- It is Wednesday, August 26th at 3.30. I'm sorry, not 3.30, slightly after 3.30, 3.36. So first on the

00:00:08.684 --> 00:00:17.145
- agenda is public input for items not on the agenda. Do you want to acknowledge? Oh, that would be good,

00:00:17.145 --> 00:00:25.525
- too, because. I don't know if we have to do a roll call. No. But that would be good. So present in the

00:00:25.525 --> 00:00:29.918
- Nattie Hill Room is Surveyor Tron and Wright Rondoff.

00:00:30.114 --> 00:00:37.232
- I'm here as Commissioner Jody Madeira and also Commissioner Julie Thomas. So first on the agenda is

00:00:37.232 --> 00:00:44.349
- public input for items not on the agenda. We have no one here in the Natt U Hill Room. Would anyone

00:00:44.349 --> 00:00:51.681
- online like to offer public comment on items not on our agenda? Seeing no hands, I will move on to the

00:00:51.681 --> 00:00:52.606
- second item.

00:00:52.898 --> 00:01:01.640
- item on our agenda. Approval of minutes. I actually have an item. I would actually like to move that

00:01:01.640 --> 00:01:10.295
- we amend our agenda to re insert something that was struck off, which is the long range dream, long

00:01:10.295 --> 00:01:17.566
- range stormwater plan contract award with WSP. Yes. And then also as suggested, but

00:01:17.794 --> 00:01:26.493
- that we should make it contingent to legal's final approver approval prior to final action. That's for

00:01:26.493 --> 00:01:35.446
- emotion. I'm just putting it on the agenda. Okay? Sure. I. That is fine with me. Do you have any comments

00:01:35.446 --> 00:01:44.146
- on putting that back on the agenda? No, I'm happy to voice vote. Yes, let's do a voice vote all on all

00:01:44.146 --> 00:01:47.102
- in favor of putting the long range

00:01:47.618 --> 00:01:56.783
- That is back on our agenda. Would you like to keep it in its original location? It's fine. Okay.

00:01:56.783 --> 00:02:06.515
- All right. So any other modifications on the agenda? Okay. Then we'll move approval, move forward with

00:02:06.515 --> 00:02:15.774
- approval of the minutes for July 22nd, 2026. Any comments or questions on the minutes? All right.

00:02:16.162 --> 00:02:24.367
- I believe we can do a voice vote for that as well. All in favor of approving the minutes for July 22nd,

00:02:24.367 --> 00:02:32.415
- 2026, say aye. Aye. Moving forward to our stormwater expenditure report for May, June, and July 2026.

00:02:32.415 --> 00:02:33.598
- Okay, for May.

00:02:33.794 --> 00:02:47.393
- pipes, we spent $4,084.76, and backfill $5,339.10, and then gas was $5,619.16. That was our main expenditures

00:02:47.393 --> 00:02:59.880
- on that month. Any questions? We need to make that change, too. Yeah. In the minutes. I already made

00:02:59.880 --> 00:03:01.982
- it in my motion.

00:03:05.698 --> 00:03:15.542
- No questions. I don't have any questions. Okay. Pull up the packet. Other one out, so I'm just trying

00:03:15.542 --> 00:03:25.289
- to dig through my email. I had not really planned to attend, but then was trying to make sure we had

00:03:25.289 --> 00:03:35.422
- a... Questions? The packet should be in there. Going through the website. Okay, there's two of them now.

00:03:35.746 --> 00:03:43.386
- I just had to refresh it. Yeah, because I sent the agenda separate, then the packet is a totally separate

00:03:43.386 --> 00:03:50.881
- document. Is there any large expenses that you wanted to bring attention to? If not, then no questions.

00:03:50.881 --> 00:03:55.710
- Not in May. The large ones were the ones I read off. Yeah, summer.

00:03:56.930 --> 00:04:13.502
- And then for June, we had field crew supplies, $5,183.16. And backfill, $22,924. Fuel, $5,978.43. Contractual

00:04:13.502 --> 00:04:26.910
- services, $22,081.35. And that was for traffic control. And we also paid the IU fellows.

00:04:28.002 --> 00:04:37.655
- Close all fees, $4,904.22 cents. That was for street sweeping. And then public education, $1,850. And

00:04:37.655 --> 00:04:47.119
- that was to rent a room for Ivy Tech for the work. Contractors workshop. Contractors workshop. That

00:04:47.119 --> 00:04:57.246
- was back in January. They billed us a little late for that one. Yeah. Yeah, they did. Okay. Any questions?

00:04:57.506 --> 00:05:05.722
- a comment not a question. Just with the out of category transfer from professional fees to backfill

00:05:05.722 --> 00:05:14.513
- slash pavement repair maintenance. Is that a reflection of us taking on some in-house projects and instead

00:05:14.513 --> 00:05:23.222
- of paying those services to contractors? We did have several more projects this spring in-house to repair

00:05:23.222 --> 00:05:24.126
- or replace

00:05:24.226 --> 00:05:30.874
- And so that would be where some of your backfill and the back, the pavement repair is coming from. Yeah,

00:05:30.874 --> 00:05:37.585
- our crew has been very busy this year. So it's not exactly a one-for-one, but it does show our initiative

00:05:37.585 --> 00:05:44.170
- of taking on more in-house projects, which I applaud and are very supportive. So I just wanted to bring

00:05:44.170 --> 00:05:50.628
- that out and bring attention to it, not just for the board, but for the public too. So bravo. They've

00:05:50.628 --> 00:05:54.174
- been very busy replacing and repairing a lot this year.

00:05:59.330 --> 00:06:12.267
- Okay, for July, we had the gas was 7,675.86, professional fees $14,857.51, and then the service, maintenance

00:06:12.267 --> 00:06:21.406
- service, fleet maintenance, 9,520.49, and the grade all needed repair again.

00:06:29.794 --> 00:06:36.715
- the cost on the repair for the greater. It gets a lot of use. Is was that divided between high that

00:06:36.715 --> 00:06:43.636
- was my question is actually how did that get divided between highway and stormwater or did storm is

00:06:43.636 --> 00:06:50.696
- this storm waters great all. Okay it's not it's not okay got it thank you. Just verify. What was that

00:06:50.696 --> 00:06:57.617
- dollar amount trying to look on my phone it's a little difficult. For the repairs or maintenance of

00:06:57.617 --> 00:06:59.486
- the greater nine thousand.

00:06:59.586 --> 00:07:11.232
- Five hundred and twenty dollars and forty nine cents. Okay, that's A lot of money, but it's a very expensive

00:07:11.232 --> 00:07:22.558
- piece of equipment. So So not as much as you would think Awesome, thank you The questions comments on the

00:07:31.330 --> 00:07:40.236
- to new business. So first item of new business, we have the shoes, very contract amendment number five

00:07:40.236 --> 00:07:48.883
- for the baby Creek redesign. And I'm going to go ahead and make a motion to approve, um, the shoes,

00:07:48.883 --> 00:07:57.962
- very contract amendment number five. I will second that. Um, so I'm sure you have not to exceed on that.

00:07:57.962 --> 00:07:59.518
- What? We can, um,

00:08:03.618 --> 00:08:12.793
- about it first, maybe. So you have all seen projects, design projects related to Baby Creek several

00:08:12.793 --> 00:08:22.519
- times now over the last almost decade. And we hope that this is the final one, the final plan that you'll

00:08:22.519 --> 00:08:28.574
- see. So notably, this plan will include a new schedule down here.

00:08:28.834 --> 00:08:37.558
- partially on pages eight and nine of the packet for the next four years to staggered design and construction

00:08:37.558 --> 00:08:45.562
- of each of these crossings. One of the biggest cost savings that we will see is not including a run

00:08:45.562 --> 00:08:53.645
- around. The replacement method will allow us to keep one lane of traffic open during construction so

00:08:53.645 --> 00:08:54.846
- that residents

00:08:54.946 --> 00:09:04.689
- will still be able to access their homes with very limited interruption. And that also means that we're

00:09:04.689 --> 00:09:14.337
- not disturbing their property or the creek area as significantly as if we did include the run arounds.

00:09:14.337 --> 00:09:23.518
- So you'll see it as a staggered approach with the final construction happening in 2029. Go ahead.

00:09:23.906 --> 00:09:32.384
- I was just going to ask if you could then give us what the change order amount is, because there are

00:09:32.384 --> 00:09:40.778
- things cut off and things added, and what is the outcome of that change order financially? That's a

00:09:40.778 --> 00:09:49.341
- great question. I think that the original, when they bid out the first crossing, the anticipated cost

00:09:49.341 --> 00:09:53.118
- was almost half of what the bids came in at.

00:09:53.634 --> 00:10:01.763
- which I think the beds were close to a million dollars just for one single crossing, which is a lot

00:10:01.763 --> 00:10:09.891
- of money for a single crossing. And so the hope here is that this design will be at least a quarter

00:10:09.891 --> 00:10:18.832
- of that. When we do go to construction, it'll be much in the couple hundred thousand dollars for construction

00:10:18.832 --> 00:10:20.702
- rather than a million.

00:10:22.402 --> 00:10:30.422
- But my question is, when you have a change order, there's usually a dollar amount involved. Is it higher?

00:10:30.422 --> 00:10:38.366
- Is it lower overall? How has the contract changed in terms of the time? It will be lower overall because

00:10:38.366 --> 00:10:46.159
- they've already done a lot of the design work. And so this is just checking to make sure that this new

00:10:46.159 --> 00:10:47.294
- design matches

00:10:47.874 --> 00:10:53.926
- the figures that they've had before. So there will be just a hydraulics check to make sure that things

00:10:53.926 --> 00:11:00.272
- haven't changed since they did their initial hydraulic modeling, and to make sure that these new structures

00:11:00.272 --> 00:11:06.324
- that are going to be part of the design all line up together to adequately convey the drainage and not

00:11:06.324 --> 00:11:12.376
- give us the same problem that we're seeing now. That's it. Thank you. Got it. Perfect. So I don't have

00:11:12.376 --> 00:11:16.254
- exact dollar amounts for you, but we do know that it will be less

00:11:22.626 --> 00:11:30.650
- Well, I guess to that point, the amount that's on here listed, if we put it not to exceed, that's fine,

00:11:30.650 --> 00:11:38.597
- right? Because any change order we would see in the future. Correct. And to be clear, this is only for

00:11:38.597 --> 00:11:42.686
- the first crossing. We don't really want to do that.

00:11:42.914 --> 00:11:50.048
- the hydraulic modeling check and then the design of the first crossing, it doesn't include construction

00:11:50.048 --> 00:11:56.976
- or anything else. So it is limited in what they're giving us with this initial. I would recommend we

00:11:56.976 --> 00:12:04.041
- do not include a dollar amount because it's lower overall and we let this play out and see how it goes

00:12:04.041 --> 00:12:11.175
- because this is something where they are, we're doing something outside of a traditional bridge project

00:12:11.175 --> 00:12:11.998
- here and so

00:12:13.090 --> 00:12:21.037
- Let's see what happens. It doesn't mean then like during each phase the construction phase would be

00:12:21.037 --> 00:12:29.223
- presented with the dollar amount again. Yes. Yes. So this is for the preliminary design. We'll get the

00:12:29.223 --> 00:12:37.409
- final design which would include a quote for the engineers design quote for the construction. And then

00:12:37.409 --> 00:12:42.654
- when we bid it out we'll see what the contractors think. I guess.

00:12:43.106 --> 00:12:52.164
- I don't see it being problematic having the not to exceed, especially if they're going to come back

00:12:52.164 --> 00:13:01.403
- here for the construction cost. If it creates some difficulties, I would want to know that outside of

00:13:01.403 --> 00:13:09.374
- us needing to approve a higher amount for the same type of work that you just outlined.

00:13:11.778 --> 00:13:22.689
- be able, depending on how the vote goes or the motion, I don't think able to support a not to exceed

00:13:22.689 --> 00:13:34.141
- clause. Also, just it would be nice to have some visualization aids or graphs, maps within this proposal,

00:13:34.141 --> 00:13:37.598
- because when you say structure,

00:13:38.018 --> 00:13:45.579
- 1345, 1349, 1362, you know, that's good because you're reviewing the design plans and things of that.

00:13:45.579 --> 00:13:53.214
- But, you know, unless I come over and ask you to kind of point to these on a map, you know, it doesn't

00:13:53.214 --> 00:14:00.923
- really give me any spatial understanding of where these structures are. So just even like just a simple

00:14:00.923 --> 00:14:04.926
- aerial with some points on it, you know, with labels.

00:14:05.378 --> 00:14:13.372
- would be really nice especially when we're talking about you know a potential over all projects and

00:14:13.372 --> 00:14:21.365
- construction you know million to half a million to a million plus to get this to the finish line so

00:14:21.365 --> 00:14:29.679
- that's just something personally that would be very helpful for me and then just to be very transparent

00:14:29.679 --> 00:14:30.878
- I did have the

00:14:31.330 --> 00:14:39.969
- conversation with our stormwater program manager just a second ago that I think I have confidence in

00:14:39.969 --> 00:14:48.608
- our stormwater program. I think we have a very expert team of people over there. My concern is still

00:14:48.608 --> 00:14:57.504
- some unknowns. So this might be a project I can get behind, but I would really like to see what happens

00:14:57.504 --> 00:15:01.182
- with that reorganization discussion before

00:15:01.538 --> 00:15:09.957
- we potentially commit more money and obligate stormwater dollars to projects without knowing what that

00:15:09.957 --> 00:15:18.131
- impact may be. And I know November's not that far away. So to get behind this, I'm going to, again,

00:15:18.131 --> 00:15:26.386
- have confidence and faith into the program and the program manager and their team. But it'll be hard

00:15:26.386 --> 00:15:31.454
- if we see another project like this come on the agenda before

00:15:31.778 --> 00:15:38.531
- we understand what's going on with that reorganization effort with the town of belts. So that's just

00:15:38.531 --> 00:15:45.485
- a general comment. I know we don't need to get into that or address that. That's just I want to be very

00:15:45.485 --> 00:15:52.238
- transparent and let everyone know kind of work time because it will impact our budget moving forward

00:15:52.238 --> 00:15:58.590
- and also have a long range plan. And I think getting that thing in place will really give us a

00:15:58.754 --> 00:16:05.993
- ability to do a forecast of our expenditures and know where those obligations are going to fall. Our

00:16:05.993 --> 00:16:13.518
- operational costs and our personnel costs. So I recognize that there is no map included with this, which

00:16:13.518 --> 00:16:20.900
- would help clarify some things for you all and the general public. So I hope you can see this map. The

00:16:20.900 --> 00:16:27.422
- first crossing is kind of right here, where this first little bend is past the big bridge.

00:16:27.682 --> 00:16:36.725
- And then there's other crossings. The second crossing is not too far. And then the third one is a little

00:16:36.725 --> 00:16:45.424
- further back, which is the worst one back here. And then there is, right around here, the fourth one

00:16:45.424 --> 00:16:53.950
- is a little further back even. So this final crossing is not part of the scope of this, but these,

00:16:54.786 --> 00:17:05.771
- and they get a little complicated because of the way that the water has winded around the road, crisscrossing

00:17:05.771 --> 00:17:16.157
- it multiple times, and so it's coming in at odd angles. Thank you for showing that. Appreciate it. This

00:17:16.157 --> 00:17:24.446
- first one, yes, is just here at this little bend. Are there questions or comments?

00:17:36.898 --> 00:17:48.192
- I don't know if we got seconded. Yeah, I seconded it. I would like to just put the not to exceed $107,700.

00:17:48.192 --> 00:17:58.852
- Complicating anything. If you're going to do a not to exceed, I'd recommend something like $120,000.

00:17:58.852 --> 00:18:05.502
- There are some things that may change here. Okay, that's fine.

00:18:05.602 --> 00:18:12.991
- even 130 would be okay. You know, I doubt, I doubt they're not, I doubt they're going to go to over

00:18:12.991 --> 00:18:20.527
- 200,000 without coming back and talking to us. But you know, I, I like to make sure we put in some of

00:18:20.527 --> 00:18:28.581
- those parameters also. Can you name a number please for a motion? I would like to offer a friendly amendment

00:18:28.581 --> 00:18:33.310
- to, but not to exceed that 120,000, $25,000. You said 125. Yes.

00:18:35.138 --> 00:18:44.284
- I will second that because it does not matter. Can we do a voice vote on that? We have to do a voice

00:18:44.284 --> 00:18:53.974
- vote to amend the motion. Yes. All right. Voice vote. All those in favor of amending the motion to approve

00:18:53.974 --> 00:19:04.478
- the Shrewsbury contract amendment number 5, Baby Creek redesign, with a not to exceed clause for $125,000, say aye.

00:19:04.898 --> 00:19:16.950
- Aye. That motion passes. So then I believe we can go to the public. We have no one here in the NatU

00:19:16.950 --> 00:19:28.158
- Hill room. Would anyone like to offer public comment on this online? No one? You have to do.

00:19:34.818 --> 00:19:42.472
- Thomas? Yes. Madeira? Yes. Enright Randolph? Yes. Motion. Wonderful. All right, so now we're on our

00:19:42.472 --> 00:19:50.279
- added item of business, bring back the long range drainage plan contract award, which was says on the

00:19:50.279 --> 00:19:58.315
- agenda continue to September 23rd, 2026. But again, we amended the agenda to move that forward to today.

00:19:58.315 --> 00:20:00.382
- I'm going to make a motion

00:20:00.514 --> 00:20:08.710
- that we consider the long-range stormwater plan contract award for WSP. Yes. And I was just going to

00:20:08.710 --> 00:20:17.637
- say that that is not the drainage plan. It is the stormwater contract. What is the title? It's the long-range

00:20:17.637 --> 00:20:25.833
- stormwater plan contract award. Yes. And yes, so. Is that going to be the official name, even though

00:20:25.833 --> 00:20:27.294
- it says drainage?

00:20:27.938 --> 00:20:34.082
- Well, it'll be the long range drainage plan. Um, I added contract award because this was, we are awarding.

00:20:34.082 --> 00:20:40.284
- I don't know why, because the drainage board isn't doing it. No, I true. Yeah. I guess it's county drainage

00:20:40.284 --> 00:20:46.026
- in general. So, um, I call it the stormwater long. It's always been a stormwater long range plan as

00:20:46.026 --> 00:20:51.768
- far as I've been like the last one we did. And the last one was to, we can just rename it. We don't

00:20:51.768 --> 00:20:56.190
- have to do it. No, no, no. Yeah. No issue with us renaming it to stormwater.

00:20:57.570 --> 00:21:06.533
- Okay, good. Okay. So, uh, Yeah, I guess that's a shilling question. No, no, I'm just saying he can give

00:21:06.533 --> 00:21:15.151
- us information about this contract. Do we have to vote on that? Okay. Yeah. All right. Mr. Dilling.

00:21:15.151 --> 00:21:24.286
- Thank you very much. Uh, the, um, I understand that the stormwater board met with Debbie SP and others to

00:21:24.418 --> 00:21:32.712
- do interviews and selected WSP. So the WSP sent us a project or some proposed contracts. One is the

00:21:32.712 --> 00:21:41.172
- master services agreement which would apply to any type of contract we have with WSP and then there's

00:21:41.172 --> 00:21:50.047
- the work order contract which is the specific one for consulting services. So the master service agreement

00:21:50.047 --> 00:21:52.286
- is written as if it covers

00:21:52.418 --> 00:22:02.048
- construction design construction documents and so forth so it's not really applicable to what we're

00:22:02.048 --> 00:22:11.775
- doing here and so if my feeling is if the county were ever desirous of hiring WSP to do construction

00:22:11.775 --> 00:22:21.502
- or design work that I would I would not recommend signing this master service agreement because it's

00:22:21.602 --> 00:22:29.704
- It limits their liability to $50,000. It requires the county to fully indemnify them, even against the

00:22:29.704 --> 00:22:38.120
- contributory negligence actions, which the Tort Claim Act gives us coverage on. So I would never recommend

00:22:38.120 --> 00:22:41.502
- signing that. But if you are going to just

00:22:41.634 --> 00:22:49.299
- have them do a consulting contract where the likelihood of damages are minuscule. I think it's okay

00:22:49.299 --> 00:22:53.438
- with a few corrections, and I shared what I suggested

00:22:53.538 --> 00:23:02.289
- with Erica, she sent it to WSP, and they sent us revised contract back. And those changes basically,

00:23:02.289 --> 00:23:11.213
- they have a, the contract starts out and it refers to WSP, then it shifts to consultant, but there was

00:23:11.213 --> 00:23:20.137
- nothing that really tied consultant to WSP, so we made that connection. Then, let me see if I can find

00:23:20.137 --> 00:23:22.910
- my email to make sure my, yeah.

00:23:23.458 --> 00:23:31.172
- get this a lot where companies say that the documents produced are professional services, and we always

00:23:31.172 --> 00:23:38.588
- have to change it to work for hire. And that's a copyright thing, which means we own the documents,

00:23:38.588 --> 00:23:46.302
- we can do whatever the heck we want with them, and you can't stop them. But we did put in there that if

00:23:46.786 --> 00:23:55.462
- if the contract ever involves construction documents or estimates, that we would not use them on any

00:23:55.462 --> 00:24:04.224
- other project without WSB's approval. And that seems fair to me, because if they design a project and

00:24:04.224 --> 00:24:13.502
- they construct it, and then we have somebody else come in to do an addendum or an amendment or an addition,

00:24:13.634 --> 00:24:24.414
- and they refer to those plans, and they make a mistake that creates problems. WSP just wants to be off

00:24:24.414 --> 00:24:35.194
- the hook, and that's reasonable. Then, let me see. Okay. Finally, we just said, let's make this master

00:24:35.194 --> 00:24:37.182
- services agreement

00:24:37.314 --> 00:24:45.175
- contract good for two years. That will cover the 15-month projected time for the consulting contract

00:24:45.175 --> 00:24:52.957
- to be completed. And then if in the future we ever wanted to hire WSP to do construction design and

00:24:52.957 --> 00:25:01.129
- so forth, we would enter into a new master services agreement. But we'd have to wait two years for that.

00:25:01.129 --> 00:25:06.110
- So those are the changes. And with those understandings, I feel

00:25:06.434 --> 00:25:14.114
- about it, but you know, it's the kind of contract we see all the time now from engineering companies

00:25:14.114 --> 00:25:21.719
- where they just, it seems like they don't want to take any responsibility for anything they do, and

00:25:21.719 --> 00:25:29.475
- if they can get away with that, good for them, but we hope that we can not agree to those things. And

00:25:29.475 --> 00:25:34.494
- WSP agreed to those changes that you've outlined here? Yes. Okay.

00:25:34.818 --> 00:25:47.606
- that. Okay so I'm good with that in this contract will then go to now it's had legal review. It will

00:25:47.606 --> 00:26:00.266
- now come to the commissioners for final approval. Yes. Yeah. I guess. When said and I guess there's

00:26:00.266 --> 00:26:04.318
- probably some subjectivity. Um.

00:26:04.450 --> 00:26:17.576
- you know, to maybe recommended practices or solutions. And I guess what I'm trying to get at is let's

00:26:17.576 --> 00:26:31.216
- say there's a project that is recommended and they provide some best practices and we have the capability

00:26:31.216 --> 00:26:33.790
- to do that in-house

00:26:34.882 --> 00:26:43.400
- and we're not gonna maybe contract that work out, where does that line come from us being able to use

00:26:43.400 --> 00:26:52.503
- the document to execute that project and it not be considered them actually almost providing us construction

00:26:52.503 --> 00:27:00.854
- plans? I mean, there's some ambiguousness there or uncertainty of what a full on engineering shovel

00:27:00.854 --> 00:27:04.862
- ready project within this plan to what is just,

00:27:05.090 --> 00:27:14.118
- best practices? Well, I would say best practices are best practices, but construction design would have

00:27:14.118 --> 00:27:22.885
- measurements, specifications, things that relate exactly to the project site. So yeah, I don't see a

00:27:22.885 --> 00:27:31.913
- lot of opportunity for confusion there. Okay. And then just to drill in a bit more, we couldn't utilize

00:27:31.913 --> 00:27:34.430
- those for in-house purposes?

00:27:34.882 --> 00:27:40.855
- I feel like if we're going to pay for that, they're going to provide it, and we have the means to do

00:27:40.855 --> 00:27:46.947
- it in-house, that seems fair. As you stated, that if we were going to do contractual services, we need

00:27:46.947 --> 00:27:53.038
- to get their approval, but like... Yeah, if we're doing it in-house, we're doing it on our own design,

00:27:53.038 --> 00:27:56.350
- okay? Our staff is going to go out there and figure out

00:27:56.610 --> 00:28:03.321
- how to install this pipe, you know, what size pipe they need to order and so forth. So that's all done

00:28:03.321 --> 00:28:09.837
- in house. So that wouldn't be something that WSP is providing us. That kind of... And they wouldn't

00:28:09.837 --> 00:28:16.744
- have to kind of give us the thumbs up approval like if we were going to... Okay, I just wanted to clarify

00:28:16.744 --> 00:28:23.391
- that because I understand using another company's work to, you know, offset some of your own time and

00:28:23.391 --> 00:28:25.150
- effort if you're a private

00:28:25.506 --> 00:28:32.692
- service provider, but using that internally for us, the stormwater program to tackle some of these issues.

00:28:32.692 --> 00:28:39.743
- And if you don't see the issue for us being able to do that, then yeah, everything's good. I just wanted

00:28:39.743 --> 00:28:46.660
- to clarify that a bit. So if that makes sense. Yeah. Okay. Well, and within the scope of what the plan

00:28:46.660 --> 00:28:53.443
- that they provide us is they're not giving us any plans. They're going to outline potential projects

00:28:53.443 --> 00:28:55.390
- for us and give us a ranking

00:28:55.618 --> 00:29:01.470
- based on the criteria we all established with them, but they're not giving us any plans. The plans will

00:29:01.470 --> 00:29:07.152
- come at a later date. Even if it is like a recommendation, like replace this pipe, that's gonna need

00:29:07.152 --> 00:29:12.892
- to have specifications as Dave said. So we don't expect to have- They go from a six to eight inch, is

00:29:12.892 --> 00:29:18.574
- that that measurement? Is that the ambiguity? It would probably be increase this pipe size. It would

00:29:18.574 --> 00:29:23.582
- be more generic. Be determined? Yeah. Okay. Yeah. So we don't expect them to give us any

00:29:23.682 --> 00:29:31.606
- specific plans that say you need to redesign it in this way. It just says redesign this intersection

00:29:31.606 --> 00:29:39.530
- for drainage. And that's what I'm anticipating. I just wanted to drill in that we had the liberty to

00:29:39.530 --> 00:29:47.611
- execute things within that document. So thank you. I have one final question on this. Is two years too

00:29:47.611 --> 00:29:52.318
- long from your perspective as a stormwater program manager?

00:29:52.674 --> 00:29:59.107
- No, I mean, there's always delays that can happen with the getting the plan together. So, you know,

00:29:59.107 --> 00:30:05.797
- we've got our 15 months ideal situation for getting the plan to us. But as we know, there's just delays

00:30:05.797 --> 00:30:12.423
- that could happen on our end on their end. But I mean, seven months. So if we end in 15 months on time

00:30:12.423 --> 00:30:16.862
- and we want to use them, we can't use them for another seven months.

00:30:17.826 --> 00:30:29.371
- We could use them for additional consulting. I just wouldn't use them for construction or design. We

00:30:29.371 --> 00:30:40.916
- have other firms. Thank you for entertaining my questions and answering them. I would hate to have a

00:30:40.916 --> 00:30:44.574
- contract that's too short, too.

00:30:45.602 --> 00:30:54.502
- I have two questions. The first one is, do you feel like the milestone points are specific enough within

00:30:54.502 --> 00:31:02.978
- the contract term that we are very clear about, you don't get paid until this happens, you get paid

00:31:02.978 --> 00:31:11.879
- this percent, then you write. So you feel comfortable with all of that, right? And Mr. Schilling? That's

00:31:11.879 --> 00:31:13.150
- something that

00:31:14.178 --> 00:31:21.863
- I mean, you're talking about the task payments? Yeah, these are just estimates, and I don't have any

00:31:21.863 --> 00:31:29.701
- feel for what stuff costs or what might be involved. There is a provision in the contract that I don't

00:31:29.701 --> 00:31:37.311
- think is applicable here that I didn't like, and that was if each of the stages has a not to exceed

00:31:37.311 --> 00:31:40.126
- clause, that they could exceed those

00:31:40.226 --> 00:31:46.693
- as long as they didn't exceed the final amount, which I would not recommend agreeing to, because they

00:31:46.693 --> 00:31:53.033
- can just push it off to the very end, and then walk away, and there you are. But that's not part of

00:31:53.033 --> 00:31:59.373
- this that I can see. I guess that's why I'm asking, because we've had difficulty with contracts and

00:31:59.373 --> 00:32:05.839
- planning relating to consultation services over a long period of time, and that's why I'm asking. And

00:32:05.839 --> 00:32:07.678
- I'm going to ask a question.

00:32:08.354 --> 00:32:15.234
- as well about GIS data and whether that becomes ours. And I just wanted to verify that that is in the

00:32:15.234 --> 00:32:22.316
- new, because I don't have the contract in front of me. So I just want to make sure that that's in there.

00:32:22.316 --> 00:32:29.129
- Yes. We did work with Tron and John, the GIS coordinator, to include the correct language so that we

00:32:29.129 --> 00:32:36.211
- would know that we were getting our GIS data from them in the correct format. OK. So yes. And it's ours?

00:32:36.211 --> 00:32:38.302
- Yes. OK. Thank you. That's it.

00:32:49.090 --> 00:33:01.097
- We have no one here in the Nattie Hill room. Any public comment online on this issue? Seeing no one.

00:33:01.097 --> 00:33:15.006
- I will do a roll call. Okay. Did we need a not to see. There'll be information on the at the commissioners contract.

00:33:15.170 --> 00:33:24.053
- we're really just, we're just really recommending to the commissioners and commissioners approved this.

00:33:24.053 --> 00:33:32.681
- I think we have to approve it too, but let's for another day. Okay. Um, so all in favor of approving

00:33:32.681 --> 00:33:41.308
- the, uh, WSP long range stormwater plan scope and a master service agreement, uh, that legal, uh, is

00:33:41.308 --> 00:33:43.614
- that how we were doing it?

00:33:44.258 --> 00:33:51.430
- we're not doing the master service agreement, right? Just the. Well, the work plan is attached to the

00:33:51.430 --> 00:33:58.813
- master service agreement. Oh, so. Would approve the master service agreement and the work plan. Oh yeah,

00:33:58.813 --> 00:34:05.914
- and you're OK with that. Yes, OK, I mean, it doesn't sound. It doesn't sound advisable like what you

00:34:05.914 --> 00:34:13.438
- wanted. Yeah, yeah, it sounded to me like we could separate them and you're saying we can't separate them.

00:34:13.602 --> 00:34:20.100
- But that's why you're saying, don't do any construction design with this particular company until this

00:34:20.100 --> 00:34:26.409
- contract lapses. Yeah, I mean, the only reason you're doing the master service agreement is because

00:34:26.409 --> 00:34:32.844
- of the work plan. But the work plan is a separate agreement of itself. So you'd really need to do the

00:34:32.844 --> 00:34:39.152
- master work service agreement and the work plan component. I'll buy that. Feel comfortable making a

00:34:39.152 --> 00:34:42.622
- motion? Do you want to? I feel like there's some legal

00:34:42.818 --> 00:34:50.425
- that needs to be. Well added in this. So like, how would we go about they did? David provided the comments

00:34:50.425 --> 00:34:57.534
- and we sent it to them and they incorporated his comments already. No, I meant from our motion. No,

00:34:57.534 --> 00:35:04.857
- because what? Yeah, I understand your question. So yes, it's already been revised and accepted by WSP.

00:35:04.857 --> 00:35:12.606
- So those revisions from legal review have already been made and accepted. So at this point, it just goes to.

00:35:12.738 --> 00:35:19.387
- the commissioners. Yes. And you got another bite at the apple if anything comes up. Yes, Mr. Schilling

00:35:19.387 --> 00:35:26.037
- was just, I think, walking us through what had been problematic. Yes. OK. All right. Sorry. I just was

00:35:26.037 --> 00:35:32.493
- like, what? Yeah. All clear? Yeah, I want to make sure you know what you're voting on. We're clear.

00:35:32.493 --> 00:35:39.271
- Thank you. I'm glad you said it, actually. Thank you. Yeah, it was a great clarification. OK. So Thomas?

00:35:39.271 --> 00:35:41.918
- Yes. Madira? Yes. Enright Randolph? Yes.

00:35:42.146 --> 00:35:52.394
- Excellent, thank you so much. Thank you. And the last item of new business is the Curry Pike Phase 2

00:35:52.394 --> 00:36:02.946
- Televising Contract with Groundbreakers LLC. I'm going to make a motion to approve the Curry Pike Phase

00:36:02.946 --> 00:36:08.222
- 2 Televising Contract with, is this? Wait a second.

00:36:08.738 --> 00:36:18.949
- I don't have the contract here. It's the last one. It's not, because that says Hydrovac and West Third.

00:36:18.949 --> 00:36:28.963
- It's a CCTV. It is. It's West Third Street. It's Groundbreakers. That's their contract. OK, sorry. So

00:36:28.963 --> 00:36:35.934
- the Curry Pike phase two, televising contract with Groundbreakers LLC.

00:36:36.098 --> 00:36:44.516
- in an amount of $28,489.80. So this is phase two. Phase one is nearing completion. So if you drive on

00:36:44.516 --> 00:36:53.016
- Curry Pike and head south from third slash west 48, you should see some nice freshly paved road there.

00:36:53.016 --> 00:37:01.517
- And so that's the goal with this is to televised those pipes before we pave it to make sure we replace

00:37:01.517 --> 00:37:05.726
- anything and make any drainage improvements before

00:37:06.242 --> 00:37:15.015
- it gets nice and freshly paved. Any questions? No. Just for the public, if they look at this, it is

00:37:15.015 --> 00:37:24.052
- very confusing because it says hydrobreakers doing business as groundbreakers. Hydrovac services. Yes,

00:37:24.052 --> 00:37:28.702
- hydrovac services. But yes, the contract is actually

00:37:28.802 --> 00:37:35.726
- on the agenda as Groundbreakers LLC. But if you look for this on the agenda, it says Hydro-Vac Services,

00:37:35.726 --> 00:37:42.385
- LLC, DBA, or doing business as Groundbreakers LLC. Yes. So this is what you're looking for if you're

00:37:42.385 --> 00:37:49.045
- looking at this online at home. So I do actually, I just want to note that I did ask Ms. Ridge about

00:37:49.045 --> 00:37:55.705
- this because this is actually on the commissioner's agenda tomorrow morning because we had done this

00:37:55.705 --> 00:37:56.958
- before and I said,

00:37:57.090 --> 00:38:04.700
- wait a minute, Curry Pike televised, I remember this. And she said, look, it's a different contract,

00:38:04.700 --> 00:38:12.234
- it's a different phase, it's a different company, in fact. So I just wanted to explain the question

00:38:12.234 --> 00:38:20.521
- and the answer I got, and I'm satisfied with that answer. Thank you. Yep. And I think, yes, that's definitely

00:38:20.521 --> 00:38:26.398
- important to emphasize that it's a different phase. This is a multiple phase.

00:38:26.562 --> 00:38:34.973
- project. So I always like to kind of make sure that we bring a little bit of awareness that this is

00:38:34.973 --> 00:38:43.637
- one of those proactive measures and one of those things that we are now kind of working in tandem with

00:38:43.637 --> 00:38:50.366
- highway to do. So like we're actually making sure that all of these underground

00:38:50.562 --> 00:38:57.711
- issues, pipings, water conveyance measures are upkept before we finish the road so we don't have to

00:38:57.711 --> 00:39:05.432
- come back after the fact and tear up a new road and then dig down and unclog something and then reconstruct

00:39:05.432 --> 00:39:12.867
- that road. So I just wanted, I always kind of try to make note of where that partnership and where that

00:39:12.867 --> 00:39:18.014
- collaboration and where that benefit does come into play. So thank you.

00:39:18.850 --> 00:39:28.744
- Something else that I found really cool in a nerdy fashion was that the mapping files are accurate to

00:39:28.744 --> 00:39:38.540
- the sub-centimeter. GPR is pretty cool. Yeah. That is really cool. Any comments or questions on this

00:39:38.540 --> 00:39:46.494
- contract? All right. We have no members of the public here in the NatU Hill Room.

00:39:46.722 --> 00:39:54.967
- Would anyone online like to offer any comments on this matter of new business? Seeing no one No roll

00:39:54.967 --> 00:40:03.293
- call votes to approve the contract with the groundbreakers for televising curry bike phase two Thomas

00:40:03.293 --> 00:40:08.926
- yes, Madeira. Yes, and right Randolph always a yes to maintenance. I

00:40:17.154 --> 00:40:24.673
- and we have one item remaining, and that is staff reports, emergency watershed protection program, litter

00:40:24.673 --> 00:40:32.476
- of intent has been submitted following the June 17th, 2025 tornado damage. Yes, so we had another significant

00:40:32.476 --> 00:40:39.570
- weather event in Monroe County, and I was actually contacted by my contacts with the NRCS asking if

00:40:39.570 --> 00:40:46.238
- we were going to apply for the same funding, this funding again, and I hadn't anticipated it,

00:40:46.338 --> 00:40:53.270
- this due to the scale. But they encouraged me to get our letter together. And then we're going to meet

00:40:53.270 --> 00:41:00.068
- with them on Monday to narrow down some of the locations for the maintenance and potential log jams.

00:41:00.068 --> 00:41:07.471
- We just know that the amount of debris that's coming through some of these valleys is going to be significant

00:41:07.471 --> 00:41:12.990
- after every single rain event we have for the foreseeable future. So we're trying

00:41:13.442 --> 00:41:21.779
- narrow that down to the ones that are going to be most impactful to our roadways or residences and or

00:41:21.779 --> 00:41:30.525
- residences so Look for an update on that in the coming months after we get our feedback from them Probably

00:41:30.525 --> 00:41:39.025
- not until November or December so the the partner agency is For this we're not doing this alone because

00:41:39.025 --> 00:41:41.886
- there's other work getting done so

00:41:43.074 --> 00:41:52.531
- Well, the review and the funds are passed through the NRCS, our local chapter, so the Indiana NRCS and

00:41:52.531 --> 00:42:02.263
- USDA, because it is federal funds. So then it comes down through them to us. But we don't have a partner.

00:42:02.263 --> 00:42:10.526
- We are the applicant, but they work with us to make sure that we have a feasible project.

00:42:11.138 --> 00:42:20.060
- Yes. Initially you had mentioned some work with Morgan Monroe State Forest. Can you explain that part

00:42:20.060 --> 00:42:28.981
- of it? Yes. NRCS has also been working with DNR at Morgan Monroe because they have significant damage

00:42:28.981 --> 00:42:36.766
- and debris there as well. And so we're exploring the possibility of partnering with them

00:42:36.866 --> 00:42:44.675
- that we will be able to partner with someone on some of that joint jurisdiction area. But we know that

00:42:44.675 --> 00:42:52.712
- there will be other areas that are Monroe County only. Um so we'll see how that all pans out. It's always

00:42:52.712 --> 00:43:00.294
- great to be able to partner with someone. But I know that the scope of this is much larger than the

00:43:00.294 --> 00:43:06.814
- Clear Creek project that is hopefully finishing up the within the next month as well.

00:43:06.946 --> 00:43:16.330
- assigned or divided or we don't have any idea yet. It's we're just applying for us. But we do recognize

00:43:16.330 --> 00:43:25.534
- that there may be a cooperative relationship with DNR in the areas where we intersect with the Morgan

00:43:25.534 --> 00:43:34.558
- Monroe. Thank you. Thank you. We did sign to approve that letter. The commissioners. Yes. So, okay.

00:43:36.898 --> 00:43:44.585
- certification. There is nothing formal to approve yet because we're not accepting any funding yet. It's

00:43:44.585 --> 00:43:52.197
- just preliminary. Do we know what the time frame will be, by the way? So we had 60 days from the event

00:43:52.197 --> 00:43:59.884
- to submit our letter, and then they have 270 days, I believe, from our letter submittal to give us back

00:43:59.884 --> 00:44:03.358
- a damage survey report and the recommendation.

00:44:04.098 --> 00:44:12.959
- So hopefully it can be a little bit shorter than that, but it is a significant area. So they may need

00:44:12.959 --> 00:44:21.994
- that full, the full timeline. And in the meantime, if something comes up like it's going to rain today,

00:44:21.994 --> 00:44:30.942
- tonight something comes up and we end up having to do some remediation work as a result of a big rain.

00:44:31.394 --> 00:44:38.139
- in that specific area, we're logging that. We're logging it, sorry. Sorry for the pun. We are keeping

00:44:38.139 --> 00:44:45.017
- track of those expenses and can potentially use that as maybe part of an offset or a match or something

00:44:45.017 --> 00:44:52.225
- like that because we're already doing the work if we have to do it. It's a little tricky with work performed

00:44:52.225 --> 00:44:59.036
- already. So we'd have to be careful about that. But yes, we are tracking all of it, especially to know

00:44:59.036 --> 00:45:01.086
- the areas that are going to be

00:45:01.282 --> 00:45:08.330
- the impacted the most. So yes, we may not be able to be reimbursed for anything, but we're tracking

00:45:08.330 --> 00:45:15.731
- it to show we're already doing all this work and it's going to end up costing us quite a bit, especially

00:45:15.731 --> 00:45:22.920
- the channels into a jam that our crew cannot, doesn't have the equipment to access. And we don't know

00:45:22.920 --> 00:45:30.814
- anything yet about whether there'd be a match required or a local match or anything. We don't know any of that.

00:45:31.330 --> 00:45:40.421
- there is a match requirement. So the funding would pay for I believe 75 70% 70 75% of the project. Um,

00:45:40.421 --> 00:45:49.248
- and then so we would bring the remaining portion of that. That's what I'm asking about. Can that go

00:45:49.248 --> 00:45:56.574
- toward a match potentially if you're already doing some work in that area? Because

00:45:56.962 --> 00:46:03.676
- I know that we can use man hours towards the match, but I don't know if it's retroactive. Got it. Well,

00:46:03.676 --> 00:46:09.873
- that'll be a good question when we get there. Thank you. That's on my list for Monday. Perfect.

00:46:09.873 --> 00:46:16.651
- Thank you, ma'am. Appreciate it. Hopefully we'll have cause to address that. Yeah. Yeah. That'd be nice.

00:46:16.651 --> 00:46:22.526
- It's not related to that. I just had a quick announcement. I want to bring some awareness.

00:46:22.978 --> 00:46:34.066
- The GIS division has launched Monroe County Precipitation Viewer, and I know that Ms. Pennell has seen

00:46:34.066 --> 00:46:44.832
- it. You can check that out. If the public wants to see it, it tracks the precipitation. And we also

00:46:44.832 --> 00:46:51.614
- created flow lines from derived contour data, from LIDAR data.

00:46:51.746 --> 00:46:57.865
- So you can actually like kind of see where the water flows. Yeah. If you want to bring it up. So you

00:46:57.865 --> 00:47:03.500
- just I think this is kind of unfortunately a good time to bring awareness because of what we

00:47:03.500 --> 00:47:09.438
- just experienced. But you know if the public is kind of interested of trying to track some of the

00:47:10.082 --> 00:47:18.118
- precipitation, look at different hooks. And also when you zoom into a certain scale, it'll show different

00:47:18.118 --> 00:47:26.229
- flow lines, it'll show different critical watersheds. And this is something that we just recently deployed

00:47:26.229 --> 00:47:33.810
- and made. I just thought it would be a good time to plug it. And thank you for showing it online as

00:47:33.810 --> 00:47:35.326
- well to the public.

00:47:37.986 --> 00:47:44.535
- And thank you for being so innovative with everything you guys do see the flow lines. I had someone

00:47:44.535 --> 00:47:51.150
- Well, this was our GIS technician Nick and Angelo's and I he Created those I actually had someone in

00:47:51.150 --> 00:47:57.830
- my office just the other day that was experiencing a little bit of flooding and ponding and you know,

00:47:57.830 --> 00:48:01.694
- you can tell what's going on with contour lines, but these

00:48:02.786 --> 00:48:11.761
- arrows make it so easy, and they were able to visualize it instantly and was super happy and impressed

00:48:11.761 --> 00:48:21.260
- by these flow lines or flow indicators. Thank you. That's it. That's wonderful. Thank you. Yeah. Absolutely.

00:48:21.260 --> 00:48:28.318
- And speaking of flow, we have flowed to the end of our... So any other business?

00:48:29.378 --> 00:48:33.246
- Alright, then I believe we are adjourned until September 23rd, 2026.