kind of going to run through and try to get a sense of what the rationale and how much time

00:58:11.222 --> 00:58:18.183
- and effort but if there is a percentage out there that seems to be safe and we can just fix that every

00:58:18.183 --> 00:58:24.941
- five years so we can stay with the increase of costs doesn't seem like a ridiculous idea to kind of

00:58:24.941 --> 00:58:32.510
- try to think out maybe for the next five years you know to that point. Commissioner Thomas has her hand raised.

00:58:33.026 --> 00:58:41.556
- Julie. Thank you so much. A couple of things. I think unless something changes in terms of the amount

00:58:41.556 --> 00:58:50.253
- of time that it takes to deal with an item on here, I think all we would have to do is every five years

00:58:50.253 --> 00:58:58.950
- add up the total percentage increase of cost of living increases or any staff changes and just add that

00:58:58.950 --> 00:59:02.462
- in after five years and that would be it.

00:59:02.722 --> 00:59:13.227
- But I do want to reiterate the importance of ensuring that the things that the average homeowner might

00:59:13.227 --> 00:59:24.345
- need or small lot owner or single family homeowner might need should be priced differently than a commercial

00:59:24.345 --> 00:59:32.606
- enterprise. A home-based business should always be cheaper than a big box store.

00:59:33.122 --> 00:59:43.075
- not just for the amount of time, but also for the fairness of it. And it seems like that's what's done

00:59:43.075 --> 00:59:52.738
- here. I have a specific question about the wireless communication new facility and the co-location.

00:59:52.738 --> 01:00:01.822
- My question is, what are we really doing with that at this point? Because I know there's a...

01:00:02.082 --> 01:00:14.855
- a speedy process and pretty much an assured permit. Given the speed that they need to occur, is this

01:00:14.855 --> 01:00:28.766
- a good permitting process, an amount to pay? Sure. Thanks. Good question. For some of these, and maybe we can

01:00:28.962 --> 01:00:36.633
- Maybe it would be a good addition to like Asterisk next to them if they need two items on this sheet.

01:00:36.633 --> 01:00:44.378
- But this one, a new facility will actually be going through first a site plan and then coming back for

01:00:44.378 --> 01:00:52.049
- a wireless new facility permit. So they will have this site plan B to go over the new compound fenced

01:00:52.049 --> 01:00:56.862
- in area, the landscaping required, the road that goes up to the

01:00:57.282 --> 01:01:06.859
- and then they will apply with this fee. But these, I do believe that the state law has been changed

01:01:06.859 --> 01:01:16.628
- in a way that says that basically you have to really closely address wireless permit fees with actual

01:01:16.628 --> 01:01:26.014
- costs of labor. You cannot just, in other words, they don't want you to just price it out because

01:01:26.626 --> 01:01:34.069
- You don't want them in our community or something like that. So it does have to be pretty closely tied

01:01:34.069 --> 01:01:41.295
- to the labor, which all of these really are. Well, that's good work. Yeah. Yeah, and I think that's

01:01:41.295 --> 01:01:48.666
- great work. But I guess my point is, because of the rush that the state's requiring, is that still an

01:01:48.666 --> 01:01:56.542
- accurate number? We can relook at that based on the latest change that just passed. That's a good point. OK.

01:01:57.090 --> 01:02:07.887
- Thank you. Any other discussion on this before we move on? I'd like a review of the action. The next

01:02:07.887 --> 01:02:18.791
- step and what's the action. I have a few. Here's some discussion points. The first one may be a shake

01:02:18.791 --> 01:02:24.670
- of the head for majority. There was a discussion about

01:02:25.090 --> 01:02:33.936
- adding a fee line for variance, residential variances for pre-existing non-conforming lots that were

01:02:33.936 --> 01:02:42.870
- made pre-existing non-conforming, having a different assessed possibly lower fee under this one. That

01:02:42.870 --> 01:02:51.629
- would be a change. And then I'm gonna do a side-by-side with the old fees just right to the side so

01:02:51.629 --> 01:02:54.782
- you can just quickly cross compare.

01:02:55.714 --> 01:03:02.734
- I'm going to come up with a statement and rationale for an increase in the second page. And some of

01:03:02.734 --> 01:03:09.825
- the things that I want to point out to the public will be that we cannot change our fee schedule for

01:03:09.825 --> 01:03:17.056
- five years based on state code. These fees are all based on a labor analysis utilizing planning salary

01:03:17.056 --> 01:03:24.638
- increases approved for the beginning of 2027. And also we'll want to continue to discuss whether we want to

01:03:26.018 --> 01:03:33.832
- in inflation now for five years from now, but typically the way we've done it is use concrete numbers

01:03:33.832 --> 01:03:41.875
- based on what's approved and in place. And then there was a request to review the wireless communication

01:03:41.875 --> 01:03:49.765
- facility items here just to make sure that like the latest changes, those fees are still accurate. And

01:03:49.765 --> 01:03:54.974
- then I'd like to, for now that you guys are bringing this up, maybe

01:03:55.074 --> 01:04:02.058
- asterisk or pull together permits that might need more than one thing on this fee schedule because if

01:04:02.058 --> 01:04:09.315
- something looks low, it's probably because they also need something else. I just want to make sure that's

01:04:09.315 --> 01:04:16.368
- clear for people. That'd be helpful. I think the inflation thing we could maybe just remove currently.

01:04:16.368 --> 01:04:23.214
- I think Commissioner Thomas had a good point that we could keep this with personnel expenses and as

01:04:23.214 --> 01:04:24.926
- cost of living comes in.

01:04:25.090 --> 01:04:38.784
- We can then adjust the numbers. I don't know. I think we should continue the discussion. OK,

01:04:38.784 --> 01:04:54.686
- that's fine. Because I think it's relevant. It's good work. Yeah. All right. Mr. President. Vice President.

01:04:54.786 --> 01:05:03.793
- That's true. I'm going to really try to stay my absolute longest, but I'm hoping to, and I don't want

01:05:03.793 --> 01:05:12.712
- to break quorum. So just, I guess, expressing desire to try to get out here at 730 if possible. If I

01:05:12.712 --> 01:05:21.720
- have to give up my personal plans, I will. I'll do it. I don't think so. We just have two items left,

01:05:21.720 --> 01:05:23.486
- one requiring that.

01:05:23.810 --> 01:05:34.347
- Okay. I showed up. I'm not going to break for me. Thank you for coming. So the next item is in the room

01:05:34.347 --> 01:05:43.870
- here and the petitions are in the room here. We have a item for one of our letters of credit.

01:05:44.002 --> 01:05:50.566
- So this is for Westbury North major subdivision. So as everyone knows, we've been working through our

01:05:50.566 --> 01:05:57.195
- liners of credit and trying to make sure that they comply with the CEO, which includes that 10% annual

01:05:57.195 --> 01:06:03.631
- adjustment of inflation, or trying to get the projects to get finished up and get accepted into the

01:06:03.631 --> 01:06:10.067
- inventory as the final step. This one is a little bit different. It was plotted and approved in the

01:06:10.067 --> 01:06:12.126
- private development, so the end

01:06:12.834 --> 01:06:21.229
- The end is just, do they meet the construction plans that they work through for? And then they put together

01:06:21.229 --> 01:06:29.002
- a business association to manage the roads, the sidewalks, the common areas, et cetera, which is in

01:06:29.002 --> 01:06:36.852
- the packet. So tonight's request is to, they would like to see their final letter of credit release,

01:06:36.852 --> 01:06:39.806
- which is in the amount of $35,826.02.

01:06:40.002 --> 01:06:49.995
- They do not have to have any kind of maintenance bond because this is going to remain private. And this

01:06:49.995 --> 01:06:59.605
- is a subversion that was plotted originally. It was built for this, but 2019 is the start date that

01:06:59.605 --> 01:07:09.502
- we have here. So we did bring that prior, but it will continue for the discussion about the as-builts.

01:07:09.666 --> 01:07:19.317
- is one issue with the subdivision, which is there's some areas of the private development sidewalks

01:07:19.317 --> 01:07:29.257
- that do not meet the cross slope ADA 2%. There is, staff estimates that the total, possibly 171 square

01:07:29.257 --> 01:07:39.390
- yards of, actually I think it's linear feet of sidewalk that does not meet the cross floods requirement.

01:07:39.682 --> 01:07:46.880
- It's a 2.2% in some areas up to seven and a half percent to the small area that I'll get your actual

01:07:46.880 --> 01:07:54.576
- in a little bit. Um, but we're bringing this to you anyways, because the, uh, essentially what we discussed

01:07:54.576 --> 01:08:02.058
- with the petitioner is that, um, it's a plan commission decision. And because this is remaining private,

01:08:02.058 --> 01:08:07.902
- the liability would be with the business association. So if someone did get hurt,

01:08:08.290 --> 01:08:15.027
- and it doesn't meet ADA, it would not be the county's liability for accepting it into the inventory,

01:08:15.027 --> 01:08:22.097
- for instance, knowing it didn't meet the ADA process. Should it be resolved? We do believe so, but that's

01:08:22.097 --> 01:08:28.967
- something that they can continue to work on. But this has been something that's been kind of lingering

01:08:28.967 --> 01:08:32.702
- as one of the last remaining things to get finished up.

01:08:33.890 --> 01:08:42.453
- So we have also worked with the petitioner on some of the common areas. They were able to successfully

01:08:42.453 --> 01:08:50.849
- design them with the right size and capacity. Stormwater has signed off. And then they just recently

01:08:50.849 --> 01:08:59.662
- fixed the paving at the entrance as of just the last morning. It looks good. There's repaving, so there's

01:08:59.662 --> 01:09:03.070
- not an issue as much at the entranceway.

01:09:03.234 --> 01:09:10.368
- There was some landscaping omissions when staff originally went out there. I think that there was a

01:09:10.368 --> 01:09:17.502
- plan or that the developer had, like, used some seed mix, native seed mix, and so that wasn't quite

01:09:17.502 --> 01:09:24.707
- grown out yet when we last did our inspection, but that's something that if that were to grow up and

01:09:24.707 --> 01:09:32.126
- mature and stay healthy, it would meet some of the requirements of the landscaping. We did repeat that.

01:09:32.642 --> 01:09:39.288
- But that was helpful. I want to move to the highway department comment on this. So when I get down to

01:09:39.288 --> 01:09:45.934
- the ad books, this will also make more sense. But Stormwater stated in February of this year that the

01:09:45.934 --> 01:09:52.710
- installed infrastructure will appear to match the approved plans. Comparing the as well to the drainage

01:09:52.710 --> 01:09:57.662
- report, the as well on capacities would capture a hundred year storm event.

01:09:58.146 --> 01:10:05.071
- a site visit on February 25th, 2026 showed the abandoned soils have been placed in the detention bases

01:10:05.071 --> 01:10:11.929
- and they had planted. No growth was observed at the time of the visit, but they did sign off on their

01:10:11.929 --> 01:10:19.191
- steps. Highway Department comments, if I can just kind of summarize these. So the intersection at Arlington

01:10:19.191 --> 01:10:26.317
- and North Canterbury, they stated there's ongoing complaints. It would be like any other private driveway

01:10:26.317 --> 01:10:27.326
- and they would

01:10:27.650 --> 01:10:33.521
- you know, contact the highway department will contact the owner and say there's been a complaint about

01:10:33.521 --> 01:10:39.221
- the status of your entryway. Can you please resolve it? Can you please fix it? And that would be on

01:10:39.221 --> 01:10:45.035
- the business association to keep up with the maintenance of that. Um, and like I said, we haven't had

01:10:45.035 --> 01:10:50.906
- any complaints, obviously in the last week, the complaints that we did know were prior to the repaying

01:10:50.906 --> 01:10:52.958
- that just occurred a few weeks ago.

01:10:53.474 --> 01:11:01.255
- Sidewalks not meeting the cross slope. We've had several conversations with planning and highway staff

01:11:01.255 --> 01:11:09.036
- there. So the Aspilton file since January 2025 show cross slope issues with the sidewalks. But highway

01:11:09.036 --> 01:11:16.666
- staff did meet with the developer, Mr. Rambo, and his engineer Kitty Stein in the field earlier this

01:11:16.666 --> 01:11:22.558
- year, discussed the exact same segments of sidewalk that require replacement.

01:11:22.914 --> 01:11:29.856
- Exact linear feet may require correction from what staff has put out there, because we're just using

01:11:29.856 --> 01:11:36.867
- the ASVILX and kind of guessing how much linear feet would be needing to be removed and replaced. But

01:11:36.867 --> 01:11:44.084
- once the engineer provides that information and could replace it, they end up being less than what we're

01:11:44.084 --> 01:11:50.270
- estimating, but we're not positive. But again, we're just noting that if this project did

01:11:50.530 --> 01:11:57.075
- If it was required to get accepted into the inventory, it would receive a negative recommendation by

01:11:57.075 --> 01:12:03.554
- the highway department and its request before the county commissioners accepting into the inventory

01:12:03.554 --> 01:12:10.164
- development that does not be ADA cross slopes is a liability to the county to not be ADA and we could

01:12:10.164 --> 01:12:16.190
- lose potential future funding. But since this development is committed to remaining private,

01:12:16.482 --> 01:12:23.012
- and it would not be a liability to the county or remain a liability to the business association.

01:12:23.012 --> 01:12:29.945
- And further, if they ever did want to make this public, it would require a new primary plan amendment,

01:12:29.945 --> 01:12:36.744
- which would come through this body, new construction plans that would have to meet the code in place

01:12:36.744 --> 01:12:43.678
- at the time to become public. So it would take some steps to become public if that were ever the case.

01:12:43.810 --> 01:12:57.748
- I want to go ahead and go down to some of the site photos. This is earlier this year. You can kind of

01:12:57.748 --> 01:13:10.046
- see the sidewalk as it goes up. Nothing extreme. It just follows the profile of the road.

01:13:10.306 --> 01:13:21.626
- ADA is strict. We acknowledge that, but it's the requirement under federal law. So here was the segments

01:13:21.626 --> 01:13:32.947
- here that were a little bit off. So this says 0.19%, but then it gets down to negative 4%, for instance.

01:13:32.947 --> 01:13:38.014
- So that would not be the cross slope this way.

01:13:38.626 --> 01:13:48.905
- And then over here, you have a 2.2%. So that's over the 2% threshold. So we estimate just like a kind

01:13:48.905 --> 01:13:59.386
- of an area by which it would have to like recover the cross-slope. So how many panels would essentially

01:13:59.386 --> 01:14:05.534
- need to be replaced? And then, sorry, this is 4.5% this way.

01:14:06.114 --> 01:14:13.990
- is the way we care is this way. And then this was seven and a half percent this way. But then this is

01:14:13.990 --> 01:14:21.712
- 25%. So we don't necessarily count this number as the issue. It's not this slope that has to be ADA

01:14:21.712 --> 01:14:29.820
- compliant. It's this slope, if that makes sense. So if it falls in profile of the road, it can be pretty

01:14:29.820 --> 01:14:35.998
- steep and still meet the requirements. So this can be the overall just segments

01:14:36.578 --> 01:14:47.175
- that within those segments, there are problems or issues. And then I would attach the preliminary plans,

01:14:47.175 --> 01:14:57.369
- which showed sidewalks and grays that would, you know, they're required to meet the ADA cross slopes

01:14:57.369 --> 01:15:00.094
- in those plans, of course.

01:15:00.290 --> 01:15:09.460
- So I did want to note, just going back to the site photos, and I might be able to do a street view,

01:15:09.460 --> 01:15:19.272
- because I didn't get a super big one. But this is the sidewalk. So this is what they're asking, basically,

01:15:19.272 --> 01:15:24.958
- for us to take in as is and to release their letter for them.

01:15:28.834 --> 01:15:36.720
- Next steps, if the plan commission did decide to release a letter of credit, this project would be finished

01:15:36.720 --> 01:15:44.240
- out. We would close out the project and release the money back to the developer. Alternatively, if the

01:15:44.240 --> 01:15:51.688
- plan commission denies this request, we continue to work with the developer on fixing the cross slope

01:15:51.688 --> 01:15:57.310
- issues and ask them to come back. We also would need to assess a performance

01:15:57.698 --> 01:16:07.317
- timeline because their last one, I think, expired last year. So they needed to tell us a new date by

01:16:07.317 --> 01:16:16.841
- which they would be completed with the project. And we would assess the 10% inflation adjustment to

01:16:16.841 --> 01:16:26.174
- that with what's left. Does anyone have any questions? Staff discussion or Commission discussion?

01:16:26.754 --> 01:16:35.415
- Just a question, have staff walk with sidewalks and what's it feel like when you're walking it? I mean,

01:16:35.415 --> 01:16:43.910
- it's a business development. The requirement of the major subdivision at the time was to do sidewalk.

01:16:43.910 --> 01:16:52.321
- I think they ended up getting a waiver to just do sidewalk on one side. I wouldn't say it's like the

01:16:52.321 --> 01:16:55.902
- most well-used sidewalk I've ever been on.

01:16:56.034 --> 01:17:04.992
- Um, I didn't, you know, have any issues with, you know, you didn't feel like you're a fall off trip.

01:17:04.992 --> 01:17:13.949
- Um, I really find it difficult when it's close to that 2% to even tell it's when you get to the 10%,

01:17:13.949 --> 01:17:23.262
- 8% that you can really, you know, you can feel it, but I wouldn't say some of these 2%, 4% we might not.

01:17:28.770 --> 01:17:37.285
- compliance. Are we setting a precedent for future petitioners? This, this had been approved. Yeah,

01:17:37.285 --> 01:17:46.144
- I got that. I'm just saying, is there, I'm playing a devil's advocate right here. Is there any concern

01:17:46.144 --> 01:17:55.176
- about precedent setting that we were to take and say, release the funds and close out the project? Could

01:17:55.176 --> 01:17:58.014
- I ask you a question about that?

01:17:58.146 --> 01:18:05.815
- Sure. So, um, well, it gets complicated because, you know, it was approved under one set of conditions

01:18:05.815 --> 01:18:13.483
- and then the conditions change. So that's then this is now. And so then compliance, are they compliant

01:18:13.483 --> 01:18:21.003
- with what they originally thought or are they compliant with what is required? When was the snapshot

01:18:21.003 --> 01:18:25.470
- taken? Was it yesterday or today? I would argue it's today.

01:18:26.722 --> 01:18:36.976
- So I'm playing the advocate here. I just want to... I've read this through this several times now and

01:18:36.976 --> 01:18:47.129
- seeing with my eyes, they condition the sidewalks and the overall condition of what they've done and

01:18:47.129 --> 01:18:55.774
- the retention basins look wonderful in my opinion. As long as this is committed to be

01:18:56.386 --> 01:19:06.578
- a private development, a private road, private sidewalks, I don't think you're setting any precedents.

01:19:06.578 --> 01:19:16.967
- If we were to accept it into the county's inventory and not request certain ADA compliance modifications

01:19:16.967 --> 01:19:24.190
- to be made, then I would say then you are setting a dangerous precedent.

01:19:26.434 --> 01:19:36.213
- So Mr. Schilling, with respect to his comments about tidy versus in the camp in compliance, an issue

01:19:36.213 --> 01:19:46.670
- or not an issue. Legally, what's the what's the take on that? I mean, I believe it's private, it's private.

01:19:46.670 --> 01:19:56.158
- And it's not going to be taken into account and so on. That was the answer to the question. Yeah.

01:19:56.322 --> 01:20:06.382
- I mean, there's two ways I look at this. They're case by case, but then it's also a level of consistency,

01:20:06.382 --> 01:20:16.157
- fairness. So it makes it really hard for me to grapple with this one. I'll also say I attended the old

01:20:16.157 --> 01:20:24.414
- Ivy Tech when I was here. So I'm very familiar with the area. And I was actually here.

01:20:24.962 --> 01:20:33.804
- So original petition that was going to meet a standards and the amendments to take off that sidewalk.

01:20:33.804 --> 01:20:42.472
- Was that when our open road was gravel? Just curious. No, but there were no sidewalks at all. But I

01:20:42.472 --> 01:20:51.834
- was kidding. I mean, I guess my my thoughts is, you know, this does serve some connectivity to one building

01:20:51.834 --> 01:20:54.174
- to the next. There's a big

01:20:54.882 --> 01:21:03.624
- rope parking, which I would, and I know I want to ask the petitioner, but I don't know if that's appropriate

01:21:03.624 --> 01:21:11.884
- since this is an admin meeting, but does planning have any idea of kind of what the occupancy of those

01:21:11.884 --> 01:21:19.102
- spaces are during your sites? I would say not typically pulled outside of certain events.

01:21:19.810 --> 01:21:27.862
- These are mostly general contractor businesses and they've been going up quick. So I think, but the

01:21:27.862 --> 01:21:35.914
- businesses are, they're coming and going by vehicle and there may be a lot of people missing. Yeah.

01:21:35.914 --> 01:21:44.288
- So I don't think the sidewalks traveled that much. So it's a tough one for me. I could almost go either

01:21:44.288 --> 01:21:48.958
- way. I guess my concern is I understand it's private, but

01:21:49.186 --> 01:21:57.677
- Also, it's meant for folks with less mobility when we look at ADA standards. And that also compels me

01:21:57.677 --> 01:22:06.084
- when we look at other things that don't go into compliance and they try to ask for it to move into a

01:22:06.084 --> 01:22:14.825
- private holding or a private situation where they will maintain it. How do we grapple with all of those?

01:22:14.825 --> 01:22:19.070
- I'm comfortable with how their planning commission

01:22:19.522 --> 01:22:27.588
- tends to lead. I might not be able to favor that, just to put my cards on the table. So if others do

01:22:27.588 --> 01:22:35.734
- favor it, that's great. So just wanted to let folks know, just in case they're wavering and they want

01:22:35.734 --> 01:22:43.879
- to see this done, there's probably going to be a no vote. And if they want to see it done, they might

01:22:43.879 --> 01:22:49.150
- want to vote yes for it. That's how close I'm cutting hairs here.

01:22:53.314 --> 01:23:08.528
- Any other comments? And you're wanting us to take action today for this? There's not a lot of traffic

01:23:08.528 --> 01:23:23.294
- there. It can be an administrative decision. I think I'm in favor of, I think I buy your argument.

01:23:23.458 --> 01:23:33.990
- about private and we're not liable. And even though I think it's a slippery slope with the compliance

01:23:33.990 --> 01:23:44.522
- portion of it and setting a precedent, and I looked at the spacing out there, it's not well-traveled.

01:23:44.522 --> 01:23:51.646
- So I think we should release. I can't breathe. So was that a motion?

01:23:55.458 --> 01:24:09.459
- Okay. I don't know what the motion is yet, but I'll try to make something up here. I move that we release,

01:24:09.459 --> 01:24:22.675
- is the amount 35,826 and a couple pennies, is that it? Yes. 35,826. So I move that we release 35,826

01:24:22.675 --> 01:24:24.638
- and two cents.

01:24:26.818 --> 01:24:34.950
- not requiring the sidewalk to meet ADA and accepting the fact that this is a essentially private property

01:24:34.950 --> 01:24:42.699
- and it would not be something the account would be liable for, I move that we take and release those

01:24:42.699 --> 01:24:50.524
- phones. Second. It wasn't particular, but it's the point. Should we make a friendly amendment that we

01:24:50.524 --> 01:24:54.974
- encourage the developer and their business association to

01:24:55.458 --> 01:25:08.424
- I personally accept that amendment. Okay. It's been moved and seconded to release the funds for SIA-22-8,

01:25:08.424 --> 01:25:19.678
- which is the Westbury North major subdivision. The amount released would be $35,826.02 with

01:25:19.938 --> 01:25:31.065
- a note to the developer that we still recommend that the ADA cross slopes be remediated for the as-built

01:25:31.065 --> 01:25:42.298
- plans. A vote yes is a vote to relieve the fires. Rudy Fields? Yes. Margaret Clements? Yes. Julie Thomas?

01:25:42.298 --> 01:25:49.822
- Yes. David Henry? Yes. Don and Wright-Randolph? Will you call me last?

01:25:50.818 --> 01:26:08.210
- David Butch? Yes. Jeff Morris? Yes. Scott Barrett? Yes. John Maregrano? With a very reluctant no.

01:26:08.210 --> 01:26:19.390
- Class 71. Where are we at on our agenda now? We have one left.

01:26:19.810 --> 01:26:27.101
- Technically going to be new business, so we will keep it brief because it will be bad. Something cool.

01:26:27.101 --> 01:26:34.320
- First of all, thank you for doing this, but next thing is I haven't missed most of it. I had a really

01:26:34.320 --> 01:26:41.965
- good speech worked out. And anyone has any doubts if I had the opportunity to speak, I could have convinced

01:26:41.965 --> 01:26:47.486
- you business exactly the right decision. I don't really need to be convinced.

01:26:47.714 --> 01:26:55.571
- We see the same things in other petitions and I want to say no to them. I can't say yes today, but that's,

01:26:55.571 --> 01:27:03.061
- I almost second his motion just so I could be very, you know, it'd be floppy. I've gotten what I came

01:27:03.061 --> 01:27:10.404
- for, thank you. I appreciate the development you're doing. You're putting people to work and giving

01:27:10.404 --> 01:27:14.590
- them a place to work and can I say something about that?

01:27:15.266 --> 01:27:21.129
- I don't mean to, and we've been here too long already, but when we bought that property, it was probably

01:27:21.129 --> 01:27:26.824
- the only truly blighted property in Monroe County. The building's been vacant for 10 years. They were

01:27:26.824 --> 01:27:32.687
- growing up, no maintenance, no utilities, nothing. And we cleaned that all up and restored the buildings

01:27:32.687 --> 01:27:38.494
- and then built these additional buildings. And I'm real proud of what we did there. Now it's a thriving

01:27:38.494 --> 01:27:41.118
- place of commerce. It employs a lot of people.

01:27:41.442 --> 01:27:57.032
- And it's a place for small business to operate, which is extremely hard to find. Thank you. Thank you.

01:27:57.032 --> 01:28:08.990
- So the last petition won't take but a moment. That's all in field space three.

01:28:09.538 --> 01:28:16.971
- We did phase one and two a couple of months ago. And actually, Esther, I have a few papers for you to

01:28:16.971 --> 01:28:24.258
- sign. They're on track for what they're supposed to be doing. But this one, they are just doing the

01:28:24.258 --> 01:28:31.764
- performance period extensions for one year. So that would make it to December 12, 2027. And then we're

01:28:31.764 --> 01:28:36.574
- also doing the inflation adjustment for the performance guarantee

01:28:36.866 --> 01:28:46.472
- So basically they currently have a letter of credit of $58,890.05. We are adding the inflation of $5,889.21.

01:28:46.472 --> 01:28:55.638
- So we will be asking for them to have a letter of credit of $64,780.46. And I did speak with Don Turner

01:28:55.638 --> 01:29:04.716
- and his attorney today while we were in email communication. And they do plan to submit this increased

01:29:04.716 --> 01:29:06.302
- letter of credit.

01:29:06.466 --> 01:29:15.485
- and be compliant and agree with this amount. So we will be presenting that at the September 17th meeting.

01:29:15.485 --> 01:29:24.248
- One way to go on that. You give them to be in the meeting. Well, we want them to finish. This is their

01:29:24.248 --> 01:29:32.926
- last. I'm trying to take it back to September. Now the side note, if they cannot meet their deadline,

01:29:33.602 --> 01:29:41.011
- We will be also asking, as we did for phase one and two, that we turn it over to legal faculty. I think

01:29:41.011 --> 01:29:48.491
- we have done well. Thanks. Any other questions from the good of the cause? I just want to make one quick

01:29:48.491 --> 01:29:55.829
- announcement. So I just want to say thank you to everyone here for your support for the county council

01:29:55.829 --> 01:30:02.526
- changes that we've had. Really appreciate your help with pushing us through that. And we did.

01:30:02.946 --> 01:30:09.971
- We have an internal selection for the senior zoning inspector. So our current zoning inspector has been

01:30:09.971 --> 01:30:16.725
- selected for the senior position and we are able to open up the zoning inspector position. So we'll

01:30:16.725 --> 01:30:23.885
- get that position out there and hopefully hire as soon as possible. We can start them as soon as December

01:30:23.885 --> 01:30:30.978
- 14th. Are you going to tell us who the senior, does it start with a DM? It's Rachel. It's Rachel. Rachel

01:30:30.978 --> 01:30:32.126
- Henry. Yes, yes.

01:30:32.450 --> 01:30:42.033
- this. Okay. Oh, inspector. Yeah. Yeah. It's still right. Okay. So we were excited and they hit the ground

01:30:42.033 --> 01:30:51.616
- running and appreciate your support. And you already got the variance too of the hiring freeze. We talked

01:30:51.616 --> 01:31:01.470
- to Kim about that. We're all good on that. Yeah, because they changed something about if you move someone up

01:31:01.634 --> 01:31:10.063
- that opens and then you don't really need a variance. Okay. Motion to adjourn. So moved. Thank you.

01:31:10.063 --> 01:31:12.254
- Thank you all. Thank you.