- I'd like to call to order the November 18th meeting of the Monroe County Redevelopment Commission. Jeff,

00:00:07.849 --> 00:00:15.248
- please call the roll. Commissioner Martin? Yes. Commissioner Cassidy? Yes. President? Yeah. Commissioner

00:00:15.248 --> 00:00:22.718
- Kiesling? Yes. Commissioner McCarty? Present. Commissioner Tucker? Present. We have established a quorum.

00:00:30.978 --> 00:00:40.666
- first item on our agenda. Is this. Work I've been trying to do on the residential too. I want to acknowledge

00:00:40.666 --> 00:00:49.820
- that Jackie John is here today. She's been helping. Work on this. She and I and Randy met. We can week

00:00:49.820 --> 00:00:58.974
- we can go a little over a week ago. And we outlined some areas for possible consideration and I've got

00:00:59.202 --> 00:01:06.593
- that in your packet today. I've started to kind of build this little portfolio of things we're looking

00:01:06.593 --> 00:01:13.913
- at or trying to do. And I sent that out. So there's a part one that kind of is the musing that I came

00:01:13.913 --> 00:01:21.304
- to is to what we're trying to accomplish in the kind of the overall search criteria that we that I had

00:01:21.304 --> 00:01:26.686
- developed, along with some narrative about a concern having to do with the

00:01:31.074 --> 00:01:43.686
- sure that whatever decisions we make don't end up being. Kind of a windfall for people so that we actually

00:01:43.686 --> 00:01:55.590
- can accomplish this notion of affordable housing going forward. So then. As I said, Randy and. Becky

00:01:55.590 --> 00:02:00.894
- and I met and we outlined several very large

00:02:01.634 --> 00:02:11.781
- possible to fair use. The reason they are large and because to get anything from a death. You have to

00:02:11.781 --> 00:02:22.127
- do it based upon the value of the property that increases over the base year which is the year in which

00:02:22.127 --> 00:02:29.886
- you would establish the tip. So we need to have a larger area because the the

00:02:30.178 --> 00:02:38.634
- assessed value of residential property, generally goes up fairly slowly. And when it is taxed, the amount

00:02:38.634 --> 00:02:46.851
- of tax you get is fairly small. So you need a lot of little pieces to get any good sized chunk. So the

00:02:46.851 --> 00:02:55.068
- areas that we've looked at are fairly large areas and they're conceptual, just rough edges. We may end

00:02:55.068 --> 00:03:00.094
- up taking something which is a smaller piece of one of them or

00:03:01.026 --> 00:03:10.537
- pieces together we don't we just don't know at this point. But I wanted to go through these areas that

00:03:10.537 --> 00:03:19.956
- we've identified to see if any of them just don't make sense at all or if there are some of them make

00:03:19.956 --> 00:03:30.206
- a lot more sense than others in terms of what we do next. I have received from Jackie the property information

00:03:30.850 --> 00:03:38.337
- for those properties in the Van Buren Airport and the Van Buren South areas. I haven't done the others

00:03:38.337 --> 00:03:45.751
- yet, and I've started to look at those and I'll give you a little bit of information about those that

00:03:45.751 --> 00:03:53.092
- I've gotten so far. OK, any questions before I start? Looking at these. Richard, just to clarify, as

00:03:53.092 --> 00:03:58.398
- we started looking at those, we looked at areas that had the possibility

00:03:59.266 --> 00:04:06.485
- utilities and services that could be extended from existing facilities so that we weren't just starting

00:04:06.485 --> 00:04:13.426
- from scratch with anything that was a major capital expense. And areas that had a reasonable amount

00:04:13.426 --> 00:04:20.368
- of housing housing that would be able to begin with. So we're not just trying to take some place in

00:04:20.368 --> 00:04:27.934
- the wilderness and put housing in it. So let's go through these. The first one we looked at is that has been

00:04:28.386 --> 00:04:37.303
- talked about under several occasions, is the area west of Bloomington, south of 48, and north of 45,

00:04:37.303 --> 00:04:46.573
- bounded on the west side by Garrison Chapel Road. Fairly large area. It's where the airport is situated.

00:04:46.573 --> 00:04:55.579
- It's where the fairgrounds are situated. It's where Cars Farm Park is situated. So a lot of that area

00:04:55.579 --> 00:04:56.638
- is actually

00:04:57.090 --> 00:05:06.382
- uh... municipal or government owned and therefore doesn't get taxed there is a bit of of uh... industrial

00:05:06.382 --> 00:05:15.762
- development uh... in the area not not a great deal uh... there and there are existing housing developments

00:05:15.762 --> 00:05:23.739
- in the area uh... the uh... area on the south along forty uh... five there are a couple of

00:05:23.739 --> 00:05:27.070
- housing subdivisions which have sewer

00:05:27.394 --> 00:05:36.569
- systems in them now that are connected actually into the city sewer system. And there are areas on the

00:05:36.569 --> 00:05:45.834
- east side of it that are essentially next to sewer if we could get it extended from the city that could

00:05:45.834 --> 00:05:54.920
- be serviced in that area. Other than that, there would have to be some kind of to support any kind of

00:05:54.920 --> 00:05:56.702
- reasonable housing.

00:05:56.930 --> 00:06:06.315
- And there are a few very large open areas still within that. And there are some areas that could be

00:06:06.315 --> 00:06:15.982
- where there is an existing structure where we might be able to upgrade that into more housing as such.

00:06:15.982 --> 00:06:26.494
- If I look at the property records, there are 1,660 properties in this area, and they're assessed value in 2026.

00:06:26.626 --> 00:06:37.603
- is roughly $427 million. There are some exceptions to that that get pulled out. So this is just a rough

00:06:37.603 --> 00:06:48.474
- first guess as to what the total value is. Now as a comparison, if you look at the Westside TIF, there

00:06:48.474 --> 00:06:53.118
- are only 134 properties in the Westside TIF

00:06:53.666 --> 00:07:00.547
- And it's assessed valuation is like 300 million. So the per property value is much lower in this area

00:07:00.547 --> 00:07:07.766
- than in a normal and are designated commercial tips. Just to clarify, make sure that that those properties

00:07:07.766 --> 00:07:14.849
- that we did in the West Side tip primarily the majority of the dollars comes from commercial industrial.

00:07:14.849 --> 00:07:22.270
- Yes, it is in that particular which as we discussed the residential tips. None of that would fall under that.

00:07:22.722 --> 00:07:30.390
- Well, it would we could capture whatever commercial. Be able to value is there put into a potential

00:07:30.390 --> 00:07:38.365
- residential TIF based on what the zoning would ensure that that's. I don't know if you know if you send

00:07:38.365 --> 00:07:46.110
- the Barnes and Thornburg thing to everybody. I think I sent it to it. Yes. There is so he sent us a.

00:07:46.946 --> 00:07:54.639
- the Barnes and Thordberg guide to... Oh, the redevelopment guide. Yeah, half and removed. Yeah. And

00:07:54.639 --> 00:08:02.563
- I'm sure you've all thoroughly read that. Oh, absolutely. We've tabbed a couple sections. Well, if you

00:08:02.563 --> 00:08:10.410
- want a paper copy, let me know, because I am going to their continuing education event on Friday. And

00:08:10.410 --> 00:08:14.718
- typically, you can grab one or two. Oh, wow. Fantastic.

00:08:15.682 --> 00:08:26.191
- I have a question you can ask them. All right, so that's area number one. Area number two is due south

00:08:26.191 --> 00:08:36.802
- of that. So if you look at the Van Buren South map, the map that we have shows the area one above State

00:08:36.802 --> 00:08:44.862
- Road 45 and area 2 to the south of that. So it's bounded again on the West by.

00:08:45.538 --> 00:08:54.353
- which is now, if you look at Garrison Chapel coming down and becomes South Harmony Road, all the way

00:08:54.353 --> 00:09:03.081
- down to May Road, then back up along South Leonard Springs, back up to the Walmart site and over to

00:09:03.081 --> 00:09:12.158
- there. Again, we've got some housing in there already in subdivisions. Actually, there is a piece of it

00:09:12.674 --> 00:09:23.513
- along Leonard Springs, which is actually incorporated into the city of Bloomington. You can see the

00:09:23.513 --> 00:09:34.677
- little black and blue dashed area there. In this area, there is a subdivision which has had houses put

00:09:34.677 --> 00:09:40.638
- in by Habitat. There is no existing sewer service here

00:09:41.026 --> 00:09:48.617
- except for the area which might be connected to this issue. Everything else would be new development.

00:09:48.617 --> 00:09:56.208
- Again there are some large tracks that are available here. There are some constraints as there are in

00:09:56.208 --> 00:10:03.948
- the one to the north. They would have to be dealt with but there are reasonable areas there which could

00:10:03.948 --> 00:10:08.190
- be service. The number of properties included is smaller

00:10:08.418 --> 00:10:16.603
- because the average lot size is larger. So there are only about 900 properties in this designation,

00:10:16.603 --> 00:10:25.197
- and their assessed value was around $230 million in 2026. So it's a little bit different characteristics

00:10:25.197 --> 00:10:33.546
- here. Less value, fewer properties, but larger properties. I think the total square miles is probably

00:10:33.546 --> 00:10:36.574
- about the same. Okay, let's move on.

00:10:38.434 --> 00:10:46.276
- So those are the two that are west of Bloomington. All of those from a utility standpoint would be either

00:10:46.276 --> 00:10:54.044
- being served by Van Buren Water and then the extension of any sewer would have to be an agreement worked

00:10:54.044 --> 00:11:01.517
- out at some point with the City of Bloomington or some new utility put in out there. Okay. Our third

00:11:01.517 --> 00:11:04.254
- area is the Smithville Sanders area.

00:11:04.674 --> 00:11:13.572
- We essentially started the Smithville Sanders area by taking the Smithville Sanders rural community

00:11:13.572 --> 00:11:23.093
- plan, which was done many years ago by the plan commission. It's kind of sat dormant, but it does identify

00:11:23.093 --> 00:11:31.902
- a rural community area. So we started with that. Then we extended it over to 37 and farther south.

00:11:32.034 --> 00:11:43.155
- and the southern border is Zeichs Road on the west end of it, and then a line which is drawn from Scott

00:11:43.155 --> 00:11:53.313
- Road east-west or to the west from the Scott Road intersection at Fairfax. Fairfax Road up to,

00:11:53.313 --> 00:12:00.798
- what is that? That's Scott Lane, I guess it is, or? I don't remember.

00:12:02.370 --> 00:12:11.475
- to Norton Street. Norton Street is actually a dirt path that goes to the west, but it's a it's a boundary.

00:12:11.475 --> 00:12:20.239
- Then it's essentially the North line of the Sanders community. And so this is an area also where there

00:12:20.239 --> 00:12:28.833
- is. Some commercial development. There is some clusters of residential development in this area, and

00:12:28.833 --> 00:12:29.854
- if you look

00:12:30.466 --> 00:12:39.808
- The second map that's here shows more detail about the southern edge of it, the Zeichs Road and the

00:12:39.808 --> 00:12:49.617
- Scott Road area on the south. You'll see then that there's a pretty significant development to the south

00:12:49.617 --> 00:12:58.398
- of that. We'll talk about that when we get to item number four. Let's go to item number four.

00:13:01.186 --> 00:13:10.997
- So the other one, item number four, is essentially the Harrodsburg Rural Community Plan, and it is bounded

00:13:10.997 --> 00:13:20.165
- by State Road 37. The north and west are the Harrodsburg Rural Community Plan areas, and then south

00:13:20.165 --> 00:13:29.334
- are the Rural Community Plan areas, and then the boundary on the north is just a section line which

00:13:29.334 --> 00:13:30.526
- extends from

00:13:30.850 --> 00:13:41.352
- kind of the intersection on 37 to the West to match up with the. There have been several proposals for

00:13:41.352 --> 00:13:51.651
- development in that area of residential housing. They seem to come and then they go away and nothing

00:13:51.651 --> 00:13:58.686
- happens. And we have admitted is a viable community. It has its own.

00:13:59.362 --> 00:14:11.022
- Festival every year and you know, it's it's there it does have sanitary sewer because it connects with

00:14:11.022 --> 00:14:21.664
- the Caslon plant, which also services the point. So there are sewer services available there.

00:14:21.664 --> 00:14:29.022
- Number five. Is what we're going to call the strain Ridge. Area.

00:14:29.474 --> 00:14:41.747
- It is bounded on the West by 37 bounded on the South by Monroe dam road and then it follows strain ridge

00:14:41.747 --> 00:14:53.552
- to going North. It it brings in the Freeman Fields subdivision which is now developing finally. As a

00:14:53.552 --> 00:14:58.110
- as a area and then essentially follows

00:14:58.274 --> 00:15:10.800
- Strain Ridge back up to the bottom of the area 3. So it does include all of those subdivisions which

00:15:10.800 --> 00:15:23.450
- are on sewer to on its northwestern corner. Those are the ones that are detailed in the second figure

00:15:23.450 --> 00:15:26.302
- on. I. Look at item 3.

00:15:27.074 --> 00:15:39.180
- The second figure shows the subdivisions that are along Strainridge Road, and that's the northern boundary

00:15:39.180 --> 00:15:50.494
- of number five. Number six, we're going to call the Clear Creek Township, and it is essentially old

00:15:50.494 --> 00:15:56.830
- 37 from the intersection of old 37 and 37 on the north.

00:15:57.282 --> 00:16:05.915
- going all the way down south to the Harrisburg. Rural community plan and then an area which is roughly

00:16:05.915 --> 00:16:14.297
- equal to the distance from old 37 to 37 just kind of mirrored on the other side taking up some farm

00:16:14.297 --> 00:16:22.678
- ground is over there, but some there are some there is some residential development in that area as

00:16:22.678 --> 00:16:26.366
- you would expect. Defined along any. Of our

00:16:27.234 --> 00:16:35.538
- Roadways that have been in existence for a long time since it was the main North-South thoroughfare

00:16:35.538 --> 00:16:43.925
- for that part of the county country our county for many many years And then the last one Is a little

00:16:43.925 --> 00:16:52.561
- closer to Bloomington again, it's essentially the area which is the old We're gonna call historic Clear

00:16:52.561 --> 00:16:55.966
- Creek, which is south of Church Lane and

00:16:56.162 --> 00:17:05.491
- bounded by 37 on the west. And then by, I think that's going to be Fairfax Road on the east and Dillman

00:17:05.491 --> 00:17:14.731
- Road on the south. And as you can see from the figure here, there's a big watershed area in that area.

00:17:14.731 --> 00:17:23.702
- There are some large parcels that are available. And there's quite a bit of existing subdivision in

00:17:23.702 --> 00:17:25.406
- this area as well.

00:17:26.146 --> 00:17:33.499
- Some of you may recall that there there have been plans to Or desire to get city sewer into this area

00:17:33.499 --> 00:17:40.708
- because it would be fairly easy to sewer it given the proximity to the Dillman Road treatment plant

00:17:40.708 --> 00:17:47.989
- But again here we'd have to be depending upon some cooperation from the city to do that So those are

00:17:47.989 --> 00:17:54.910
- the ones that we we thought made the most sense at the present time in terms of looking at what

00:17:55.138 --> 00:18:04.139
- there might be possible. Any. Or opinions about these at this point or shall I? Go on and talk about

00:18:04.139 --> 00:18:13.050
- what other things we gotta think about. I guess I got a question on number three. Does that include

00:18:13.050 --> 00:18:22.319
- the Smithville Diamond? Smithville. That's what Community Center. Yeah, OK, yeah, because that's within

00:18:22.319 --> 00:18:24.190
- the world community.

00:18:26.818 --> 00:18:35.308
- I mean, we've got proximity to utilize utilities, but it's a significant cost accordingly to get there.

00:18:35.308 --> 00:18:43.552
- But it's downhill to Caslon, essentially. It could be, but it's a matter of what the overall cost is

00:18:43.552 --> 00:18:51.879
- going to be. I would just say that probably a year or two ago, the water utility in the area did some

00:18:51.879 --> 00:18:54.654
- kind of expansion there, and they

00:18:55.074 --> 00:19:01.103
- I think it's Southern Monroe. Yes, and so. We hopefully we will plan and the hope was that it would

00:19:01.103 --> 00:19:07.374
- deal with getting more water in the area. So fire protection and those would would be so there is water

00:19:07.374 --> 00:19:13.645
- infrastructure right there. Yeah, they just finished the booster pump and then because they were having

00:19:13.645 --> 00:19:19.795
- an issue with the tower feeling and it was. One of the things that held up the Freeman Fields project

00:19:19.795 --> 00:19:23.774
- was they couldn't get certifications that they get water service.

00:19:24.194 --> 00:19:31.310
- But that has occurred. There are now two homes there connected into the sewer system. And so they're

00:19:31.310 --> 00:19:38.426
- actually using water. And there are two more under construction there. And I think the original plan

00:19:38.426 --> 00:19:45.330
- was maybe like 50-some homes. And I think the current plan is somewhere around 40 in terms of it.

00:19:45.330 --> 00:19:52.798
- I mean, yeah, it's not large. Yeah, it's not really large. And they're going to be large expensive homes.

00:19:52.898 --> 00:20:01.759
- not what you'd call affordable. Had we been able to capture that revenue, had this in place, it would

00:20:01.759 --> 00:20:10.446
- be substantial from a residential would still cap out. But yeah, so those are the places we thought

00:20:10.446 --> 00:20:19.220
- about. Now, since then, as I said, Jackie has provided me with information from the property records

00:20:19.220 --> 00:20:22.782
- for those areas. What I find interesting

00:20:23.586 --> 00:20:33.610
- in the property records is that there's the. I will have to understand a great deal more about which

00:20:33.610 --> 00:20:43.732
- properties are actually included. In a tough capture. There are in the designation of properties. For

00:20:43.732 --> 00:20:50.878
- each of these there are probably 20 different property classifications.

00:20:51.618 --> 00:21:00.143
- And I can sort them. I can do things. But I don't know which ones are going to be valuable for what.

00:21:00.143 --> 00:21:09.258
- Some of them have exemptions on them for one reason or another that get taken out. So it's not the assessed

00:21:09.258 --> 00:21:18.121
- value. It's assessed value minus this minus this before you get to a captured value. And then they would

00:21:18.121 --> 00:21:20.062
- be applying a tax rate

00:21:20.770 --> 00:21:30.749
- based upon a different set of calculations that would tell us then how much we can actually capture

00:21:30.749 --> 00:21:41.027
- from one of these districts over a period of time. I also did get from the county, the TIF records for

00:21:41.027 --> 00:21:49.310
- our existing TIFs. So I can tell you that on the west side TIF where we've got the

00:21:49.634 --> 00:21:57.941
- 134 properties. It's got a gross AV of 147 million of which we capture 189 million as tiff-capturable

00:21:57.941 --> 00:22:06.493
- and that the tiff net taxes were three million two hundred and fifty eight thousand three hundred eighty

00:22:06.493 --> 00:22:14.800
- four dollars and seventy three cents. I just want to clarify that. Did you say 147 million we capture

00:22:14.800 --> 00:22:18.302
- 189 million or is it the other way around?

00:22:18.562 --> 00:22:34.860
- $246,799,500 is the gross AV. We capture of that AV, we only get $189,693. So all that other stuff gets

00:22:34.860 --> 00:22:47.710
- pulled out before we get into it. Based upon what reductions are in the tax base.

00:22:48.098 --> 00:22:54.944
- I think I think that TIF districts includes residential, which when that was created, we did not. We

00:22:54.944 --> 00:23:01.992
- did not capture the residential there. It probably does not include. Well, I guess I guess it shouldn't

00:23:01.992 --> 00:23:09.380
- include because the GE plant was the one that gave personal property and so it's no longer in that district,

00:23:09.380 --> 00:23:16.226
- so. So but I I think what I would do. My next thing is I'm going to start talking with Charlie up at

00:23:16.226 --> 00:23:17.310
- FSG and say OK,

00:23:17.762 --> 00:23:25.569
- where we're at, how do I figure out what realistically could happen here? And I don't want to try and

00:23:25.569 --> 00:23:33.453
- tackle all these areas at once. I want to figure out one that we'll work with, figure out what process

00:23:33.453 --> 00:23:41.414
- we have to go through to just figure out what might be possible. The next step is what would we do with

00:23:41.414 --> 00:23:43.710
- the money if we could get it?

00:23:45.058 --> 00:23:54.147
- The residential TIF allows us to do a number of things having to do with residential housing, including

00:23:54.147 --> 00:24:03.412
- the purchase of land that could be then turned into residential housing, the provision of infrastructure,

00:24:03.412 --> 00:24:12.239
- roads, sewers, water, whatever is necessary in those areas to provide residential housing. There are

00:24:12.239 --> 00:24:14.686
- some, at least an illusion,

00:24:15.458 --> 00:24:22.861
- to some kind of leasing arrangements that might be available for things. So sometimes you can use those

00:24:22.861 --> 00:24:30.050
- arrangements to spread out costs over a longer period of time, which if you have low enough interest

00:24:30.050 --> 00:24:37.382
- rates or lease rates, you can make things more affordable for people. So there are some, a lot of that

00:24:37.382 --> 00:24:43.646
- we'd have to look into as well. But this would at least give us a way to approach this.

00:24:44.322 --> 00:24:51.770
- in my opinion fundamentally different than the kind of tips that we've done in the past where we had

00:24:51.770 --> 00:24:59.292
- a specific area. We knew we wanted commercial development there. We knew what that was going to take.

00:24:59.292 --> 00:25:06.961
- We knew that once we got it, we'd get escalating values at a particular rate. You don't know that here.

00:25:06.961 --> 00:25:11.902
- You would have to essentially learn all of that. From what I hear,

00:25:12.322 --> 00:25:19.574
- residential tips have not been particularly successful people are using them there was a lot of change

00:25:19.574 --> 00:25:26.755
- in the laws early on because the people just couldn't do it it's not clear to me that it's gonna find

00:25:26.755 --> 00:25:33.866
- is it is feasible to actually use it to create affordable housing I think one of the things we would

00:25:33.866 --> 00:25:37.246
- want to do would be to have a conversation with

00:25:37.410 --> 00:25:43.743
- folks' life habitat for humanity about the kind of arrangements they make that allow them to reduce

00:25:43.743 --> 00:25:50.140
- the cost of housing for people. They get a lot of gratis labor, which helps, I'm sure, but they have

00:25:50.140 --> 00:25:56.600
- some of the same issues with they got to own the property in the first place, they got to provide all

00:25:56.600 --> 00:26:02.110
- the utilities in the first place. A lot of that we would have to work through as well.

00:26:04.386 --> 00:26:09.628
- your point exactly Richard when you're talking about the residential TIF it's a matter of what's the

00:26:09.628 --> 00:26:14.870
- public infrastructures that need to be put in and the expenses accordingly well a lot of these areas

00:26:14.870 --> 00:26:20.268
- are large areas what we know that there's still two unresolved issues we have to deal with was you know

00:26:20.268 --> 00:26:25.822
- the final basis on annexation and then we have to do with the sewer situation in order to have the density

00:26:26.882 --> 00:26:34.255
- will generate enough revenue and then not have to build so many roads or the improvements of roads in

00:26:34.255 --> 00:26:41.627
- order to serve these areas. So when we try to look at these, which ones will provide the most density

00:26:41.627 --> 00:26:48.855
- or be able to serve an existing residential area that may not have the infrastructure that needs to

00:26:48.855 --> 00:26:56.734
- put in that would then increase the AV at the quickest amount or be able to provide employment opportunities

00:26:56.930 --> 00:27:05.400
- and the living density that we say we kind of need because as we spread out the cost of the infrastructure

00:27:05.400 --> 00:27:13.394
- just increases so substantially and with the residential TIF correct me Jeff our capture is based on

00:27:13.394 --> 00:27:21.310
- what we can go some multifamily only to a certain amount. And then the individual homes would still

00:27:21.310 --> 00:27:25.822
- have a cap on them from the state. But I looked at that.

00:27:26.562 --> 00:27:39.020
- document. It looked like residential housing is up to four families per unit. Commercial is beyond that,

00:27:39.020 --> 00:27:51.121
- but it does say that we can capture commercial value. I think we alluded to the fact, and I think you

00:27:51.121 --> 00:27:54.206
- said it out loud, is that

00:27:54.306 --> 00:28:00.144
- when they first started making all these changes to include residential TIFs, they just weren't getting

00:28:00.144 --> 00:28:05.813
- any traction, right? And the reason I think they weren't getting any traction is because the funding

00:28:05.813 --> 00:28:11.707
- doesn't come in as you need it to in order to substantiate bonding and all those kinds of things, right?

00:28:11.707 --> 00:28:17.489
- So, you know, you do a hundred home or a hundred unit housing development, and you're probably looking

00:28:17.489 --> 00:28:23.102
- at, you know, maybe we would get 10% done a year, whereas if you put, we're gonna put a factory in,

00:28:23.202 --> 00:28:30.447
- that thing gets built in a year and it's going, right? So I think they included what you can capture

00:28:30.447 --> 00:28:38.195
- in there, including multifamily. I went back and forth with some of the people, some of the other attorneys

00:28:38.195 --> 00:28:45.655
- who do the redevelopment work as to what is a residential building. Because if you look at the building

00:28:45.655 --> 00:28:52.542
- code, commercial is over four units. But if people are sleeping there, it's residential, right?

00:28:52.642 --> 00:28:58.369
- I think we had a different definition and then what bond councils had and so, but I think now that's

00:28:58.369 --> 00:29:04.322
- kind of merged and that, you know, anywhere that people are sleep is now residential and you can include

00:29:04.322 --> 00:29:09.709
- some other commercial in that as well. I think when you're talking about a limit to the number

00:29:09.709 --> 00:29:15.492
- of commercials, I'm not sure we're talking about commercial property where people are sleeping. We're

00:29:15.492 --> 00:29:16.286
- talking about

00:29:16.802 --> 00:29:23.673
- commercial property where people are working. Within a residential TIF, so the increased AV would increase

00:29:23.673 --> 00:29:30.352
- quicker and give us the revenue to potentially bond. If you had an apartment complex built in two years

00:29:30.352 --> 00:29:36.774
- and you're collecting that in two years and you probably has the assessed value equivalent of maybe

00:29:36.774 --> 00:29:43.838
- the rest of the TIF, right? Once it gets built out, I mean, I think. Things like, for example, nursing homes.

00:29:45.218 --> 00:29:53.357
- They get developed. They're more like a commercial enterprise. It's all there. And it comes online all

00:29:53.357 --> 00:30:01.258
- at once. Often, however, we have to worry about when we get, especially in some of the stuff that's

00:30:01.258 --> 00:30:09.476
- happened in our business, personal areas, is that we get an abatement, which impacts the red generation

00:30:09.476 --> 00:30:13.822
- of revenue. So you don't get what you expected to get.

00:30:14.562 --> 00:30:22.088
- And it could be if you're in areas where you've got one commercial development and you can't really

00:30:22.088 --> 00:30:29.840
- depend upon it supporting all this other residential development. See, it's a different kind of animal

00:30:29.840 --> 00:30:37.367
- that we have to try and understand. Just to verify, the residential TIF we're looking at, this is a

00:30:37.367 --> 00:30:42.334
- 25-year time period? They are limited to 25 years in terms of the

00:30:43.234 --> 00:30:53.637
- The residential TIF, at least the way that manual says, is limited to 25 years, starting when it takes

00:30:53.637 --> 00:31:03.839
- debt. So we could have a residential TIF, which we anticipate is gonna be 30 years, but doesn't take

00:31:03.839 --> 00:31:12.222
- any debt for the first five years. And we might be able to do something like that.

00:31:12.386 --> 00:31:20.052
- we would try and look at would be some way to capture a sufficient amount of funding in the early years

00:31:20.052 --> 00:31:27.718
- without debt that would allow us to generate enough capital to do a project which would then facilitate

00:31:27.718 --> 00:31:35.237
- more online housing which could help then to fund the entire debt package. If we've got other revenue

00:31:35.237 --> 00:31:41.502
- sources within existing TIF or if we utilized one of the TIFs, my understanding from

00:31:41.762 --> 00:31:48.846
- the city's RDC is you can actually borrow from that to start a project and then pay back. I think once

00:31:48.846 --> 00:31:55.723
- we get I think once we take once the TIF takes on a note obligation that's when the clock kicks in.

00:31:55.723 --> 00:32:02.945
- I'm sure that's the case I guess in the back of my mind I thought it was 20 but I mean I have not looked

00:32:02.945 --> 00:32:09.822
- at that in a while and I'll ask about that but it used to be five years less than a commercial TIF.

00:32:12.578 --> 00:32:22.837
- I think you're right, Jeff. Could be. But whatever it is, we would be a judge. Now, there is some language

00:32:22.837 --> 00:32:32.424
- that I found a little bit concerning. And that was language that talks about capturing the assessed

00:32:32.424 --> 00:32:40.574
- value of new residential. And yet, they also talk about commercial and other things.

00:32:40.738 --> 00:32:50.657
- Exactly what do they mean by new residential? Do they mean new residential occupancy? Or do they mean

00:32:50.657 --> 00:33:00.382
- new residential structures? Or do they mean new residential value which could occur without any new

00:33:00.382 --> 00:33:07.870
- residential structure? Exactly what that language means is really important.

00:33:08.226 --> 00:33:15.605
- And I think what it means, and again, we could talk with the auditors because they do a neutralization

00:33:15.605 --> 00:33:22.842
- of all our TIF districts. So what I think it means is the increase in value due to it being within a

00:33:22.842 --> 00:33:30.364
- TIF, right? So you build a road and the neighbors, 20 feet down, that's not part of the new development,

00:33:30.364 --> 00:33:34.878
- but their home is increased in value because this road exists.

00:33:35.010 --> 00:33:41.792
- or because now it's on sewer or those kind of things. So the infrastructure can increase the assessed

00:33:41.792 --> 00:33:48.573
- value of current structures. With commercial, we typically think it's a new building, right? But that

00:33:48.573 --> 00:33:55.421
- could be part of the increased and assessed value. Because you can do property improvement and putting

00:33:55.421 --> 00:34:02.336
- a road, paving the road that's now a dirt road is a property improvement that does occur. Any addition,

00:34:02.336 --> 00:34:03.998
- any things of the nature

00:34:04.322 --> 00:34:10.921
- infrastructure improvements are natural natural increase of property values anyway you can think of

00:34:10.921 --> 00:34:17.520
- areas in that in that certainly in the Smithville Sanders or the Harrodsburg where a single home is

00:34:17.520 --> 00:34:24.515
- now on a fairly large lot now they get access they could be splitting that lot into a couple of different

00:34:24.515 --> 00:34:31.180
- lots and put a new home on one of them and I'm I'm not heard and I don't want to make any statements

00:34:31.180 --> 00:34:33.886
- about whether that kind of zoning change

00:34:35.874 --> 00:34:42.220
- how that affects if it's in a TIF district or not, I just don't know. I mean, my assumption is that

00:34:42.220 --> 00:34:48.694
- it's in a TIF district and then the zoning changes and it increases value, then the TIF would be able

00:34:48.694 --> 00:34:55.167
- to capture that. That would be my assumption, but I've not thought about that issue. Well, one of the

00:34:55.167 --> 00:35:02.021
- things in the criteria here was that these areas had to have existing zoning that would support residential

00:35:02.021 --> 00:35:02.846
- development.

00:35:04.514 --> 00:35:13.689
- The two areas west of Bloomington don't have a great deal, but they do have some. The Clear Creek one

00:35:13.689 --> 00:35:22.684
- does have some, but not a great deal. The area that the two community plans, Smithville Sanders and

00:35:22.684 --> 00:35:32.129
- Harrisburg, have zoning that would allow more dense development than they have currently. It just hasn't

00:35:32.129 --> 00:35:33.118
- been used.

00:35:33.698 --> 00:35:41.994
- The Smithville Sanders or the the Strain Ridge Road area has some zoning that would allow more density,

00:35:41.994 --> 00:35:50.370
- but it also has a lot of open farmland. The other thing that you'll notice on those areas is we've tried

00:35:50.370 --> 00:35:58.347
- to avoid any kind of increase in density in the watershed for Lake Monroe. We have some sensitivity

00:35:58.347 --> 00:36:02.814
- to the karst features in the north part of the airport.

00:36:03.330 --> 00:36:12.137
- feature or area. So we're trying to pick areas where we've got real capability that's not going to be

00:36:12.137 --> 00:36:20.857
- just closed down by the forces of nature or environmental. Yeah, right, yeah. So and then which ones

00:36:20.857 --> 00:36:29.577
- would actually benefit the individuals over there in the older homes that either need sewer increase

00:36:29.577 --> 00:36:32.254
- in roads proximity to schools.

00:36:33.058 --> 00:36:40.276
- Yeah. And I guess my question is, mechanically, how do you guys see this happening, right? Because in

00:36:40.276 --> 00:36:47.423
- my mind, I'm hearing all this conversation. And mechanically, what I see happening is we're going to

00:36:47.423 --> 00:36:54.783
- designate a TIF. We're going to get a developer interested in the area, probably based on conversations

00:36:54.783 --> 00:37:02.142
- or zoning or whatever. But that developer is going to want something. And what they're going to want is

00:37:02.978 --> 00:37:09.706
- agreement with the RDC that, you know, will essentially repay the taxes that are going to come from

00:37:09.706 --> 00:37:16.031
- these properties in order to do certain infrastructural things, right? I mean, to build this,

00:37:16.031 --> 00:37:22.961
- it's essentially infrastructure tax payment, right? You know, we're going to build this and it's going

00:37:22.961 --> 00:37:29.690
- to cost us X dollars and that, you know, as you collect your redevelopment commission, collects the

00:37:29.690 --> 00:37:30.430
- TIF money,

00:37:31.330 --> 00:37:36.709
- some some of that's going to come back to us in the form of the incentive we needed to get this project

00:37:36.709 --> 00:37:41.880
- going and the incentives that we needed that we're giving in order to not only keep it get it going

00:37:41.880 --> 00:37:47.052
- but keep them actively marketing and building the infrastructure right which i guess that brings me

00:37:47.052 --> 00:37:52.327
- to the question as far as where we're going at the first thing of course we always have to look at is

00:37:52.327 --> 00:37:57.550
- our water sewer infrastructure because that dictates density and before jackie leaves real quick how

00:37:57.550 --> 00:37:59.774
- does any of these areas you've heard about

00:38:00.226 --> 00:38:07.935
- impact us in regards to from a zoning standpoint, because the area, some of the areas have very large

00:38:07.935 --> 00:38:15.116
- parcels, but they are some of them in the watershed. And we have rural residential and estate,

00:38:15.116 --> 00:38:22.749
- an agricultural rural residential in our in our new plan. So when we look at things that are farther

00:38:22.749 --> 00:38:29.854
- out, maybe longer term to have it, you know, Smithville, Sanders, we have pockets of density.

00:38:30.146 --> 00:38:36.597
- Where's the want the closer areas that you've seen that falls within a planning jurisdictional area

00:38:36.597 --> 00:38:43.177
- that will be able to be either changed for higher density already has existing. And I'll specifically

00:38:43.177 --> 00:38:49.821
- one as the clear. I'll just use the Clear Creek where you had mentioned habitat and they had had plans

00:38:49.821 --> 00:38:53.950
- for 76 units at one time, but they had an infrastructure issue.

00:38:55.618 --> 00:39:01.826
- without roads, water, sewers, environmental and watershed are the keys I'm kind of looking at. Which

00:39:01.826 --> 00:39:08.034
- ones give us the most buying and which ones, from a planning perspective, would work through to give

00:39:08.034 --> 00:39:11.230
- us the increased AV and the density that we'd need.

00:39:12.066 --> 00:39:19.642
- So I think that the biggest question is going to always be sewer capacity. So some of the other limitations

00:39:19.642 --> 00:39:27.358
- I see in some of the areas so area one near the airport. I think that would be important to have a discussion

00:39:27.358 --> 00:39:34.513
- with the airport themselves as to whether they want to see increased density across the airport. They

00:39:34.513 --> 00:39:41.598
- typically don't encourage residential near the airport. There's also some floodplain considerations.

00:39:41.698 --> 00:39:51.351
- Area two, I think you're still close to the city. I don't think there's as much concern about maybe

00:39:51.351 --> 00:39:58.302
- floodplain, but I do think that there's some karst considerations. Area

00:39:58.946 --> 00:40:06.379
- I'm sorry if I said area three, area two. Area three, Smithville, Sanders, and then there's also an

00:40:06.379 --> 00:40:14.332
- area of Harrodsburg. I do think that there's been an interest by the plan commission just in the re-review

00:40:14.332 --> 00:40:21.838
- of the comprehensive plan and the rural community plans. I think they do see support for these areas

00:40:21.838 --> 00:40:23.102
- to be built out.

00:40:23.394 --> 00:40:30.304
- that's a consideration for targeting the rural communities. But I don't, you know, Richard had me look

00:40:30.304 --> 00:40:37.079
- at aerial changes and they're already zoned for pretty high leniency, I would say commercial or high

00:40:37.079 --> 00:40:43.989
- density residential. And especially in the Harrisburg area, we've seen very little activity. So zoning

00:40:43.989 --> 00:40:46.270
- has not been the hindrance there.

00:40:46.402 --> 00:40:54.702
- So I don't know. And then Strain Ridge similar. I think we're just starting to see a little bit of build

00:40:54.702 --> 00:41:02.606
- out with Freeman Fields. Floodplain is a consideration. I know there would be some pretty big sewer

00:41:02.606 --> 00:41:10.984
- expansion needed for that area. And then we haven't really evaluated too much on the area six that really

00:41:10.984 --> 00:41:15.806
- long stretch by the highway. And then area seven, of course,

00:41:15.938 --> 00:41:23.941
- floodplain considerations, that's the biggest thing that would be hindering that project. I know there's

00:41:23.941 --> 00:41:31.716
- also some road projects, MPO urban area. This is the closest one to the city's limits. So there could

00:41:31.716 --> 00:41:39.338
- be an interest in terms of location. Our primary thing is which sewer capacity has the capacity and

00:41:39.338 --> 00:41:43.454
- has the willingness to allow that expansion to occur.

00:41:43.874 --> 00:41:50.232
- and then try to work our zoning accordingly. When we get into this Harrodsburg and Smithville area,

00:41:50.232 --> 00:41:56.653
- is part of the situation that we looked at and you've seen the fact that while the resident, there's

00:41:56.653 --> 00:42:03.582
- not been a lot of residential, does that just have to do with the proximity of driving, close to employment,

00:42:03.582 --> 00:42:10.258
- or just asking for a little feedback? That's the foundational question. The zoning is not the hindrance.

00:42:10.258 --> 00:42:13.246
- So I would say if you're looking at areas that

00:42:13.538 --> 00:42:19.543
- you know, our hindrance in terms of zoning, you could look at some of the larger lot ones and say, well,

00:42:19.543 --> 00:42:25.376
- maybe those would go if they were allowed to subdivide or if they had sewer, because they haven't had

00:42:25.376 --> 00:42:31.381
- that opportunity. But lots that are already zoned for higher density that just aren't naturally building

00:42:31.381 --> 00:42:37.271
- out might be something to consider. We start looking at the area from an employment standpoint. Right.

00:42:37.271 --> 00:42:42.590
- There might be other hindrances in those cases. OK. So everyone has a little bit of problem.

00:42:42.882 --> 00:42:49.660
- It's just which is the least one. Nothing new. Yeah. And then which one? I think Jeff brought up the

00:42:49.660 --> 00:42:56.706
- thing. We need to find willing partners to invest in doing the development. Without that, we go nowhere.

00:42:56.706 --> 00:43:03.819
- So when we get to willing partners and you've brought up Habitat accordingly, of course, I mean, they're,

00:43:03.819 --> 00:43:11.134
- you know, part of their circumstance that it creates from an affordability is still the infrastructure cost.

00:43:12.642 --> 00:43:18.603
- If I remember correctly, and I may be off a little bit, it's somewhere around 60, $70,000 for them to

00:43:18.603 --> 00:43:24.564
- do a lot with roads, sewers, waters, and all the rest of it. But when we look at that, and we look at

00:43:24.564 --> 00:43:30.759
- what kind of density, and then where these, you know, a developer would actually be able to do it, what's

00:43:30.759 --> 00:43:36.778
- the thing we would want to look at? Because, I mean, Lisa, we've got to, between Jeff figuring out how

00:43:36.778 --> 00:43:42.622
- to bond it, and Lisa saying, okay, what kind of road improvements and things would have to be done?

00:43:43.138 --> 00:43:51.881
- in each of these areas in zoning. Well, and we as a commission are not going to do all that work. No,

00:43:51.881 --> 00:44:01.225
- no, no. What I'm saying is what we need to do is to find that kind of sweet spot where we make it attractive

00:44:01.225 --> 00:44:10.054
- enough for a private partner to be willing to risk their capital with our support for the parts of the

00:44:10.054 --> 00:44:13.054
- infrastructure that we can supply.

00:44:14.242 --> 00:44:24.376
- I mean, that's how we make it work. And that is essentially the same formula we've used on the commercial

00:44:24.376 --> 00:44:33.936
- TIFFs. It's the same formula, but the payback time is much different. The incremental value that we

00:44:33.936 --> 00:44:38.334
- gain is much smaller, so you need more of it.

00:44:38.690 --> 00:44:44.563
- to the point of Jackie, what Jackie indicated as far as our sewer is one of the first things we need

00:44:44.563 --> 00:44:50.552
- to do conversation wise is discuss with the city and southern Indiana regional sewer to identify those

00:44:50.552 --> 00:44:56.658
- areas and make sure that these areas we look at have the capacity. SCRSD. Well, Harrodsburg is the prime

00:44:56.658 --> 00:45:02.822
- target. It's ready to go from us from that standpoint. It's got water. It's got sewer. It's got electric.

00:45:02.822 --> 00:45:06.718
- It's got natural gas. All it needs is people who want to go there.

00:45:06.818 --> 00:45:12.857
- right and that's the one thing that it doesn't really have and private development down there has not

00:45:12.857 --> 00:45:18.836
- been taken off now i think there's been one duplex project and it's flat so i guess maybe a question

00:45:18.836 --> 00:45:24.934
- to ask you guys um because in my mind if we're looking at affordability and building affordable houses

00:45:24.934 --> 00:45:30.854
- when when the county had the arpa money and we were looking at projects to do affordable housing we

00:45:30.854 --> 00:45:34.110
- would not have considered harrodsburg because it's not

00:45:34.562 --> 00:45:40.135
- close to access to groceries. It's not close access. I mean, you have to have a car to live there to

00:45:40.135 --> 00:45:45.653
- get to work and things like that. I don't I don't know how that fits into this equation at all, but

00:45:45.653 --> 00:45:51.281
- I do think it's a question to ask as we're going through the process. Well, and that's the areas that

00:45:51.281 --> 00:45:57.185
- you start looking at. It's like where is the existing areas that not just new expansion, but also existing

00:45:57.185 --> 00:46:02.923
- communities that have under you lot or don't have. I'll use the old Clear Creek here because I probably

00:46:02.923 --> 00:46:03.806
- know it better.

00:46:03.970 --> 00:46:11.174
- Several of the old homes in there don't have sewer they're on their septic We the sidewalks aren't there

00:46:11.174 --> 00:46:18.241
- even though we have you know two schools right there So and then to Richard's point regards to habitat

00:46:18.241 --> 00:46:25.170
- the ARPA money that was looked to be utilized to build I think approximately 76 Homes that they were

00:46:25.170 --> 00:46:30.590
- going to do and correct me if I'm my memories wrong No, I think that's I think

00:46:31.490 --> 00:46:37.393
- between the developer and Habitat, there was gonna be 76 units. I don't think there were gonna be homes.

00:46:37.393 --> 00:46:43.128
- I think there are townhouses and it was a split and all that kind of stuff. It's in the past on that,

00:46:43.128 --> 00:46:48.976
- but that is an area that take a look at. But that would be subject to having a discussion with the city

00:46:48.976 --> 00:46:54.879
- of Bloomington regards their sewer capacity. And then road-wise, Lisa, how does that work in when you're

00:46:54.879 --> 00:47:00.670
- redoing, trying to redo some of the roads in the community? I mean, just like- It's all new, so- Okay.

00:47:01.282 --> 00:47:06.999
- I think it's just on the area and what you're looking at and what you're building. And again, it's gonna

00:47:06.999 --> 00:47:12.552
- be out of our realm. It's gonna be an engineering firm that's gonna develop all that, probably by the

00:47:12.552 --> 00:47:18.269
- person that you find to invest into it. Well, the primary thing is identify a sewer, make sure the zone,

00:47:18.269 --> 00:47:24.095
- our zoning sounds reasonable in all of them. It's just a matter of what constraint we have to work around.

00:47:24.095 --> 00:47:30.029
- And then we look at sewer, water, and our watersheds and our environment. Well, we could also do residential

00:47:30.029 --> 00:47:30.846
- housing roads.

00:47:31.618 --> 00:47:38.614
- I mean, typically we've had, that has been paid for by the developer, but that's, we can make that part

00:47:38.614 --> 00:47:45.407
- of the TIP infrastructure. I think that's a very positive thing to look at because anything, we know

00:47:45.407 --> 00:47:52.201
- a typical home is gonna last a minimum of 50 years and probably 100 when we look at the overall cost

00:47:52.201 --> 00:47:58.995
- and the upfront infrastructure costs that it's been done for the last 20, 30 years as they're passed

00:47:58.995 --> 00:48:00.542
- on, two things happen.

00:48:00.706 --> 00:48:08.643
- One, the private developer has to recapture that revenue in the lot cost and the house cost, which then

00:48:08.643 --> 00:48:16.275
- increases it. And from our standpoint, we're going to get 50, 100 years of tax revenue from it. And

00:48:16.275 --> 00:48:24.288
- to a point of actually where we are, Lisa would get roads built without any questions as far as quality.

00:48:24.288 --> 00:48:30.622
- It depends on when this tip is done because Lisa will probably be retired by then.

00:48:30.914 --> 00:48:36.768
- to pass this on to the next person. And I guess there's a little chicken or in front of the egg there

00:48:36.768 --> 00:48:42.048
- too, because you can't pay for that infrastructure until you have development. And in order

00:48:42.048 --> 00:48:48.017
- to get development, how much incentive do you have to get to get it going? And then therefore, how much

00:48:48.017 --> 00:48:54.100
- do you get to retain to do the next round? I mean, it's chicken and egg. Chicken and egg, but then you're

00:48:54.100 --> 00:48:58.462
- also driving up the assessed value. So my question, and one of my questions

00:48:58.754 --> 00:49:05.858
- questions as we go along this is okay looking down the line when is the assessed value become the trap.

00:49:05.858 --> 00:49:12.826
- And we become. The cost cause or in terms of lack of affordability. I don't know I mean it just seems

00:49:12.826 --> 00:49:20.135
- like this is going to be more of a difficult transition. On the residential side than it is the commercial

00:49:20.135 --> 00:49:27.102
- side because you've got one typically one big building or complex right we have two major facilities.

00:49:27.746 --> 00:49:37.944
- right now on the west side, we've got the bus depot is gonna be there as well. So that kind of investment

00:49:37.944 --> 00:49:47.758
- is usually recouped over time. But when we're looking at housing and trying to address the very issue

00:49:47.758 --> 00:49:54.974
- of affordability, is that going to work? I look at this and I look at what

00:49:55.618 --> 00:50:03.460
- let's say what the utilities would have to do to upgrade. It's not like building a road, it's building

00:50:03.460 --> 00:50:11.378
- a pipe, whether it's gas, water, electric bills, a conduit. So then they have investment in the ground,

00:50:11.378 --> 00:50:19.144
- and they have to recover that cost. And that becomes an issue if you borrow, let's say through RUS or

00:50:19.144 --> 00:50:24.702
- Cobank, and you're getting paid back on the bonds or from the TIF areas,

00:50:25.282 --> 00:50:33.791
- What happens if we're not meeting expectations as a tiff? Because it's residential is a very fickle

00:50:33.791 --> 00:50:42.725
- market I just those are that spiraling in my head because it's really it's and I say it's a trap because

00:50:42.725 --> 00:50:51.489
- That's where a lot of our brethren the telecom industry are finding themselves You know you if you use

00:50:51.489 --> 00:50:52.510
- asset based

00:50:52.674 --> 00:51:00.077
- or asset-backed securities to build out a fiber network, and you're using fiber network A to finance

00:51:00.077 --> 00:51:07.554
- fiber network B, and A is not meeting expectations, you're running into trouble. And we've had, there

00:51:07.554 --> 00:51:14.957
- is currently one co-op, telecom co-op that has filed bankruptcy because they overcommitted, and that

00:51:14.957 --> 00:51:20.894
- includes loans and BEED, the federal loan program, so our federal grant program.

00:51:21.538 --> 00:51:27.953
- bright speed, which is the eastern half of the Mississippi of the old century link is running into that

00:51:27.953 --> 00:51:34.121
- issue as well on the asset back security. So that's what runs through my mind on the infrastructure

00:51:34.121 --> 00:51:40.289
- is are we going to run into that point because we're not meeting the expectations going back to why

00:51:40.289 --> 00:51:46.273
- I say it's a foundational question. What does it take to get people to move to that area, right?

00:51:46.273 --> 00:51:51.454
- Instead of, you know, further south of the county line to be polite, because again,

00:51:51.842 --> 00:51:58.397
- Are we chasing after something and then accidentally, unintentionally creating? I'm going to repeat

00:51:58.397 --> 00:52:05.148
- myself, so I'll just stop. But you know what I'm saying. Create ourselves our own problem by expanding

00:52:05.148 --> 00:52:11.768
- ourselves too large. So I guess the area I start looking at is either a Harrisburg area, which has a

00:52:11.768 --> 00:52:18.453
- car-centric basis and doesn't have the public infrastructure and doesn't necessarily have the density

00:52:18.453 --> 00:52:21.534
- that we're looking for to try to help capture.

00:52:22.018 --> 00:52:29.553
- my understanding of how we could fund it, it would depend on what our other TIFFs are and if there was

00:52:29.553 --> 00:52:37.089
- any loan ability that would be covered by that in a short time period. But getting- Short time period.

00:52:37.089 --> 00:52:44.990
- I mean, when I look at what the recapture of the cost of infrastructure, 20 years is nothing. Right. Right.

00:52:45.186 --> 00:52:51.429
- That's the bigger problem. It's a risk question. What's our risk? It's a risk. And if we are going to

00:52:51.429 --> 00:52:58.039
- take on risk, how do we guarantee that that risk is paid back? And I'll use the Westside TIF as an example.

00:52:58.039 --> 00:53:04.221
- We've done loans in the Westside TIF. We've done bonds in the Westside TIF. And we've always gone to

00:53:04.221 --> 00:53:10.892
- the county council. We've always got a property tax backup on the bond. But we always made the demonstration

00:53:10.892 --> 00:53:14.014
- that there's no way we're ever going to need that.

00:53:14.786 --> 00:53:22.089
- Right? This, it would be, if you're going to go in with that kind of an attitude, it's gonna be very

00:53:22.089 --> 00:53:29.392
- difficult to show that there's no risk here. There's a lot more risk here. It's risk, it's just what

00:53:29.392 --> 00:53:37.128
- areas are we looking at of the total six that would be the least risky that would give us the most density

00:53:37.128 --> 00:53:42.334
- and then help drive down the cost of the affordability of our residents

00:53:42.562 --> 00:53:48.905
- while also being as close to the public services that are already existing. So we're not having to try

00:53:48.905 --> 00:53:55.064
- to leapfrog out. And I just point out that what we've done in the North Park TIF, or the State Road

00:53:55.064 --> 00:54:01.591
- 46 corridor, sorry, TIF, is that we've made the developer take on that risk, right? And so that's another

00:54:01.591 --> 00:54:07.134
- way to look at it. Can we get a developer in that is willing to take on that risk for the

00:54:07.458 --> 00:54:13.302
- but we give them the incentive of, hey, the property taxes you pay that are paid in for this area for

00:54:13.302 --> 00:54:19.090
- the next 10, 15 years, whatever, how long will we choose? We'll go back to you if you build out this

00:54:19.090 --> 00:54:25.221
- physical infrastructure. And I guess in my mind, a third thought, and this goes to kind of the affordable,

00:54:25.221 --> 00:54:30.950
- when you said it's a trap, I thought you were meaning that if we build this infrastructure, that we

00:54:30.950 --> 00:54:33.758
- build these houses, those houses are just gonna,

00:54:34.018 --> 00:54:40.550
- go up in value at such a rate that it's gonna make it not affordable anymore, right? And so, you know,

00:54:40.550 --> 00:54:47.145
- one way to think about that is if you put the residential TIF in a neighborhood that has a lot of aging

00:54:47.145 --> 00:54:53.740
- homes that need repair work and things like that, then you use the, and then you don't worry about what

00:54:53.740 --> 00:55:00.208
- the new homes cost, right? But you're collecting that TIF to improve the smaller homes that are gonna

00:55:00.208 --> 00:55:02.174
- be inherently more affordable.

00:55:02.306 --> 00:55:09.139
- So that would be another way to kind of look at it. They're all right and they're all got issues with

00:55:09.139 --> 00:55:16.105
- it. I mean, it's just kind of the world is. Yeah. But it's like the original intent with redevelopment.

00:55:16.105 --> 00:55:22.871
- You take an old factory at Brownfield, the same issue applies. And do you take these old houses that

00:55:22.871 --> 00:55:29.636
- come on the market that are somewhat dilapidated and charge a dollar or whatever. I know cities used

00:55:29.636 --> 00:55:31.646
- to do that and go from there.

00:55:32.130 --> 00:55:40.283
- We covered the redevelopment covers cost of the street or, you know, the basic, yeah, the basic foundations.

00:55:40.283 --> 00:55:48.211
- The three areas I see that we look at, of course, Harrodsburg, the Van Buren area is a good future build,

00:55:48.211 --> 00:55:55.765
- but there's so much airport land out there, karst figures, features. We got, you know, environmental

00:55:55.765 --> 00:56:01.150
- as far as watershed on that area that I know has created quite a bit of

00:56:01.282 --> 00:56:07.562
- issues for the county as a whole, you know, maintenance wise. So that's the one that concerns me. The

00:56:07.562 --> 00:56:13.843
- Harrodsburg area and the Clear Creek area seemed, but you know, Harrodsburg area, we'd have to figure

00:56:13.843 --> 00:56:20.246
- out how we're going to get increased demand for something on a private developer. The Clear Creek area,

00:56:20.246 --> 00:56:26.588
- we've got any and any of the area even on the Van Buren area, we're going to have to have this serious

00:56:26.588 --> 00:56:30.590
- discussion with city of Bloomington utilities on sewer capacity.

00:56:31.714 --> 00:56:38.316
- Now, and this is where Richard, it would come in, while it may be outside, and they have city sewer

00:56:38.316 --> 00:56:45.183
- service, but like our Westmont that we have, any potential possibility of the Southern Indiana Regional

00:56:45.183 --> 00:56:51.983
- Sewer District having some agreement with CBU, if there was an expansion and I'll utilize the Westmont

00:56:51.983 --> 00:56:58.651
- area that we've sewered years ago, or even take in, while we haven't looked at Richland Township for

00:56:58.651 --> 00:57:00.830
- obvious reasons, which you were,

00:57:01.282 --> 00:57:08.580
- We met before the before and Richard specifically said, let's not even look at that until afterwards,

00:57:08.580 --> 00:57:15.878
- which was absolutely genius. And we're still not afterwards. Exactly. We didn't spend any time having

00:57:15.878 --> 00:57:23.176
- to think about it and it was good. So one of the other things that I mean, if we've got a pool of tax

00:57:23.176 --> 00:57:29.758
- dollars available for some reason, we might also be able to leverage that to obtain grants.

00:57:31.042 --> 00:57:40.078
- to do more. Both state and federal government have grants available for these are essentially rural

00:57:40.078 --> 00:57:49.115
- areas. And so there is an interest in developing rural areas with funding that is available through

00:57:49.115 --> 00:57:58.332
- either federal or state. That brings me up to a very interesting question. And this will come. Are we

00:57:58.332 --> 00:58:00.862
- able to hire a grant writer

00:58:00.962 --> 00:58:30.718
- I'm just asking the question because when we bring up grants

00:58:30.882 --> 00:58:40.662
- Those are hard. People that do that are special and are very good. So. They're for some of the transportation

00:58:40.662 --> 00:58:49.642
- grants out there. There's no way we would even be competitive. You need to have a good grant writer.

00:58:49.642 --> 00:58:58.977
- I was just looking at it as you mentioned that Richard how we would. We think right? Charlotte Charlotte

00:58:58.977 --> 00:59:00.222
- mode. Oh, OK.

00:59:00.674 --> 00:59:13.479
- I'm just curious in regards to it because as we mentioned these things in the rural community and what

00:59:13.479 --> 00:59:26.782
- we're looking for, even though we may be aware of them as you know, I mean, Lisa's does great with in dot.

00:59:26.914 --> 00:59:34.916
- I'm getting money. I don't know. Well, I'm not writing grants for that. I'm just applying for the grants.

00:59:34.916 --> 00:59:42.617
- That individual that has the ability. But you get into the bigger, what's it called, TRAM, I think is

00:59:42.617 --> 00:59:50.242
- one of the bigger ones out there that's a nationwide. You get into the bigger grants. You definitely

00:59:50.242 --> 00:59:56.734
- have to have expertise in that. I mean, I wouldn't even go after a grant unless I had

00:59:57.954 --> 01:00:05.508
- at that level unless I had 30 to $50,000 sitting around to pay a grant writer. Because I want to say

01:00:05.508 --> 01:00:13.586
- we applied for one back in probably 11 years ago and that grant just I think it cost us with the consultant

01:00:13.586 --> 01:00:21.440
- 10 to 15,000. We didn't get come close. It's just it's just very competitive when you get to that level,

01:00:21.440 --> 01:00:26.750
- right? So we've had a good discussion tonight. I guess my question is,

01:00:27.266 --> 01:00:35.089
- What should I do next? Do you feel about having a conversation with Utility Service Board? I've done

01:00:35.089 --> 01:00:42.911
- that once. I can do that again. You might want to do it with somebody. That's the other thing. Yeah.

01:00:42.911 --> 01:00:50.889
- Not just a lot. I do think I need to spend some time with the folks at FSG to figure out from the data

01:00:50.889 --> 01:00:54.142
- that I got what we might want to look at.

01:00:56.226 --> 01:01:02.991
- sure Jackie would get me the data for the other places for the other areas without any trouble. But

01:01:02.991 --> 01:01:09.892
- I think that my next thing is to make sure I understand what data is available and try and figure out

01:01:09.892 --> 01:01:16.792
- which of that one of that data is pertinent to our questions. That'd be the first thing that I should

01:01:16.792 --> 01:01:23.760
- do. I guess maybe my input would be I think looking at the current residential communities makes a lot

01:01:23.760 --> 01:01:25.790
- more sense to me than looking

01:01:26.562 --> 01:01:32.595
- kind of in the area, like the airport, I think is a great area that someday we'll want to develop. But

01:01:32.595 --> 01:01:38.510
- right now, I think there's just a lot of environmental issues that I think would make an initial, at

01:01:38.510 --> 01:01:44.367
- least our initial go at a residential TIF difficult. I mean, I would look at residential, because I

01:01:44.367 --> 01:01:50.282
- think you'll have a lot more information of stormwater issues and all those kinds of things in those

01:01:50.282 --> 01:01:54.558
- areas. And I think that is going to be crucial in order to move forward.

01:01:55.682 --> 01:02:04.773
- I think Harrodsburg's probably got the most infrastructure right now. It's problem is access. It's problem

01:02:04.773 --> 01:02:13.354
- is access. Smithville Sanders, it's got access, good access. What it lacks right now is a sewer. And

01:02:13.354 --> 01:02:22.361
- that's unfortunately the part of the sewer it lacks is the collection system, which is the most expensive

01:02:22.361 --> 01:02:23.550
- part of this.

01:02:25.026 --> 01:02:33.957
- But that's worth looking at, I think. Now I do notice, I do know as I was driving back up Strain Ridge,

01:02:33.957 --> 01:02:42.631
- housing is moving that direction, but it's on septic systems. And so if you've got sewer down there,

01:02:42.631 --> 01:02:51.304
- they might pop. That's what I wondered because having that, the geographic basis that, you know, the

01:02:51.304 --> 01:02:53.022
- IDEM has identified

01:02:53.346 --> 01:03:00.208
- for our sewers in Monroe County. Now, if I remember correctly, we have anything outside the jurisdictional

01:03:00.208 --> 01:03:07.070
- area of the city of Bloomington, Ellitsville, Eastern Richland, Northern Richland falls under the auspices

01:03:07.070 --> 01:03:13.676
- of the Southern Indiana Regional Sewer District. And where Westmont and then even Sterling Woods, when

01:03:13.676 --> 01:03:20.153
- that was first done, had to, because did they have to come, Bryn Mawr have to come to hook on or did

01:03:20.153 --> 01:03:22.398
- that go directly through the city?

01:03:23.202 --> 01:03:31.060
- that was added that was before my time getting on there but we the sewer district services the Bryn

01:03:31.060 --> 01:03:39.233
- Mawr area on the east side serves Westmont and Sunrise on the west side they are very expensive because

01:03:39.233 --> 01:03:47.248
- the city socks it to us and I might say for the people in the done Westmont and Sunrise they get they

01:03:47.248 --> 01:03:52.670
- get a double whammy because of the way the original funding was done

01:03:52.898 --> 01:03:59.869
- with the idea they got a million dollar loan and they're paying on it for 40 years and it's. It is it

01:03:59.869 --> 01:04:06.771
- has driven up their rates to some of the highest that we've got just service that long. Yeah. We can

01:04:06.771 --> 01:04:13.605
- do really hard. Yeah, I just curious in regards to if utilities are one of our biggest things to at

01:04:13.605 --> 01:04:21.054
- least have that conversation. Yeah, no, I'm not. I'm well prepared to talk with the city again about things.

01:04:21.666 --> 01:04:28.938
- appreciate that because some of the things have been worked out. But as you know, I did prepare for

01:04:28.938 --> 01:04:36.284
- both this commission and I gave to the city of Bloomington a summary of the sewer service that South

01:04:36.284 --> 01:04:43.992
- Central Regional Sewer District provides, including the service that we have with them in a presentation.

01:04:43.992 --> 01:04:50.974
- And I think it was well received. They just I think at this point, their hands are tied by this

01:04:54.786 --> 01:05:02.613
- that gets resolved. They're they're going to have a conversation and maybe say OK when this is right.

01:05:02.613 --> 01:05:10.287
- We can do so we don't have to buy the beer. OK all right, so that that tells me what I can do and I

01:05:10.287 --> 01:05:18.497
- can report back to you at the next shot. OK, let's move on our agenda. The next topic is Richland Township

01:05:18.497 --> 01:05:22.334
- merger discussion. Do we know anything more than?

01:05:23.042 --> 01:05:31.508
- We did. Well, we know the election happened and that the merger was approved by the people there. I'm

01:05:31.508 --> 01:05:41.054
- working with trying. In my mind, this came up because we have an abatement with Simtra and that abatement includes

01:05:41.794 --> 01:05:48.821
- What happens if new equipment is placed in future years? And so I'm sure I've set up. I mean, I think

01:05:48.821 --> 01:05:55.847
- the first week of December I'm having a conversation with the with representatives from Alexville and

01:05:55.847 --> 01:06:02.736
- one of the. Simtra is kind of in the middle of the. The whole West Side TIF area. It's in the Curry

01:06:02.736 --> 01:06:09.694
- profile and so I'm I'm anticipating having a conversation with them about that. I'm talking to Lisa.

01:06:10.690 --> 01:06:18.550
- neither one of us are real comfortable with this group moving forward with infrastructure projects that

01:06:18.550 --> 01:06:26.183
- Ellitsville hasn't seen signed off on and done things like that because now once it's completed it's

01:06:26.183 --> 01:06:33.968
- going to be theirs to maintain and we've had history where we think the city has done things that then

01:06:33.968 --> 01:06:37.822
- became our our duty to maintain and we always have

01:06:38.210 --> 01:06:43.533
- talk to the city about how if you're going to do these things, you have to include us in the planning

01:06:43.533 --> 01:06:48.804
- and that so that we know what we're getting. And so we wouldn't want to do that to somebody else. So

01:06:48.804 --> 01:06:54.022
- I think that's kind of where we're at with, you know, so there's a, and I'm going to ask, but there

01:06:54.022 --> 01:06:59.345
- is a pretty good chance that we'll start having Elittville representatives at these RDC meetings when

01:06:59.345 --> 01:07:05.086
- we're talking about things in Westside TIF, right? We're just uncomfortable moving forward with things that's

01:07:05.474 --> 01:07:12.337
- that we now know is going to be theirs without them saying, well, yeah, that makes sense. And probably

01:07:12.337 --> 01:07:19.066
- doing a lot of the contracts for inspections, because you want the inspectors to be people that they

01:07:19.066 --> 01:07:25.928
- know work with and can communicate with. So I think that's kind of the big merger discussion. The only

01:07:25.928 --> 01:07:32.791
- question I have, there is no project that we've got ongoing now which is impacted by that merger. Have

01:07:32.791 --> 01:07:34.590
- we finished off the Curry?

01:07:35.298 --> 01:07:41.927
- Phase one phase one is done. So I think that if you consider the whole Curry one project, then yes we

01:07:41.927 --> 01:07:48.751
- do. But if the but where we're at is kind of between phases. I'm as a vernal Pike is that it's not we're

01:07:48.751 --> 01:07:55.380
- working on. It shouldn't have any effects. It's just closing out the paperwork. One more invoice. The

01:07:55.380 --> 01:08:01.879
- only thing that we put on hold was we were getting ready to do the contract for the design of Curry

01:08:01.879 --> 01:08:04.414
- Pike phase two. So I put that on hold.

01:08:04.546 --> 01:08:11.385
- It would be something, you know, the RDC board would have to decide if they want to fund it. And then

01:08:11.385 --> 01:08:18.223
- it would be managed and everything, the whole project by town of Ellitsville. I wouldn't want to take

01:08:18.223 --> 01:08:25.062
- on the role of managing for somebody else when it's the end product's going to be theirs. I can spend

01:08:25.062 --> 01:08:31.230
- more time on our projects. And we just have so much more to sort out of transferring stuff.

01:08:31.842 --> 01:08:37.788
- You know the traffic signals the street lighting profile Parkway the roundabout. I mean it just it's

01:08:37.788 --> 01:08:43.970
- it's going to be a lot. And I think moving forward with the curry pipe project would it's it's something

01:08:43.970 --> 01:08:49.857
- that could kind of be put on the back burner until Ellisville decides what they want to do. I think

01:08:49.857 --> 01:08:55.979
- they're going to have their hands full with everything else that they're going to inherit from us that.

01:08:55.979 --> 01:08:59.806
- Throwing another new project on them probably isn't good timing.

01:09:00.706 --> 01:09:07.861
- going to communicate this in some of the meetings you have in regards to. We met with Mike Farmer back

01:09:07.861 --> 01:09:14.946
- in May and then we're meeting actually with Town of Bellisville Street Department tomorrow to discuss

01:09:14.946 --> 01:09:21.961
- some stuff. We've already started forwarding some information to them, you know stressing to them to

01:09:21.961 --> 01:09:28.977
- get a signal contractor under contract because that takes time and January 1 they won't be hours and

01:09:28.977 --> 01:09:30.366
- they need to have a

01:09:30.722 --> 01:09:36.638
- contract for maintenance if they you know something goes wrong with the traffic it's a big deal if they

01:09:36.638 --> 01:09:42.327
- don't have anybody on board before that day it could be a problem so we've you know we're trying to

01:09:42.327 --> 01:09:48.244
- help to pass on all of our contact information they might not want to use that company but we just want

01:09:48.244 --> 01:09:53.989
- to help help help them make that transition so the citizens of Minerva County aren't left in a lurch

01:09:53.989 --> 01:09:59.166
- correct so we are meeting tomorrow i think we're trying to set up a bigger meeting between

01:09:59.330 --> 01:10:06.061
- Ellsville and legal and planning department, building department, those kind of just to make sure you

01:10:06.061 --> 01:10:12.924
- know how the transition goes as smoothly as possible. What about the transition for the the school pass

01:10:12.924 --> 01:10:19.523
- or how does that how do you think how do you see pursue that like the school corporation depends on

01:10:19.523 --> 01:10:24.670
- that money for some of the programs does that money go through Ellsville then

01:10:24.802 --> 01:10:32.940
- No, the redevelopment commission, as long as there's debt in place, the redevelopment commission controls

01:10:32.940 --> 01:10:40.847
- the funding. For the county? Yeah. So the town of Ellsville will not control it? No. Good to know. OK,

01:10:40.847 --> 01:10:48.678
- I did not know that. Once the debt's paid off, well, not really, because then the TIF ends, right? We

01:10:48.678 --> 01:10:53.438
- haven't got it. As long as there's debt to be paid, then yes.

01:10:53.986 --> 01:11:00.350
- So moving forward, this school has had a representative on this, nine voting members, such as myself

01:11:00.350 --> 01:11:06.650
- and Mr. Kerr. We had two new board members coming on January 1st. One of them may step into my role

01:11:06.650 --> 01:11:13.203
- here, because I think they're going, I'm going to have to end up with some other headaches to deal with

01:11:13.203 --> 01:11:19.630
- at the school, or not. Opportunities. Opportunities, right. So that's what I just wanted to make sure

01:11:19.630 --> 01:11:20.638
- moving forward.

01:11:21.026 --> 01:11:28.213
- As long as the debt's there, this group gets the revenue and does the contracts and all that. You'll

01:11:28.213 --> 01:11:35.684
- explain that to, when you meet with Ellsworth folks, what's going on with that? I can. I think the basis

01:11:35.684 --> 01:11:43.155
- of the conversation is going to be we're continuing the TIF. We want your representative at our meetings

01:11:43.155 --> 01:11:49.630
- for road projects and making sure that, but the RDC is still going to control the funding.

01:11:50.146 --> 01:11:57.741
- There's a school, remember, on the Ellisville RDC as well, which I think helps to stay informed, because

01:11:57.741 --> 01:12:05.192
- with a lot of the change in the legislature, it affects the schools quite a bit right now. Absolutely.

01:12:05.192 --> 01:12:12.571
- Just to make sure we move forward, our contract that we have with RBB. It's got a year left. It's got

01:12:12.571 --> 01:12:18.430
- one more year left. So we need to look at that on the agenda sometime next year.

01:12:18.594 --> 01:12:25.423
- Well, I would hope that we could continue the partnership because those programs depend on that. But

01:12:25.423 --> 01:12:32.184
- we've got a partnership with a biotech addition on our new building project that we're depending on

01:12:32.184 --> 01:12:39.284
- the companies that say they're going to help us out with this. We're going to partner with them. I guess

01:12:39.284 --> 01:12:46.180
- who from the school is it? Should I talk to Dr. Sanders about getting a draft together for this group

01:12:46.180 --> 01:12:47.262
- and the school?

01:12:47.458 --> 01:12:55.429
- I mean, who do I negotiate with RBB? What regard? For the contract? Continuing on for another.

01:12:55.429 --> 01:13:03.819
- I would say Dr. Sanders or the school attorney. Christine. Oh Bartlett. Yeah, I'll give Christine a

01:13:03.819 --> 01:13:12.209
- call. Yeah, OK. And he relies on Christine to do 99% of that. And I and I've worked with her. She's

01:13:12.209 --> 01:13:15.230
- the attorney for the fire district.

01:13:15.458 --> 01:13:22.610
- I assume she's going to be reappointed on January 1st with the school. OK, it's going to be a fun year

01:13:22.610 --> 01:13:29.277
- next year, isn't it? That's why we're trying to get about that. Yeah, take nothing for granted.

01:13:29.277 --> 01:13:36.568
- So I mean, but it does. I mean, the merger does affect us financially. I mean, if effects County Highway

01:13:36.568 --> 01:13:43.998
- affects stormwater, so it's. It's I mean, that's a huge change for us too. It affects our department quite

01:13:44.898 --> 01:13:52.866
- So financial, how does that? I'm just curious that this commission are already sees paying for part

01:13:52.866 --> 01:14:00.834
- of that is paid for that fire truck. Does that continue on the commitment to that too? Because. OK,

01:14:00.834 --> 01:14:08.802
- but we may not buy another one. Well, Monroe County's got been bossing under control now too. Yeah.

01:14:08.802 --> 01:14:13.662
- OK, anything else on that? Alright, let's move on to claims.

01:14:14.434 --> 01:14:24.204
- We have before us two claims that have been submitted. One for signal construction. This is an addition

01:14:24.204 --> 01:14:33.598
- to an existing project, is that right? This was part of Curry Pike phase one. The contractor was DC

01:14:33.598 --> 01:14:40.926
- Construction. When they were working at Constitution and Curry Pike, they hit

01:14:41.026 --> 01:14:47.851
- When the lines underground at that traffic signal we had our contractor come in because they didn't

01:14:47.851 --> 01:14:54.744
- have a contractor We had signal construction come in to do the emergency repair They had to build us

01:14:54.744 --> 01:15:02.251
- for it because they were their client However in the last bill on the claim that you paid for DC construction

01:15:02.251 --> 01:15:08.734
- last month There was seven thousand this amount exact amount deducted from their final payment

01:15:08.994 --> 01:15:17.874
- So we paid it, but we actually got it back. So it's just to pay signal construction for that emergency

01:15:17.874 --> 01:15:26.581
- repair. The other amount is $7,295 and 90 cents. Correct. Okay, next. The next thing that you'll see

01:15:26.581 --> 01:15:35.374
- on your paperwork is a transfer. So this project started in 2017 is when we first got awarded funding

01:15:35.374 --> 01:15:36.926
- for this project.

01:15:37.378 --> 01:15:45.648
- We were in the process too of learning how to set up grant funds with all of our projects and federal

01:15:45.648 --> 01:15:54.161
- aid projects with the auditors office. So the original construction inspection contract for this project

01:15:54.161 --> 01:16:02.269
- was $1,015,700. 20% of that is $203,140. That's typically what you anticipate for reimbursement for

01:16:02.269 --> 01:16:05.918
- a federal aid project. It is not always 20%.

01:16:06.146 --> 01:16:12.293
- Let me clarify that it is not always 20%. It's going to depend on what end up funding is at the time.

01:16:12.293 --> 01:16:18.319
- They did increase our funding throughout the years as the project increased. When we did a transfer

01:16:18.319 --> 01:16:24.405
- back in 2021 setting up these grant funds, we did not transfer the whole cash into that account. You

01:16:24.405 --> 01:16:30.491
- don't know how projects going to come out until the very end. You don't know what it's going to cost

01:16:30.491 --> 01:16:33.022
- for construction till it goes to letting.

01:16:33.314 --> 01:16:40.140
- and everything else. If you have change orders, there could be participating items within DOT. There's

01:16:40.140 --> 01:16:46.966
- non participating items within DOT. So there's a lot of moving parts to this. We were originally going

01:16:46.966 --> 01:16:53.792
- to just transfer the 151,000. That's what we're negative in the cash balance of this grant fund. After

01:16:53.792 --> 01:17:00.551
- working with Charlotte and the auditor's office for audit purposes, we want to transfer the full 20%.

01:17:00.551 --> 01:17:02.142
- So it matches what that

01:17:02.306 --> 01:17:10.045
- that match is. I expect one more invoice from the consultant for construction inspection services. I

01:17:10.045 --> 01:17:17.938
- have agreed to the amount of $40,000. It was at 102. So we'll see how that plays out. But that is also

01:17:17.938 --> 01:17:26.290
- reimbursable through the grant with NDOT because there's still money left on the PO. That's all I anticipate

01:17:26.290 --> 01:17:32.190
- for this project of being. It does take your funds very low and in the cash,

01:17:32.546 --> 01:17:40.808
- for the Westside TIF, which we have anticipated the last couple of years, but you will get your fall

01:17:40.808 --> 01:17:49.560
- settlement in December, which is around a million dollars, and that fund will be fine. It's a pain getting

01:17:49.560 --> 01:17:58.394
- there, but I've never seen probably so low and cringing. But we're there. That's why you see the difference

01:17:58.394 --> 01:18:00.766
- of the amounts. Like I said,

01:18:00.898 --> 01:18:07.404
- auditors office and what they deal with on an audit it helps explain why we came up with that 203 140

01:18:07.404 --> 01:18:13.910
- because it's 20 percent of that original contract for the consultant. It's your cash balance where it

01:18:13.910 --> 01:18:20.352
- needs to be. And it gets our cash balance it'll be above what's the negative amount right now but it

01:18:20.352 --> 01:18:26.922
- will cover that last invoice reimbursements if there's anything not spent in that grant but when we're

01:18:26.922 --> 01:18:30.494
- done and audits are done and everybody's satisfied that

01:18:31.042 --> 01:18:37.725
- that cash goes back into the original fund. It'll go back to Westside TIF. Right now we're just doing

01:18:37.725 --> 01:18:44.605
- a front load to make sure we got enough to cover while you finish it and then that fund. Get it to zero.

01:18:44.605 --> 01:18:51.616
- It's easier to have it at a zero balance for these grant funds and that's how the Auditor's Office prefers

01:18:51.616 --> 01:18:58.430
- to have a zero balance. That still puts us not into a negative capacity in our Westside TIF. It is not.

01:18:58.754 --> 01:19:05.613
- Yeah, it's close. It's might be close. Might have $100,000 left, but we are there. We have been sweating

01:19:05.613 --> 01:19:12.145
- this project, but we are there. Good. Right now, we have to approve. That Fullerton Pike's the most

01:19:12.145 --> 01:19:18.808
- expensive bridge you've ever built. That's true. Yeah, just that bridge was probably $13 million. You

01:19:18.808 --> 01:19:25.341
- spent a lot of money on bridges. We spent a lot of money last year and the last two years. And that

01:19:25.341 --> 01:19:26.974
- one's still a nightmare.

01:19:27.138 --> 01:19:35.756
- So, but that's how we got to the surface down there. That get resolved. I'll do that in your staff comments

01:19:35.756 --> 01:19:44.214
- for you. All right. We have approval of claims to have a motion to approve. We have a motion and a second

01:19:44.214 --> 01:19:47.486
- to approve the claims which consists of.

01:19:47.842 --> 01:19:57.236
- $7,295.90 for signal construction and $203,140 is a transfer from the Westside TIF account to the Vernal

01:19:57.236 --> 01:20:06.361
- Pike Sunrise Greetings account. We'll go to the council on Tuesday for their approval. Call the roll.

01:20:06.361 --> 01:20:15.934
- Commissioner Martin? Yes. Commissioner Cassidy? Yes. Commissioner Keasley? Yes. Commissioner McCarty? Yes.

01:20:16.162 --> 01:20:25.200
- Motion is approved, four to zero. And we are on staff comments, so Lisa, you get to go now. I'll just

01:20:25.200 --> 01:20:34.060
- give you an update really quick on Fullerton Pike phase three. The deck has been sealed, the bridge

01:20:34.060 --> 01:20:43.009
- deck, the pavement has been repaired. The reason why that pavement rippled the way it did is because

01:20:43.009 --> 01:20:44.958
- it was damaged during

01:20:45.250 --> 01:20:52.934
- installation by a subcontractor. We are going to do our final walkthrough on Tuesday for that project.

01:20:52.934 --> 01:21:00.618
- There's going to be some change orders. Not sure if any will have to come through RDC because it could

01:21:00.618 --> 01:21:08.302
- result from being part of the bridge since that was the major part of the project. However, I can tell

01:21:08.302 --> 01:21:14.046
- you at this time our contractor is under liquidated damages, have been since

01:21:15.138 --> 01:21:25.042
- August of 2025 and is at $2.3 million. That is unheard of in a federal aid project. It was a lot of

01:21:25.042 --> 01:21:35.343
- personnel issues, false information. There's no utility delays. So it's a big issue. There's still some

01:21:35.343 --> 01:21:44.158
- outstanding change orders that I've been trying to get for months and months and months.

01:21:44.290 --> 01:21:52.406
- But as far as the completion of the project, I think the property owners are satisfied. We had gone

01:21:52.406 --> 01:22:00.684
- in, done some extra work for some erosion control and some embankments stabilization. We got the road

01:22:00.684 --> 01:22:08.150
- fixed, we got the bridge. I don't foresee any closures. There could be some issues come out

01:22:08.150 --> 01:22:13.182
- of our walk-through on Tuesday. I don't anticipate real major

01:22:14.242 --> 01:22:23.710
- in our fingers and then we'll be able to maybe start that closeout process. Fullerton Pike phase one

01:22:23.710 --> 01:22:33.929
- Fullerton Pike started in 2008 so here we are 27 years later or 20 years later that we're just now finishing

01:22:33.929 --> 01:22:42.366
- phase three but that's how federal aid projects go so well let me take solace in the fact

01:22:42.978 --> 01:22:49.984
- And if you look at the oldest planning map that I know of from Monroe County, that road was across there,

01:22:49.984 --> 01:22:56.660
- and that map is dated in the 1960s. So it has been a while since we've been working on this program.

01:22:56.660 --> 01:23:03.336
- It's about the time I was born here, Richard. No, I mean, it's turned out to be a good project. It's

01:23:03.336 --> 01:23:10.079
- a love-hate project. You either love it or you hate it. Most people like it. I'm sure it gets heavily

01:23:10.079 --> 01:23:11.070
- used. It does.

01:23:11.330 --> 01:23:17.702
- it does, it's serving its purpose of what it was built for. I think it has eliminated cut through traffic

01:23:17.702 --> 01:23:23.894
- and subdivisions down through there. I think the residents can tell. So we're hopefully getting to the

01:23:23.894 --> 01:23:30.086
- end of that project, but I don't think I have any other projects that you guys would have interest in.

01:23:30.086 --> 01:23:36.098
- I appreciate you taking care of that, because I will tell you, even those that were naysayers about

01:23:36.098 --> 01:23:40.126
- it, I see them using it. I'm sure. I'm sure. I had someone calling

01:23:40.322 --> 01:23:46.669
- tell me that every time he uses it, I take a year off his life. Oh my God. Yeah, yeah. But now it's

01:23:46.669 --> 01:23:53.207
- been a it's been really a good addition for the East West connection for our community as a whole. And

01:23:53.207 --> 01:23:59.618
- that's and that's what it was built for. You know it it's it is a good project. I really took a long

01:23:59.618 --> 01:24:06.156
- time to get there, but it ended up being a good project. So and I like it that we were able to connect

01:24:06.156 --> 01:24:07.806
- the trail to it. So huge.

01:24:08.674 --> 01:24:15.606
- Just briefly, I'm going to go to a conference on Friday. I sent you all the TIF handbook. The people

01:24:15.606 --> 01:24:22.537
- who produce that TIF handbook is putting on this conference. So I expect to have some back and forth

01:24:22.537 --> 01:24:29.538
- with them. I have heard as we've been talking about, you know, mergers and things like that, that the

01:24:29.538 --> 01:24:36.126
- state has opened up some alternative uses of TIF funds that we haven't been able to use it for.

01:24:36.290 --> 01:24:42.498
- And if one of them is true, I'm probably going to try to get some background information on that. I

01:24:42.498 --> 01:24:48.892
- don't want to release it because it might make people start asking questions that I don't have answers

01:24:48.892 --> 01:24:55.285
- to. But just kind of want to let you know that. And if it is true, I'll give you guys an update in the

01:24:55.285 --> 01:25:01.555
- near future. Appreciate it. Find out everything you can that can benefit our communities as a whole.

01:25:01.555 --> 01:25:02.238
- All right.

01:25:03.074 --> 01:25:11.713
- Anybody have anything else? Anybody online have any questions, issues? I don't think we've got anybody

01:25:11.713 --> 01:25:20.856
- out there active. Okay, if not, I will take a motion for adjournment. A motion and a second for adjournment.

01:25:20.856 --> 01:25:22.366
- We are adjourned.